Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
20 views

Purchase of Transformer

Uploaded by

chandrasuha568
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Purchase of Transformer

Uploaded by

chandrasuha568
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Ref. No.l9lRINL/DGM (Projccts)/FWP/{ienl06 Date: 09.O2.

2O19

Sub: ln Principal Approvurl lor Purchase of NtrW 33/6.6KV,1000 KVA


Power transformer lor FWP Construction srte - Reg.

1. trxisting Power transformer of FWP Construction site has failed on


fi.qfl.ft 19.01.2019 due to the fault in Power cable dunng excavation work at
vsP site by SMI. Break down report of the same is attached at C 11.
Upon inquiry, it is noticed that the repair of the failed transformer w'i1l
take 'a minimum of 45 days from the date of receipt at
mamufactu r er f r ep atrer's premises.
.). As all construction activities of FWP are in Iuli swrng, trlectrical powcr
is lhe most vital to continue the pace of Civil worklDrecLionlTr:sling
and due to failurc of the lone construction Power transformcr, all rhc
construction activities of FWP are a-lmost come to stalled slagc.
1. In Vrew of the above, it is proposed to Purchase a NEW transformr:r
(Quotation attached al Cl2) ol the sarne capacity arrd install al site
for continuation of construction activities so as to completc thr:
project as per schedule.
5. CMD may kindly accord In principal approval for Pr:rchase of NtrW
1000 KVA,3316.6 KV Power transformer for FWP at an estimalccl cost
oi 12 Lakhs approxi.mately cxcluding taxes and tran
":"r",',
AGM
lt''
(Projects)/FWI)
L !'i

{e.rl'dS'}'^I-
o3.02' e'tls

Cnr*t
Lp.rrfr,rD flo*,.x uFdf :

ffi
H#*H
DB-1.-1 >-
\

Breakdown Report

Equipment-1000 KVA,33/606KV VOLTAMP make power transformer of FWP site

Date and time-19.01.2019 at 9:30 H rs

Affect of B/S-No power supply to RINL- FWP construction site

Observations-1. Transformer PRV supply open at oilgushed out from vent pipe

2.Bulging of transformer body near HT bushings observed

3.HT and LT bushings are intact

4.On preliminary testing,it is found

a)HT winding got open in allthree phases

b)LT winding resistance is not getting stabilized at around 0.9 ohm

c)HT lR values are in the order of 2 giga ohm

d)LT lR values are fourrd ok

5,No protection relay is operated either in Transformer feeder or outgoing feeder

6.Both transformer feeder and outgoing feeder VCB's are in ON condition

Analysis- l.While GDCL, a sub agency of M/S SMI excavating the cable trench withcut taking proper

clearance from MECOII and RINL ncar MRSS,thc 5.6 KV cable from CSS-1to CSS-2 got cut

and Short circuited among allthree phases,

2.This has resulted in failure of power transformer

,'ii' I '3. Protection of neither outgoing feeder nor transformer feeder operated due to failure of DC
\l
i. 'Jl.- I ,

i"l. "'i itr Supply from power packs from both panels.
Action Taken-1"VCB's of transformer feeder and outgoing feeder panel kept outside

2.lncomers of CSS-1 and CSS-2 are switched off

3.Transformer cable anrl other accessories are Cisconnected and transfo;'mer maCe ready

to lift for repair

M,r,rq
k*r\

4'Trying to explore the possibilities


of extending power suppry to
RrNL-FWp construction
site
,1,
(Ll('
i
t r
-) I .\.\q
(S
\WRao)
Srinifasa t

AG M(Electrical)-FWp

b&prG',cr)/ 16.: Iiv K' --4 * {"nw.^a.Aov, I v

*(rlr/ 'r-i^ q' hdj--


,rl or f ">or_t
-
>D LP*,Xl&,tJ D( .'
k aprh+ .@M\sIilD f^ @/^ ane7r fl;
W
it 6hJ'"'
+W + bt'd 0\a' er^nc, . hia'l'd '/PatI1
W IAC^ 4 aAI"^tY; ww ;\
c'.{to^ba
tl

r^al/z- W +V" Yb $-b a G-+ a''a


Wk€-il; s''tl'*;g
Wer,rz ; ,q,, W,"/^t zro.a {y\or;W
eJ'f)
/..s W fV?,]- - 9P Ar S,u?o /\oA 7o b
W aA fia 'vW * wF *;
tr\ uan ["g--
U^ dl
"ab
.Ax*o,t@^,
6"&"*!; tld br***t akl6 e4^*
f-t rc
6" ,Co**u'-,$at\ hAgJ
tYz
'4 {rlalvt0 'l

cq(f*DW
WG,C flL
c-2_

i$ Hi -, f { $n !e . ,

pl)1,!r n :tili ijirlif;li


r$:]* i {t $'rl}i$ui'ir'{ }$ $qxx$x;l $ul
iAN ISO g001 :2008 COMPANY)
i i ;ii
'"t,r'ilt iri,"rr:tl
li,lfq & Erpo::er *f A(lon*l{t irr:,tage SU:brJ:;e: hT
Tr.rns,(:rr,;r rrlir uull ,, ,.irft. U,ir;ir*nI;;, f,,r*,",,*
REF No. ; MPIL/GEC
/ZZs/zotS-tg Dated; 09.02.20L9

Parth Sharma

General Manager
Central Technical project Management

SMS India Pvt. Ltd.

286 ' udyog vihar phase - II . Gurgaon (Derhi


NCR) -1zz0h6 / rndia

Dear Sir,
This is in reference to your requirement of
TRANSF0RMER. we feer prease to qLrote
your recluirement as under:
s.NO. DESCRIPTTON OTY. RATE/UNIT AMOUNT
01 "MACRO" MAKE TRANSFORMER
1OOO 01 Rs. 11,60,000.00 Rs.11,60, ,000.00
KVA, 33/6.6 KV ONAN TYPE, THREE NO,
PHASE, \OHZ,, FOOT MOUNTED
PROVISION OF
OIL TEMP./ WINDING
TEMP./ OIL LEVEL INDTCATION &
BUCHHOLZ RELAY CONTROL AND
MARSHELLING BOX WITH OFF CIRCUIT
TAP CHANGER.

sTANpARDS

'l'he fransl'ornlers woulcl


conform in all respects to rs:2026/7997 or latest
thereof' Equipment meeting any other authoritative amendment
standard, which ensure an equal or better
quality than the standard mentioned above
could also be considerecl.
CTIMATIC CONDITIONS

The' transformer shall be suitable for operation under


climatic conclitions,
TYPE RATING AND QUANTITY
PRICE FOR site
SCOPE Above quotecl priffif,ili"g
TAXES GST 1B% Exrra.
"fb,l
PAYMENT 50% Advance and 50% Bal an ce aga i nst pe rformai-nio i.u.
FRIEGHT Extra,
DELIVERY Within 15 Days.
GUARANTEE Our equipment is under ;
gly ate ol, supplv."
'l'hanl<ing you
& assuring you of our best services
at ail times
YOURS FAI'THFULLY,
i..OR, MACRO POWERTECH
INDIA PVT. tTD

Ajay Singh,
lMai'laging Director)
i'v'lotr. No. - 9B1AZ7ZSS0

NarEr This Document is generated by computer


Hence does not required signature,

You might also like