• Approved granite @ 800/ Sft shall be fixed for kitchen counter top.
• Approved granite @ 800/ Sft for vanities.
• Parlino marble will be used for porch area @ 200/Sft.
• MS gate shall be fixed of 16-gauge sheet complete in all respect.
• Chandelier shall not be fixed in these rates.
General Notes:
• Foundation brick blast and bricks masonry in1:6 mortar as per approved drawings.
• R.C.C Work (Beam and Slab Ratio (1:2:4) With 40 Grade Steel. good quality plant crushes
use in concrete. Clean sand will be used in all construction.as pr markete
• Plaster Ratio (1:4) With Proper cement sand mortar with perfect mixing.
• First class bricks will be used Complete in Structure.
• Provisions of all materials would be responsibility of the Company, inclusive of all carriage,
loading, unloading.
• The Company will use Ply Shuttering/Plate Shuttering.
• A Company will arrange all construction tools for construction.
• Internal Plaster thickness ½ inches and Outdoor plaster thickness ½ inches with Ratio (1:4).
• Proper Leveled of Wall and of Floor According to Drawings.
• Excavation according to drawing.
• Back filling of sandy soil (gassu).
•
•
00
Anti-termite treatment in foundation and Ground floor included.
All electric works according to drawing.
• The Company should be using sewerage conducting made by PVC material.
• After selecting of any design / work and completion or during completion of the work. If the
owner desire to change design or measurement. It will charge as extra works.
• Construction work wills not start until owner provides the copy of land clearance documents
or NOC. The Agreement between the Owner and the Company will not be in force until the
Development and regulations Authorities has approved the plans for the construction of the
house.
• Schedule of payment will remain flexible company can demand for payment of work done at
any stage but it will be discussed with the owner. Owner shall consider request of builder
according to work done.
• Complete work will be done within four eight months Except Holidays.
• Elevation will be done according to drawing. if there any change owner should inform before
work. incase work done and owner want to change, it will charge as extra work.
• Water Bore, Water Pump, Electric Meter and Electric Bill shall be managed by the Land
Owner.
• Boundary wall standard height 6 feet from the road level.
• Water Tanks and Septic Tank (All R.C.C)
• No plaster at roof wooden shuttering used for slab poring. If steel shuttering used and roof
also plaster then owner shall pay Extra amount.
• The height of Ground Floor is 11.0 Feet and 1st floor& 2nd floor is 10 Feet, If Clint
increase the height it will be charged.
.
Address: CCA-2,102 Phase-6 DHA Lahore
Mobile: +92 333 9116980 & +92 344 9077566
Email: masvi.interiors@gmail.com
Watchman Salary Rs. 25,000/- duty of watchman only safe the building material from theft
and cure Building & building material. , Utility bills etc. will be made and arranged by the owner.
Terms & Conditions:
Mode of payment:
1. 15 % shall be paid as an advance amount after mobilization.
2. 10 % shall be paid after plinth beam pouring.
3. 15 % shall be paid before G.F slab.
4. 15 % shall be paid before 1st floor slab
5. 5 % shall be paid before 2nd floor slab pouring.
6. 5 % shall be paid after ceiling work.
7. 15 % shall be paid after complete tile work
8. 10 % shall be paid after complete wood work.
9. 5 % shall be paid after complete windows and electric work
10. 5 % shall be paid after paint work complete.
Regards,
Masvi interiors &
construction company
Signature: _ Signature: _
CNIC#: CNIC#:
Mobile: Mobile: