Soil Improvement
Soil Improvement
Soil Improvement
Contract Identification No :
BH No :
Nature of the work :
Name of Road :
Collection rate of 'Aggregate 13.2 mm' is taken as default for all types of AGGREGATE
Collection rate of 'Collection, quarrying and sieving sand in local river' is taken as default for all types of SAND
For Loading and Unloading:
Manual Loading is taken as default for AGGREGATES, SANDS, RUBBLES and WOODS
Abstract of Cost Page 1 of 18
Government of Nepal
0
0
0
0
Abstract Of Cost
0
0
0
0
Rate Amount
S.N. Description of Works Unit Quantity Remarks
(NRs) (NRs)
1 General
for composite soil reinforcement system, made of polyester core with
1.1 polyethylene coating including secondary
with design life >100reinforcement
years includingof secondary
Terramesh system sqm 0 0 0
1.2 (TMS) as per Specifications
reinforcement Clause 2402
of Green Terramesh systemwith Zincas
(GTM) +PVC coated as Facing
per Specifications Clause sqm 0 0 0
system
2402 (GTM) as per Specifications Clause 2402 with Zn+PVC coated withmm
1.3 designwith Zn+PVC
lifeSteel
Bio-Mat, >100 yearscoated
Greed
with Bio-Mat, Steel
including
made of MSsecondary
bar (10 mm
Greed madeofofGreen
reinforcement
dia and grid size
MS bar (10
Terramesh
160 mm x 160
sqm 0 0 0
1.4 system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with sqm 0 0 0
Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160
Total (Excl. VAT & Contin.) 0
Provisional Sum 0
VAT (13%) 0
Contingency (5%) 0
Provision for Price Escalation (10%) 0
Physical Contingency (10%) 0
GRAND TOTAL 0
Quantity Sheet
0
0
0
0
Length Breadth Height
S.N. Description of Works Unit No. Quantity Remarks
(m) (m) (m)
1 General
1.1 0 sqm
1.2 0 sqm
1.3 0 sqm
1.4 0 sqm
Total : 0
Description of Work:
Providing suitable material and Back filling behind abutment, wing wall and return wall complete as per Drawing and Technical Specifications., Granular Material 10 cum
Spec. cl. No: 908
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.11.A Skilled day 0.2 0 0.0 Granular Material cum 11 0 0 Plate Compactor hour 2.5 0 0.0
Unskilled day 5 0 0.0 Water KL 1 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
240 cum
Technical Specifications., Ordinary soil by Mechanical Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.B.i Skilled day 1 0 0.0 0 Hydraulic Excavator hour 6 0 0.0
Unskilled day 3 0 0.0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Description of Work: Reinforced Soil wall Structure with Tera Mesh System (TMS) Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating including 1000
secondary reinforcement of Terramesh system (TMS) as per Specifications Clause 2402 with Zinc +PVC coated as Facing material, laying of Geo textile, drainage gallery filling with boulder all complete as per Specifications sqm
Spec. cl. No: 301
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount High
Type Strength Flexible Geogrids ( made of polyester core with Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.1 Skilled day 346 0 0.0 polyethylene coating) with Strength as per design ( at least sqm 9000 0 0 Tractor - Trolley hour 24 0 0.0
Terra Mesh System (TMS)( 3 m * 2 m * 0.5 m ) made of
Unskilled day 1398 0 0.0 200 KN/ m)
mechanically woven Zn +PVC coated
Terra Mesh System (3 * 2 * 0.5 m) nos 500 0 0
Terra Mesh System (3 * 2 * 1 m) nos 250 0 0
Stone/Boulder ( for TMS drainage gallery) cum 1826 0 0
Geo textile sqm 4290 0 0
in longitudinal direction ( 100 m) and in Transverse direction,
m 199 0 0
from rare end
compacted up to
to front end plus
Modified 1m@
Proctors 10 m at
density c/c, 99 m,
layers not
cum 10200 0 0.0
exceeding 15 cm all complete with compaction by using
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with design life >100 years
Description of Work: 1000
including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to
sqm
Spec. cl. No: 301 maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications., Para web 50 KN and 100 ken each
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.3_a Skilled day 80 0 0.0 Para web 50 KN and 100 ken each m 39936 0 0 Tractor - Trolley hour 72 0 0.0
Precast Concrete Panel of M 25 grade concrete (2 m * 0.8 m
Unskilled day 160 0 0.0 cum 219.7 0 0
slope 6 deg
Coarse Drained Material at the facing of Concrete Panel cum 300 0 0
Boulder ( for drainage gallery 0.6 m width volume 658.94 cum) cum 725 0 0
Geo textile sqm 2196 0 0
in longitudinal direction (104 m) and in Transverse direction,
m 199 0 0
from rare end
compacted up to
to front end plus
Modified 1m@
Proctors 10 m at
density c/c, 99 m,
layers not
cum 10852 0 0.0
exceeding 15 cm all complete with compaction by using
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0
Loading/Unloading Mechanical
S.N. Description Unit Loader Tipper Total
1 Gravel cum 0.060 0.060 0.0
2 Sand cum 0.060 0.060 0.0
3 Rubble cum 0.140 0.140 0.0
4 Aggregate cum 0.140 0.140 0.0
Loading/Unloading Manual
Unskille
S.N. Description Unit Skilled Truck Tipper Total
d
1 Cement tonne 0.200 0.000 0.200 0.000 0.0
1000
2 Bricks 0.000 0.000 0.000 0.000 0.0
Nos.
3 Bitumen Drums tonne 0.150 0.000 0.150 0.000 0.0
4 Timber tonne 0.270 0.003 0.200 0.000 0.0
5 C.C. Blocks, Kerb, etc. cum 0.400 0.050 0.300 0.000 0.0
6 Steel tonne 0.200 0.000 0.200 0.000 0.0
7 Gravel cum 0.136 0.000 0.000 0.136 0.0
8 Sand cum 0.136 0.000 0.000 0.136 0.0
9 Rubble cum 0.136 0.000 0.000 0.136 0.0
10 Aggregate cum 0.136 0.000 0.000 0.136 0.0
Collection
Unskille
S.N. Description Unit Rate Amount
d
Gravel
a 5 mm - 70 mm cum 2.060 0 0.0
b 40 mm cum 3.090 0 0.0
c 20 mm cum 4.120 0 0.0
d 8 mm cum 6.180 0 0.0
e 40 mm - 70 mm cum 4.120 0 0.0
f 70 mm - 100 mm cum 3.090 0 0.0
Sand
a Quarry output less than 33% cum 4.120 0 0.0
b Quarry output 33 - 66% cum 3.090 0 0.0
c Quarry output more than 66% cum 1.545 0 0.0
Collection, quarrying and sieving
d cum 1.545 0 0.0
sand in local river
3 Rubble cum 1.442 0 0.0
4 Aggregate cum 1.442 0 0.0
Washing
Unskille
S.N. Description Unit Rate Amount
d
1 Gravel cum 0.515 0 0.000
2 Sand cum 0.515 0 0.000
3 Rubble cum 0.206 0 0.000
4 Aggregate cum 0.210 0 0.000
Tipper
ER GR BT ER GR BT 0
rate:
Coefficient/Distance(km) 0.09 0.06 0.045 0.18 0.12 0.09
Conversio Total Total
S.N. Description Unit Terai Hilly Remarks
n to tonne time Amount
Materials ER GR BT ER GR BT
1 Diesel litre 0 0 From District HQ
2 Electric Detonator nos. 0 0 From District HQ
3 Electricity unit 0 0 From District HQ
4 Fuse Wire meter 0 0 From District HQ
5 Gelatin kg 0.001 0 0 From District HQ
6 Geo textile sqm 0 0 From District HQ
7 Granular Material cum 0 0 From District HQ
Green Terra Mesh System (3 * 2 * 0.6
8 nos 0 0 From District HQ
m)
Green Terra Mesh System (3 * 2 * 0.8
9 nos 0 0 From District HQ
m)
of polyester core with polyethylene
10 sqm 0 0 From District HQ
coating) with Strength as per design
11 Kerosene Lit 0 0 From District HQ
12 LPG litre 0 0 From District HQ
13 Para web 50 KN and 100 ken each m 0 0 From District HQ
direction ( 100 m) and in Transverse
14 m 0 0 From District HQ
direction, from rare end to front end plus
15 Petrol litre 0 0 From District HQ
Stone/Boulder ( for TMS drainage 0 0 From Quarry
16 cum
gallery) 0 0 From District HQ
17 Terra Mesh System (3 * 2 * 0.5 m) nos 0 0 From District HQ
18 Terra Mesh System (3 * 2 * 1 m) nos 0 0 From District HQ
19 Water KL 0 0 From District HQ
Sub-Total :
VAT 13% :
Grand Total with VAT: