Soil Improvement

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 18

Government of Nepal

Ministry of Physical Infrastructure & Transport


Department of Roads
[Branch/Directorate/FHSMO]
[Division/Project Office]

Contract Identification No :
BH No :
Nature of the work :
Name of Road :
Collection rate of 'Aggregate 13.2 mm' is taken as default for all types of AGGREGATE
Collection rate of 'Collection, quarrying and sieving sand in local river' is taken as default for all types of SAND
For Loading and Unloading:
Manual Loading is taken as default for AGGREGATES, SANDS, RUBBLES and WOODS
Abstract of Cost Page 1 of 18
Government of Nepal
0
0
0
0
Abstract Of Cost
0
0
0
0
Rate Amount
S.N. Description of Works Unit Quantity Remarks
(NRs) (NRs)
1 General
for composite soil reinforcement system, made of polyester core with
1.1 polyethylene coating including secondary
with design life >100reinforcement
years includingof secondary
Terramesh system sqm 0 0 0
1.2 (TMS) as per Specifications
reinforcement Clause 2402
of Green Terramesh systemwith Zincas
(GTM) +PVC coated as Facing
per Specifications Clause sqm 0 0 0
system
2402 (GTM) as per Specifications Clause 2402 with Zn+PVC coated withmm
1.3 designwith Zn+PVC
lifeSteel
Bio-Mat, >100 yearscoated
Greed
with Bio-Mat, Steel
including
made of MSsecondary
bar (10 mm
Greed madeofofGreen
reinforcement
dia and grid size
MS bar (10
Terramesh
160 mm x 160
sqm 0 0 0
1.4 system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with sqm 0 0 0
Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160
Total (Excl. VAT & Contin.) 0
Provisional Sum 0
VAT (13%) 0
Contingency (5%) 0
Provision for Price Escalation (10%) 0
Physical Contingency (10%) 0
GRAND TOTAL 0

Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________


Quantity Sheet Page 1 of 18
Government of Nepal
0
0
0
0

Quantity Sheet
0
0
0
0
Length Breadth Height
S.N. Description of Works Unit No. Quantity Remarks
(m) (m) (m)
1 General
1.1 0 sqm
1.2 0 sqm
1.3 0 sqm
1.4 0 sqm
Total : 0

Prepared By:________________ Checked By:________________ Approved By:________________


District Rates Page 1 of 18
1) District rates: Materials District Loading and Total Rate
District Rate Total District Collection Rate Transportation
S.N. Description Unit Transportation Royalty (R) Unloading Rate (C + R + Lu + Adopted Rate Remarks
(D) Rate (D + Dt) (C) (Tp)
1 diesel litre 84.1 (Dt) 0 0.0 (Lu) Tp) 0.0 0.0
2 electric_detonator nos 0.0 0 0.0 0.0 0.0
3 electricity kWh 12.0 0 0.0 0.0 0.0
4 fuse_wire_blasting m 0.0 0 0.0 0.0 0.0
5 gelatin Kg 0.0 0 0.0 0.0 0.0
6 geogrid sqm 0.0 0 0.0 0.0 0.0
7 geotextile sqm 0.0 0 0.0 0.0 0.0
8 gravel cum 0.0 0 0.0 0.000 0.0 0.0 0.0
9 GTM_3_2_0.6_mm nos 0.0 0 0.0 0.0 0.0
10 GTM_3_2_0.8_mm nos 0.0 0 0.0 0.0 0.0
11 HDPE_pipe_160_mm meter 0.0 0 0.0 0.0 0.0
12 kerosene litre 84.1 0 0.0 0.0 0.0
13 lpg litre 0.0 0 0.0 0.0 0.0
14 para_web m 0.0 0 0.0 0.0 0.0
15 petrol litre 95.6 0 0.0 0.0 0.0
16 rubble cum 0.0 0 0.0 0.000 0.0 0.0 0.0 0.0
17 TMS_3_2_0.5_mm nos 0.0 0 0.0 0.0 0.0
18 TMS_3_2_1_mm nos 0.0 0 0.0 0.0 0.0
19 water KL 0.0 0 0.0 0.0 0.0

2) District rates: Labours


District Rate
S.N. Description Unit Remarks
(D)
1 skilled day 0.0
2 unskilled day 0.0

Prepared By:________________ Checked By:________________ Approved By:________________


Equipment Rates Page 1 of 18
Usage Rates of Plant and Machinery
The usage rates include: cost of repair and maintenance, running and operation charge which includes crew, fuel & lubricants
Ownership Operation Charges Tyre
(Rs/ hr) Fuel oil
Load Time Rate Fuel Electrictity
SL.no Name Activity Capacity Output of Machine Unit Charge Servicin Maintenan (L/hr) (Units/hr) (Heating-
Factor Factor (Rs.) Fuel Crew replaceme
P&M- (Rs/hr) g ce L/hr)
Crane 5 tonne capacity Soil Ordinary/Soil 0.75 0.75 hour 0 1276 0 240 275 nt cost
42.21 437 9.9
061
P&M- Hydraulic Excavator of 1 cum
Marshy / Soil 60 cum/hour 0.75 0.8 hour 0 1716 0 240 253 0 594 9.12
027
P&M- bucket
Front End loader 1 cum bucket Soil loading /
Unsuitable 60 /25 cum/hour 0.85 0.8 hour 0 1201 0 360 229 79.14 392 8.27
017
P&M- capacity Aggregate loading
Plate compactor 0.9 0.9 hour 0 72 0 120 18 0 25 0.65
076
P&M-
Integrated Stone Crusher Crushing of spalls
Transportation of soil, 100 ton/ hr 0.85 0.9 hour 0 977 0 240 85 0 327 3.06
029
P&M-
Tipper - 5 cum GSB, WMM, Hotmix 5.5 cum/hr 0.65 0.65 hour 0 300 0 240 191 47.48 95 6.9
047
P&M-
Tractor etc.
Pulling 50 HP 0.75 0.75 hour 0 248 0 240 125 36.93 81 4.5
050
P&M-
Truck 5.5 cum per 10 tonnes Material Transport 4.5 cum 0.7 0.65 hour 0 496 0 240 263 55.4 165 9.46
054

Prepared By:________________ Checked By:________________ Approved By:________________


Summary of Rates Page 1 of 18
Summary of Rates
Specificati
Norms
S.N. on Clause Description Unit Rate (NRs)
No
1 3.1 No.
301 0 sqm 0
2 3.2 301 0 sqm 0
3 3.3 301 0 sqm 0
4 3.3_a 301 0 sqm 0

Prepared By:________________ Checked By:________________ Approved By:________________


District: Fiscal Year: 2074/75 Page 1 of 18
Rate Analysis

Description of Work:
Providing suitable material and Back filling behind abutment, wing wall and return wall complete as per Drawing and Technical Specifications., Granular Material 10 cum
Spec. cl. No: 908
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.11.A Skilled day 0.2 0 0.0 Granular Material cum 11 0 0 Plate Compactor hour 2.5 0 0.0
Unskilled day 5 0 0.0 Water KL 1 0 0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0

Description of Work: Excavation for Structures Foundation, Earth work in excavation of foundation of structures, including construction of shoring and bracing, removal of stumps and other deleterious matter and backfilling with approved Material as per Drawing and
240 cum
Technical Specifications., Ordinary soil by Mechanical Means, Depth upto 3 m
Spec. cl. No: 907
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
9.4.I.B.i Skilled day 1 0 0.0 0 Hydraulic Excavator hour 6 0 0.0
Unskilled day 3 0 0.0
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0

Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________


District: Fiscal Year: 2074/75 Page 2 of 18

Description of Work: Reinforced Soil wall Structure with Tera Mesh System (TMS) Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating including 1000
secondary reinforcement of Terramesh system (TMS) as per Specifications Clause 2402 with Zinc +PVC coated as Facing material, laying of Geo textile, drainage gallery filling with boulder all complete as per Specifications sqm
Spec. cl. No: 301
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount High
Type Strength Flexible Geogrids ( made of polyester core with Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.1 Skilled day 346 0 0.0 polyethylene coating) with Strength as per design ( at least sqm 9000 0 0 Tractor - Trolley hour 24 0 0.0
Terra Mesh System (TMS)( 3 m * 2 m * 0.5 m ) made of
Unskilled day 1398 0 0.0 200 KN/ m)
mechanically woven Zn +PVC coated
Terra Mesh System (3 * 2 * 0.5 m) nos 500 0 0
Terra Mesh System (3 * 2 * 1 m) nos 250 0 0
Stone/Boulder ( for TMS drainage gallery) cum 1826 0 0
Geo textile sqm 4290 0 0
in longitudinal direction ( 100 m) and in Transverse direction,
m 199 0 0
from rare end
compacted up to
to front end plus
Modified 1m@
Proctors 10 m at
density c/c, 99 m,
layers not
cum 10200 0 0.0
exceeding 15 cm all complete with compaction by using
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0

Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________


District: Fiscal Year: 2074/75 Page 3 of 18
Reinforced Soil wall Structure with Green Terra Mesh (GTM) Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with design
Description of Work: 1000
life >100 years including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of
sqm
Spec. cl. No: 301 10 mm dia to maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications.
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount High
Type Strength Flexible Geogrids ( made of polyester core with Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.2 Skilled day 140 0 0.0 polyethylene coating) with Strength as per design ( at least sqm 7987 0 0 Tractor - Trolley hour 24 0 0.0
+PVC
200 KN/coated
m) with bio mat, steel grid made of MS bar, ( 10 mm
Unskilled day 545 0 0.0
dia and grid size 160 mm * 160 mm, 3 nos of anchor bars of 10
Green Terra Mesh System (3 * 2 * 0.8 m) nos 312 0 0
Green Terra Mesh System (3 * 2 * 0.6 m) nos 416 0 0
Boulder ( for drainage gallery 0.6 m width volume 658.94 cum) cum 725 0 0
Geo textile sqm 2196 0 0
Perforated Pipe (PVC/HDPE)160 mm dia including all joints
Filling with as
and fixings fertile soil immediately behind the GTM facia for a m
required.
199 0 0
thickness of 0.30 m with compaction at layers not exceeding 15 cum 299.5 0 0.0
compacted up
cm all complete to Modified Proctors density at layers not
cum 7987.2 0 0.0
exceeding 15 cm all complete with compaction by using
Seeding for vegetation sqm 998.4
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0

Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________


District: Fiscal Year: 2074/75 Page 4 of 18
Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with design life >100 years
Description of Work: including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to 1000
maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications., High Strength Flexible Geogrids ( made of polyester core with polyethylene coating) with Strength as per design ( at least 200 sqm
Spec. cl. No: 301 KN/ m)
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount High
Type Strength Flexible Geogrids ( made of polyester core with Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.3 Skilled day 80 0 0.0 polyethylene coating) with Strength as per design ( at least sqm 19968 0 0 Tractor - Trolley hour 72 0 0.0
Precast
200 KN/Concrete
m) Panel of M 25 grade concrete (2 m * 0.8 m
Unskilled day 160 0 0.0 cum 219.7 0 0
slope 6 deg
Coarse Drained Material at the facing of Concrete Panel cum 300 0 0
Boulder ( for drainage gallery 0.6 m width volume 658.94 cum) cum 725 0 0
Geo textile sqm 2196 0 0
in longitudinal direction (104 m) and in Transverse direction,
m 199 0 0
from rare end
compacted up to
to front end plus
Modified 1m@
Proctors 10 m at
density c/c, 99 m,
layers not
cum 10852 0 0.0
exceeding 15 cm all complete with compaction by using
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0

Reinforced Soil wall Structure with Concrete Facing:, Providing and fixing Flexible Geogrids ( e.g. Paralink) as primary reinforcement for composite soil reinforcement system, made of polyester core with polyethylene coating with design life >100 years
Description of Work: 1000
including secondary reinforcement of Green Terramesh system (GTM) as per Specifications Clause 2402 with Zn+PVC coated with Bio-Mat, Steel Greed made of MS bar (10 mm dia and grid size 160 mm x 160 mm), 3 nos of anchor bars of 10 mm dia to
sqm
Spec. cl. No: 301 maintain the slope of GTM, laying of Geo textile, drainage gallery filling with boulder etc. all complete as per Specifications., Para web 50 KN and 100 ken each
Norms Labour (A) Material (B) Equipment (C) Formworks (D)
No. Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount Type Unit Quantity Rate Amount
3.3_a Skilled day 80 0 0.0 Para web 50 KN and 100 ken each m 39936 0 0 Tractor - Trolley hour 72 0 0.0
Precast Concrete Panel of M 25 grade concrete (2 m * 0.8 m
Unskilled day 160 0 0.0 cum 219.7 0 0
slope 6 deg
Coarse Drained Material at the facing of Concrete Panel cum 300 0 0
Boulder ( for drainage gallery 0.6 m width volume 658.94 cum) cum 725 0 0
Geo textile sqm 2196 0 0
in longitudinal direction (104 m) and in Transverse direction,
m 199 0 0
from rare end
compacted up to
to front end plus
Modified 1m@
Proctors 10 m at
density c/c, 99 m,
layers not
cum 10852 0 0.0
exceeding 15 cm all complete with compaction by using
Sub total of A = 0.0 Sub total of B = 0.0 Sub total of C = 0.0 Sub total of D = 0.0
Sub total of A +B + C = 0.0 Sub total of A + B + C + D= 0.0 Contractor's overhead expenses 15% = 0.0 Norms Rate = 0.0
Unit Rate = 0

Prepared By:________________ Checked By:________________ Recommended By:________________ Approved By:________________


Loading/Unloading of Materials Page 1 of 18
Section 800: Loading/Unloading

Loading/Unloading Mechanical
S.N. Description Unit Loader Tipper Total
1 Gravel cum 0.060 0.060 0.0
2 Sand cum 0.060 0.060 0.0
3 Rubble cum 0.140 0.140 0.0
4 Aggregate cum 0.140 0.140 0.0

Loading/Unloading Manual
Unskille
S.N. Description Unit Skilled Truck Tipper Total
d
1 Cement tonne 0.200 0.000 0.200 0.000 0.0
1000
2 Bricks 0.000 0.000 0.000 0.000 0.0
Nos.
3 Bitumen Drums tonne 0.150 0.000 0.150 0.000 0.0
4 Timber tonne 0.270 0.003 0.200 0.000 0.0
5 C.C. Blocks, Kerb, etc. cum 0.400 0.050 0.300 0.000 0.0
6 Steel tonne 0.200 0.000 0.200 0.000 0.0
7 Gravel cum 0.136 0.000 0.000 0.136 0.0
8 Sand cum 0.136 0.000 0.000 0.136 0.0
9 Rubble cum 0.136 0.000 0.000 0.136 0.0
10 Aggregate cum 0.136 0.000 0.000 0.136 0.0

Prepared By:________________ Checked By:________________ Approved By:________________


Loading/Unloading of Materials Page 2 of 18
Section 800: Loading/Unloading

RCC Hume pipes


Unskille
S.N. Description Unit Skilled Truck Crane Total
d
Loading of RCC Hume pipes by mechanical means including a lead upto 30 m
a 900 mm dia RCC Hume pipe meter 0.133 0.033 0.067 0.067 0.0
1000 mm dia RCC Hume
b meter 0.133 0.033 0.067 0.067 0.0
pipe
1200 mm dia RCC Hume
c meter 0.133 0.033 0.067 0.067 0.0
pipe
d 750 mm dia RCC Hume pipe meter 0.080 0.020 0.040 0.040 0.0
e 600 mm dia RCC Hume pipe meter 0.080 0.020 0.040 0.040 0.0
f 450 mm dia RCC Hume pipe meter 0.080 0.020 0.040 0.040 0.0
450 mm dia RCC Hume pipe
g meter 0.053 0.013 0.027 0.027 0.0
37.5 m
h 300 mm dia RCC Hume pipe meter 0.053 0.013 0.027 0.027 0.0

Unloading of RCC Hume pipes by mechanical means including a lead upto 30 m


a 900 mm dia RCC Hume pipe meter 0.067 0.007 0.033 0.033 0.0
1000 mm dia RCC Hume
b meter 0.067 0.007 0.033 0.033 0.0
pipe
1200 mm dia RCC Hume
c meter 0.067 0.007 0.033 0.033 0.0
pipe
d 750 mm dia RCC Hume pipe meter 0.040 0.020 0.020 0.020 0.0
e 600 mm dia RCC Hume pipe meter 0.040 0.020 0.020 0.020 0.0
f 450 mm dia RCC Hume pipe meter 0.040 0.020 0.020 0.020 0.0
450 mm dia RCC Hume pipe
g meter 0.027 0.003 0.013 0.013 0.0
37.5 m
h 300 mm dia RCC Hume pipe meter 0.027 0.003 0.013 0.013 0.0

Loading of RCC Hume pipe by manual means including a lead upto 30 m


a 900 mm dia RCC Hume pipe meter 0.206 0.021 0.267 0.0
1000 mm dia RCC Hume
b meter 0.206 0.021 0.267 0.0
pipe
1200 mm dia RCC Hume
c meter 0.206 0.021 0.267 0.0
pipe
d 750 mm dia RCC Hume pipe meter 0.165 0.012 0.160 0.0
e 600 mm dia RCC Hume pipe meter 0.165 0.012 0.160 0.0
f 450 mm dia RCC Hume pipe meter 0.137 0.008 0.107 0.0
g 300 mm dia RCC Hume pipe meter 0.137 0.008 0.107 0.0

Prepared By:________________ Checked By:________________ Approved By:________________


Collection of Materials Page 1 of 18
Section 800: Collection
Collectio
S.N. Description Unit Washing Amount Remarks Washing
n
Gravel
a 5 mm - 70 mm cum 0 0 0.0 Without Washing
b 40 mm cum 0 0 0.0 Without Washing
c 20 mm cum 0 0 0.0 Without Washing
d 8 mm cum 0 0 0.0 Without Washing
e 40 mm - 70 mm cum 0 0 0.0 Without Washing
f 70 mm - 100 mm cum 0 0 0.0 Without Washing
Sand
a Quarry output less than 33% cum 0 0 0.0 Without Washing
b Quarry output 33 - 66% cum 0 0 0.0 Without Washing
c Quarry output more than 66% cum 0 0 0.0 Without Washing
Collection, quarrying and sieving
d cum 0 0 0.0 Without Washing
sand in local river
3 Rubble cum 0 0 0.0 Without Washing
4 Aggregate cum 0 0 0.0 Without Washing
a 70 mm - 100 mm cum 0 0 0.0 Without Washing
b 40 mm - 70 mm cum 0 0 0.0 Without Washing
c 20 mm - 40 mm cum 0 0 0.0 Without Washing
d 10 mm - 20 mm cum 0 0 0.0 Without Washing
e 10 mm cum 0 0 0.0 Without Washing
Mechanical
a 13.2 mm cum 0 0 0.0 Without Washing
b 20 mm cum 0 0 0.0 Without Washing
c 40 mm cum 0 0 0.0 Without Washing

Collection
Unskille
S.N. Description Unit Rate Amount
d
Gravel
a 5 mm - 70 mm cum 2.060 0 0.0
b 40 mm cum 3.090 0 0.0
c 20 mm cum 4.120 0 0.0
d 8 mm cum 6.180 0 0.0
e 40 mm - 70 mm cum 4.120 0 0.0
f 70 mm - 100 mm cum 3.090 0 0.0
Sand
a Quarry output less than 33% cum 4.120 0 0.0
b Quarry output 33 - 66% cum 3.090 0 0.0
c Quarry output more than 66% cum 1.545 0 0.0
Collection, quarrying and sieving
d cum 1.545 0 0.0
sand in local river
3 Rubble cum 1.442 0 0.0
4 Aggregate cum 1.442 0 0.0

Washing
Unskille
S.N. Description Unit Rate Amount
d
1 Gravel cum 0.515 0 0.000
2 Sand cum 0.515 0 0.000
3 Rubble cum 0.206 0 0.000
4 Aggregate cum 0.210 0 0.000

Manually Breaking Stones (excluding Collection of Rubble)


Unskille
S.N. Description Unit Total
d
Aggregate
a 70 mm - 100 mm cum 1.545 0.000
b 40 mm - 70 mm cum 2.060 0.000
c 20 mm - 40 mm cum 3.090 0.000
d 10 mm - 20 mm cum 4.120 0.000
e 10 mm cum 6.180 0.000
Mechanical
f 13.2 mm cum 1.545 0.000
g 20 mm cum 2.060 0.000

Making rubbles of required size including and stacking.(Without Blasting)


Unskille
S.N. Description Unit Skilled Total
d
1 Rubbles cum 4.120 0.103 0.0

Making rubbles of required size including and stacking.(Blasting)


Unskille
S.N. Description Unit Skilled Gelatin Detonator Fuse Wire Total
d
1 Rubbles cum 2.575 0.103 0.250 2.000 2.000 0.0
Prepared By:________________ Checked By:________________ Approved By:________________
Collection of Materials Page 2 of 18

Mechanically Crushing of Stone Aggregates Stone Boulder


Unskille Stone Crusher
S.N. Description Unit Skilled of size 150mm Loader Tipper Total
d with Screen
Aggregate and below
a 13.2 mm cum 0.030 0.003 1.3 0.020 0.030 0.030 0.0
b 20 mm cum 0.027 0.003 1.2 0.018 0.027 0.027 0.0
c 40 mm cum 0.023 0.003 1.1 0.008 0.027 0.027 0.0

Prepared By:________________ Checked By:________________ Approved By:________________


Transportation of Materials Page 1 of 18
Section 800: Transportation of Materials
Speed of loaded truck
ER GR BT Notes:
Speed of Empty truck =25 % more than loaded truck of corresponding terrain
Terai 20 30 40
Mountai Speed of Empty truck =25 % more than loaded truck of corresponding terrain
10 15 20 Speed of vehicle may be modified as per site condition
n

Tipper
ER GR BT ER GR BT 0
rate:
Coefficient/Distance(km) 0.09 0.06 0.045 0.18 0.12 0.09
Conversio Total Total
S.N. Description Unit Terai Hilly Remarks
n to tonne time Amount
Materials ER GR BT ER GR BT
1 Diesel litre 0 0 From District HQ
2 Electric Detonator nos. 0 0 From District HQ
3 Electricity unit 0 0 From District HQ
4 Fuse Wire meter 0 0 From District HQ
5 Gelatin kg 0.001 0 0 From District HQ
6 Geo textile sqm 0 0 From District HQ
7 Granular Material cum 0 0 From District HQ
Green Terra Mesh System (3 * 2 * 0.6
8 nos 0 0 From District HQ
m)
Green Terra Mesh System (3 * 2 * 0.8
9 nos 0 0 From District HQ
m)
of polyester core with polyethylene
10 sqm 0 0 From District HQ
coating) with Strength as per design
11 Kerosene Lit 0 0 From District HQ
12 LPG litre 0 0 From District HQ
13 Para web 50 KN and 100 ken each m 0 0 From District HQ
direction ( 100 m) and in Transverse
14 m 0 0 From District HQ
direction, from rare end to front end plus
15 Petrol litre 0 0 From District HQ
Stone/Boulder ( for TMS drainage 0 0 From Quarry
16 cum
gallery) 0 0 From District HQ
17 Terra Mesh System (3 * 2 * 0.5 m) nos 0 0 From District HQ
18 Terra Mesh System (3 * 2 * 1 m) nos 0 0 From District HQ
19 Water KL 0 0 From District HQ

Prepared By:________________ Checked By:________________ Approved By:________________


References Page 1 of 18
References

Densities of some materials:


S.N. Name Density Remarks
Excavated earth work
Soil Material 1400 kg/m3
Rock Material 2400 kg/m3
Sand 1600 kg/m3
Gravel, river shingle, broken stone aggregates, and bats.
Gravel 1800 kg/m3
River shingle (round aggregate) 1800 kg/m3
Broken stone aggregates 2400 kg/m3
Surface Dressing Chips 2400 kg/m3
Brick bats 1420 kg/m3
Boulder, Cobbles, quarry stone 2400 kg/m3
Dressed Stone 2400 kg/m3 wt.of 1 brick
Bricks 1900 kg/m3 (240*115*57
Cement 1440 kg/m3 mm3)=2.98 Kg
Reinforcement Steel 7850 kg/m3
Gabion wire 7850 kg/m3
Bitumen 1010 kg/m3
GI, CI, Pipe and fittings 7850 kg/m3
Timber for temporary works 350 kg/m3
Fabricated Structural Timber 850 kg/m3
Fabricated Structural Steel 7850 kg/m3
RCC Precast Element 2500 kg/m3
RCC hume pipe
900mm dia wt./m= 785 kg
750 mm dia wt./m= 667.25 kg
600mm dia wt./m= 549.5 kg
450 mm dia wt./m= 431.75 kg
300 mm dia wt./m= 314 kg
Water 1000 kg/m3
Petrol 720 kg/m3 0.770 Kg/l
Diesel 720 kg/m3 0.770 Kg/l
Kerosene 720 kg/m3 0.770 Kg/l
Thermoplastic Paint 2100 kg/m3
Bill of Quantities Page 1 of 18
Government of Nepal
0
Department of Roads
0
0
BILL OF QUANTITIES
0
0
0
0 Rate Amount
Rate in words
S.N. Description of Works Unit Quantity Without VAT Without VAT
Without VAT (NRs)
General (NRs) (NRs)
1 0 sqm 0 0 0.0
2 0 sqm 0 0 0.0
3 0 sqm 0 0 0.0
4 0 sqm 0 0 0.0

Sub-Total :
VAT 13% :
Grand Total with VAT:

Note: Signature of Authorised Person :


All the works as listed above shall be completed complying the Specification, the
The costProvision
of laboratory tests as stipulated in the Speicification shall be borne by Name of Authorised Person :
Special and other Contract Documents.
the Contractor and such cost is deemed to be included in the relevant BOQ Contractor's Name :
items.
The numbers in parenthesis [ ] represent the respective Specification number. Address and Telephone No:
Seal :
Date :
PPMO Bill of Quantities First Custom Second Custom Third Custom Page 1 of 18
Sub- Official
Sector Group Title Level(optional) Level(optional) Level(optional) Item Name & Description Unit Quantity
Provisional Sum Group Rate
(Provide Description) (Provide Description) (Provide Description) P.S. 1.0 1.0
#[XXX0001]
General 0 sqm 0.0 0.0
0 sqm 0.0 0.0
0 sqm 0.0 0.0
0 sqm 0.0 0.0