RB Instruction Regarding Missing Traction Bonds1

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SOUTH EASTERN RAILWAY

ofice of the
Pr. Chief Electrical Engineer
South Eastern Railway
11,Garden Reach Road
Kolkata- 700 043.

./No.CEE/D/ 103 fio/Date: 26.11.2024

Sr.DEE (TRO)
Adra, Chakradharpur, Kharagpur & Ranchi.
faqq/Sub: Missing Traction bonds.
HHIRef: Railway Board letter no. 2022/EEM/161/8/Punct Pt-II
E-3384079, dt. 12.11.24.

Reference above Railway Board instructed Zonal railways on missing


Traction bonds as:
traction.
Traction bonds are vital for safe and reliable electric
Hence there should not be any deficiency of traction bonds and
missing/damaged bonds should be provisioned on immediate
basis.

Zonal Railways should take necessary action to make good of


deficient/missing traction bonds and submit the action plan.

action for provision of


Therefore, Divisions are hereby requested to take necessary
as per enclosed proforma
missing traction bonds and send the action plan with TDC
for its onward submission to the Railway Board.

HCHO /Encl: As above

(Sunil Kt'sin2024
AEEE/RE-TRD/HQ
for Chief Electrical Distribution Engineer
utatet/Copy to: Secy to PCEE for kind information PCEE/SER
Annexure-I

Traction Bonds Deficiencies (Opened/ Missing/ Damaged) as per


Foot-patroling/ Joint Bond checking/Engg. Machine working

Traction Bonds Traction bond deficiency Action Plan


(Opened/Missing/Damaged)
Division TDC
Rail Holes No Rail Total
Type Population avallable Holes

Structure Bond

Transverse/Cro
ss Bond/Inter
ADA
track
Longitudinal/R
ail Bonds
Total
Structure Bond
Transverse/Cro
ss Bond/Inter
CKP
track
Longitudinal/R
ail Bonds
Total

Structure Bond
Transverse/Cro
ss Bond/Inter
KGP
track
Longitudinal/R
ail Bonds
Total

Structure Bond
Transverse/Cro
RNC
ss Bond/ Inter
track

Longitudinal/R
ail Bonds
Total