Wet Sediment Trap Design Guidelines

Uploaded by

Nuek Jer (NuEk)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views4 pages

Wet Sediment Trap Design Guidelines

Uploaded by

Nuek Jer (NuEk)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Job No. Sheet No. Rev.

Calculation Sheet
ST
-SEDIMENT TRAP
-Catchment 2 ha Member/Location :
Drg. Ref. :
Job Title : SEDIMENT TRAP Made by NAS Date 13.11.2018 Remark

WET SEDIMENT TRAP DESIGN

1 Sizing a Wet Sediment Trap

Limitation in design

Table 12.15 Rain Fall = 50.00 mm

Catchment Area
Total Catchment Area = 2 ha
= 20000 m2

To provide silt Trap basin with earth embankment and emergency spillway.

Assumptions

1 Total storage 125m3/ha over contributing area

2 Run off quantity up to 10 ARI

3 Design Criteria of Sediment Trap for Sediment Control as per Table 12.15

4 The temporary basin design life is 6 to 12 months.


Job No. Sheet No. Rev.
Calculation Sheet
ST
-SEDIMENT TRAP
-Catchment 2 ha Member/Location :
Drg. Ref. :
Job Title : SEDIMENT TRAP Made by NAS Date 13.11.2018 Remark

1 Sizing of sediment trap.

Rainfall = 50.00 mm

Table 12.5 Total volume = 125 m3/ha

(a) Settling Zone Volume & Total Volume

Wet Sediment Basin Sizing Guidelines,


the nearest magnitud of design storm event in mm = 50.00 mm

Therefore :

Total Basin volume = 125 m3/ha x 2.0 ha = 250 m3 Req. Volume

(b) Sediment Storage Zone

The required total sediment storage volume, V1


V1 = Total Volume = 250 m3

For a side slope z = 2 (H) : 1 (V), the dimensions at the top of the sediment storage zone are :

W1 = = = 12.0 m
L1 ≥ 2W1 ok
L1 = = = 25.0 m
Job No. Sheet No. Rev.
Calculation Sheet
ST
-SEDIMENT TRAP
-Catchment 2 ha Member/Location :
Drg. Ref. :
Job Title : SEDIMENT TRAP Made by NAS Date 13.11.2018 Remark

The required depth for the sediment TRAP, which must be at least 1.0m, can be calculated
from the following relationship :

2 3 2
V1 = Z Y1 - Z Y1 (W1 + L1) + Y1 (W1 L1)

which gives,

2 3 2
250 = ( 2 ) Y1 - ( 2 ) Y1 ( 37.0 ) + Y1 ( 300.0 )

3 2
= 4 Y1 -( 74.0 ) Y1 + Y1 ( 300.0 )

use trial and error method to find Y1 ,

For Y1 = 1 m , V1 = 230.0 m3

For Y1 = 1.2 m , V1 = 260.4 m3

For Y1 = 1.4 m , V1 = 285.9 m3

Y1 = 1.200 > 1.000 m minimum depth requirement

V1 = 260.4 > 250 m3 of sediment storage volume OK!

( c ) Overal Basin Dimension

Base : WB = W2 - 2 x Z x [ y2 ] = 7.2 m say 8 m


LB = L2 - 2 x Z x [ y2 ] = 20.2 m say 20 m

Depth :
Depth of Sediment Storage y1 = 1.20 m

Side slope , Z = 2.0 (H): 1.0 (V)


Job No. Sheet No. Rev.
Calculation Sheet
ST
-SEDIMENT TRAP
-Catchment 2 ha Member/Location :
Drg. Ref. :
Job Title : SEDIMENT TRAP Made by NAS Date 13.11.2018 Remark

2 SIZING OF BASIN OUTLET

Table 12.17 The emergency spill way must be designed for a 10-yr ARI
Assumpption :-

A) Determine of Q10

k
Eqn. 2.2 i = λT
(d+ө)ŋ
where;
i = the ave. rainfall (mm/hr) for selected ARI(T) and storm duration
T = ave. recurrence interval, ARI (years)
d = storm duration (hrs) ; 0.20 ≤ d ≤ 72
λ, k, ө and ŋ = fitting constants dependent on the raingauge location

Appendix 2B ARI, T Storm Derived Parameters


Table 2B Location & Station ID (years) Duration , d λ k ө ŋ
JPS Kemaman Jambatan 10 15 75.8258 0.2385 0.3811 0.7303

As Such;

0.2385
i = 75.8258 x 10 = 131.32 = 184 mm/hr
0.7303
15 0.3811 0.71
+
60

Section 2.3.1 Rational Method


Table 2.5 Coefficient of Runoff, C = 0.5 (Bare Soil)
Catchment Area, A = 2 ha

3
Q10 = C. I . A = 0.50 x 184 x 2 = 0.52 m /s
360 360

B) Determine the size of Spillway

Q required = = 0.52 m3/s

where :
1.5
Eqn. 2.6 Q spillway = Csp B Hp
Q = emergency spillway discharge (m3/sec)
Csp = spillway discharge coefficient
B = emergency spillway base width (m)
Hp = effective head on the spillway crest (m)

Trial spillway dimensions :

B = 2.00 m
Hp = 0.30 m
Csp = 1.60 m

Q spillway = 0.53 m3/sec > Q10 = 0.52 m3/sec OK!