Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

WS - 01

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

BUILT IN TRASH BIN

DOOR TO BE FLIPPED DOOR TO BE FLIPPED BUILT IN TRASH BIN


TOILET PAPER DISPENSER
TOILET PAPER DISPENSER

PROVIDE 2 3PHASE
PROVISIONS @1.2m

PROVIDE 3 DOUBLE
SOCKETS @1.2m
OVEN
TIE-IN WITH EXISTING PREPARATION TIE-IN WITH EXISTING
TIE-IN WITH EXISTING
WATER SUPPLY LINE TABLE WATER SUPPLY LINE
FILTERED WATER
SUPPLY LINE FOR

FRIDGES

FOOD-KITCHEN-DELI
TIE-IN WITH EXISTING
FILTERED WATER SPECIALTY
PROVIDE 3 DOUBLE
COFFEE PROVIDE POWER
SOCKETS @1.2m SUPPLY LINE FOR DRINK AREA
TIE-IN WITH EXISTING COFFEE MACHINE PROVISIONS FOR
FILTERED WATER FUTURE FREEZERS
SUPPLY LINE FOR
BLENDER & ICE MAKER
GONDOLA

PROVIDE POWER SALES AREA SHELVES


PROVISION
STAND UP
TABLE

OPEN FRIDGE
ENTRY
LOBBY SHELVES
POWER PROVISION
FOR GONDOLAS POWER
PROVIDE POWER PROVISION
PROVISION TRASH
FOR HEALTH &
SELF CHUTE

WELLNESS
CHECK OUT UNIT

ICE-CREAM
CASE SEATING AREA

ISSUE DATE REVISIONS BY

ADNOC DISTRIBUTION
- ENGINEERING & PROJECTS DIVISION -

PROJECT:-
893 - 894 - ABU AL ABIAD - 1 & 2
C-STORE MODIFICATION

TITLE:-
WATER SUPPLY LAYOUT

PROJECT No.
DRAWN BY DESIGNED BY E.D.M. EPD/TINV/07/11/

SCALE :- N.T.S DATE :- 23-07-2020 DWG. No.: WS-01

COMP. REF.

You might also like