General Notes: Guimaras
General Notes: Guimaras
General Notes: Guimaras
UNDERTAKING
COLD WATER LINE CB CATCH BASIN FAU FAUCET GV GATE VALVE CWL COLD WATER SS SOIL STACK OFFICE OF THE BUILDING OFFICIAL
LINE
I ______________ DO HEREBY AGREE THAT THE TOP SLAB OF THE SEPTIC VAULT SHALL NOT BE CONSTRUCTED OR PUT
WASTE PIPE SV SEPTIC VAULT WT WATER TANK CV CHECK VALVE PVC POLYVINYL
CHLORIDE PIPE
VS VENT STACK INTO PLACE, NOT UNTIL AFTER INSPECTION OF THE DESIGNER MASTER PLUMBER IN CHARGE OF CONSTRUCTION AND AFTER DPWH
APPROPRIATE INSPECTION REPORT FORMS HAVE BEEN SIGNED BY THIS MASTER PLUMBER. THAT INDEED THE SEPTIC VAULT IS
SOIL PIPE WM WATER METER DC DIGESTIVE CHAMBER WC WATER CLOSET SHO SHOWER SP SOIL PIPE WATERTIGHT/WATERPROOFED. THIS SIGNED REPORT FORM SHALL THEN BE ATTACHED BY ME WHEN APPLYING FOR THE
CERTIFICATE OF OCCUPANCY.
GUIMARAS
WP WATER PUMP VSTR VENT STACK THE UNDERSIGNED ALSO ACKNOWLEDGE TO ABIDE WITH THE PROVISIONS AS STATED ON THE TABLE - 1 OF THE CITY/DISTRICT/MUNICIPALITY
FD FLOOR DRAIN LAV LAVATORY CO CLEAN OUT DP DRAIN PIPE
THRU ROOF
NATIONAL PLUMBING CODE OF THE PHILIPPINES.
DS DOWNSPOUT KS KITCHEN SINK SV SHOWER VALVE
_____________________
SIGNATURE OF OWNER
P R O P E R T Y L I N E
SOU THEAS
T
*
NOR THEAS
S O U T H WE S
T
N
PLUMBING
T
N O R T H WE S
GENERAL NOTES
1.O ALL PLUMBING WORKS INCLUDED
HERE IN SHALL BE EXECUTED ACCORDING TO
THE PROVISION OF THE PHILIPPINE PLUMBING
CODE THE NATIONAL PLUMBING CODE & THE
L RULES AND REGULATIONS OF MANILA CITY.
AL 2.O COORDINATE THE DRAWING WITH
EW R OTHER RELATED DRAWINGS AND
FI SPECIFICATION THE ENGINEER/ARCHITECT
SHALL BE NOTIFIED IMMEDIATELY OF ANY
E DESCREPANCY FOUND THEREIN.
P
E
ROOF 3.O ALL PIPES SHALL BE INSTALLED AS
O INDICATED ON PLANS .ANY RELOCATIONS
N
L REQUIRED FOR PROPER EXECUTION OF OTHER
I
TRADES SHALL BE WITH PRIOR APPROVAL OF
L S THE ARCHITECT OR ENGINEER.
4.O PROPOSED SANITARY UTILITIES SHALL
Y
CONTRACTOR.
E
7 1 3
56 1 4
L OTHERWISE SPECIFIED.
O
12 1
E SHALL BE IN ACCORDANCE WITH THE
P A IR
P
F MANUFACTURER'S INSTRUCTIONS.
do
wn
L S 7.O THE CONTRACTOR SHALL VERIFY ALL
CB CB CB
S
CL
F LOOR LE V EL
L
10mm Ø DEF. BAR
GROUND FLOOR
C IA 1.O COLD WATER LINES (CWL) -
100 MM THK. CHB
P L A N 100 MM Ø PVC PIPE
M ER POLYPROPYLENE PIPES BRAND.
2.O DRAINAGE LINES - PVC PIPE SERIES
NOTE:
A R C H I T E C T U R A L D E S I G N , ALL DESIGNS, DRAWINGS, SPECIFICATIONS
PLUMBING DESIGN AND ENVIRONMENTAL
, & COPIES PREPARED AND FURNISHED BY PROPOSED TWO STOREY COMMERCIAL /
P L A N N I N G S E R V I C E S THE ARCHITECT IN CONNECTION WITH THE MR. ARTURO BERMUDO
M A S T E R P L U M B E R PROJECT ARE INSTRUMENTS OF RESIDENTIAL BUILDING
PROFESSIONAL SERVICE, THEY ARE THE
A B I L A Y N O R T E O T O N , I L O I L O PROPERTY OF THE ARCHITECT, WHETHER
5 0 2 0 , P H I L I P P I N E S THEY ARE EXECUTED OR NOT, THEY ARE NOT
m v p 1 2 2 3 0 3 @ g m a i l . c o m TO BE REPRODUCED OR USE ON OTHER
0 9 0 8 5 1 5 2 9 3 0 WORK EXCEPT IF WRITTEN AGREEMENT
ODYUNG, SAN MIGUEL, JORDAN, GUIMARAS
WITH THE ARCHITECT.
RA 9266, ART 4, SEC 33