Support Team Performance

Scrum ceremonies Agile ceremonies

Sprint planning Product strategy meeting

• Team and product owner plan • Product owner shares the


work for the current sprint. product vision.
• Scrum master or senior scrum
master facilitates the planning
session.

Daily scrum Daily stand-up or stand-up


• Team holds a daily stand-up • Team conducts a status
meeting. meeting.
• Team members discuss work, • Meeting is timeboxed, limited
request assistance, and assess to 5 to 15 minutes.
progress toward the goal. • Not necessarily daily
• Not a status meeting

Sprint review (can include


demo)
Backlog refinement
• Held at the end of each sprint
• Team, product owner, • Product owner prioritizes
stakeholders, or customers items on backlog.
review progress and give
feedback.

Sprint retrospective Project retrospective

• Team identifies and plans • Team reviews work and


improvements in performance processes at the end of a
and collaboration. project.
• Similar to lessons learned

Scope validation: Process of customer


acceptance of completed deliverables

Predictive project life cycle


• Acceptance criteria

Adaptive project life cycle


• Definition of Ready (DoR)
• Definition of Done (DoD)
• Acceptance criteria
• Iteration reviews

Hybrid project life cycle


• Any combination of the above

Evaluate and Manage Quality

Predictive projects

• Team members dislike and avoid work.


• Team members avoid increased responsibility.
• Team members need direction.

Adaptive projects

• Team, customer, and product owner set and meet the quality
goal and metrics.
• Feedback from iterations monitor quality continuously
• Quality performance is measured with:
• Service Level Agreements (SLAs)
• KPIs
• Contractual measures
• Quality methods or frameworks, such as Lean Six Sigma

Quality Control Tools

Data Gathering Tools Data Analysis Tools

• Checklists or check sheets • Performance reviews


• Statistical sampling • Root cause analysis
• Questionnaires
• Surveys

Data Representation Tools

• Cause-and-effect diagrams
• Scatter diagrams
• Control charts
• Histograms
• Pareto charts
Tailor performance measurement to the project
context and stakeholders:

• Percentage of work completed


Scope
• Change requests

• Actual duration of work against projected start and


Schedule finish dates

• Actual costs
Budget
• Procurements vs. needs

• Team allocations, availability, or procurement


Resources • Performance appraisals of team, including vendors
• Contract management

• Technical performance
Quality • Defects

Performance reports

Earned value
Milestone schedule Quality reports management (EVM)
reports

High-level
Charts and reports Graphs and values
visualization of
based on the quality based on EVM
progress on work
metrics collected equations
against planned dates

Variance analysis Work performance


Dashboards
reports reports

Physical or electronic
representation of Physical or electronic
Graphs and their work performance progress summaries,
analysis comparing information compiled usually with visuals
actual results to in project documents, or graphics to
expected results intended to generate represent the larger
decisions, actions, or dataset
awareness

EVM Measures for Cost Control

Is the project on budget? How efficient is your project?

Calculate cost variance (CV) to Calculate cost performance index


find the current amount of (CPI) to measure the cost efficiency
budget deficit or surplus. of budgeted resources.

𝐄𝐕
𝐂𝐕 = 𝐄𝐕 − 𝐀𝐂 𝐂𝐏𝐈 =
𝐀𝐂

Project over Project under Project over Project under


budget budget budget budget

CV value=0, CPI value = 1.0,


project on budget project on budget

EVM Measures for Schedule Control

Is the project progressing How efficiently is the


on schedule? team working?

Schedule variance measures Schedule performance index


performance by calculating the measures efficiency by calculating
difference between EV and PV the ratio of EV to PV

𝐄𝐕
𝐒𝐕 = 𝐄𝐕 − 𝐏𝐕 𝐒𝐏𝐈 =
𝐏𝐕

Project over Project under Project over Project under


budget budget budget budget

CV value=0, CPI value = 1.0,


project on budget project on budget

How much more cost is


What will be the project cost
required to complete the
in total?
remainder of the project?

Use Estimate At Use Estimate To


Completion (EAC) Complete (ETC)

Based on: Based on:


• CPI: Current spending efficiency • CPI
• BAC: Budget at completion • AC (actual cost)

𝐁𝐀𝐂
𝐄𝐀𝐂 = 𝐄𝐓𝐂 = 𝐄𝐀𝐂 − 𝐀𝐂
𝐂𝐏𝐈
Charts and graphs are visual representations of
the team’s progress.

Burn-down chart (Iteration) is used to track the work to be completed


within an iteration.

The burn-up chart (Release) shows the accumulated progress of


completed work and is updated after each iteration.

The continuous flow approach


measures the following:

Done • WIP: Measure of work in


Started progress but not completed
Queued BACKLOG

• Lead time: Length of time work


item goes through the entire
process

• Cycle time: Length of time


work item is being worked on

• Throughput: Number of items


entering or exiting the system

The Cumulative Flow Diagram

Change Management Process Flowchart

Change
request form

Change initiators

Log change request

Send rejection notice

Change
request passes
filter? Rejected

Accepted

No
Deliverable
affected?

Yes

Prepare impact statement

Moderate impact: PM Major impact: PM,


Minor impact: PM
and stakeholder sponsor, and
reviews
review stakeholder review

Rebalance the
project

Execute the
change

Build and Yes No


Change
communicate authorized?
the change