3S Heater installation guide 42332_rev B
3S Heater installation guide 42332_rev B
3S Heater installation guide 42332_rev B
INSTALLATION GUIDE
Balboa Generic Model Series BP2000 BP2100 BP6013 BP501 BP601
Agency Prefix B20 BP21 BP21 BP501 BP6
3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.
2 Heater Installation Guide 42332_rev B
Nomenclature
System Pack System Pack Without Cover J29 is a heater disable switch input.
Agency Prefixes: BP20, BP21, BP501, BP6
C D
Heater Mounting
Posts Nuts
3S Heater
3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.
3 Heater Installation Guide 42332_rev B
Installation Instructions
Step 1 Tools / Supplies
Power Off the system pack at the GFCI
or circuit breaker.
Step 2 3S Heater
Heater F
B
Connector
3S Heater
3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.
4 Heater Installation Guide 42332_rev B
Step 5
Remove the heater from the system pack. The heater
is mounted to the system pack with two nuts on
mounting posts (D). Loosen the nuts with an open
ended 3/8” (9.5mm) wrench, and remove the heater.
Step 6
Install the new heater into the system pack, and
tighten the two mounting nuts (D).
G Three Metal Contacts
Step 7 Step 10
Connect the M7 temperature sensors (A) to J16 and If the agency prefix is BP501 or BP6, connect the heater
J17 on the circuit board. The locking tabs only align connector (B) to J46 on the circuit board.
one way on the J16 and J17 connectors (refer to page
If the agency prefix is BP20 or BP21, connect the heater
1). Misalignment may cause damage.
connector (B) to J44 on the circuit board.
You will hear a click when the connection is secure.
Step 8
Connect the third temperature sensor switch (view “E” Step 11
on page 2) to the circuit board at J29. The connector Install the system pack lid and tighten the two
has alignment tabs that only align one way on the J29 mounting screws (F).
connector (view “E” on page 1). Misalignment may
cause damage.
Confirm that “HTR DISBL” or “HTR DSBL” is written near Step 12
J29 on the wiring diagram (view “H” and “ I “ on page Power On the system pack at the GFCI
1). If J29 isn’t thus labeled as Heater Disable, the 3S or circuit breaker.
heater is incompatible with this system pack.
If something is already connected to J29, F
please contact our technical support at
techsupport@balboawater.com.
Step 9
If the agency prefix is BP501 or BP6, use an applicator
stick to apply Nyogel 760G to the three metal contacts
(G) on J46. System pack with cover
3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.