Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

3S Heater installation guide 42332_rev B

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

1 3S HEATER

Heater Installation Guide 42332_rev B

INSTALLATION GUIDE
Balboa Generic Model Series BP2000 BP2100 BP6013 BP501 BP601
Agency Prefix B20 BP21 BP21 BP501 BP6

of the jumper picture. If “HTR DISBL” or “HTR DSBL”


WARNING (abbreviations for Heater Disable) is not near J29, then
the 3S heater is incompatible with this system pack.
There are no user serviceable parts inside the system. 5C - If something is already connected to J29,
All connections must be made by a qualified electrician please contact our technical support at
in accordance with the country or local electrical codes techsupport@balboawater.com.
in effect at the time of installation.
6 - Each connector is labeled on the system pack circuit
board. The text is small, so a flashlight and magnifying
Installation Precautions glass can help with identification.
7 - Do not bump or bend the heater posts.
1 - Make sure the system pack is powered Off at 8 - Do not pull or apply unnecessary pressure
the GFCI or circuit breaker before starting the to the heater connector wires.
installation process.
Wiring Diagram
2 - These instructions apply to system packs with one
of the following agency prefixes: BP20, BP21, BP501,
BP6. The agency prefix is noted on the system pack H
identification label (view page 2).
3 - The M7 temperature sensor connector has a
locking tab (A). Depress the tab before disconnecting I
the sensor from the circuit board. When installing
the new heater, make sure the locking tab is
aligned properly with the circuit board connector.
Misalignment may cause damage. The connectors are
small, so a flashlight and magnifying glass can help
with alignment. A Locking Tab
4 - The third temperature sensor switch connector has
alignment tabs (E). Make sure the tabs are aligned
properly with the circuit board connector.
Misalignment may cause damage.
The connectors are small, so a flashlight and
magnifying glass can help with alignment.
5A - Find J29 on the wiring diagram (H). The wiring
diagram is on the inside surface of the system pack
cover. J29 may be at the bottom right of the diagram E Alignment Tabs

of the board, or more toward the bottom center


of the board.
5B - Confirm that on the wiring diagram “HTR DISBL”
or “HTR DSBL” is written near J29 ( I ). It may be
above or below the “J29” text and may be on the
same side of the jumper picture or on the other side

3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.
2 Heater Installation Guide 42332_rev B

Nomenclature

AGENCY PREFIX Each connector is labeled


on the circuit board. In this
The agency prefix is noted
example the label is J29.
on the identification label,
The location of J29 may vary
which is on the top surface
depending on which system
of the system pack.
pack model you have. All
In this example the agency
other connector locations
prefix is BP20.
vary, depending on the
system pack model.
Identification label
Circuit Board Circuit Board Label

System Pack System Pack Without Cover J29 is a heater disable switch input.
Agency Prefixes: BP20, BP21, BP501, BP6

M7 Temperature Heater Third Temperature


A B E
Sensor Connectors Connector Sensor Switch
Connector

C D
Heater Mounting
Posts Nuts

3S Heater

3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.
3 Heater Installation Guide 42332_rev B

Installation Instructions
Step 1 Tools / Supplies
Power Off the system pack at the GFCI
or circuit breaker.

Step 2 3S Heater

Remove the system pack cover by loosening two


screws (F) with a phillips head screwdriver. Wrench, 3/8” (9.5mm),
open end

Step 3 Phillips screwdriver


If the agency prefix is BP501 or BP6, disconnect the
heater connector (B) from J46 on the circuit board.
If the agency prefix is BP20 or BP21, disconnect the Nyogel 760G
heater connector (B) from J44 on the circuit board.
.
Applicator stick
for Nyogel

Heater F
B
Connector

System pack with cover

3S Heater

3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.
4 Heater Installation Guide 42332_rev B

Step 4 If the agency prefix is BP20 or BP21, use an applicator


stick to apply Nyogel 760G to the three metal contacts
Disconnect both M7 temperature sensors (A) from J16 (G) on J44.
and J17 on the circuit board. The connectors have Cover all surfaces of the metal contacts. Nyogel
locking tabs (refer to page 1). Depress the locking tab provides corrosion protection.
before disconnecting the sensor from the circuit board.

Step 5
Remove the heater from the system pack. The heater
is mounted to the system pack with two nuts on
mounting posts (D). Loosen the nuts with an open
ended 3/8” (9.5mm) wrench, and remove the heater.

Step 6
Install the new heater into the system pack, and
tighten the two mounting nuts (D).
G Three Metal Contacts

Step 7 Step 10
Connect the M7 temperature sensors (A) to J16 and If the agency prefix is BP501 or BP6, connect the heater
J17 on the circuit board. The locking tabs only align connector (B) to J46 on the circuit board.
one way on the J16 and J17 connectors (refer to page
If the agency prefix is BP20 or BP21, connect the heater
1). Misalignment may cause damage.
connector (B) to J44 on the circuit board.
You will hear a click when the connection is secure.
Step 8
Connect the third temperature sensor switch (view “E” Step 11
on page 2) to the circuit board at J29. The connector Install the system pack lid and tighten the two
has alignment tabs that only align one way on the J29 mounting screws (F).
connector (view “E” on page 1). Misalignment may
cause damage.
Confirm that “HTR DISBL” or “HTR DSBL” is written near Step 12
J29 on the wiring diagram (view “H” and “ I “ on page Power On the system pack at the GFCI
1). If J29 isn’t thus labeled as Heater Disable, the 3S or circuit breaker.
heater is incompatible with this system pack.
If something is already connected to J29, F
please contact our technical support at
techsupport@balboawater.com.

Step 9
If the agency prefix is BP501 or BP6, use an applicator
stick to apply Nyogel 760G to the three metal contacts
(G) on J46. System pack with cover

3S Heater Installation
©2019 Balboa Water Group. Single Source Solution. All rights reserved.
3030 Airway Avenue, Suite B | Costa Mesa, CA 92626 | p 714.384.0384 | www.balboawater.com
Specifications subject to change without notice.

You might also like