REINFORCEMENT DETAILS OF STRUCTURAL MEMBERS FOR THE CONSTRUCTION OF GODOWN BUILDING AT

LUMBAJONG LAMPS LTD. IN LUMBAJONG CONSTITUENCY UNDER OFFICE OF THE ADDITIONAL REGISTRAR
OF COOPERATIVE SOCIETIES (HILLS) DIPHU.
ALL DIMENSIONS ARE IN MILLIMETER
SCALE: NOT TO SCALE.
COLUMN ABOVE PLINTH LEVEL
COLUMN BELOW PLINTH LEVEL
200 mm

250 mm 4- Nos. 12 mm ф TMT Bars

6- Nos. 12 mm ф TMT Bars


2- Nos. 12 mm ф TMT Bars 200 mm

250 mm

2-Legged 6 mm ф Stirrups @100mm C/C Upto Plinth and Upto 1000mm from Colum Beam Joint.

COVER (25 mm)


COVER (25 mm)

POST-PLATE BEAM
LINTEL BEAM

125 mm
125 mm
4- Nos. 10 mm ф TMT Bars
4- Nos. 10 mm ф TMT Bars

150 mm
150 mm

2-Legged 6 mm ф Stirrups @100mm C/C From End point to L/4 Distance & 150mm C/C by L/2
Distance at Mid Section,Where L= Span of Beam.

COVER (15 mm)


COVER (15 mm)

L/4 L/2 L/4

Ldt

Ldt = 40 d,
d = Diameter of
Bar
6 mm ф @130mm
6 mm ф @100mm 6 mm ф @130mm C/C (STIRRUP)
C/C (STIRRUP) C/C (STIRRUP)

TIE - BEAM
135®

200 mm

4- Nos. 12 mm ф TMT Bars

250 mm

2- Legged 6 mm ф Stirrups @100mm C/C From End point to L/4 Distance & 130mm C/C by L/2
75 mm
Distance at Mid Section,Where L= Span of Beam.

STIRRUP HOOK IN CLOSED TIES


COVER (15 mm)