Task Name Duration Start Finish

1139.42
NMJ Rehab 1 Cluster (A to G & Hospital) 3/27/2023 12/30/2026
days
Preliminaries 1 day 3/27/2023 3/28/2023
1139.42
Project Milestone 3/27/2023 12/30/2026
days

Commencement of Project 0 days 3/27/2023 3/27/2023

Completion of Project 0 days 12/30/2026 12/30/2026


Mobilization Works 30 days 4/4/2023 5/10/2023
Submission of Approval of Project Site
5 days 4/7/2023 4/13/2023
Layout
Site Office Layout 4 days 4/10/2023 4/14/2023
Mobilization of key Site Staff and office
30 days 4/4/2023 5/10/2023
equipments
Pre construction Activities 786 days 4/18/2023 11/22/2025
Materials & WMS submission 786 days 4/18/2023 11/22/2025
Submission 782 days 4/18/2023 11/17/2025

RMC Mix Design 2 days 4/18/2023 4/20/2023

Waterproofing 2 days 5/12/2023 5/15/2023

Steel Reinforcement 2 days 5/15/2023 5/17/2023

Aluminium Scheme Drawing with


2 days 4/22/2024 4/24/2024
Method statement

Block/Brick 2 days 11/7/2024 11/9/2024

Tiles 2 days 10/16/2025 10/19/2025

Stones 2 days 10/16/2025 10/19/2025

Wooden Door & Windows 2 days 11/8/2025 11/10/2025


Metal Door & Window 2 days 11/8/2025 11/10/2025
Paint 2 days 9/17/2025 9/19/2025
CI Pipes 2 days 8/19/2025 8/21/2025
Hume Pipe 2 days 8/19/2025 8/21/2025
Insulation Material 2 days 8/19/2025 8/21/2025
Sanitary Fixtures 2 days 11/15/2025 11/17/2025
CP Fittings 2 days 11/15/2025 11/17/2025
Motor 2 days 8/19/2025 8/21/2025
Valves 2 days 8/19/2025 8/21/2025
Pipe Joints 2 days 8/19/2025 8/21/2025
Pipes 2 days 8/19/2025 8/21/2025
Fire Hydrants 2 days 8/19/2025 8/21/2025
Hand Held Fire Extinguisher 2 days 8/19/2025 8/21/2025
Connectors 2 days 11/15/2025 11/17/2025
Pump Sets 2 days 11/15/2025 11/17/2025
Conduits 2 days 11/15/2025 11/17/2025
Cables 2 days 11/15/2025 11/17/2025
Approvals 783 days 4/21/2023 11/22/2025
RMC Mix Design 14 days 4/21/2023 5/9/2023
Waterproofing 14 days 5/16/2023 6/1/2023
Steel Reinforcement 14 days 5/18/2023 6/4/2023
Aluminium Scheme Drawing with
3 days 4/25/2024 4/29/2024
Method statement
Block/Brick 3 days 11/11/2024 11/14/2024
Tiles 3 days 10/20/2025 10/24/2025
Stones 3 days 10/20/2025 10/24/2025
Wooden Door & Windows 3 days 11/12/2025 11/15/2025
Metal Door & Window 3 days 11/12/2025 11/15/2025
Paint 3 days 9/20/2025 9/24/2025
CI Pipes 3 days 8/22/2025 8/26/2025
Hume Pipe 3 days 8/22/2025 8/26/2025
Insulation Material 3 days 8/22/2025 8/26/2025
Sanitary Fixtures 3 days 11/19/2025 11/22/2025
CP Fittings 3 days 11/19/2025 11/22/2025
Motor 3 days 8/22/2025 8/26/2025
Valves 3 days 8/22/2025 8/26/2025
Pipe Joints 3 days 8/22/2025 8/26/2025
Pipes 3 days 8/22/2025 8/26/2025
Fire Hydrants 3 days 8/22/2025 8/26/2025
Hand Held Fire Extinguisher 3 days 8/22/2025 8/26/2025
Connectors 3 days 11/19/2025 11/22/2025
Pump Sets 3 days 11/19/2025 11/22/2025
Conduits 3 days 11/19/2025 11/22/2025
Cables 3 days 11/19/2025 11/22/2025

Drawings 560.58 days 5/8/2023 3/13/2025

Submissions 535.58 days 5/8/2023 2/11/2025

Wing G Foundation Structural 10 days 6/1/2023 6/12/2023

Wing G Setting Out & Centre Line Plan 8 days 6/1/2023 6/10/2023

Wing G Colums & Core Wall up to GF 11 days 6/10/2023 6/23/2023

Wing G Colums & Core Wall above GF 33 days 9/25/2023 11/4/2023


Wing G structural Floor Plans (upto 1st
65 days 8/8/2023 10/26/2023
floor)
Wing G architectural Floor Plans (upto
29 days 8/9/2023 9/13/2023
1st floor)
Wing G structural Floor Plans (above 1st
56 days 10/12/2023 12/18/2023
floor)
Wing G architectural Floor Plans Typical
44 days 8/29/2023 10/20/2023
Floors ( above 1st floor)
Wing G Plumbing Drawings 86 days 7/22/2023 11/3/2023
Wing G Electrical Drawings 83 days 8/2/2023 11/11/2023
Wing G HVAC Drawings 83 days 8/2/2023 11/11/2023
Wing G FPS Drawings 81 days 8/2/2023 11/8/2023
Wing F Foundation Structural 19 days 5/8/2023 5/30/2023

Wing F Setting Out & Centre Line Plan 7 days 6/29/2023 7/7/2023

Wing F Colums & Core Wall up to GF 13 days 6/13/2023 6/28/2023

Wing F Colums & Core Wall above GF 38 days 10/15/2023 11/30/2023

Wing F structural Floor Plans (upto 1st


62 days 8/26/2023 11/9/2023
floor)
Wing F architectural Floor Plans (upto 1st
44 days 8/2/2023 9/23/2023
floor)
Wing F structural Floor Plans (above 1st
57 days 10/25/2023 1/1/2024
floor)
Wing F architectural Floor Plans Typical
38 days 9/13/2023 10/30/2023
Floors ( above 1st floor)
Wing F Plumbing Drawings 96 days 7/21/2023 11/15/2023
Wing F Electrical Drawings 93 days 8/2/2023 11/23/2023
Wing F HVAC Drawings 93 days 8/2/2023 11/23/2023
Wing F FPS Drawings 90 days 8/2/2023 11/20/2023
Wing E Foundation Structural 19 days 6/20/2023 7/12/2023

Wing E Setting Out & Centre Line Plan 10 days 7/2/2023 7/13/2023

Wing E Colums & Core Wall up to GF 12 days 7/6/2023 7/20/2023

Wing E Colums & Core Wall above GF 24 days 10/30/2023 11/27/2023

Wing E structural Floor Plans (upto 1st


53 days 9/10/2023 11/14/2023
floor)
Wing E architectural Floor Plans (upto 1st
51 days 8/2/2023 10/3/2023
floor)
Wing E structural Floor Plans (above 1st
62 days 11/9/2023 1/22/2024
floor)
Wing E architectural Floor Plans Typical
36 days 9/23/2023 11/7/2023
Floors ( above 1st floor)
Wing E Plumbing Drawings 106 days 7/21/2023 11/27/2023
Wing E Electrical Drawings 103 days 8/2/2023 12/5/2023
Wing E HVAC Drawings 103 days 8/2/2023 12/5/2023
Wing E FPS Drawings 101 days 8/2/2023 12/2/2023
Wing D & C Foundation Structural 19 days 6/20/2023 7/12/2023
Wing D &C Setting Out & Centre Line
10 days 7/2/2023 7/13/2023
Plan

Wing D & C Colums & Core Wall up to GF 13 days 7/5/2023 7/20/2023

Wing D &C Colums & Core Wall above GF 40 days 11/14/2023 12/30/2023

Wing D & C structural Floor Plans (upto


53 days 9/25/2023 11/29/2023
1st floor)
Wing D &C architectural Floor Plans (upto
60 days 8/2/2023 10/13/2023
1st floor)
Wing D & C structural Floor Plans (above
57 days 11/3/2023 1/10/2024
1st floor)
Wing D & C architectural Floor Plans
340 days 10/3/2023 11/17/2024
Typical Floors ( above 1st floor)
Wing D & C Plumbing Drawings 117 days 7/21/2023 12/9/2023
Wing D & C Electrical Drawings 113 days 8/2/2023 12/17/2023
Wing D & C HVAC Drawings 113 days 8/2/2023 12/17/2023
Wing D &C FPS Drawings 111 days 8/2/2023 12/14/2023
Wing A & B Foundation Structural 15 days 11/26/2023 12/13/2023
Wing A & B Setting Out & Centre Line
7 days 12/15/2023 12/23/2023
Plan

Wing A & B Colums & Core Wall up to GF 10 days 1/1/2024 1/12/2024

Wing A & B Colums & Core Wall above


10 days 1/1/2024 1/12/2024
GF
Wing A & B structural Floor Plans (upto
10 days 1/16/2024 1/28/2024
1st floor)
Wing A & B architectural Floor Plans
10 days 1/16/2024 1/28/2024
(upto 1st floor)
Wing A & B structural Floor Plans (above
10 days 1/31/2025 2/11/2025
1st floor)
Wing A & B architectural Floor Plans
10 days 1/31/2024 2/11/2024
Typical Floors ( above 1st floor)
Wing A & B Plumbing Drawings 10 days 3/16/2024 3/28/2024
Wing A & B Electrical Drawings 10 days 3/10/2024 3/21/2024
Wing A & B HVAC Drawings 10 days 3/5/2024 3/16/2024
Wing A & B FPS Drawings 10 days 3/16/2024 3/28/2024
External Development Drawing 25 days 1/4/2024 2/3/2024
External MEP Drawing 29 days 1/4/2024 2/8/2024

Approvals 535.67 days 6/7/2023 3/13/2025


Wing G Founation Structural 10 days 6/7/2023 6/18/2023

Wing G Setting Out & Centre Line Plan 7 days 6/10/2023 6/18/2023

Wing G Colums & Core Wall up to GF 15 days 6/24/2023 7/11/2023

Wing G Colums & Core Wall above GF 33 days 10/13/2023 11/23/2023

Wing G Floor Plans 65 days 8/26/2023 11/14/2023


Wing G architectural Floor Plans 29 days 8/28/2023 10/1/2023
Wing G Floor Plans Typical Floors 56 days 10/31/2023 1/5/2024
Wing G architectural Floor Plans Typical
44 days 9/15/2023 11/8/2023
Floors
Wing G Plumbing Drawings 86 days 8/9/2023 11/22/2023
Wing G Electrical Drawings 83 days 8/21/2023 11/29/2023
Wing G HVAC Drawings 83 days 8/21/2023 11/29/2023
Wing G FPS Drawings 81 days 8/21/2023 11/27/2023
Wing F Founation Structural 15 days 7/8/2023 7/25/2023

Wing F Setting Out & Centre Line Plan 15 days 7/8/2023 7/25/2023

Wing F Colums & Core Wall up to GF 15 days 6/29/2023 7/16/2023

Wing F Colums & Core Wall above GF 38 days 11/3/2023 12/18/2023

Wing F Floor Plans 62 days 9/13/2023 11/28/2023


Wing F architectural Floor Plans 44 days 8/21/2023 10/12/2023
Wing F Floor Plans Typical Floors 57 days 11/13/2023 1/19/2024
Wing F architectural Floor Plans Typical
38 days 10/1/2023 11/17/2023
Floors
Wing F Plumbing Drawings 96 days 8/8/2023 12/3/2023
Wing F Electrical Drawings 93 days 8/21/2023 12/11/2023
Wing F HVAC Drawings 93 days 8/21/2023 12/11/2023
Wing F FPS Drawings 90 days 8/21/2023 12/8/2023
Wing E Founation Structural 19 days 7/8/2023 7/30/2023

Wing E Setting Out & Centre Line Plan 15 days 7/14/2023 7/31/2023

Wing E Colums & Core Wall up to GF 15 days 7/20/2023 8/7/2023

Wing E Colums & Core Wall above GF 24 days 11/17/2023 12/15/2023

Wing E Floor Plans 53 days 9/28/2023 12/2/2023

Wing E architectural Floor Plans 51 days 8/21/2023 10/21/2023

Wing E Floor Plans Typical Floors 62 days 11/28/2023 2/10/2024


Wing E architectural Floor Plans Typical
36 days 10/12/2023 11/25/2023
Floors

Wing E Plumbing Drawings 106 days 8/8/2023 12/14/2023


Wing E Electrical Drawings 103 days 8/21/2023 12/23/2023

Wing E HVAC Drawings 103 days 8/21/2023 12/23/2023

Wing E FPS Drawings 101 days 8/21/2023 12/20/2023

Wing D & C Foundation Structural 19 days 7/8/2023 7/30/2023


Wing D & C Setting Out & Centre Line
15 days 7/14/2023 7/31/2023
Plan

Wing D &C Colums & Core Wall up to GF 15 days 7/21/2023 8/7/2023

Wing D & C Colums & Core Wall above


40 days 12/1/2023 1/17/2024
GF
Wing D & C Floor Plans 53 days 10/13/2023 12/16/2023
Wing D & C architectural Floor Plans 50 days 8/21/2023 10/19/2023
Wing D & C Floor Plans Typical Floors 56 days 11/16/2023 1/21/2024
Wing D & C architectural Floor Plans
340 days 10/20/2023 12/5/2024
Typical Floors
Wing D & C Plumbing Drawings 117 days 8/8/2023 12/27/2023
Wing D & C Electrical Drawings 113 days 8/21/2023 1/4/2024
Wing D & C HVAC Drawings 113 days 8/21/2023 1/4/2024
Wing D & C FPS Drawings 111 days 8/21/2023 1/1/2024
Wing A & B Foundation Structural 15 days 1/1/2024 1/18/2024
Wing A & B Setting Out & Centre Line
7 days 1/11/2024 1/19/2024
Plan

Wing A & B Colums & Core Wall up to GF 10 days 2/1/2024 2/12/2024

Wing A & B Colums & Core Wall above


10 days 2/1/2024 2/12/2024
GF
Wing A & B structural Floor Plans (upto
10 days 2/15/2024 2/27/2024
1st floor)
Wing A & B architectural Floor Plans
10 days 2/15/2024 2/27/2024
(upto 1st floor)
Wing A & B structural Floor Plans (above
10 days 3/1/2025 3/13/2025
1st floor)
Wing A & B architectural Floor Plans
10 days 2/29/2024 3/12/2024
Typical Floors ( above 1st floor)
Wing A & B Plumbing Drawings 10 days 4/16/2024 4/27/2024
Wing A & B Electrical Drawings 10 days 4/10/2024 4/21/2024
Wing A & B HVAC Drawings 10 days 4/5/2024 4/16/2024
Wing A & B FPS Drawings 10 days 4/16/2024 4/27/2024
External Development Drawing 25 days 1/22/2024 2/21/2024
External MEP Drawing 29 days 1/22/2024 2/26/2024
Procurement 821 days 4/8/2023 12/24/2025
RMC Mix Design 1 day 6/10/2023 6/11/2023
Waterproofing 20 days 4/24/2023 5/18/2023
Steel Reinforcement 80 days 4/8/2023 7/13/2023
Conventional Formwork Materials 30 days 5/19/2023 6/24/2023
Aluminium Shuttering Material 45 days 5/11/2024 7/3/2024
Block/Brick 20 days 11/19/2024 12/13/2024
Tiles 20 days 10/29/2025 11/22/2025
Stones 30 days 10/29/2025 12/4/2025
Wooden Door & Windows 30 days 7/14/2025 8/20/2025
Metal Door & Window 30 days 7/14/2025 8/20/2025
Paint 30 days 9/23/2025 11/1/2025
CI Pipes 30 days 2/17/2025 3/25/2025
Hume Pipe 30 days 2/17/2025 3/25/2025
Sanitary Fixtures 30 days 11/19/2025 12/24/2025
CP Fittings 30 days 11/19/2025 12/24/2025
Motor 30 days 11/19/2025 12/24/2025
Valves 30 days 11/19/2025 12/24/2025
Pipe Joints 30 days 8/19/2025 9/23/2025
Pipes 30 days 8/19/2025 9/23/2025
Fire Hydrants 30 days 8/19/2025 9/23/2025
Hand Held Fire Extinguisher 30 days 8/19/2025 9/23/2025
Connectors 30 days 8/19/2025 9/23/2025
Pump Sets 30 days 8/19/2025 9/23/2025
Conduits 30 days 8/19/2025 9/23/2025
ELV (PA System) 40 days 9/26/2025 11/16/2025
Cables 30 days 8/19/2025 9/23/2025
Jockey Pump 45 days 6/25/2025 8/19/2025
Lift 60 days 6/29/2025 9/9/2025
1139.42
Construction Activities 3/27/2023 12/30/2026
days
Wing G 948 days 3/27/2023 5/13/2026
Sub Structure 276 days 3/27/2023 2/22/2024

Excavation level 26 days 3/27/2023 4/26/2023

Inclined Rock Anchor 18 days 4/11/2023 5/3/2023

Excavation Level 2 18 days 4/22/2023 5/15/2023


Inclined Rock Anchor 21 days 5/5/2023 5/30/2023
Excavation Level 3 20 days 5/23/2023 6/16/2023
Anti Termitte 8 days 6/11/2023 6/21/2023

Plain Cement Concrete 8 days 6/11/2023 6/21/2023

Passive Rock Anchor 29 days 7/13/2023 8/17/2023


Waterproofing below raft 28 days 6/17/2023 7/20/2023

Raft Reinforcement 34 days 6/20/2023 7/29/2023

Raft Shuttering 34 days 6/24/2023 8/3/2023

Raft Concrete 12 days 7/29/2023 8/12/2023


Basement 3 (UGT) Pour 1 52 days 8/14/2023 10/17/2023
Col & RW Reinforcement 22 days 8/14/2023 9/10/2023

Col & RW Shuttering 27 days 8/21/2023 9/22/2023

Col & RW Concrete 27 days 8/26/2023 9/27/2023


UGT top Slab Decking 31 days 8/28/2023 10/5/2023
UGT & STP top Slab RF 32 days 9/4/2023 10/13/2023
UGT & STP top Slab concrete 1 day 10/16/2023 10/17/2023
Basement - 3 Slab Pour 2 46 days 9/27/2023 11/23/2023
Col & RW Reinforcement 22 days 9/27/2023 10/25/2023
Col & RW Shuttering 27 days 10/4/2023 11/6/2023
Col & RW Concrete 27 days 10/9/2023 11/10/2023
Slab Decking- Staircase shuttering
29 days 10/12/2023 11/17/2023
included
Slab RF 27 days 10/17/2023 11/19/2023
Slab Concrete 1 day 11/22/2023 11/23/2023
Basement 2 Slab- Pour 1 36 days 10/19/2023 12/2/2023
Col & RW Reinforcement 19 days 10/19/2023 11/11/2023
Col & RW Shuttering 17 days 10/26/2023 11/16/2023
Col & RW Concrete 15 days 11/1/2023 11/19/2023
Slab Decking 17 days 11/3/2023 11/24/2023
Slab RF 16 days 11/10/2023 11/30/2023
Slab Concrete 1 day 12/1/2023 12/2/2023
Basement 2 Slab- Pour 2 39 days 11/25/2023 1/10/2024
Col & RW Reinforcement 19 days 11/25/2023 12/18/2023
Col & RW Shuttering 17 days 12/1/2023 12/21/2023
Col & RW Concrete 15 days 12/7/2023 12/25/2023
Slab Decking 17 days 12/12/2023 1/1/2024
Slab RF 16 days 12/19/2023 1/6/2024
Slab Concrete 1 day 1/9/2024 1/10/2024
Basement 1 Slab- Pour 1 41 days 12/5/2023 1/22/2024
Col & RW Reinforcement 19 days 12/5/2023 12/27/2023
Col & RW Shuttering 17 days 12/11/2023 12/30/2023
Col & RW Concrete 16 days 12/16/2023 1/4/2024
Slab Decking 19 days 12/19/2023 1/10/2024
Slab RF 21 days 12/26/2023 1/19/2024
Slab Concrete 1 day 1/21/2024 1/22/2024
Basement 1 Slab- Pour 2 34 days 1/11/2024 2/22/2024
Col & RW Reinforcement 18 days 1/11/2024 2/3/2024
Col & RW Shuttering 15 days 1/16/2024 2/4/2024
Col & RW Concrete 13 days 1/22/2024 2/7/2024
Slab Decking 15 days 1/24/2024 2/12/2024
Slab RF 15 days 2/2/2024 2/19/2024
Slab Concrete 1 day 2/21/2024 2/22/2024
Super Structure 483 days 1/23/2024 8/28/2025
GF slab- Pour 1 40 days 1/23/2024 3/12/2024

Col Reinforcement 19 days 1/23/2024 2/16/2024

Col Shuttering 17 days 1/29/2024 2/18/2024


Col Concrete 16 days 2/4/2024 2/23/2024
Slab Decking 19 days 2/6/2024 2/29/2024
Slab RF 21 days 2/14/2024 3/9/2024
Slab Concrete 1 day 3/11/2024 3/12/2024
GF slab- Pour 2 41 days 2/24/2024 4/13/2024
Col Reinforcement 19 days 2/24/2024 3/18/2024
Col Shuttering 17 days 3/1/2024 3/21/2024
Col Concrete 16 days 3/7/2024 3/27/2024
Slab Decking 19 days 3/9/2024 4/2/2024
Slab RF 21 days 3/16/2024 4/11/2024
Slab Concrete 1 day 4/12/2024 4/13/2024
Plinth Level Checking 15 days 4/15/2024 5/3/2024
Podium 1 Slab 34 days 5/5/2024 6/14/2024
Col Reinforcement 14 days 5/5/2024 5/21/2024
Col Shuttering 18 days 5/8/2024 5/30/2024
Col Concrete 19 days 5/11/2024 6/2/2024
Slab Decking 21 days 5/13/2024 6/7/2024
Slab RF 20 days 5/19/2024 6/12/2024
Slab Concrete 1 day 6/13/2024 6/14/2024
Typical 1 35 days 6/15/2024 7/26/2024

Vertical Reinforcement 13 days 6/15/2024 7/1/2024

Vertical Shuttering 19 days 6/19/2024 7/11/2024


Slab Decking 23 days 6/25/2024 7/22/2024
Beam & slab Reinforcement 21 days 6/29/2024 7/24/2024
Slab Concrete 1 day 7/25/2024 7/26/2024
Typical 2 35 days 7/28/2024 9/9/2024
Vertical Reinforcement 13 days 7/28/2024 8/12/2024
Vertical Shuttering 19 days 7/31/2024 8/24/2024
Slab Decking 23 days 8/6/2024 9/4/2024
Beam & slab Reinforcement 21 days 8/11/2024 9/6/2024
Slab Concrete 1 day 9/7/2024 9/9/2024
Typical 3 11 days 9/10/2024 9/23/2024
Vertical Reinforcement 4 days 9/10/2024 9/14/2024
Vertical Shuttering 5 days 9/12/2024 9/18/2024
Slab Decking 4 days 9/14/2024 9/19/2024
Beam & slab Reinforcement 3 days 9/17/2024 9/20/2024
Slab Concrete 1 day 9/21/2024 9/23/2024
Typical 4 11 days 9/24/2024 10/8/2024
Vertical Reinforcement 4 days 9/24/2024 9/28/2024
Vertical Shuttering 5 days 9/26/2024 10/3/2024
Slab Decking 4 days 9/28/2024 10/4/2024
Beam & slab Reinforcement 3 days 10/1/2024 10/5/2024
Slab Concrete 1 day 10/7/2024 10/8/2024
Typical 5 11 days 10/9/2024 10/23/2024
Vertical Reinforcement 4 days 10/9/2024 10/15/2024
Vertical Shuttering 5 days 10/11/2024 10/18/2024
Slab Decking 4 days 10/15/2024 10/19/2024
Beam & slab Reinforcement 3 days 10/17/2024 10/21/2024
Slab Concrete 1 day 10/22/2024 10/23/2024
Typical 6 11 days 10/24/2024 11/7/2024
Vertical Reinforcement 4 days 10/24/2024 10/29/2024
Vertical Shuttering 5 days 10/26/2024 11/2/2024
Slab Decking 4 days 10/29/2024 11/4/2024
Beam & slab Reinforcement 3 days 11/1/2024 11/5/2024
Slab Concrete 1 day 11/6/2024 11/7/2024
Typical 7 (Refuge Floor) 15 days 11/8/2024 11/26/2024
Vertical Reinforcement 7 days 11/8/2024 11/17/2024
Vertical Shuttering 9 days 11/11/2024 11/21/2024
Slab Decking 8 days 11/16/2024 11/25/2024
Beam & slab Reinforcement 5 days 11/18/2024 11/24/2024

Slab Concrete 1 day 11/25/2024 11/26/2024

Typical 8 15 days 11/28/2024 12/15/2024


Vertical Reinforcement 7 days 11/28/2024 12/6/2024
Vertical Shuttering 9 days 11/30/2024 12/11/2024
Slab Decking 8 days 12/5/2024 12/14/2024
Beam & slab Reinforcement 5 days 12/7/2024 12/13/2024
Slab Concrete 1 day 12/14/2024 12/15/2024
Typical 9 11 days 12/17/2024 12/30/2024
Vertical Reinforcement 4 days 12/17/2024 12/21/2024
Vertical Shuttering 5 days 12/19/2024 12/25/2024
Slab Decking 4 days 12/21/2024 12/26/2024
Beam & slab Reinforcement 3 days 12/24/2024 12/27/2024
Slab Concrete 1 day 12/28/2024 12/30/2024
Typical 10 11 days 12/31/2024 1/13/2025
Vertical Reinforcement 4 days 12/31/2024 1/4/2025
Vertical Shuttering 5 days 1/2/2025 1/8/2025
Slab Decking 4 days 1/4/2025 1/9/2025
Beam & slab Reinforcement 3 days 1/7/2025 1/10/2025
Slab Concrete 1 day 1/11/2025 1/13/2025
Typical 11 11 days 1/14/2025 1/27/2025
Vertical Reinforcement 4 days 1/14/2025 1/18/2025
Vertical Shuttering 5 days 1/16/2025 1/22/2025
Slab Decking 4 days 1/18/2025 1/23/2025
Beam & slab Reinforcement 3 days 1/21/2025 1/24/2025
Slab Concrete 1 day 1/25/2025 1/27/2025
Typical 12 11 days 1/29/2025 2/11/2025
Vertical Reinforcement 4 days 1/29/2025 2/2/2025
Vertical Shuttering 5 days 1/31/2025 2/6/2025
Slab Decking 4 days 2/3/2025 2/7/2025
Beam & slab Reinforcement 3 days 2/5/2025 2/8/2025
Slab Concrete 1 day 2/10/2025 2/11/2025
Typical 13 11 days 2/12/2025 2/25/2025
Vertical Reinforcement 4 days 2/12/2025 2/17/2025
Vertical Shuttering 5 days 2/14/2025 2/20/2025
Slab Decking 4 days 2/17/2025 2/21/2025
Beam & slab Reinforcement 3 days 2/19/2025 2/22/2025
Slab Concrete 1 day 2/24/2025 2/25/2025
Typical 14 (Refuge Floor) 15 days 2/26/2025 3/17/2025
Vertical Reinforcement 7 days 2/26/2025 3/6/2025
Vertical Shuttering 9 days 2/28/2025 3/11/2025
Slab Decking 8 days 3/5/2025 3/15/2025
Beam & slab Reinforcement 5 days 3/7/2025 3/13/2025
Slab Concrete 1 day 3/15/2025 3/17/2025
Typical 15 15 days 3/18/2025 4/4/2025
Vertical Reinforcement 7 days 3/18/2025 3/26/2025
Vertical Shuttering 9 days 3/20/2025 3/31/2025
Slab Decking 8 days 3/25/2025 4/3/2025
Beam & slab Reinforcement 5 days 3/27/2025 4/2/2025
Slab Concrete 1 day 4/3/2025 4/4/2025
Typical 16 11 days 4/6/2025 4/19/2025
Vertical Reinforcement 4 days 4/6/2025 4/10/2025
Vertical Shuttering 5 days 4/8/2025 4/14/2025
Slab Decking 4 days 4/11/2025 4/15/2025
Beam & slab Reinforcement 3 days 4/13/2025 4/16/2025
Slab Concrete 1 day 4/18/2025 4/19/2025
Typical 17 11 days 4/20/2025 5/4/2025
Vertical Reinforcement 4 days 4/20/2025 4/25/2025
Vertical Shuttering 5 days 4/23/2025 4/28/2025
Slab Decking 4 days 4/25/2025 4/30/2025
Beam & slab Reinforcement 3 days 4/27/2025 5/2/2025
Slab Concrete 1 day 5/3/2025 5/4/2025
Typical 18 11 days 5/6/2025 5/19/2025
Vertical Reinforcement 4 days 5/6/2025 5/10/2025
Vertical Shuttering 5 days 5/8/2025 5/14/2025
Slab Decking 4 days 5/10/2025 5/15/2025
Beam & slab Reinforcement 3 days 5/13/2025 5/16/2025
Slab Concrete 1 day 5/17/2025 5/19/2025
Typical 19 11 days 5/20/2025 6/2/2025
Vertical Reinforcement 4 days 5/20/2025 5/24/2025
Vertical Shuttering 5 days 5/22/2025 5/28/2025
Slab Decking 4 days 5/24/2025 5/29/2025
Beam & slab Reinforcement 3 days 5/27/2025 5/30/2025
Slab Concrete 1 day 5/31/2025 6/2/2025
Typical 20 11 days 6/3/2025 6/16/2025
Vertical Reinforcement 4 days 6/3/2025 6/7/2025
Vertical Shuttering 5 days 6/5/2025 6/11/2025
Slab Decking 4 days 6/7/2025 6/12/2025
Beam & slab Reinforcement 3 days 6/10/2025 6/13/2025
Slab Concrete 1 day 6/14/2025 6/16/2025
Typical 21 (Refuge Floor) 15 days 6/17/2025 7/4/2025
Vertical Reinforcement 7 days 6/17/2025 6/25/2025
Vertical Shuttering 9 days 6/19/2025 6/30/2025
Slab Decking 8 days 6/24/2025 7/3/2025
Beam & slab Reinforcement 5 days 6/26/2025 7/2/2025
Slab Concrete 1 day 7/3/2025 7/4/2025
Typical 22 11 days 7/6/2025 7/19/2025
Vertical Reinforcement 4 days 7/6/2025 7/10/2025
Vertical Shuttering 5 days 7/8/2025 7/14/2025
Slab Decking 4 days 7/11/2025 7/15/2025
Beam & slab Reinforcement 3 days 7/13/2025 7/16/2025
Slab Concrete 1 day 7/18/2025 7/19/2025
Terrace Floor 11 days 7/20/2025 8/2/2025
Vertical Reinforcement 4 days 7/20/2025 7/25/2025
Vertical Shuttering 5 days 7/23/2025 7/28/2025
Slab Decking 4 days 7/25/2025 7/30/2025
Beam & slab Reinforcement 3 days 7/27/2025 7/31/2025
Slab Concrete 1 day 8/1/2025 8/2/2025
OHT LMR 20 days 8/4/2025 8/28/2025
Col RF 6 days 8/4/2025 8/11/2025

Col Shuttering 8 days 8/6/2025 8/16/2025

Col Concrete 8 days 8/8/2025 8/19/2025


Beam & Slab Decking (LMR & OHT) 11 days 8/9/2025 8/23/2025
Beam & Slab RF 12 days 8/11/2025 8/26/2025

Concrete 1 day 8/27/2025 8/28/2025

Finishing Works 419 days 12/13/2024 5/3/2026


Blockwork 279 days 12/13/2024 11/15/2025

Basement 3 9 days 12/13/2024 12/24/2024

Basement 2 9 days 12/25/2024 1/4/2025

Basement 1 9 days 1/6/2025 1/16/2025

GF 9 days 1/17/2025 1/29/2025

Typical 1 9 days 1/30/2025 2/10/2025

Typical 2 9 days 2/11/2025 2/21/2025

Typical 3 9 days 2/22/2025 3/5/2025

Typical 4 9 days 3/6/2025 3/18/2025

Typical 5 9 days 3/19/2025 3/29/2025


Typical 6 9 days 3/31/2025 4/10/2025

Typical 7 (Refuge Floor) 9 days 4/12/2025 4/22/2025

Typical 8 9 days 4/24/2025 5/5/2025

Typical 9 9 days 5/7/2025 5/17/2025

Typical 10 9 days 5/19/2025 5/29/2025

Typical 11 9 days 5/30/2025 6/10/2025

Typical 12 9 days 6/11/2025 6/21/2025

Typical 13 9 days 6/23/2025 7/3/2025

Typical 14 (Refuge Floor) 9 days 7/5/2025 7/15/2025

Typical 15 9 days 7/17/2025 7/27/2025

Typical 16 9 days 7/29/2025 8/8/2025

Typical 17 9 days 8/9/2025 8/21/2025

Typical 18 9 days 8/22/2025 9/2/2025

Typical 19 9 days 9/3/2025 9/13/2025


Typical 20 9 days 9/15/2025 9/25/2025

Typical 21 (Refuge Floor) 9 days 9/26/2025 10/9/2025

Typical 22 9 days 10/10/2025 10/22/2025

Terrace Floor 9 days 10/23/2025 11/3/2025

OHT LMR 9 days 11/4/2025 11/15/2025


Plaster 280 days 12/18/2024 11/21/2025
Basement 3 10 days 12/18/2024 12/30/2024
Basement 2 10 days 12/30/2024 1/10/2025
Basement 1 10 days 1/10/2025 1/22/2025
GF 10 days 1/22/2025 2/4/2025
Typical 1 10 days 2/4/2025 2/15/2025
Typical 2 10 days 2/15/2025 2/27/2025
Typical 3 10 days 2/27/2025 3/11/2025

Typical 4 10 days 3/11/2025 3/24/2025

Typical 5 10 days 3/24/2025 4/4/2025


Typical 6 10 days 4/5/2025 4/16/2025
Typical 7 (Refuge Floor) 10 days 4/17/2025 4/28/2025
Typical 8 10 days 4/29/2025 5/11/2025
Typical 9 10 days 5/12/2025 5/23/2025
Typical 10 10 days 5/23/2025 6/4/2025
Typical 11 10 days 6/4/2025 6/16/2025
Typical 12 10 days 6/16/2025 6/27/2025
Typical 13 10 days 6/27/2025 7/9/2025
Typical 14 (Refuge Floor) 10 days 7/9/2025 7/21/2025
Typical 15 10 days 7/21/2025 8/2/2025
Typical 16 10 days 8/2/2025 8/14/2025
Typical 17 10 days 8/14/2025 8/27/2025
Typical 18 10 days 8/27/2025 9/8/2025
Typical 19 10 days 9/8/2025 9/19/2025
Typical 20 10 days 9/19/2025 10/3/2025
Typical 21 (Refuge Floor) 10 days 10/3/2025 10/15/2025
Typical 22 10 days 10/15/2025 10/28/2025
Terrace Floor 10 days 10/28/2025 11/9/2025
OHT LMR 10 days 11/9/2025 11/21/2025
Preparation of toilet waterproofing &
276 days 3/25/2025 2/21/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 3/25/2025 4/8/2025

Typical 2 12 days 4/8/2025 4/22/2025


Typical 3 12 days 4/23/2025 5/8/2025

Typical 4 12 days 5/8/2025 5/22/2025

Typical 5 12 days 5/22/2025 6/5/2025


Typical 6 12 days 6/5/2025 6/19/2025
Typical 7 (Refuge Floor) 12 days 6/19/2025 7/3/2025
Typical 8 12 days 7/3/2025 7/18/2025
Typical 9 12 days 7/18/2025 8/1/2025
Typical 10 12 days 8/1/2025 8/16/2025
Typical 11 12 days 8/16/2025 8/30/2025
Typical 12 12 days 8/30/2025 9/13/2025
Typical 13 12 days 9/13/2025 9/27/2025
Typical 14 (Refuge Floor) 12 days 9/28/2025 10/14/2025
Typical 15 12 days 10/14/2025 10/29/2025
Typical 16 12 days 10/29/2025 11/13/2025
Typical 17 12 days 11/13/2025 11/27/2025
Typical 18 12 days 11/27/2025 12/11/2025
Typical 19 12 days 12/11/2025 12/25/2025
Typical 20 12 days 12/25/2025 1/8/2026
Typical 21 (Refuge Floor) 12 days 1/8/2026 1/22/2026
Typical 22 12 days 1/23/2026 2/7/2026
Terrace Floor 12 days 2/7/2026 2/21/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 5/23/2025 2/25/2026
and Kitchen with Plaster
Typical 1 10 days 5/23/2025 6/4/2025
Typical 2 10 days 6/4/2025 6/16/2025
Typical 3 10 days 6/16/2025 6/27/2025

Typical 4 10 days 6/27/2025 7/9/2025

Typical 5 10 days 7/9/2025 7/21/2025


Typical 6 10 days 7/21/2025 8/2/2025
Typical 7 (Refuge Floor) 10 days 8/2/2025 8/14/2025
Typical 8 10 days 8/14/2025 8/27/2025
Typical 9 10 days 8/27/2025 9/8/2025
Typical 10 10 days 9/8/2025 9/19/2025
Typical 11 10 days 9/19/2025 10/3/2025
Typical 12 10 days 10/3/2025 10/15/2025
Typical 13 10 days 10/15/2025 10/28/2025
Typical 14 (Refuge Floor) 10 days 10/28/2025 11/9/2025
Typical 15 10 days 11/9/2025 11/21/2025
Typical 16 10 days 11/21/2025 12/3/2025
Typical 17 10 days 12/3/2025 12/15/2025
Typical 18 10 days 12/15/2025 12/26/2025
Typical 19 10 days 12/26/2025 1/7/2026
Typical 20 10 days 1/7/2026 1/19/2026
Typical 21 (Refuge Floor) 10 days 1/19/2026 2/1/2026
Typical 22 10 days 2/1/2026 2/13/2026
Terrace Floor 10 days 2/13/2026 2/25/2026
Granite Door Jambs ,window sill Fixing
184 days 7/11/2025 2/19/2026
and Dado in Toilets
Typical 1 8 days 7/11/2025 7/20/2025
Typical 2 8 days 7/20/2025 7/30/2025
Typical 3 8 days 7/30/2025 8/8/2025

Typical 4 8 days 8/8/2025 8/19/2025

Typical 5 8 days 8/19/2025 8/28/2025


Typical 6 8 days 8/28/2025 9/6/2025
Typical 7 (Refuge Floor) 8 days 9/6/2025 9/16/2025
Typical 8 8 days 9/16/2025 9/25/2025
Typical 9 8 days 9/25/2025 10/7/2025
Typical 10 8 days 10/7/2025 10/16/2025
Typical 11 8 days 10/16/2025 10/27/2025
Typical 12 8 days 10/27/2025 11/5/2025
Typical 13 8 days 11/6/2025 11/15/2025
Typical 14 (Refuge Floor) 8 days 11/15/2025 11/25/2025
Typical 15 8 days 11/25/2025 12/4/2025
Typical 16 8 days 12/4/2025 12/13/2025
Typical 17 8 days 12/13/2025 12/23/2025
Typical 18 8 days 12/23/2025 1/1/2026
Typical 19 8 days 1/1/2026 1/10/2026
Typical 20 8 days 1/11/2026 1/20/2026
Typical 21 (Refuge Floor) 8 days 1/20/2026 1/31/2026
Typical 22 8 days 1/31/2026 2/9/2026
Terrace Floor 8 days 2/9/2026 2/19/2026
Door & Window Frame Fixing incl alu
161 days 8/20/2025 3/3/2026
joineries fixing

Typical 1 7 days 8/20/2025 8/28/2025

Typical 2 7 days 8/28/2025 9/5/2025


Typical 3 7 days 9/5/2025 9/13/2025

Typical 4 7 days 9/13/2025 9/22/2025


Typical 5 7 days 9/22/2025 9/30/2025
Typical 6 7 days 9/30/2025 10/10/2025
Typical 7 (Refuge Floor) 7 days 10/10/2025 10/19/2025
Typical 8 7 days 10/19/2025 10/28/2025
Typical 9 7 days 10/28/2025 11/5/2025
Typical 10 7 days 11/6/2025 11/14/2025
Typical 11 7 days 11/14/2025 11/22/2025
Typical 12 7 days 11/22/2025 12/1/2025
Typical 13 7 days 12/1/2025 12/9/2025
Typical 14 (Refuge Floor) 7 days 12/9/2025 12/17/2025
Typical 15 7 days 12/17/2025 12/25/2025
Typical 16 7 days 12/25/2025 1/2/2026
Typical 17 7 days 1/2/2026 1/10/2026
Typical 18 7 days 1/11/2026 1/19/2026
Typical 19 7 days 1/19/2026 1/28/2026
Typical 20 7 days 1/28/2026 2/6/2026
Typical 21 (Refuge Floor) 7 days 2/6/2026 2/14/2026
Typical 22 7 days 2/14/2026 2/22/2026
Terrace Floor 7 days 2/23/2026 3/3/2026
Fire Fighting Works 138 days 9/23/2025 3/11/2026

Typical 1 6 days 9/23/2025 9/30/2025

Typical 2 6 days 9/30/2025 10/9/2025


Typical 3 6 days 10/9/2025 10/16/2025

Typical 4 6 days 10/16/2025 10/24/2025

Typical 5 6 days 10/25/2025 11/1/2025


Typical 6 6 days 11/1/2025 11/8/2025
Typical 7 (Refuge Floor) 6 days 11/8/2025 11/15/2025
Typical 8 6 days 11/15/2025 11/22/2025
Typical 9 6 days 11/22/2025 11/29/2025
Typical 10 6 days 11/29/2025 12/6/2025
Typical 11 6 days 12/6/2025 12/13/2025
Typical 12 6 days 12/13/2025 12/20/2025
Typical 13 6 days 12/20/2025 12/27/2025
Typical 14 (Refuge Floor) 6 days 12/27/2025 1/3/2026
Typical 15 6 days 1/3/2026 1/10/2026
Typical 16 6 days 1/11/2026 1/18/2026
Typical 17 6 days 1/18/2026 1/25/2026
Typical 18 6 days 1/25/2026 2/2/2026
Typical 19 6 days 2/2/2026 2/9/2026
Typical 20 6 days 2/9/2026 2/16/2026
Typical 21 (Refuge Floor) 6 days 2/17/2026 2/24/2026
Typical 22 6 days 2/24/2026 3/3/2026
Terrace Floor 6 days 3/3/2026 3/11/2026
Putty and Primer & 1 st coat Paint 117 days 10/26/2025 3/16/2026

Typical 1 7 days 10/26/2025 11/3/2025

Typical 2 7 days 11/1/2025 11/9/2025


Typical 3 7 days 11/7/2025 11/15/2025

Typical 4 7 days 11/13/2025 11/21/2025

Typical 5 7 days 11/19/2025 11/27/2025


Typical 6 7 days 11/25/2025 12/3/2025
Typical 7 (Refuge Floor) 7 days 12/1/2025 12/9/2025
Typical 8 7 days 12/6/2025 12/15/2025
Typical 9 7 days 12/12/2025 12/20/2025
Typical 10 7 days 12/18/2025 12/26/2025
Typical 11 7 days 12/24/2025 1/1/2026
Typical 12 7 days 12/30/2025 1/7/2026
Typical 13 7 days 1/5/2026 1/13/2026
Typical 14 (Refuge Floor) 7 days 1/11/2026 1/19/2026
Typical 15 7 days 1/17/2026 1/25/2026
Typical 16 7 days 1/23/2026 2/1/2026
Typical 17 7 days 1/30/2026 2/7/2026
Typical 18 7 days 2/5/2026 2/13/2026
Typical 19 7 days 2/11/2026 2/19/2026
Typical 20 7 days 2/17/2026 2/25/2026
Typical 21 (Refuge Floor) 7 days 2/23/2026 3/3/2026
Typical 22 7 days 2/28/2026 3/10/2026
Terrace Floor 7 days 3/7/2026 3/16/2026
Flooring and kitchen platform fixing 117 days 11/22/2025 4/11/2026

Typical 1 7 days 11/22/2025 12/1/2025

Typical 2 7 days 11/28/2025 12/6/2025

Typical 3 7 days 12/4/2025 12/12/2025

Typical 4 7 days 12/10/2025 12/18/2025


Typical 5 7 days 12/16/2025 12/24/2025
Typical 6 7 days 12/22/2025 12/30/2025
Typical 7 (Refuge Floor) 7 days 12/27/2025 1/5/2026
Typical 8 7 days 1/2/2026 1/10/2026
Typical 9 7 days 1/8/2026 1/16/2026
Typical 10 7 days 1/14/2026 1/22/2026
Typical 11 7 days 1/20/2026 1/29/2026
Typical 12 7 days 1/27/2026 2/4/2026
Typical 13 7 days 2/2/2026 2/10/2026
Typical 14 (Refuge Floor) 7 days 2/8/2026 2/16/2026
Typical 15 7 days 2/14/2026 2/22/2026
Typical 16 7 days 2/20/2026 2/28/2026
Typical 17 7 days 2/26/2026 3/7/2026
Typical 18 7 days 3/5/2026 3/13/2026
Typical 19 7 days 3/11/2026 3/19/2026
Typical 20 7 days 3/17/2026 3/25/2026
Typical 21 (Refuge Floor) 7 days 3/23/2026 3/31/2026
Typical 22 7 days 3/28/2026 4/6/2026
Terrace Floor 7 days 4/3/2026 4/11/2026

Door Shutter and window shutter fixing 93 days 12/13/2025 4/4/2026

Typical 1 5 days 12/13/2025 12/19/2025

Typical 2 5 days 12/18/2025 12/24/2025


Typical 3 5 days 12/23/2025 12/29/2025

Typical 4 5 days 12/27/2025 1/2/2026

Typical 5 5 days 1/1/2026 1/7/2026


Typical 6 5 days 1/6/2026 1/12/2026
Typical 7 (Refuge Floor) 5 days 1/11/2026 1/16/2026
Typical 8 5 days 1/15/2026 1/21/2026
Typical 9 5 days 1/20/2026 1/27/2026
Typical 10 5 days 1/25/2026 2/1/2026
Typical 11 5 days 1/31/2026 2/6/2026
Typical 12 5 days 2/5/2026 2/10/2026
Typical 13 5 days 2/9/2026 2/15/2026
Typical 14 (Refuge Floor) 5 days 2/14/2026 2/20/2026
Typical 15 5 days 2/19/2026 2/25/2026
Typical 16 5 days 2/24/2026 3/2/2026
Typical 17 5 days 2/28/2026 3/7/2026
Typical 18 5 days 3/6/2026 3/12/2026
Typical 19 5 days 3/11/2026 3/17/2026
Typical 20 5 days 3/16/2026 3/21/2026
Typical 21 (Refuge Floor) 5 days 3/20/2026 3/26/2026
Typical 22 5 days 3/25/2026 3/31/2026
Terrace Floor 5 days 3/30/2026 4/4/2026
CP Sanitary Fixing,Electrical fixtures
71 days 12/20/2025 3/17/2026
fixing

Typical 1 5 days 12/20/2025 12/26/2025

Typical 2 5 days 12/24/2025 12/30/2025

Typical 3 5 days 12/27/2025 1/2/2026

Typical 4 5 days 12/31/2025 1/6/2026


Typical 5 5 days 1/3/2026 1/9/2026
Typical 6 5 days 1/7/2026 1/13/2026
Typical 7 (Refuge Floor) 5 days 1/11/2026 1/16/2026
Typical 8 5 days 1/14/2026 1/20/2026
Typical 9 5 days 1/18/2026 1/24/2026
Typical 10 5 days 1/21/2026 1/28/2026
Typical 11 5 days 1/25/2026 2/1/2026
Typical 12 5 days 1/30/2026 2/4/2026
Typical 13 5 days 2/2/2026 2/8/2026
Typical 14 (Refuge Floor) 5 days 2/6/2026 2/12/2026
Typical 15 5 days 2/9/2026 2/15/2026
Typical 16 5 days 2/13/2026 2/19/2026
Typical 17 5 days 2/17/2026 2/22/2026
Typical 18 5 days 2/20/2026 2/26/2026
Typical 19 5 days 2/24/2026 3/2/2026
Typical 20 5 days 2/27/2026 3/6/2026
Typical 21 (Refuge Floor) 5 days 3/3/2026 3/10/2026
Typical 22 5 days 3/7/2026 3/13/2026
Terrace Floor 5 days 3/11/2026 3/17/2026
Second coat painting 79 days 1/3/2026 4/9/2026
Typical 1 8 days 1/3/2026 1/13/2026
Typical 2 8 days 1/9/2026 1/19/2026
Typical 3 7 days 1/15/2026 1/24/2026
Typical 4 7 days 1/20/2026 1/29/2026
Typical 5 6 days 1/25/2026 2/2/2026
Typical 6 6 days 1/30/2026 2/6/2026
Typical 7 (Refuge Floor) 6 days 2/2/2026 2/9/2026
Typical 8 6 days 2/6/2026 2/13/2026
Typical 9 6 days 2/9/2026 2/16/2026
Typical 10 6 days 2/13/2026 2/20/2026
Typical 11 6 days 2/17/2026 2/24/2026
Typical 12 6 days 2/20/2026 2/27/2026
Typical 13 6 days 2/24/2026 3/3/2026
Typical 14 (Refuge Floor) 6 days 2/27/2026 3/7/2026
Typical 15 6 days 3/3/2026 3/11/2026
Typical 16 6 days 3/7/2026 3/14/2026
Typical 17 6 days 3/11/2026 3/18/2026
Typical 18 6 days 3/14/2026 3/21/2026
Typical 19 6 days 3/18/2026 3/25/2026
Typical 20 6 days 3/21/2026 3/28/2026
Typical 21 (Refuge Floor) 7 days 3/25/2026 4/2/2026
Typical 22 6 days 3/30/2026 4/6/2026
Terrace Floor 6 days 4/2/2026 4/9/2026
Common Area & Lift Lobby Finishing 143 days 9/26/2025 3/20/2026

Terrace Pedestal and Bracket Fixing 11 days 11/10/2025 11/23/2025

External MS Grill Fixing in Toilet Duct


28 days 10/4/2025 11/8/2025
Areas
Basement Putty 35 days 11/7/2025 12/18/2025
Electrical Works in lift Lobby Areas - 1st
24 days 12/18/2025 1/15/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
18 days 1/15/2026 2/7/2026
Testing
Block Masonry & Plaster Work in Lift
55 days 9/26/2025 12/4/2025
Lobby Areas
Lift Area Stone Cladding 55 days 10/23/2025 12/27/2025
Door Frame Fixing of FD and other
20 days 12/29/2025 1/21/2026
Doors in Liftlobby Areas
Flooring in Lift Lobby Area 18 days 1/15/2026 2/7/2026
Electrical Wire Pulling and GI Box Fixing
18 days 2/7/2026 2/28/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 2/8/2026 3/5/2026
False Ceiling in Lift Lobby Area 20 days 2/14/2026 3/11/2026
Putty in Lift in Lobby Areas 20 days 2/19/2026 3/16/2026
Primer & Internal Painting 1st Coat in
20 days 2/24/2026 3/20/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 3/2/2026 3/17/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 3/2/2026 3/16/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 151 days 9/20/2025 3/24/2026


Staircase - Window Framing 42 days 9/20/2025 11/13/2025

Staircase - Electrical Works - Conduiting


42 days 9/20/2025 11/13/2025
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 9/26/2025 11/28/2025

Staircase - Railing Fixing 55 days 10/10/2025 12/16/2025


Staircase - Flooring 60 days 10/15/2025 12/26/2025
Staircase - Electrical Wire pulling and GI
42 days 10/10/2025 12/1/2025
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 12/1/2025 1/5/2026

Staircase - Putty 35 days 12/12/2025 1/22/2026


Staircase - Primer & Internal Painting
34 days 12/18/2025 1/28/2026
1st Coat
Staircase - Doors and window shutter
30 days 12/30/2025 2/4/2026
fixing
Staircase - Switch Socket Fixing &
25 days 1/5/2026 2/4/2026
Electrical Fittings Fixing
2nd coat Painting 60 days 1/9/2026 3/24/2026
External Paint 80 days 1/3/2026 4/10/2026
Waterproofing above Terrace 80 days 10/4/2025 1/8/2026
Waterproofing of Lift Pit 28 days 10/4/2025 11/8/2025
Waterproofing of OH Tank 28 days 10/23/2025 11/26/2025
Waterproofing of LMR Top Slab 25 days 11/10/2025 12/10/2025
Waterproofing Terrace Slab 25 days 12/10/2025 1/8/2026
Finishing and MEP Works in Ducts 78 days 9/3/2025 12/8/2025
All rounder paint in Kitchen and toilet
33 days 9/3/2025 10/14/2025
Ducts
All rounder paint in Electrical, ELV and
28 days 9/15/2025 10/20/2025
Fire Ducts
S W R Downtake lines - Common
22 days 10/14/2025 11/10/2025
Plumbing works
Electrical Works in Ducts - Common
27 days 10/20/2025 11/22/2025
Electrical Works
Fire Fighting Pipe fixing in Ducts -
25 days 11/8/2025 12/8/2025
Common Fire Fighting Works
Lift Work 110 days 9/9/2025 1/20/2026

Scaffolding in Lift Shafts 7 days 9/9/2025 9/17/2025

White Wash in Lift Shafts 7 days 9/17/2025 9/25/2025


Electrical work in Lift Shafts 8 days 9/25/2025 10/7/2025
Ladder Fixing for OHT and LMR Slab 5 days 10/7/2025 10/13/2025

All Rounder PAINT in LMR 5 days 10/13/2025 10/19/2025

Electrical work in LMR 9 days 10/19/2025 10/30/2025


Trap Door Fixing 5 days 10/19/2025 10/26/2025
Handover of LMR to Lift Agency 4 days 10/7/2025 10/11/2025
Lift Templet Fixing 14 days 10/12/2025 10/29/2025
Lift Works 70 days 10/29/2025 1/20/2026
Parking Area 134 days 11/22/2025 5/3/2026
Finishing & MEP Works 134 days 11/22/2025 5/3/2026

Painting on Ceiling surfaces 30 days 11/22/2025 12/27/2025

Painting on Wall surfaces 1st Coat 40 days 12/6/2025 1/22/2026


Basement and Podium Levels
22 days 1/23/2026 2/19/2026
Electrical Works & Testing
Basement & Podium Levels Fire
fighting Hydrants and Sprinkler pipe fixing & 22 days 2/19/2026 3/18/2026
testing
Basement & Podium Levels PHE Line
20 days 3/18/2026 4/10/2026
Fixing & testing
VDF in Parking Area 45 days 2/7/2026 4/2/2026

Fixing Paver Blocks at Podium Levels 43 days 2/8/2026 4/1/2026


Driveway and Parking Area Markings 30 days 3/10/2026 4/14/2026

Fixing of Signages in Basement and


20 days 4/2/2026 4/26/2026
podium levels
Deep Cleaning 45 days 3/10/2026 5/3/2026

Snagging Desnagging & Handover 120 days 12/19/2025 5/13/2026

Wing F 947 days 4/11/2023 5/28/2026


Sub Structure 294 days 4/11/2023 3/30/2024
Excavation level 36 days 4/11/2023 5/24/2023
Inclined Rock Anchor 29 days 4/26/2023 5/31/2023

Excavation Level 2 18 days 5/19/2023 6/10/2023

Inclined Rock Anchor 21 days 6/15/2023 7/10/2023


Excavation Level 3 22 days 6/24/2023 7/20/2023
Anti Termitte 12 days 7/15/2023 7/29/2023
Plain Cement Concrete 12 days 7/15/2023 7/29/2023
Passive Rock Anchor 33 days 7/20/2023 8/29/2023
Waterproofing below raft 33 days 7/25/2023 9/3/2023
Raft Reinforcement 36 days 8/3/2023 9/16/2023
Raft Shuttering 34 days 8/14/2023 9/24/2023
Raft Concrete 12 days 9/9/2023 9/23/2023
Basement 3 (UGT) Pour 1 43 days 9/25/2023 11/17/2023
Col & RW Reinforcement 22 days 9/25/2023 10/21/2023
Col & RW Shuttering 21 days 9/30/2023 10/27/2023

Col & RW Concrete 20 days 10/6/2023 10/31/2023

UGT top Slab Decking 21 days 10/13/2023 11/8/2023


UGT & STP top Slab RF 20 days 10/20/2023 11/14/2023
UGT & STP top Slab concrete 1 day 11/16/2023 11/17/2023
Basement - 3 Slab Pour 2 46 days 11/1/2023 12/26/2023
Col & RW Reinforcement 22 days 11/1/2023 11/28/2023
Col & RW Shuttering 21 days 11/7/2023 12/2/2023
Col & RW Concrete 20 days 11/15/2023 12/8/2023
Slab Decking 21 days 11/22/2023 12/16/2023
Slab RF 20 days 11/30/2023 12/23/2023
Slab Concrete 1 day 12/25/2023 12/26/2023
Basement 2 Slab- Pour 1 41 days 11/1/2023 12/20/2023
Col & RW Reinforcement 22 days 11/1/2023 11/28/2023
Col & RW Shuttering 21 days 11/7/2023 12/2/2023
Col & RW Concrete 20 days 11/15/2023 12/8/2023
Slab Decking 21 days 11/22/2023 12/16/2023
Slab RF 20 days 11/24/2023 12/18/2023

Slab Concrete 1 day 12/19/2023 12/20/2023

Basement 2 Slab - Pour 2 41 days 12/22/2023 2/10/2024


Col & RW Reinforcement 19 days 12/22/2023 1/13/2024
Col & RW Shuttering 17 days 12/28/2023 1/17/2024
Col & RW Concrete 15 days 1/4/2024 1/22/2024
Slab Decking 17 days 1/11/2024 2/1/2024
Slab RF 16 days 1/18/2024 2/7/2024
Slab Concrete 1 day 2/9/2024 2/10/2024
Basement 1 Slab- Pour 1 38 days 12/22/2023 2/6/2024
Col & RW Reinforcement 19 days 12/22/2023 1/13/2024
Col & RW Shuttering 17 days 12/26/2023 1/15/2024
Col & RW Concrete 16 days 1/1/2024 1/19/2024
Slab Decking 19 days 1/6/2024 1/30/2024
Slab RF 21 days 1/9/2024 2/4/2024
Slab Concrete 1 day 2/5/2024 2/6/2024
Basement 1 Slab Pour 2 39 days 2/12/2024 3/30/2024
Col & RW Reinforcement 19 days 2/12/2024 3/6/2024
Col & RW Shuttering 17 days 2/16/2024 3/7/2024
Col & RW Concrete 18 days 2/22/2024 3/14/2024
Slab Decking 20 days 2/29/2024 3/23/2024
Slab RF 21 days 3/2/2024 3/28/2024
Slab Concrete 1 day 3/29/2024 3/30/2024
Super Structure 498 days 2/9/2024 9/30/2025
GF Slab- Pour 1 52 days 2/9/2024 4/11/2024

Col & RW Reinforcement 19 days 2/9/2024 3/2/2024

Col & RW Shuttering 17 days 2/12/2024 3/4/2024


Col & RW Concrete 16 days 2/18/2024 3/8/2024
Slab Decking 19 days 2/24/2024 3/18/2024
Slab RF 21 days 2/27/2024 3/22/2024
Slab Concrete 1 day 3/23/2024 3/26/2024

Outside Back Filling upto Basement - 1 14 days 3/26/2024 4/11/2024

GF Slab- Pour 2 52 days 4/2/2024 6/4/2024


Col & RW Reinforcement 19 days 4/2/2024 4/24/2024
Col & RW Shuttering 17 days 4/5/2024 4/25/2024
Col & RW Concrete 16 days 4/11/2024 4/30/2024
Slab Decking 19 days 4/17/2024 5/11/2024
Slab RF 21 days 4/19/2024 5/15/2024
Slab Concrete 1 day 5/17/2024 5/18/2024

Outside Back Filling upto Basement - 1 14 days 5/18/2024 6/4/2024


Plinth Level checking 15 days 5/18/2024 6/5/2024
P1 level Slab 35 days 6/6/2024 7/17/2024
Col Reinforcement 14 days 6/6/2024 6/22/2024
Col Shuttering 18 days 6/10/2024 7/1/2024
Col Concrete 19 days 6/12/2024 7/4/2024
Slab Decking 23 days 6/14/2024 7/11/2024
Slab RF 21 days 6/20/2024 7/15/2024
Slab Concrete 1 day 7/16/2024 7/17/2024
Typical 1 35 days 7/18/2024 8/30/2024
Vertical Reinforcement 13 days 7/18/2024 8/3/2024
Vertical Shuttering 19 days 7/22/2024 8/13/2024
Slab Decking 23 days 7/28/2024 8/25/2024
Beam & slab Reinforcement 21 days 8/2/2024 8/28/2024
Slab Concrete 1 day 8/29/2024 8/30/2024
Typical 2 35 days 8/31/2024 10/14/2024
Vertical Reinforcement 13 days 8/31/2024 9/16/2024
Vertical Shuttering 19 days 9/4/2024 9/26/2024
Slab Decking 23 days 9/10/2024 10/8/2024
Beam & slab Reinforcement 21 days 9/14/2024 10/10/2024
Slab Concrete 1 day 10/11/2024 10/14/2024
Typical 3 11 days 10/15/2024 10/28/2024
Vertical Reinforcement 4 days 10/15/2024 10/19/2024
Vertical Shuttering 5 days 10/17/2024 10/23/2024
Slab Decking 4 days 10/19/2024 10/24/2024
Beam & slab Reinforcement 3 days 10/22/2024 10/25/2024
Slab Concrete 1 day 10/26/2024 10/28/2024
Typical 4 11 days 10/29/2024 11/12/2024
Vertical Reinforcement 4 days 10/29/2024 11/4/2024
Vertical Shuttering 5 days 11/1/2024 11/7/2024
Slab Decking 4 days 11/4/2024 11/8/2024
Beam & slab Reinforcement 3 days 11/6/2024 11/9/2024
Slab Concrete 1 day 11/11/2024 11/12/2024
Typical 5 11 days 11/13/2024 11/26/2024
Vertical Reinforcement 4 days 11/13/2024 11/18/2024
Vertical Shuttering 5 days 11/16/2024 11/21/2024
Slab Decking 4 days 11/18/2024 11/23/2024
Beam & slab Reinforcement 3 days 11/20/2024 11/24/2024
Slab Concrete 1 day 11/25/2024 11/26/2024
Typical 6 11 days 11/28/2024 12/11/2024
Vertical Reinforcement 4 days 11/28/2024 12/2/2024
Vertical Shuttering 5 days 11/30/2024 12/6/2024
Slab Decking 4 days 12/2/2024 12/7/2024
Beam & slab Reinforcement 3 days 12/5/2024 12/8/2024
Slab Concrete 1 day 12/10/2024 12/11/2024
Typical 7 (Refuge Floor) 15 days 12/12/2024 12/30/2024
Vertical Reinforcement 7 days 12/12/2024 12/20/2024
Vertical Shuttering 9 days 12/14/2024 12/25/2024
Slab Decking 8 days 12/19/2024 12/28/2024
Beam & slab Reinforcement 5 days 12/21/2024 12/27/2024

Slab Concrete 1 day 12/28/2024 12/30/2024

Typical 8 15 days 12/31/2024 1/17/2025


Vertical Reinforcement 7 days 12/31/2024 1/8/2025
Vertical Shuttering 9 days 1/2/2025 1/13/2025
Slab Decking 8 days 1/7/2025 1/16/2025
Beam & slab Reinforcement 5 days 1/9/2025 1/15/2025
Slab Concrete 1 day 1/16/2025 1/17/2025
Typical 9 11 days 1/18/2025 2/1/2025
Vertical Reinforcement 4 days 1/18/2025 1/23/2025
Vertical Shuttering 5 days 1/21/2025 1/27/2025
Slab Decking 4 days 1/23/2025 1/29/2025
Beam & slab Reinforcement 3 days 1/25/2025 1/30/2025
Slab Concrete 1 day 1/31/2025 2/1/2025
Typical 10 11 days 2/3/2025 2/15/2025
Vertical Reinforcement 4 days 2/3/2025 2/7/2025
Vertical Shuttering 5 days 2/5/2025 2/11/2025
Slab Decking 4 days 2/7/2025 2/12/2025
Beam & slab Reinforcement 3 days 2/10/2025 2/13/2025
Slab Concrete 1 day 2/14/2025 2/15/2025
Typical 11 11 days 2/17/2025 3/1/2025
Vertical Reinforcement 4 days 2/17/2025 2/21/2025
Vertical Shuttering 5 days 2/19/2025 2/25/2025
Slab Decking 4 days 2/21/2025 2/26/2025
Beam & slab Reinforcement 3 days 2/24/2025 2/27/2025
Slab Concrete 1 day 2/28/2025 3/1/2025
Typical 12 11 days 3/3/2025 3/17/2025
Vertical Reinforcement 4 days 3/3/2025 3/7/2025
Vertical Shuttering 5 days 3/5/2025 3/11/2025
Slab Decking 4 days 3/7/2025 3/12/2025
Beam & slab Reinforcement 3 days 3/10/2025 3/13/2025
Slab Concrete 1 day 3/15/2025 3/17/2025
Typical 13 11 days 3/18/2025 3/31/2025
Vertical Reinforcement 4 days 3/18/2025 3/22/2025
Vertical Shuttering 5 days 3/20/2025 3/26/2025
Slab Decking 4 days 3/22/2025 3/27/2025
Beam & slab Reinforcement 3 days 3/25/2025 3/28/2025
Slab Concrete 1 day 3/30/2025 3/31/2025
Typical 14 (Refuge Floor) 15 days 4/1/2025 4/19/2025
Vertical Reinforcement 7 days 4/1/2025 4/9/2025
Vertical Shuttering 9 days 4/3/2025 4/14/2025
Slab Decking 8 days 4/8/2025 4/18/2025
Beam & slab Reinforcement 5 days 4/11/2025 4/16/2025
Slab Concrete 1 day 4/18/2025 4/19/2025
Typical 15 15 days 4/20/2025 5/9/2025
Vertical Reinforcement 7 days 4/20/2025 4/28/2025
Vertical Shuttering 9 days 4/23/2025 5/4/2025
Slab Decking 8 days 4/27/2025 5/8/2025
Beam & slab Reinforcement 5 days 4/30/2025 5/7/2025
Slab Concrete 1 day 5/8/2025 5/9/2025
Typical 16 11 days 5/10/2025 5/23/2025
Vertical Reinforcement 4 days 5/10/2025 5/15/2025
Vertical Shuttering 5 days 5/13/2025 5/19/2025
Slab Decking 4 days 5/15/2025 5/20/2025
Beam & slab Reinforcement 3 days 5/17/2025 5/21/2025
Slab Concrete 1 day 5/22/2025 5/23/2025
Typical 17 11 days 5/24/2025 6/6/2025
Vertical Reinforcement 4 days 5/24/2025 5/29/2025
Vertical Shuttering 5 days 5/27/2025 6/2/2025
Slab Decking 4 days 5/29/2025 6/3/2025
Beam & slab Reinforcement 3 days 5/31/2025 6/4/2025
Slab Concrete 1 day 6/5/2025 6/6/2025
Typical 18 11 days 6/7/2025 6/20/2025
Vertical Reinforcement 4 days 6/7/2025 6/12/2025
Vertical Shuttering 5 days 6/10/2025 6/16/2025
Slab Decking 4 days 6/12/2025 6/17/2025
Beam & slab Reinforcement 3 days 6/14/2025 6/18/2025
Slab Concrete 1 day 6/19/2025 6/20/2025
Typical 19 11 days 6/21/2025 7/4/2025
Vertical Reinforcement 4 days 6/21/2025 6/26/2025
Vertical Shuttering 5 days 6/24/2025 6/30/2025
Slab Decking 4 days 6/26/2025 7/1/2025
Beam & slab Reinforcement 3 days 6/29/2025 7/2/2025
Slab Concrete 1 day 7/3/2025 7/4/2025
Typical 20 11 days 7/6/2025 7/19/2025
Vertical Reinforcement 4 days 7/6/2025 7/10/2025
Vertical Shuttering 5 days 7/8/2025 7/14/2025
Slab Decking 4 days 7/11/2025 7/15/2025
Beam & slab Reinforcement 3 days 7/13/2025 7/16/2025
Slab Concrete 1 day 7/18/2025 7/19/2025
Typical 21 (Refuge floor) 15 days 7/20/2025 8/7/2025
Vertical Reinforcement 7 days 7/20/2025 7/28/2025
Vertical Shuttering 9 days 7/23/2025 8/2/2025
Slab Decking 8 days 7/27/2025 8/6/2025
Beam & slab Reinforcement 5 days 7/30/2025 8/5/2025
Slab Concrete 1 day 8/6/2025 8/7/2025
Typical 22 11 days 8/8/2025 8/22/2025
Vertical Reinforcement 4 days 8/8/2025 8/13/2025
Vertical Shuttering 5 days 8/11/2025 8/18/2025
Slab Decking 4 days 8/13/2025 8/19/2025
Beam & slab Reinforcement 3 days 8/16/2025 8/20/2025
Slab Concrete 1 day 8/21/2025 8/22/2025
Terrace Floor 11 days 8/23/2025 9/5/2025
Vertical Reinforcement 4 days 8/23/2025 8/28/2025
Vertical Shuttering 5 days 8/26/2025 9/1/2025
Slab Decking 4 days 8/28/2025 9/2/2025
Beam & slab Reinforcement 3 days 8/30/2025 9/3/2025
Slab Concrete 1 day 9/4/2025 9/5/2025
OHT LMR 20 days 9/6/2025 9/30/2025
Col RF 6 days 9/6/2025 9/13/2025

Col Shuttering 8 days 9/9/2025 9/18/2025

Col Concrete 8 days 9/11/2025 9/20/2025


Beam & Slab Decking (LMR & OHT) 11 days 9/12/2025 9/25/2025
Beam & Slab RF 12 days 9/13/2025 9/27/2025

Concrete 1 day 9/29/2025 9/30/2025

Finishing Works 406 days 1/15/2025 5/21/2026


Blockwork 279 days 1/15/2025 12/18/2025

Basement 3 9 days 1/15/2025 1/25/2025

Basement 2 9 days 1/28/2025 2/7/2025

Basement 1 9 days 2/8/2025 2/19/2025

GF Slab 9 days 2/20/2025 3/3/2025


Typical 1 9 days 3/4/2025 3/15/2025

Typical 2 9 days 3/17/2025 3/27/2025

Typical 3 9 days 3/28/2025 4/8/2025

Typical 4 9 days 4/9/2025 4/20/2025

Typical 5 9 days 4/21/2025 5/3/2025

Typical 6 9 days 5/4/2025 5/15/2025

Typical 7 (Refuge Floor) 9 days 5/16/2025 5/27/2025

Typical 8 9 days 5/28/2025 6/7/2025

Typical 9 9 days 6/9/2025 6/19/2025

Typical 10 9 days 6/20/2025 7/1/2025

Typical 11 9 days 7/2/2025 7/13/2025

Typical 12 9 days 7/14/2025 7/25/2025

Typical 13 9 days 7/26/2025 8/6/2025

Typical 14 (Refuge Floor) 9 days 8/7/2025 8/19/2025

Typical 15 9 days 8/20/2025 8/30/2025


Typical 16 9 days 9/1/2025 9/11/2025

Typical 17 9 days 9/12/2025 9/23/2025

Typical 18 9 days 9/24/2025 10/7/2025

Typical 19 9 days 10/8/2025 10/19/2025

Typical 20 9 days 10/20/2025 11/1/2025

Typical 21 (Refuge Floor) 9 days 11/2/2025 11/13/2025

Typical 22 9 days 11/14/2025 11/25/2025

Terrace Floor 9 days 11/26/2025 12/6/2025

OHT LMR 9 days 12/8/2025 12/18/2025


Plaster 280 days 1/20/2025 12/24/2025
Basement 3 10 days 1/20/2025 2/1/2025
Basement 2 10 days 2/1/2025 2/13/2025
Basement 1 10 days 2/13/2025 2/25/2025
GF Slab 10 days 2/25/2025 3/8/2025
Typical 1 10 days 3/8/2025 3/21/2025
Typical 2 10 days 3/21/2025 4/2/2025
Typical 3 10 days 4/2/2025 4/14/2025

Typical 4 10 days 4/14/2025 4/26/2025

Typical 5 10 days 4/26/2025 5/9/2025


Typical 6 10 days 5/9/2025 5/21/2025
Typical 7 (Refuge Floor) 10 days 5/21/2025 6/2/2025
Typical 8 10 days 6/2/2025 6/13/2025
Typical 9 10 days 6/13/2025 6/25/2025
Typical 10 10 days 6/25/2025 7/7/2025
Typical 11 10 days 7/7/2025 7/19/2025
Typical 12 10 days 7/19/2025 7/31/2025
Typical 13 10 days 7/31/2025 8/12/2025
Typical 14 (Refuge Floor) 10 days 8/12/2025 8/25/2025
Typical 15 10 days 8/25/2025 9/5/2025
Typical 16 10 days 9/5/2025 9/17/2025
Typical 17 10 days 9/17/2025 9/29/2025
Typical 18 10 days 9/29/2025 10/13/2025
Typical 19 10 days 10/13/2025 10/26/2025
Typical 20 10 days 10/26/2025 11/7/2025
Typical 21 (Refuge Floor) 10 days 11/7/2025 11/19/2025
Typical 22 10 days 11/19/2025 12/1/2025
Terrace Floor 10 days 12/1/2025 12/12/2025
OHT LMR 10 days 12/12/2025 12/24/2025

Preparation of toilet waterproofing &


276 days 4/27/2025 3/27/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 4/27/2025 5/13/2025


Typical 2 12 days 5/13/2025 5/27/2025
Typical 3 12 days 5/27/2025 6/10/2025

Typical 4 12 days 6/10/2025 6/24/2025

Typical 5 12 days 6/24/2025 7/8/2025


Typical 6 12 days 7/8/2025 7/22/2025
Typical 7 (Refuge Floor) 12 days 7/23/2025 8/6/2025
Typical 8 12 days 8/6/2025 8/21/2025
Typical 9 12 days 8/21/2025 9/4/2025
Typical 10 12 days 9/4/2025 9/18/2025
Typical 11 12 days 9/18/2025 10/4/2025
Typical 12 12 days 10/4/2025 10/19/2025
Typical 13 12 days 10/19/2025 11/3/2025
Typical 14 (Refuge Floor) 12 days 11/3/2025 11/17/2025
Typical 15 12 days 11/18/2025 12/2/2025
Typical 16 12 days 12/2/2025 12/16/2025
Typical 17 12 days 12/16/2025 12/30/2025
Typical 18 12 days 12/30/2025 1/13/2026
Typical 19 12 days 1/13/2026 1/28/2026
Typical 20 12 days 1/28/2026 2/12/2026
Typical 21 (Refuge Floor) 12 days 2/12/2026 2/26/2026
Typical 22 12 days 2/26/2026 3/13/2026
Terrace Floor 12 days 3/13/2026 3/27/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 6/25/2025 3/31/2026
and Kitchen with Plaster
Typical 1 10 days 6/25/2025 7/7/2025
Typical 2 10 days 7/7/2025 7/19/2025
Typical 3 10 days 7/19/2025 7/31/2025

Typical 4 10 days 7/31/2025 8/12/2025


Typical 5 10 days 8/12/2025 8/25/2025
Typical 6 10 days 8/25/2025 9/5/2025
Typical 7 (Refuge Floor) 10 days 9/5/2025 9/17/2025
Typical 8 10 days 9/17/2025 9/29/2025
Typical 9 10 days 9/29/2025 10/13/2025
Typical 10 10 days 10/13/2025 10/26/2025
Typical 11 10 days 10/26/2025 11/7/2025
Typical 12 10 days 11/7/2025 11/19/2025
Typical 13 10 days 11/19/2025 12/1/2025
Typical 14 (Refuge Floor) 10 days 12/1/2025 12/12/2025
Typical 15 10 days 12/12/2025 12/24/2025
Typical 16 10 days 12/24/2025 1/5/2026
Typical 17 10 days 1/5/2026 1/16/2026
Typical 18 10 days 1/17/2026 1/29/2026
Typical 19 10 days 1/30/2026 2/10/2026
Typical 20 10 days 2/11/2026 2/22/2026
Typical 21 (Refuge Floor) 10 days 2/23/2026 3/7/2026
Typical 22 10 days 3/7/2026 3/19/2026
Terrace Floor 10 days 3/19/2026 3/31/2026
Granite Door Jambs ,window sill Fixing
184 days 8/13/2025 3/25/2026
and Dado in Toilets
Typical 1 8 days 8/13/2025 8/23/2025
Typical 2 8 days 8/23/2025 9/2/2025
Typical 3 8 days 9/2/2025 9/11/2025

Typical 4 8 days 9/11/2025 9/20/2025

Typical 5 8 days 9/20/2025 9/30/2025


Typical 6 8 days 9/30/2025 10/11/2025
Typical 7 (Refuge Floor) 8 days 10/12/2025 10/22/2025
Typical 8 8 days 10/22/2025 11/1/2025
Typical 9 8 days 11/1/2025 11/10/2025
Typical 10 8 days 11/10/2025 11/20/2025
Typical 11 8 days 11/20/2025 11/29/2025
Typical 12 8 days 11/29/2025 12/9/2025
Typical 13 8 days 12/9/2025 12/18/2025
Typical 14 (Refuge Floor) 8 days 12/18/2025 12/27/2025
Typical 15 8 days 12/27/2025 1/6/2026
Typical 16 8 days 1/6/2026 1/15/2026
Typical 17 8 days 1/15/2026 1/25/2026
Typical 18 8 days 1/25/2026 2/4/2026
Typical 19 8 days 2/5/2026 2/14/2026
Typical 20 8 days 2/14/2026 2/24/2026
Typical 21 (Refuge Floor) 8 days 2/24/2026 3/6/2026
Typical 22 8 days 3/6/2026 3/16/2026
Terrace Floor 8 days 3/16/2026 3/25/2026
Door & Window Frame Fixing incl alu
161 days 9/22/2025 4/6/2026
joineries fixing
Typical 1 7 days 9/22/2025 9/30/2025
Typical 2 7 days 9/30/2025 10/10/2025
Typical 3 7 days 10/10/2025 10/19/2025

Typical 4 7 days 10/19/2025 10/28/2025

Typical 5 7 days 10/28/2025 11/5/2025


Typical 6 7 days 11/6/2025 11/14/2025
Typical 7 (Refuge Floor) 7 days 11/14/2025 11/22/2025
Typical 8 7 days 11/22/2025 12/1/2025
Typical 9 7 days 12/1/2025 12/9/2025
Typical 10 7 days 12/9/2025 12/17/2025
Typical 11 7 days 12/17/2025 12/25/2025
Typical 12 7 days 12/25/2025 1/2/2026
Typical 13 7 days 1/2/2026 1/10/2026
Typical 14 (Refuge Floor) 7 days 1/11/2026 1/19/2026
Typical 15 7 days 1/19/2026 1/28/2026
Typical 16 7 days 1/28/2026 2/6/2026
Typical 17 7 days 2/6/2026 2/14/2026
Typical 18 7 days 2/14/2026 2/22/2026
Typical 19 7 days 2/23/2026 3/3/2026
Typical 20 7 days 3/3/2026 3/12/2026
Typical 21 (Refuge Floor) 7 days 3/12/2026 3/20/2026
Typical 22 7 days 3/20/2026 3/28/2026
Terrace Floor 7 days 3/28/2026 4/6/2026
Fire Fighting Works 138 days 10/29/2025 4/13/2026
Typical 1 6 days 10/29/2025 11/5/2025
Typical 2 6 days 11/6/2025 11/13/2025
Typical 3 6 days 11/13/2025 11/20/2025

Typical 4 6 days 11/20/2025 11/27/2025

Typical 5 6 days 11/27/2025 12/4/2025


Typical 6 6 days 12/4/2025 12/11/2025
Typical 7 (Refuge Floor) 6 days 12/11/2025 12/18/2025
Typical 8 6 days 12/18/2025 12/25/2025
Typical 9 6 days 12/25/2025 1/1/2026
Typical 10 6 days 1/1/2026 1/8/2026
Typical 11 6 days 1/8/2026 1/15/2026
Typical 12 6 days 1/15/2026 1/22/2026
Typical 13 6 days 1/23/2026 1/31/2026
Typical 14 (Refuge Floor) 6 days 1/31/2026 2/7/2026
Typical 15 6 days 2/7/2026 2/14/2026
Typical 16 6 days 2/14/2026 2/21/2026
Typical 17 6 days 2/21/2026 2/28/2026
Typical 18 6 days 2/28/2026 3/9/2026
Typical 19 6 days 3/9/2026 3/16/2026
Typical 20 6 days 3/16/2026 3/23/2026
Typical 21 (Refuge Floor) 6 days 3/23/2026 3/30/2026
Typical 22 6 days 3/30/2026 4/6/2026
Terrace Floor 6 days 4/6/2026 4/13/2026
Putty and Primer & 1 st coat Paint 117 days 11/28/2025 4/17/2026

Typical 1 7 days 11/28/2025 12/6/2025

Typical 2 7 days 12/4/2025 12/12/2025


Typical 3 7 days 12/10/2025 12/18/2025

Typical 4 7 days 12/16/2025 12/24/2025

Typical 5 7 days 12/22/2025 12/30/2025


Typical 6 7 days 12/27/2025 1/5/2026
Typical 7 (Refuge Floor) 7 days 1/2/2026 1/10/2026
Typical 8 7 days 1/8/2026 1/16/2026
Typical 9 7 days 1/14/2026 1/22/2026
Typical 10 7 days 1/20/2026 1/29/2026
Typical 11 7 days 1/27/2026 2/4/2026
Typical 12 7 days 2/2/2026 2/10/2026
Typical 13 7 days 2/8/2026 2/16/2026
Typical 14 (Refuge Floor) 7 days 2/14/2026 2/22/2026
Typical 15 7 days 2/20/2026 2/28/2026
Typical 16 7 days 2/26/2026 3/7/2026
Typical 17 7 days 3/5/2026 3/13/2026
Typical 18 7 days 3/11/2026 3/19/2026
Typical 19 7 days 3/17/2026 3/25/2026
Typical 20 7 days 3/23/2026 3/31/2026
Typical 21 (Refuge Floor) 7 days 3/28/2026 4/6/2026
Typical 22 7 days 4/3/2026 4/11/2026
Terrace Floor 7 days 4/9/2026 4/17/2026
Flooring and kitchen platform fixing 117 days 12/25/2025 5/16/2026
Typical 1 7 days 12/25/2025 1/2/2026
Typical 2 7 days 12/31/2025 1/8/2026
Typical 3 7 days 1/6/2026 1/14/2026

Typical 4 7 days 1/12/2026 1/20/2026

Typical 5 7 days 1/18/2026 1/27/2026


Typical 6 7 days 1/24/2026 2/2/2026
Typical 7 (Refuge Floor) 7 days 1/31/2026 2/8/2026
Typical 8 7 days 2/6/2026 2/14/2026
Typical 9 7 days 2/12/2026 2/20/2026
Typical 10 7 days 2/18/2026 2/26/2026
Typical 11 7 days 2/24/2026 3/5/2026
Typical 12 7 days 3/2/2026 3/11/2026
Typical 13 7 days 3/9/2026 3/17/2026
Typical 14 (Refuge Floor) 7 days 3/14/2026 3/23/2026
Typical 15 7 days 3/20/2026 3/28/2026
Typical 16 7 days 3/26/2026 4/3/2026
Typical 17 7 days 4/1/2026 4/9/2026
Typical 18 7 days 4/7/2026 4/15/2026
Typical 19 7 days 4/13/2026 4/21/2026
Typical 20 7 days 4/19/2026 4/27/2026
Typical 21 (Refuge Floor) 7 days 4/25/2026 5/4/2026
Typical 22 7 days 5/2/2026 5/10/2026
Terrace Floor 7 days 5/8/2026 5/16/2026

Door Shutter and window shutter fixing 93 days 1/21/2026 5/15/2026

Typical 1 5 days 1/21/2026 1/28/2026

Typical 2 5 days 1/27/2026 2/2/2026


Typical 3 5 days 2/1/2026 2/7/2026

Typical 4 5 days 2/6/2026 2/12/2026

Typical 5 5 days 2/11/2026 2/16/2026


Typical 6 5 days 2/15/2026 2/21/2026
Typical 7 (Refuge Floor) 5 days 2/20/2026 2/26/2026
Typical 8 5 days 2/25/2026 3/3/2026
Typical 9 5 days 3/2/2026 3/9/2026
Typical 10 5 days 3/7/2026 3/13/2026
Typical 11 5 days 3/12/2026 3/18/2026
Typical 12 5 days 3/17/2026 3/23/2026
Typical 13 5 days 3/21/2026 3/27/2026
Typical 14 (Refuge Floor) 5 days 3/26/2026 4/1/2026
Typical 15 5 days 3/31/2026 4/6/2026
Typical 16 5 days 4/4/2026 4/10/2026
Typical 17 5 days 4/9/2026 4/15/2026
Typical 18 5 days 4/14/2026 4/20/2026
Typical 19 5 days 4/19/2026 4/24/2026
Typical 20 5 days 4/23/2026 4/29/2026
Typical 21 (Refuge Floor) 5 days 4/28/2026 5/5/2026
Typical 22 5 days 5/4/2026 5/10/2026
Terrace Floor 5 days 5/9/2026 5/15/2026
CP Sanitary Fixing,Electrical fixtures
71 days 1/30/2026 4/24/2026
fixing
Typical 1 5 days 1/30/2026 2/4/2026
Typical 2 5 days 2/2/2026 2/8/2026

Typical 3 5 days 2/6/2026 2/12/2026

Typical 4 5 days 2/9/2026 2/15/2026


Typical 5 5 days 2/13/2026 2/19/2026
Typical 6 5 days 2/17/2026 2/22/2026
Typical 7 (Refuge Floor) 5 days 2/20/2026 2/26/2026
Typical 8 5 days 2/24/2026 3/2/2026
Typical 9 5 days 2/27/2026 3/6/2026
Typical 10 5 days 3/3/2026 3/10/2026
Typical 11 5 days 3/7/2026 3/13/2026
Typical 12 5 days 3/11/2026 3/17/2026
Typical 13 5 days 3/14/2026 3/20/2026
Typical 14 (Refuge Floor) 5 days 3/18/2026 3/24/2026
Typical 15 5 days 3/21/2026 3/27/2026
Typical 16 5 days 3/25/2026 3/31/2026
Typical 17 5 days 3/28/2026 4/3/2026
Typical 18 5 days 4/1/2026 4/7/2026
Typical 19 5 days 4/4/2026 4/10/2026
Typical 20 5 days 4/8/2026 4/14/2026
Typical 21 (Refuge Floor) 5 days 4/11/2026 4/17/2026
Typical 22 5 days 4/15/2026 4/21/2026
Terrace Floor 5 days 4/19/2026 4/24/2026
Second coat painting 79 days 2/13/2026 5/19/2026
Typical 1 8 days 2/13/2026 2/22/2026
Typical 2 8 days 2/19/2026 2/28/2026
Typical 3 7 days 2/25/2026 3/6/2026
Typical 4 7 days 3/2/2026 3/11/2026
Typical 5 6 days 3/7/2026 3/14/2026
Typical 6 6 days 3/11/2026 3/18/2026
Typical 7 (Refuge Floor) 6 days 3/14/2026 3/21/2026
Typical 8 6 days 3/18/2026 3/25/2026
Typical 9 6 days 3/21/2026 3/28/2026
Typical 10 6 days 3/25/2026 4/1/2026
Typical 11 6 days 3/28/2026 4/4/2026
Typical 12 6 days 4/1/2026 4/8/2026
Typical 13 6 days 4/4/2026 4/11/2026
Typical 14 (Refuge Floor) 6 days 4/8/2026 4/15/2026
Typical 15 6 days 4/11/2026 4/18/2026
Typical 16 6 days 4/15/2026 4/22/2026
Typical 17 6 days 4/19/2026 4/26/2026
Typical 18 6 days 4/22/2026 4/29/2026
Typical 19 6 days 4/26/2026 5/4/2026
Typical 20 6 days 4/29/2026 5/7/2026
Typical 21 (Refuge Floor) 7 days 5/4/2026 5/12/2026
Typical 22 6 days 5/9/2026 5/16/2026
Terrace Floor 6 days 5/12/2026 5/19/2026
Common Area & Lift Lobby Finishing 155 days 11/2/2025 5/7/2026

Terrace Pedestal and Bracket Fixing 14 days 12/13/2025 12/30/2025

External MS Grill Fixing in Toilet Duct


32 days 11/8/2025 12/16/2025
Areas
Basement Putty 42 days 12/10/2025 1/29/2026
Electrical Works in lift Lobby Areas - 1st
27 days 1/30/2026 3/3/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
21 days 3/3/2026 3/28/2026
Testing
Block Masonry & Plaster Work in Lift
60 days 11/2/2025 1/12/2026
Lobby Areas
Lift Area Stone Cladding 60 days 11/26/2025 2/6/2026
Door Frame Fixing of FD and other
22 days 2/7/2026 3/6/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 2/25/2026 3/21/2026

Electrical Wire Pulling and GI Box Fixing


20 days 3/28/2026 4/21/2026
in Lift Lobby Areas

FA/PA and ELV works 1st fix 20 days 3/30/2026 4/22/2026


False Ceiling in Lift Lobby Area 22 days 4/3/2026 4/29/2026
Putty in Lift in Lobby Areas 22 days 4/8/2026 5/5/2026
Primer & Internal Painting 1st Coat in
20 days 4/13/2026 5/7/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 4/19/2026 5/4/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 4/19/2026 5/3/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 151 days 10/27/2025 4/26/2026


Staircase - Window Framing 40 days 10/27/2025 12/13/2025

Staircase - Electrical Works - Conduiting


40 days 10/27/2025 12/13/2025
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 48 days 11/2/2025 12/29/2025


Staircase - Railing Fixing 53 days 11/14/2025 1/15/2026
Staircase - Flooring 60 days 11/19/2025 1/29/2026
Staircase - Electrical Wire pulling and GI
42 days 11/14/2025 1/2/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 1/2/2026 2/8/2026

Staircase - Putty 35 days 1/14/2026 2/26/2026

Staircase - Primer & Internal Painting


34 days 1/20/2026 3/3/2026
1st Coat

Staircase - Doors and window shutter


30 days 2/2/2026 3/11/2026
fixing
Staircase - Switch Socket Fixing &
25 days 2/8/2026 3/11/2026
Electrical Fittings Fixing

2nd coat Painting 60 days 2/13/2026 4/26/2026

External Paint 80 days 2/13/2026 5/21/2026

Waterproofing above Terrace 86 days 11/8/2025 2/19/2026

Waterproofing of Lift Pit 28 days 11/8/2025 12/11/2025

Waterproofing of OH Tank 28 days 11/26/2025 12/29/2025

Waterproofing of LMR Top Slab 28 days 12/13/2025 1/15/2026

Waterproofing Terrace Slab 28 days 1/15/2026 2/19/2026

Finishing and MEP Works in Ducts 81 days 10/10/2025 1/15/2026

All rounder paint in Kitchen and toilet


33 days 10/10/2025 11/20/2025
Ducts

All rounder paint in Electrical, ELV and


30 days 10/23/2025 11/28/2025
Fire Ducts
S W R Downtake lines - Common
27 days 11/20/2025 12/22/2025
Plumbing works
Electrical Works in Ducts - Common
30 days 11/28/2025 1/2/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
26 days 12/16/2025 1/15/2026
Common Fire Fighting Works
Lift Work 110 days 10/14/2025 2/24/2026
Scaffolding in Lift Shafts 7 days 10/14/2025 10/23/2025
White Wash in Lift Shafts 7 days 10/23/2025 11/1/2025
Electrical work in Lift Shafts 8 days 11/1/2025 11/10/2025
Ladder Fixing for OHT and LMR Slab 6 days 11/10/2025 11/17/2025
All Rounder PAINT in LMR 6 days 11/18/2025 11/25/2025
Electrical work in LMR 9 days 11/25/2025 12/5/2025
Trap Door Fixing 5 days 11/25/2025 12/1/2025
Handover of LMR to Lift Agency 4 days 11/10/2025 11/15/2025
Lift Templet Fixing 14 days 11/15/2025 12/2/2025
Lift Works 70 days 12/2/2025 2/24/2026
Parking Area 138 days 11/20/2025 5/5/2026
Finishing & MEP Works 138 days 11/20/2025 5/5/2026

Painting on Ceiling surfaces 30 days 11/20/2025 12/25/2025

Painting on Wall surfaces 1st Coat 44 days 12/4/2025 1/25/2026


Basement and Podium Levels
22 days 1/25/2026 2/21/2026
Electrical Works & Testing

Basement & Podium Levels Fire


fighting Hydrants and Sprinkler pipe fixing & 22 days 2/21/2026 3/20/2026
testing

Basement & Podium Levels PHE Line


17 days 3/20/2026 4/9/2026
Fixing & testing

VDF in Parking Area 48 days 2/9/2026 4/8/2026

Fixing Paver Blocks at Podium Levels 45 days 2/9/2026 4/4/2026

Driveway and Parking Area Markings 30 days 3/16/2026 4/20/2026

Fixing of Signages in Basement and


20 days 4/4/2026 4/28/2026
podium levels

Deep Cleaning 42 days 3/16/2026 5/5/2026

Snagging Desnagging & Handover 120 days 1/2/2026 5/28/2026

Wing E 946 days 5/22/2023 7/6/2026


Sub Structure 260 days 5/22/2023 3/30/2024

Excavation level 40 days 5/22/2023 7/8/2023

Inclined Rock Anchor 40 days 6/9/2023 7/26/2023

Excavation Level 2 34 days 7/14/2023 8/24/2023

Anti Termitte 12 days 8/18/2023 9/2/2023


Plain Cement Concrete 12 days 8/18/2023 9/2/2023
Passive Rock Anchor 26 days 8/20/2023 9/20/2023
Waterproofing below raft 27 days 8/26/2023 9/27/2023
Raft Reinforcement 36 days 9/1/2023 10/14/2023
Raft Shuttering 34 days 9/5/2023 10/17/2023
Raft Concrete 12 days 10/11/2023 10/26/2023
Basement - 2 Slab Pour 1 51 days 10/28/2023 12/28/2023
Col & RW Reinforcement 19 days 10/28/2023 11/20/2023

Col & RW Shuttering 17 days 11/3/2023 11/24/2023

Col & RW Concrete 17 days 11/8/2023 11/29/2023


Slab Decking 16 days 11/16/2023 12/5/2023
Slab RF 16 days 12/7/2023 12/26/2023
Slab Concrete 1 day 12/27/2023 12/28/2023
Basement - 2 Slab Pour 2 51 days 11/27/2023 1/25/2024
Col & RW Reinforcement 19 days 11/27/2023 12/19/2023
Col & RW Shuttering 17 days 12/2/2023 12/22/2023
Col & RW Concrete 17 days 12/7/2023 12/27/2023
Slab Decking 16 days 12/14/2023 1/2/2024
Slab RF 16 days 1/4/2024 1/23/2024
Slab Concrete 1 day 1/24/2024 1/25/2024
Basement 1 Slab Pour 1 49 days 12/30/2023 2/28/2024
Col & RW Reinforcement 19 days 12/30/2023 1/22/2024
Col & RW Shuttering 17 days 1/3/2024 1/23/2024
Col & RW Concrete 17 days 1/8/2024 1/29/2024
Slab Decking 16 days 1/12/2024 2/1/2024
Slab RF 18 days 2/4/2024 2/25/2024
Slab Concrete 1 day 2/27/2024 2/28/2024
Basement 1 Slab Pour 2 51 days 1/29/2024 3/30/2024
Col & RW Reinforcement 19 days 1/29/2024 2/21/2024
Col & RW Shuttering 17 days 2/4/2024 2/24/2024
Col & RW Concrete 17 days 2/9/2024 2/29/2024
Slab Decking 16 days 2/16/2024 3/6/2024
Slab RF 16 days 3/8/2024 3/28/2024
Slab Concrete 1 day 3/29/2024 3/30/2024
Super Structure 507 days 3/1/2024 11/4/2025
GF slab Pour 1 51 days 3/1/2024 5/2/2024

Col Reinforcement 19 days 3/1/2024 3/23/2024

Col Shuttering 17 days 3/7/2024 3/28/2024


Col Concrete 17 days 3/12/2024 4/2/2024
Slab Decking 16 days 3/19/2024 4/8/2024
Slab RF 16 days 4/10/2024 4/29/2024
Slab Concrete 1 day 4/30/2024 5/2/2024
GF slab Pour 2 49 days 4/2/2024 5/31/2024
Col Reinforcement 19 days 4/2/2024 4/24/2024
Col Shuttering 17 days 4/8/2024 4/28/2024
Col Concrete 17 days 4/12/2024 5/3/2024
Slab Decking 16 days 4/17/2024 5/7/2024
Slab RF 16 days 5/10/2024 5/29/2024
Slab Concrete 1 day 5/30/2024 5/31/2024
Plinth Level Checking 15 days 6/1/2024 6/19/2024
Podium 1 Slab 41 days 6/20/2024 8/7/2024
Col Reinforcement 14 days 6/20/2024 7/6/2024
Col Shuttering 18 days 6/25/2024 7/16/2024
Col Concrete 19 days 6/29/2024 7/22/2024
Slab Decking 23 days 7/5/2024 8/1/2024
Slab RF 21 days 7/11/2024 8/5/2024
Slab Concrete 1 day 8/6/2024 8/7/2024
Typical 1 35 days 8/9/2024 9/20/2024
Vertical Reinforcement 13 days 8/9/2024 8/25/2024
Vertical Shuttering 19 days 8/12/2024 9/5/2024
Slab Decking 23 days 8/19/2024 9/16/2024
Beam & slab Reinforcement 21 days 8/24/2024 9/18/2024
Slab Concrete 1 day 9/19/2024 9/20/2024
Typical 2 35 days 9/21/2024 11/5/2024
Vertical Reinforcement 13 days 9/21/2024 10/8/2024
Vertical Shuttering 19 days 9/25/2024 10/19/2024
Slab Decking 23 days 10/1/2024 10/30/2024
Beam & slab Reinforcement 21 days 10/7/2024 11/2/2024
Slab Concrete 1 day 11/4/2024 11/5/2024
Typical 3 11 days 11/6/2024 11/19/2024
Vertical Reinforcement 4 days 11/6/2024 11/11/2024
Vertical Shuttering 5 days 11/8/2024 11/14/2024
Slab Decking 4 days 11/11/2024 11/15/2024
Beam & slab Reinforcement 3 days 11/13/2024 11/17/2024
Slab Concrete 1 day 11/18/2024 11/19/2024
Typical 4 11 days 11/20/2024 12/3/2024
Vertical Reinforcement 4 days 11/20/2024 11/25/2024
Vertical Shuttering 5 days 11/23/2024 11/29/2024
Slab Decking 4 days 11/25/2024 11/30/2024
Beam & slab Reinforcement 3 days 11/28/2024 12/1/2024
Slab Concrete 1 day 12/2/2024 12/3/2024
Typical 5 11 days 12/5/2024 12/18/2024
Vertical Reinforcement 4 days 12/5/2024 12/9/2024
Vertical Shuttering 5 days 12/7/2024 12/13/2024
Slab Decking 4 days 12/10/2024 12/14/2024
Beam & slab Reinforcement 3 days 12/12/2024 12/15/2024
Slab Concrete 1 day 12/17/2024 12/18/2024
Typical 6 11 days 12/19/2024 1/1/2025
Vertical Reinforcement 4 days 12/19/2024 12/24/2024
Vertical Shuttering 5 days 12/21/2024 12/27/2024
Slab Decking 4 days 12/24/2024 12/28/2024
Beam & slab Reinforcement 3 days 12/26/2024 12/30/2024
Slab Concrete 1 day 12/31/2024 1/1/2025
Typical 7 (Refuge Floor) 15 days 1/2/2025 1/20/2025
Vertical Reinforcement 7 days 1/2/2025 1/10/2025
Vertical Shuttering 9 days 1/4/2025 1/15/2025
Slab Decking 8 days 1/9/2025 1/18/2025
Beam & slab Reinforcement 5 days 1/11/2025 1/17/2025

Slab Concrete 1 day 1/18/2025 1/20/2025

Typical 8 15 days 1/21/2025 2/8/2025


Vertical Reinforcement 7 days 1/21/2025 1/30/2025
Vertical Shuttering 9 days 1/23/2025 2/4/2025
Slab Decking 8 days 1/29/2025 2/7/2025
Beam & slab Reinforcement 5 days 1/31/2025 2/6/2025
Slab Concrete 1 day 2/7/2025 2/8/2025
Typical 9 11 days 2/10/2025 2/22/2025
Vertical Reinforcement 4 days 2/10/2025 2/14/2025
Vertical Shuttering 5 days 2/12/2025 2/18/2025
Slab Decking 4 days 2/14/2025 2/19/2025
Beam & slab Reinforcement 3 days 2/17/2025 2/20/2025
Slab Concrete 1 day 2/21/2025 2/22/2025
Typical 10 11 days 2/24/2025 3/8/2025
Vertical Reinforcement 4 days 2/24/2025 2/28/2025
Vertical Shuttering 5 days 2/26/2025 3/4/2025
Slab Decking 4 days 2/28/2025 3/5/2025
Beam & slab Reinforcement 3 days 3/3/2025 3/6/2025
Slab Concrete 1 day 3/7/2025 3/8/2025
Typical 11 11 days 3/10/2025 3/24/2025
Vertical Reinforcement 4 days 3/10/2025 3/15/2025
Vertical Shuttering 5 days 3/12/2025 3/19/2025
Slab Decking 4 days 3/15/2025 3/20/2025
Beam & slab Reinforcement 3 days 3/18/2025 3/21/2025
Slab Concrete 1 day 3/22/2025 3/24/2025
Typical 12 11 days 3/25/2025 4/7/2025
Vertical Reinforcement 4 days 3/25/2025 3/29/2025
Vertical Shuttering 5 days 3/27/2025 4/2/2025
Slab Decking 4 days 3/30/2025 4/3/2025
Beam & slab Reinforcement 3 days 4/1/2025 4/4/2025
Slab Concrete 1 day 4/6/2025 4/7/2025
Typical 13 11 days 4/8/2025 4/21/2025
Vertical Reinforcement 4 days 4/8/2025 4/13/2025
Vertical Shuttering 5 days 4/11/2025 4/16/2025
Slab Decking 4 days 4/13/2025 4/18/2025
Beam & slab Reinforcement 3 days 4/15/2025 4/19/2025
Slab Concrete 1 day 4/20/2025 4/21/2025
Typical 14 (Refuge Floor) 15 days 4/23/2025 5/11/2025
Vertical Reinforcement 7 days 4/23/2025 5/2/2025
Vertical Shuttering 9 days 4/25/2025 5/7/2025
Slab Decking 8 days 4/30/2025 5/10/2025
Beam & slab Reinforcement 5 days 5/3/2025 5/9/2025
Slab Concrete 1 day 5/10/2025 5/11/2025
Typical 15 15 days 5/13/2025 5/30/2025
Vertical Reinforcement 7 days 5/13/2025 5/21/2025
Vertical Shuttering 9 days 5/15/2025 5/26/2025
Slab Decking 8 days 5/20/2025 5/29/2025
Beam & slab Reinforcement 5 days 5/22/2025 5/28/2025
Slab Concrete 1 day 5/29/2025 5/30/2025
Typical 16 11 days 5/31/2025 6/13/2025
Vertical Reinforcement 4 days 5/31/2025 6/5/2025
Vertical Shuttering 5 days 6/3/2025 6/9/2025
Slab Decking 4 days 6/5/2025 6/10/2025
Beam & slab Reinforcement 3 days 6/7/2025 6/11/2025
Slab Concrete 1 day 6/12/2025 6/13/2025
Typical 17 11 days 6/14/2025 6/27/2025
Vertical Reinforcement 4 days 6/14/2025 6/19/2025
Vertical Shuttering 5 days 6/17/2025 6/23/2025
Slab Decking 4 days 6/19/2025 6/24/2025
Beam & slab Reinforcement 3 days 6/21/2025 6/25/2025
Slab Concrete 1 day 6/26/2025 6/27/2025
Typical 18 11 days 6/29/2025 7/12/2025
Vertical Reinforcement 4 days 6/29/2025 7/3/2025
Vertical Shuttering 5 days 7/1/2025 7/7/2025
Slab Decking 4 days 7/3/2025 7/8/2025
Beam & slab Reinforcement 3 days 7/6/2025 7/9/2025
Slab Concrete 1 day 7/11/2025 7/12/2025
Typical 19 11 days 7/13/2025 7/26/2025
Vertical Reinforcement 4 days 7/13/2025 7/18/2025
Vertical Shuttering 5 days 7/15/2025 7/21/2025
Slab Decking 4 days 7/18/2025 7/22/2025
Beam & slab Reinforcement 3 days 7/20/2025 7/24/2025
Slab Concrete 1 day 7/25/2025 7/26/2025
Typical 20 11 days 7/27/2025 8/9/2025
Vertical Reinforcement 4 days 7/27/2025 8/1/2025
Vertical Shuttering 5 days 7/30/2025 8/5/2025
Slab Decking 4 days 8/1/2025 8/6/2025
Beam & slab Reinforcement 3 days 8/4/2025 8/7/2025
Slab Concrete 1 day 8/8/2025 8/9/2025
Typical 21 (Refuge Floor) 15 days 8/11/2025 8/29/2025
Vertical Reinforcement 7 days 8/11/2025 8/20/2025
Vertical Shuttering 9 days 8/13/2025 8/25/2025
Slab Decking 8 days 8/19/2025 8/28/2025
Beam & slab Reinforcement 5 days 8/21/2025 8/27/2025
Slab Concrete 1 day 8/28/2025 8/29/2025
Typical 22 15 days 8/30/2025 9/17/2025
Vertical Reinforcement 7 days 8/30/2025 9/8/2025
Vertical Shuttering 9 days 9/2/2025 9/12/2025
Slab Decking 8 days 9/6/2025 9/16/2025
Beam & slab Reinforcement 5 days 9/9/2025 9/15/2025
Slab Concrete 1 day 9/16/2025 9/17/2025
Terrace Floor 15 days 9/18/2025 10/8/2025
Vertical Reinforcement 7 days 9/18/2025 9/26/2025
Vertical Shuttering 9 days 9/20/2025 10/3/2025
Slab Decking 8 days 9/25/2025 10/7/2025
Beam & slab Reinforcement 5 days 9/28/2025 10/6/2025
Slab Concrete 1 day 10/7/2025 10/8/2025
OHT LMR 21 days 10/9/2025 11/4/2025
Col RF 6 days 10/9/2025 10/16/2025

Col Shuttering 8 days 10/13/2025 10/23/2025

Col Concrete 8 days 10/15/2025 10/26/2025


Beam & Slab Decking (LMR & OHT) 11 days 10/16/2025 10/30/2025
Beam & Slab RF 12 days 10/18/2025 11/2/2025

Concrete 1 day 11/3/2025 11/4/2025

Finishing Works 417 days 2/1/2025 6/19/2026


Blockwork 270 days 2/1/2025 12/24/2025

Basement 3 9 days 2/1/2025 2/12/2025

Basement 2 9 days 2/10/2025 2/20/2025


Basement 1 9 days 2/18/2025 2/28/2025

GF 9 days 2/26/2025 3/8/2025

Typical 1 9 days 3/10/2025 3/21/2025

Typical 2 9 days 3/22/2025 4/2/2025

Typical 3 9 days 4/3/2025 4/14/2025

Typical 4 9 days 4/15/2025 4/26/2025

Typical 5 9 days 4/27/2025 5/9/2025

Typical 6 9 days 5/10/2025 5/21/2025

Typical 7 (Refuge Floor) 9 days 5/22/2025 6/2/2025

Typical 8 9 days 6/3/2025 6/13/2025

Typical 9 9 days 6/14/2025 6/25/2025

Typical 10 9 days 6/26/2025 7/7/2025

Typical 11 9 days 7/8/2025 7/19/2025

Typical 12 9 days 7/20/2025 7/31/2025

Typical 13 9 days 8/1/2025 8/12/2025


Typical 14 (Refuge Floor) 9 days 8/13/2025 8/25/2025

Typical 15 9 days 8/26/2025 9/5/2025

Typical 16 9 days 9/6/2025 9/17/2025

Typical 17 9 days 9/18/2025 9/29/2025

Typical 18 9 days 9/30/2025 10/13/2025

Typical 19 9 days 10/14/2025 10/26/2025

Typical 20 9 days 10/27/2025 11/7/2025

Typical 21 (Refuge Floor) 9 days 11/8/2025 11/19/2025

Typical 22 9 days 11/20/2025 12/1/2025

Terrace Floor 9 days 12/2/2025 12/12/2025

OHT LMR 9 days 12/13/2025 12/24/2025


Plaster 261 days 2/6/2025 12/18/2025
Basement 3 10 days 2/6/2025 2/18/2025
Basement 2 10 days 2/14/2025 2/26/2025
Basement 1 10 days 2/22/2025 3/6/2025
GF 10 days 3/3/2025 3/15/2025
Typical 1 10 days 3/15/2025 3/27/2025
Typical 2 10 days 3/27/2025 4/8/2025
Typical 3 10 days 4/8/2025 4/20/2025

Typical 4 10 days 4/20/2025 5/3/2025

Typical 5 10 days 5/3/2025 5/15/2025


Typical 6 10 days 5/15/2025 5/27/2025
Typical 7 (Refuge Floor) 10 days 5/27/2025 6/7/2025
Typical 8 10 days 6/7/2025 6/19/2025
Typical 9 10 days 6/19/2025 7/1/2025
Typical 10 10 days 7/1/2025 7/13/2025
Typical 11 10 days 7/13/2025 7/25/2025
Typical 12 10 days 7/25/2025 8/6/2025
Typical 13 10 days 8/6/2025 8/19/2025
Typical 14 (Refuge Floor) 10 days 8/19/2025 8/30/2025
Typical 15 10 days 8/30/2025 9/11/2025
Typical 16 10 days 9/11/2025 9/23/2025
Typical 17 10 days 9/23/2025 10/7/2025
Typical 18 10 days 10/7/2025 10/19/2025
Typical 19 10 days 10/19/2025 11/1/2025
Typical 20 10 days 11/1/2025 11/13/2025
Typical 21 (Refuge Floor) 10 days 11/13/2025 11/25/2025
Typical 22 10 days 11/25/2025 12/6/2025
Terrace Floor 10 days 11/25/2025 12/6/2025
OHT LMR 10 days 12/6/2025 12/18/2025

Preparation of toilet waterproofing &


276 days 5/4/2025 4/2/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 5/4/2025 5/19/2025


Typical 2 12 days 5/19/2025 6/2/2025
Typical 3 12 days 6/2/2025 6/16/2025

Typical 4 12 days 6/16/2025 6/30/2025

Typical 5 12 days 6/30/2025 7/14/2025


Typical 6 12 days 7/14/2025 7/28/2025
Typical 7 (Refuge Floor) 12 days 7/29/2025 8/12/2025
Typical 8 12 days 8/12/2025 8/27/2025
Typical 9 12 days 8/27/2025 9/10/2025
Typical 10 12 days 9/10/2025 9/24/2025
Typical 11 12 days 9/24/2025 10/10/2025
Typical 12 12 days 10/10/2025 10/26/2025
Typical 13 12 days 10/26/2025 11/9/2025
Typical 14 (Refuge Floor) 12 days 11/9/2025 11/23/2025
Typical 15 12 days 11/24/2025 12/8/2025
Typical 16 12 days 12/8/2025 12/22/2025
Typical 17 12 days 12/22/2025 1/5/2026
Typical 18 12 days 1/5/2026 1/19/2026
Typical 19 12 days 1/19/2026 2/3/2026
Typical 20 12 days 2/3/2026 2/18/2026
Typical 21 (Refuge Floor) 12 days 2/18/2026 3/5/2026
Typical 22 12 days 3/5/2026 3/19/2026
Terrace Floor 12 days 3/19/2026 4/2/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 7/1/2025 4/6/2026
and Kitchen with Plaster
Typical 1 10 days 7/1/2025 7/13/2025
Typical 2 10 days 7/13/2025 7/25/2025
Typical 3 10 days 7/25/2025 8/6/2025

Typical 4 10 days 8/6/2025 8/19/2025

Typical 5 10 days 8/19/2025 8/30/2025


Typical 6 10 days 8/30/2025 9/11/2025
Typical 7 (Refuge Floor) 10 days 9/11/2025 9/23/2025
Typical 8 10 days 9/23/2025 10/7/2025
Typical 9 10 days 10/7/2025 10/19/2025
Typical 10 10 days 10/19/2025 11/1/2025
Typical 11 10 days 11/1/2025 11/13/2025
Typical 12 10 days 11/13/2025 11/25/2025
Typical 13 10 days 11/25/2025 12/6/2025
Typical 14 (Refuge Floor) 10 days 12/6/2025 12/18/2025
Typical 15 10 days 12/18/2025 12/30/2025
Typical 16 10 days 12/30/2025 1/10/2026
Typical 17 10 days 1/11/2026 1/22/2026
Typical 18 10 days 1/23/2026 2/4/2026
Typical 19 10 days 2/5/2026 2/16/2026
Typical 20 10 days 2/17/2026 2/28/2026
Typical 21 (Refuge Floor) 10 days 2/28/2026 3/13/2026
Typical 22 10 days 3/13/2026 3/25/2026
Terrace Floor 10 days 3/25/2026 4/6/2026
Granite Door Jambs ,window sill Fixing
184 days 8/20/2025 3/31/2026
and Dado in Toilets
Typical 1 8 days 8/20/2025 8/29/2025
Typical 2 8 days 8/29/2025 9/8/2025
Typical 3 8 days 9/8/2025 9/17/2025

Typical 4 8 days 9/17/2025 9/26/2025

Typical 5 8 days 9/26/2025 10/8/2025


Typical 6 8 days 10/8/2025 10/17/2025
Typical 7 (Refuge Floor) 8 days 10/18/2025 10/28/2025
Typical 8 8 days 10/28/2025 11/7/2025
Typical 9 8 days 11/7/2025 11/16/2025
Typical 10 8 days 11/16/2025 11/26/2025
Typical 11 8 days 11/26/2025 12/5/2025
Typical 12 8 days 12/5/2025 12/15/2025
Typical 13 8 days 12/15/2025 12/24/2025
Typical 14 (Refuge Floor) 8 days 12/24/2025 1/2/2026
Typical 15 8 days 1/2/2026 1/12/2026
Typical 16 8 days 1/12/2026 1/21/2026
Typical 17 8 days 1/21/2026 2/1/2026
Typical 18 8 days 2/1/2026 2/10/2026
Typical 19 8 days 2/11/2026 2/20/2026
Typical 20 8 days 2/20/2026 3/2/2026
Typical 21 (Refuge Floor) 8 days 3/2/2026 3/12/2026
Typical 22 8 days 3/12/2026 3/21/2026
Terrace Floor 8 days 3/21/2026 3/31/2026
Door & Window Frame Fixing incl alu
161 days 9/28/2025 4/11/2026
joineries fixing
Typical 1 7 days 9/28/2025 10/8/2025
Typical 2 7 days 10/8/2025 10/16/2025
Typical 3 7 days 10/16/2025 10/26/2025

Typical 4 7 days 10/26/2025 11/3/2025

Typical 5 7 days 11/3/2025 11/11/2025


Typical 6 7 days 11/12/2025 11/20/2025
Typical 7 (Refuge Floor) 7 days 11/20/2025 11/28/2025
Typical 8 7 days 11/28/2025 12/6/2025
Typical 9 7 days 12/6/2025 12/15/2025
Typical 10 7 days 12/15/2025 12/23/2025
Typical 11 7 days 12/23/2025 12/31/2025
Typical 12 7 days 12/31/2025 1/8/2026
Typical 13 7 days 1/8/2026 1/16/2026
Typical 14 (Refuge Floor) 7 days 1/17/2026 1/25/2026
Typical 15 7 days 1/25/2026 2/3/2026
Typical 16 7 days 2/3/2026 2/12/2026
Typical 17 7 days 2/12/2026 2/20/2026
Typical 18 7 days 2/20/2026 2/28/2026
Typical 19 7 days 2/28/2026 3/10/2026
Typical 20 7 days 3/10/2026 3/18/2026
Typical 21 (Refuge Floor) 7 days 3/18/2026 3/26/2026
Typical 22 7 days 3/26/2026 4/3/2026
Terrace Floor 7 days 4/3/2026 4/11/2026
Fire Fighting Works 138 days 11/4/2025 4/18/2026
Typical 1 6 days 11/4/2025 11/11/2025
Typical 2 6 days 11/12/2025 11/19/2025
Typical 3 6 days 11/19/2025 11/26/2025

Typical 4 6 days 11/26/2025 12/3/2025

Typical 5 6 days 12/3/2025 12/10/2025


Typical 6 6 days 12/10/2025 12/17/2025
Typical 7 (Refuge Floor) 6 days 12/17/2025 12/24/2025
Typical 8 6 days 12/24/2025 12/31/2025
Typical 9 6 days 12/31/2025 1/7/2026
Typical 10 6 days 1/7/2026 1/14/2026
Typical 11 6 days 1/14/2026 1/21/2026
Typical 12 6 days 1/21/2026 1/29/2026
Typical 13 6 days 1/30/2026 2/6/2026
Typical 14 (Refuge Floor) 6 days 2/6/2026 2/13/2026
Typical 15 6 days 2/13/2026 2/20/2026
Typical 16 6 days 2/20/2026 2/27/2026
Typical 17 6 days 2/27/2026 3/7/2026
Typical 18 6 days 3/7/2026 3/14/2026
Typical 19 6 days 3/14/2026 3/21/2026
Typical 20 6 days 3/21/2026 3/28/2026
Typical 21 (Refuge Floor) 6 days 3/28/2026 4/4/2026
Typical 22 6 days 4/4/2026 4/11/2026
Terrace Floor 6 days 4/11/2026 4/18/2026
Putty and Primer & 1 st coat Paint 117 days 12/4/2025 4/23/2026

Typical 1 7 days 12/4/2025 12/12/2025

Typical 2 7 days 12/10/2025 12/18/2025


Typical 3 7 days 12/16/2025 12/24/2025

Typical 4 7 days 12/22/2025 12/30/2025

Typical 5 7 days 12/27/2025 1/5/2026


Typical 6 7 days 1/2/2026 1/10/2026
Typical 7 (Refuge Floor) 7 days 1/8/2026 1/16/2026
Typical 8 7 days 1/14/2026 1/22/2026
Typical 9 7 days 1/20/2026 1/29/2026
Typical 10 7 days 1/27/2026 2/4/2026
Typical 11 7 days 2/2/2026 2/10/2026
Typical 12 7 days 2/8/2026 2/16/2026
Typical 13 7 days 2/14/2026 2/22/2026
Typical 14 (Refuge Floor) 7 days 2/20/2026 2/28/2026
Typical 15 7 days 2/26/2026 3/7/2026
Typical 16 7 days 3/5/2026 3/13/2026
Typical 17 7 days 3/11/2026 3/19/2026
Typical 18 7 days 3/17/2026 3/25/2026
Typical 19 7 days 3/23/2026 3/31/2026
Typical 20 7 days 3/28/2026 4/6/2026
Typical 21 (Refuge Floor) 7 days 4/3/2026 4/11/2026
Typical 22 7 days 4/9/2026 4/17/2026
Terrace Floor 7 days 4/15/2026 4/23/2026
Flooring and kitchen platform fixing 117 days 12/31/2025 5/22/2026
Typical 1 7 days 12/31/2025 1/8/2026
Typical 2 7 days 1/6/2026 1/14/2026
Typical 3 7 days 1/12/2026 1/20/2026
Typical 4 7 days 1/18/2026 1/27/2026

Typical 5 7 days 1/24/2026 2/2/2026


Typical 6 7 days 1/31/2026 2/8/2026
Typical 7 (Refuge Floor) 7 days 2/6/2026 2/14/2026
Typical 8 7 days 2/12/2026 2/20/2026
Typical 9 7 days 2/18/2026 2/26/2026
Typical 10 7 days 2/24/2026 3/5/2026
Typical 11 7 days 3/2/2026 3/11/2026
Typical 12 7 days 3/9/2026 3/17/2026
Typical 13 7 days 3/14/2026 3/23/2026
Typical 14 (Refuge Floor) 7 days 3/20/2026 3/28/2026
Typical 15 7 days 3/26/2026 4/3/2026
Typical 16 7 days 4/1/2026 4/9/2026
Typical 17 7 days 4/7/2026 4/15/2026
Typical 18 7 days 4/13/2026 4/21/2026
Typical 19 7 days 4/19/2026 4/27/2026
Typical 20 7 days 4/25/2026 5/4/2026
Typical 21 (Refuge Floor) 7 days 5/2/2026 5/10/2026
Typical 22 7 days 5/8/2026 5/16/2026
Terrace Floor 7 days 5/14/2026 5/22/2026

Door Shutter and window shutter fixing 93 days 1/28/2026 5/21/2026

Typical 1 5 days 1/28/2026 2/3/2026


Typical 2 5 days 2/2/2026 2/8/2026
Typical 3 5 days 2/7/2026 2/13/2026

Typical 4 5 days 2/12/2026 2/18/2026

Typical 5 5 days 2/17/2026 2/22/2026


Typical 6 5 days 2/21/2026 2/27/2026
Typical 7 (Refuge Floor) 5 days 2/26/2026 3/5/2026
Typical 8 5 days 3/3/2026 3/10/2026
Typical 9 5 days 3/9/2026 3/14/2026
Typical 10 5 days 3/13/2026 3/19/2026
Typical 11 5 days 3/18/2026 3/24/2026
Typical 12 5 days 3/23/2026 3/28/2026
Typical 13 5 days 3/27/2026 4/2/2026
Typical 14 (Refuge Floor) 5 days 4/1/2026 4/7/2026
Typical 15 5 days 4/6/2026 4/11/2026
Typical 16 5 days 4/10/2026 4/16/2026
Typical 17 5 days 4/15/2026 4/21/2026
Typical 18 5 days 4/20/2026 4/26/2026
Typical 19 5 days 4/25/2026 4/30/2026
Typical 20 5 days 4/29/2026 5/6/2026
Typical 21 (Refuge Floor) 5 days 5/5/2026 5/11/2026
Typical 22 5 days 5/10/2026 5/16/2026
Terrace Floor 5 days 5/15/2026 5/21/2026
CP Sanitary Fixing,Electrical fixtures
71 days 2/19/2026 5/16/2026
fixing
Typical 1 5 days 2/19/2026 2/25/2026
Typical 2 5 days 2/23/2026 2/28/2026

Typical 3 5 days 2/26/2026 3/5/2026

Typical 4 5 days 3/2/2026 3/9/2026


Typical 5 5 days 3/6/2026 3/12/2026
Typical 6 5 days 3/10/2026 3/16/2026
Typical 7 (Refuge Floor) 5 days 3/13/2026 3/19/2026
Typical 8 5 days 3/17/2026 3/23/2026
Typical 9 5 days 3/20/2026 3/26/2026
Typical 10 5 days 3/24/2026 3/30/2026
Typical 11 5 days 3/27/2026 4/2/2026
Typical 12 5 days 3/31/2026 4/6/2026
Typical 13 5 days 4/3/2026 4/9/2026
Typical 14 (Refuge Floor) 5 days 4/7/2026 4/13/2026
Typical 15 5 days 4/10/2026 4/16/2026
Typical 16 5 days 4/14/2026 4/20/2026
Typical 17 5 days 4/17/2026 4/23/2026
Typical 18 5 days 4/21/2026 4/27/2026
Typical 19 5 days 4/25/2026 4/30/2026
Typical 20 5 days 4/28/2026 5/5/2026
Typical 21 (Refuge Floor) 5 days 5/3/2026 5/9/2026
Typical 22 5 days 5/6/2026 5/12/2026
Terrace Floor 5 days 5/10/2026 5/16/2026
Second coat painting 49 days 3/6/2026 5/4/2026
Typical 1 5 days 3/6/2026 3/12/2026
Typical 2 5 days 3/9/2026 3/14/2026
Typical 3 5 days 3/11/2026 3/17/2026
Typical 4 5 days 3/13/2026 3/19/2026
Typical 5 5 days 3/16/2026 3/21/2026
Typical 6 5 days 3/18/2026 3/24/2026
Typical 7 (Refuge Floor) 5 days 3/20/2026 3/26/2026
Typical 8 5 days 3/23/2026 3/28/2026
Typical 9 5 days 3/25/2026 3/31/2026
Typical 10 5 days 3/27/2026 4/2/2026
Typical 11 5 days 3/30/2026 4/4/2026
Typical 12 5 days 4/1/2026 4/7/2026
Typical 13 5 days 4/3/2026 4/9/2026
Typical 14 (Refuge Floor) 5 days 4/6/2026 4/11/2026
Typical 15 5 days 4/8/2026 4/14/2026
Typical 16 5 days 4/10/2026 4/16/2026
Typical 17 5 days 4/13/2026 4/18/2026
Typical 18 5 days 4/15/2026 4/21/2026
Typical 19 5 days 4/17/2026 4/23/2026
Typical 20 5 days 4/20/2026 4/26/2026
Typical 21 (Refuge Floor) 5 days 4/22/2026 4/28/2026
Typical 22 5 days 4/25/2026 4/30/2026
Terrace Floor 5 days 4/27/2026 5/4/2026
Common Area & Lift Lobby Finishing 142 days 11/8/2025 4/27/2026

Terrace Pedestal and Bracket Fixing 14 days 1/14/2026 2/1/2026

External MS Grill Fixing in Toilet Duct


34 days 12/10/2025 1/19/2026
Areas
Basement Putty 42 days 12/16/2025 2/4/2026
Electrical Works in lift Lobby Areas - 1st
27 days 2/5/2026 3/10/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
27 days 3/10/2026 4/10/2026
Testing
Block Masonry & Plaster Work in Lift
62 days 11/8/2025 1/20/2026
Lobby Areas
Lift Area Stone Cladding 62 days 12/2/2025 2/14/2026
Door Frame Fixing of FD and other
22 days 2/15/2026 3/14/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 3/6/2026 3/30/2026

Electrical Wire Pulling and GI Box Fixing


20 days 3/18/2026 4/10/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 3/19/2026 4/11/2026
False Ceiling in Lift Lobby Area 22 days 3/25/2026 4/20/2026
Putty in Lift in Lobby Areas 22 days 3/30/2026 4/24/2026

Primer & Internal Painting 1st Coat in


20 days 4/3/2026 4/27/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 4/9/2026 4/23/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 4/9/2026 4/22/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 151 days 11/28/2025 5/29/2026


Staircase - Window Framing 38 days 11/28/2025 1/12/2026
Staircase - Electrical Works - Conduiting
44 days 11/28/2025 1/19/2026
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 12/4/2025 2/2/2026

Staircase - Railing Fixing 55 days 12/16/2025 2/20/2026


Staircase - Flooring 60 days 12/20/2025 3/3/2026
Staircase - Electrical Wire pulling and GI
42 days 12/16/2025 2/4/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 2/5/2026 3/13/2026

Staircase - Putty 35 days 2/17/2026 3/31/2026

Staircase - Primer & Internal Painting


34 days 2/23/2026 4/4/2026
1st Coat

Staircase - Doors and window shutter


30 days 3/7/2026 4/11/2026
fixing
Staircase - Switch Socket Fixing &
25 days 3/13/2026 4/11/2026
Electrical Fittings Fixing

2nd coat Painting 60 days 3/18/2026 5/29/2026

External Paint 80 days 2/19/2026 5/27/2026

Waterproofing above Terrace 94 days 12/10/2025 4/2/2026

Waterproofing of Lift Pit 32 days 12/10/2025 1/16/2026

Waterproofing of OH Tank 32 days 12/27/2025 2/4/2026

Waterproofing of LMR Top Slab 32 days 1/14/2026 2/22/2026

Waterproofing Terrace Slab 32 days 2/23/2026 4/2/2026

Finishing and MEP Works in Ducts 93 days 11/12/2025 3/3/2026

All rounder paint in Kitchen and toilet


43 days 11/12/2025 1/1/2026
Ducts

All rounder paint in Electrical, ELV and


38 days 11/24/2025 1/7/2026
Fire Ducts
S W R Downtake lines - Common
25 days 1/1/2026 2/1/2026
Plumbing works
Electrical Works in Ducts - Common
30 days 1/7/2026 2/13/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
30 days 1/25/2026 3/3/2026
Common Fire Fighting Works
Lift Work 123 days 11/16/2025 4/13/2026
Scaffolding in Lift Shafts 9 days 11/16/2025 11/27/2025
White Wash in Lift Shafts 9 days 11/27/2025 12/8/2025
Electrical work in Lift Shafts 11 days 12/8/2025 12/20/2025
Ladder Fixing for OHT and LMR Slab 5 days 12/20/2025 12/26/2025
All Rounder PAINT in LMR 5 days 12/26/2025 1/1/2026
Electrical work in LMR 9 days 1/1/2026 1/12/2026
Trap Door Fixing 5 days 1/1/2026 1/7/2026
Handover of LMR to Lift Agency 4 days 12/20/2025 12/25/2025
Lift Template Fixing 15 days 12/25/2025 1/12/2026
Lift Works 75 days 1/12/2026 4/13/2026
Parking Area 140 days 1/1/2026 6/19/2026
Finishing & MEP Works 140 days 1/1/2026 6/19/2026

Painting on Ceiling surfaces 35 days 1/1/2026 2/13/2026

Painting on Wall surfaces 1st Coat 35 days 1/15/2026 2/27/2026


Basement and Podium Levels
24 days 2/27/2026 3/28/2026
Electrical Works & Testing

Basement & Podium Levels Fire


fighting Hydrants and Sprinkler pipe fixing & 22 days 3/28/2026 4/23/2026
testing

Basement & Podium Levels PHE Line


15 days 4/23/2026 5/12/2026
Fixing & testing

VDF in Parking Area 54 days 3/17/2026 5/21/2026

Fixing Paver Blocks at Podium Levels 45 days 3/17/2026 5/10/2026

Driveway and Parking Area Markings 30 days 4/26/2026 6/2/2026

Fixing of Signages in Basement and


20 days 5/15/2026 6/8/2026
podium levels

Deep Cleaning 43 days 4/28/2026 6/19/2026

Snagging Desnagging & Handover 120 days 2/12/2026 7/6/2026

Wing D 952 days 6/2/2023 7/23/2026


Sub Structure 266 days 6/2/2023 4/17/2024

Excavation level 40 days 6/2/2023 7/19/2023

Inclined Rock Anchor 40 days 6/20/2023 8/5/2023

Excavation Level 2 40 days 7/25/2023 9/11/2023

Anti Termitte 12 days 9/5/2023 9/20/2023


Plain Cement Concrete 12 days 9/5/2023 9/20/2023
Passive Rock Anchor 26 days 9/7/2023 10/9/2023
Waterproofing below raft 27 days 9/13/2023 10/16/2023
Raft Reinforcement 36 days 9/19/2023 11/2/2023
Raft Shuttering 34 days 9/23/2023 11/4/2023
Raft Concrete 12 days 10/30/2023 11/13/2023
Basement - 2 Slab Pour 1 49 days 11/16/2023 1/12/2024
Col & RW Reinforcement 19 days 11/16/2023 12/8/2023

Col & RW Shuttering 19 days 11/24/2023 12/16/2023

Col & RW Concrete 17 days 12/2/2023 12/22/2023

Slab Decking 16 days 12/11/2023 12/29/2023

Slab RF 16 days 12/22/2023 1/10/2024


Slab Concrete 1 day 1/11/2024 1/12/2024
Basement - 2 Slab Pour 2 49 days 12/19/2023 2/16/2024
Col & RW Reinforcement 19 days 12/19/2023 1/10/2024
Col & RW Shuttering 19 days 12/27/2023 1/18/2024
Col & RW Concrete 17 days 1/4/2024 1/24/2024

Slab Decking 16 days 1/12/2024 2/1/2024

Slab RF 16 days 1/24/2024 2/13/2024


Slab Concrete 1 day 2/15/2024 2/16/2024
Basement 1 Slab Pour 1 49 days 1/15/2024 3/14/2024
Col & RW Reinforcement 19 days 1/15/2024 2/7/2024
Col & RW Shuttering 19 days 1/23/2024 2/16/2024
Col & RW Concrete 17 days 2/2/2024 2/22/2024

Slab Decking 16 days 2/10/2024 2/29/2024

Slab RF 16 days 2/22/2024 3/12/2024


Slab Concrete 1 day 3/13/2024 3/14/2024
Basement 1 Slab Pour 2 49 days 2/18/2024 4/17/2024
Col & RW Reinforcement 19 days 2/18/2024 3/12/2024
Col & RW Shuttering 19 days 2/27/2024 3/20/2024
Col & RW Concrete 17 days 3/6/2024 3/27/2024

Slab Decking 16 days 3/14/2024 4/3/2024

Slab RF 16 days 3/27/2024 4/15/2024


Slab Concrete 1 day 4/16/2024 4/17/2024
Super Structure 481 days 4/19/2024 11/22/2025
GF slab Pour 1 49 days 12/5/2024 2/1/2025

Col Reinforcement 19 days 12/5/2024 12/27/2024

Col Shuttering 19 days 12/13/2024 1/4/2025


Col Concrete 17 days 12/21/2024 1/10/2025

Slab Decking 16 days 12/30/2024 1/18/2025

Slab RF 16 days 1/11/2025 1/30/2025


Slab Concrete 1 day 1/31/2025 2/1/2025
GF slab Pour 2 49 days 4/19/2024 6/18/2024
Col Reinforcement 19 days 4/19/2024 5/13/2024
Col Shuttering 19 days 4/28/2024 5/21/2024
Col Concrete 17 days 5/7/2024 5/27/2024

Slab Decking 16 days 5/16/2024 6/4/2024

Slab RF 16 days 5/28/2024 6/15/2024


Slab Concrete 1 day 6/17/2024 6/18/2024
Plinth Level Checking 15 days 6/19/2024 7/6/2024
Podium 1 Slab 35 days 7/8/2024 8/19/2024
Col Reinforcement 14 days 7/8/2024 7/24/2024
Col Shuttering 18 days 7/11/2024 8/1/2024
Col Concrete 19 days 7/13/2024 8/5/2024
Slab Decking 23 days 7/16/2024 8/12/2024
Slab RF 21 days 7/22/2024 8/17/2024
Slab Concrete 1 day 8/18/2024 8/19/2024
Typical 1 35 days 8/21/2024 10/1/2024
Vertical Reinforcement 13 days 8/21/2024 9/5/2024
Vertical Shuttering 19 days 8/24/2024 9/16/2024
Slab Decking 23 days 8/30/2024 9/26/2024
Beam & slab Reinforcement 21 days 9/4/2024 9/28/2024
Slab Concrete 1 day 9/30/2024 10/1/2024
Typical 2 35 days 10/3/2024 11/15/2024
Vertical Reinforcement 13 days 10/3/2024 10/19/2024
Vertical Shuttering 19 days 10/7/2024 10/30/2024
Slab Decking 23 days 10/14/2024 11/11/2024
Beam & slab Reinforcement 21 days 10/18/2024 11/13/2024
Slab Concrete 1 day 11/14/2024 11/15/2024
Typical 3 11 days 11/17/2024 11/30/2024
Vertical Reinforcement 4 days 11/17/2024 11/21/2024
Vertical Shuttering 5 days 11/19/2024 11/25/2024
Slab Decking 4 days 11/22/2024 11/26/2024
Beam & slab Reinforcement 3 days 11/24/2024 11/27/2024
Slab Concrete 1 day 11/29/2024 11/30/2024
Typical 4 11 days 12/1/2024 12/14/2024
Vertical Reinforcement 4 days 12/1/2024 12/6/2024
Vertical Shuttering 5 days 12/4/2024 12/9/2024
Slab Decking 4 days 12/6/2024 12/11/2024
Beam & slab Reinforcement 3 days 12/8/2024 12/12/2024
Slab Concrete 1 day 12/13/2024 12/14/2024
Typical 5 11 days 12/16/2024 12/28/2024
Vertical Reinforcement 4 days 12/16/2024 12/20/2024
Vertical Shuttering 5 days 12/18/2024 12/24/2024
Slab Decking 4 days 12/20/2024 12/25/2024
Beam & slab Reinforcement 3 days 12/23/2024 12/26/2024
Slab Concrete 1 day 12/27/2024 12/28/2024
Typical 6 11 days 12/30/2024 1/11/2025
Vertical Reinforcement 4 days 12/30/2024 1/3/2025
Vertical Shuttering 5 days 1/1/2025 1/7/2025
Slab Decking 4 days 1/3/2025 1/8/2025
Beam & slab Reinforcement 3 days 1/6/2025 1/9/2025
Slab Concrete 1 day 1/10/2025 1/11/2025
Typical 7 (Refuge Floor) 15 days 1/13/2025 1/31/2025
Vertical Reinforcement 7 days 1/13/2025 1/21/2025
Vertical Shuttering 9 days 1/15/2025 1/25/2025
Slab Decking 8 days 1/20/2025 1/30/2025
Beam & slab Reinforcement 5 days 1/22/2025 1/29/2025

Slab Concrete 1 day 1/30/2025 1/31/2025

Typical 8 15 days 2/1/2025 2/19/2025


Vertical Reinforcement 7 days 2/1/2025 2/10/2025
Vertical Shuttering 9 days 2/4/2025 2/14/2025
Slab Decking 8 days 2/8/2025 2/18/2025
Beam & slab Reinforcement 5 days 2/11/2025 2/17/2025
Slab Concrete 1 day 2/18/2025 2/19/2025
Typical 9 11 days 2/20/2025 3/5/2025
Vertical Reinforcement 4 days 2/20/2025 2/25/2025
Vertical Shuttering 5 days 2/22/2025 2/28/2025
Slab Decking 4 days 2/25/2025 3/1/2025
Beam & slab Reinforcement 3 days 2/27/2025 3/3/2025
Slab Concrete 1 day 3/4/2025 3/5/2025
Typical 10 11 days 3/6/2025 3/20/2025
Vertical Reinforcement 4 days 3/6/2025 3/11/2025
Vertical Shuttering 5 days 3/8/2025 3/15/2025
Slab Decking 4 days 3/11/2025 3/17/2025
Beam & slab Reinforcement 3 days 3/13/2025 3/18/2025
Slab Concrete 1 day 3/19/2025 3/20/2025
Typical 11 11 days 3/21/2025 4/3/2025
Vertical Reinforcement 4 days 3/21/2025 3/26/2025
Vertical Shuttering 5 days 3/24/2025 3/29/2025
Slab Decking 4 days 3/26/2025 3/31/2025
Beam & slab Reinforcement 3 days 3/28/2025 4/1/2025
Slab Concrete 1 day 4/2/2025 4/3/2025
Typical 12 11 days 4/5/2025 4/18/2025
Vertical Reinforcement 4 days 4/5/2025 4/9/2025
Vertical Shuttering 5 days 4/7/2025 4/13/2025
Slab Decking 4 days 4/9/2025 4/14/2025
Beam & slab Reinforcement 3 days 4/12/2025 4/15/2025
Slab Concrete 1 day 4/17/2025 4/18/2025
Typical 13 11 days 4/19/2025 5/3/2025
Vertical Reinforcement 4 days 4/19/2025 4/24/2025
Vertical Shuttering 5 days 4/21/2025 4/27/2025
Slab Decking 4 days 4/24/2025 4/28/2025
Beam & slab Reinforcement 3 days 4/26/2025 4/30/2025
Slab Concrete 1 day 5/2/2025 5/3/2025
Typical 14 (Refuge Floor) 15 days 5/4/2025 5/22/2025
Vertical Reinforcement 7 days 5/4/2025 5/13/2025
Vertical Shuttering 9 days 5/7/2025 5/17/2025
Slab Decking 8 days 5/12/2025 5/21/2025
Beam & slab Reinforcement 5 days 5/14/2025 5/20/2025
Slab Concrete 1 day 5/21/2025 5/22/2025
Typical 15 15 days 5/23/2025 6/10/2025
Vertical Reinforcement 7 days 5/23/2025 5/31/2025
Vertical Shuttering 9 days 5/26/2025 6/5/2025
Slab Decking 8 days 5/30/2025 6/9/2025
Beam & slab Reinforcement 5 days 6/2/2025 6/7/2025
Slab Concrete 1 day 6/9/2025 6/10/2025
Typical 16 11 days 6/11/2025 6/24/2025
Vertical Reinforcement 4 days 6/11/2025 6/16/2025
Vertical Shuttering 5 days 6/13/2025 6/19/2025
Slab Decking 4 days 6/16/2025 6/20/2025
Beam & slab Reinforcement 3 days 6/18/2025 6/21/2025
Slab Concrete 1 day 6/23/2025 6/24/2025
Typical 17 11 days 6/25/2025 7/8/2025
Vertical Reinforcement 4 days 6/25/2025 6/30/2025
Vertical Shuttering 5 days 6/27/2025 7/3/2025
Slab Decking 4 days 6/30/2025 7/4/2025
Beam & slab Reinforcement 3 days 7/2/2025 7/6/2025
Slab Concrete 1 day 7/7/2025 7/8/2025
Typical 18 11 days 7/9/2025 7/22/2025
Vertical Reinforcement 4 days 7/9/2025 7/14/2025
Vertical Shuttering 5 days 7/12/2025 7/18/2025
Slab Decking 4 days 7/14/2025 7/19/2025
Beam & slab Reinforcement 3 days 7/17/2025 7/20/2025
Slab Concrete 1 day 7/21/2025 7/22/2025
Typical 19 11 days 7/24/2025 8/6/2025
Vertical Reinforcement 4 days 7/24/2025 7/28/2025
Vertical Shuttering 5 days 7/26/2025 8/1/2025
Slab Decking 4 days 7/29/2025 8/2/2025
Beam & slab Reinforcement 3 days 7/31/2025 8/3/2025
Slab Concrete 1 day 8/5/2025 8/6/2025
Typical 20 11 days 8/7/2025 8/21/2025
Vertical Reinforcement 4 days 8/7/2025 8/12/2025
Vertical Shuttering 5 days 8/9/2025 8/16/2025
Slab Decking 4 days 8/12/2025 8/18/2025
Beam & slab Reinforcement 3 days 8/14/2025 8/19/2025
Slab Concrete 1 day 8/20/2025 8/21/2025
Typical 21 (Refuge Floor) 15 days 8/22/2025 9/9/2025
Vertical Reinforcement 7 days 8/22/2025 8/30/2025
Vertical Shuttering 9 days 8/25/2025 9/4/2025
Slab Decking 8 days 8/29/2025 9/8/2025
Beam & slab Reinforcement 5 days 9/1/2025 9/6/2025
Slab Concrete 1 day 9/8/2025 9/9/2025
Typical 22 15 days 9/10/2025 9/27/2025
Vertical Reinforcement 7 days 9/10/2025 9/18/2025
Vertical Shuttering 9 days 9/12/2025 9/23/2025
Slab Decking 8 days 9/17/2025 9/26/2025
Beam & slab Reinforcement 5 days 9/19/2025 9/25/2025
Slab Concrete 1 day 9/26/2025 9/27/2025
Terrace Floor 15 days 9/29/2025 10/19/2025
Vertical Reinforcement 7 days 9/29/2025 10/9/2025
Vertical Shuttering 9 days 10/3/2025 10/14/2025
Slab Decking 8 days 10/8/2025 10/17/2025
Beam & slab Reinforcement 5 days 10/10/2025 10/16/2025
Slab Concrete 1 day 10/18/2025 10/19/2025
OHT LMR 27 days 10/20/2025 11/22/2025
Col RF 6 days 10/20/2025 10/28/2025
Col Shuttering 8 days 10/25/2025 11/3/2025
Col Concrete 8 days 10/29/2025 11/8/2025
Beam & Slab Decking (LMR & OHT) 10 days 11/3/2025 11/15/2025
Beam & Slab RF 10 days 11/8/2025 11/20/2025

Concrete 1 day 11/21/2025 11/22/2025

Finishing Works 426 days 2/12/2025 7/10/2026


Blockwork 269 days 2/12/2025 1/2/2026

Basement 3 8 days 2/12/2025 2/21/2025


Basement 2 8 days 2/20/2025 3/1/2025

Basement 1 8 days 2/28/2025 3/10/2025

GF 8 days 3/8/2025 3/19/2025

Typical 1 9 days 3/20/2025 3/31/2025

Typical 2 9 days 4/1/2025 4/12/2025

Typical 3 9 days 4/13/2025 4/24/2025

Typical 4 9 days 4/25/2025 5/7/2025

Typical 5 9 days 5/8/2025 5/19/2025

Typical 6 9 days 5/20/2025 5/30/2025

Typical 7 (Refuge Floor) 9 days 5/31/2025 6/11/2025

Typical 8 9 days 6/12/2025 6/23/2025

Typical 9 9 days 6/24/2025 7/4/2025

Typical 10 9 days 7/6/2025 7/16/2025

Typical 11 9 days 7/18/2025 7/28/2025

Typical 12 9 days 7/30/2025 8/9/2025


Typical 13 9 days 8/11/2025 8/22/2025

Typical 14 (Refuge Floor) 9 days 8/23/2025 9/3/2025

Typical 15 9 days 9/4/2025 9/15/2025

Typical 16 9 days 9/16/2025 9/26/2025

Typical 17 9 days 9/28/2025 10/10/2025

Typical 18 9 days 10/12/2025 10/23/2025

Typical 19 9 days 10/25/2025 11/4/2025

Typical 20 9 days 11/6/2025 11/16/2025

Typical 21 (Refuge Floor) 9 days 11/18/2025 11/28/2025

Typical 22 9 days 11/29/2025 12/10/2025

Terrace Floor 9 days 12/11/2025 12/22/2025

OHT LMR 9 days 12/23/2025 1/2/2026


Plaster 261 days 2/15/2025 12/27/2025
Basement 3 10 days 2/15/2025 2/27/2025
Basement 2 10 days 2/24/2025 3/7/2025
Basement 1 10 days 3/4/2025 3/17/2025
GF 10 days 3/12/2025 3/25/2025
Typical 1 10 days 3/25/2025 4/6/2025
Typical 2 10 days 4/6/2025 4/18/2025
Typical 3 10 days 4/18/2025 4/30/2025
Typical 4 10 days 4/30/2025 5/13/2025

Typical 5 10 days 5/13/2025 5/24/2025


Typical 6 10 days 5/24/2025 6/5/2025
Typical 7 (Refuge Floor) 10 days 6/5/2025 6/17/2025
Typical 8 10 days 6/17/2025 6/28/2025
Typical 9 10 days 6/29/2025 7/10/2025
Typical 10 10 days 7/11/2025 7/22/2025
Typical 11 10 days 7/23/2025 8/3/2025
Typical 12 10 days 8/4/2025 8/16/2025
Typical 13 10 days 8/16/2025 8/28/2025
Typical 14 (Refuge Floor) 10 days 8/28/2025 9/9/2025
Typical 15 10 days 9/9/2025 9/20/2025
Typical 16 10 days 9/20/2025 10/4/2025
Typical 17 10 days 10/4/2025 10/16/2025
Typical 18 10 days 10/16/2025 10/29/2025
Typical 19 10 days 10/29/2025 11/10/2025
Typical 20 10 days 11/10/2025 11/22/2025
Typical 21 (Refuge Floor) 10 days 11/22/2025 12/4/2025
Typical 22 10 days 12/4/2025 12/16/2025
Terrace Floor 10 days 12/4/2025 12/16/2025
OHT LMR 10 days 12/16/2025 12/27/2025

Preparation of toilet waterproofing &


276 days 5/14/2025 4/11/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 5/14/2025 5/28/2025


Typical 2 12 days 5/28/2025 6/11/2025
Typical 3 12 days 6/11/2025 6/25/2025

Typical 4 12 days 6/25/2025 7/9/2025

Typical 5 12 days 7/9/2025 7/24/2025


Typical 6 12 days 7/24/2025 8/7/2025
Typical 7 (Refuge Floor) 12 days 8/7/2025 8/22/2025
Typical 8 12 days 8/22/2025 9/5/2025
Typical 9 12 days 9/5/2025 9/19/2025
Typical 10 12 days 9/19/2025 10/6/2025
Typical 11 12 days 10/6/2025 10/20/2025
Typical 12 12 days 10/20/2025 11/4/2025
Typical 13 12 days 11/4/2025 11/19/2025
Typical 14 (Refuge Floor) 12 days 11/19/2025 12/3/2025
Typical 15 12 days 12/3/2025 12/17/2025
Typical 16 12 days 12/17/2025 12/31/2025
Typical 17 12 days 12/31/2025 1/14/2026
Typical 18 12 days 1/14/2026 1/29/2026
Typical 19 12 days 1/30/2026 2/13/2026
Typical 20 12 days 2/13/2026 2/27/2026
Typical 21 (Refuge Floor) 12 days 2/27/2026 3/14/2026
Typical 22 12 days 3/14/2026 3/28/2026
Terrace Floor 12 days 3/28/2026 4/11/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 7/11/2025 4/15/2026
and Kitchen with Plaster
Typical 1 10 days 7/11/2025 7/22/2025
Typical 2 10 days 7/23/2025 8/3/2025
Typical 3 10 days 8/4/2025 8/16/2025

Typical 4 10 days 8/16/2025 8/28/2025

Typical 5 10 days 8/28/2025 9/9/2025


Typical 6 10 days 9/9/2025 9/20/2025
Typical 7 (Refuge Floor) 10 days 9/20/2025 10/4/2025
Typical 8 10 days 10/4/2025 10/16/2025
Typical 9 10 days 10/16/2025 10/29/2025
Typical 10 10 days 10/29/2025 11/10/2025
Typical 11 10 days 11/10/2025 11/22/2025
Typical 12 10 days 11/22/2025 12/4/2025
Typical 13 10 days 12/4/2025 12/16/2025
Typical 14 (Refuge Floor) 10 days 12/16/2025 12/27/2025
Typical 15 10 days 12/27/2025 1/8/2026
Typical 16 10 days 1/8/2026 1/20/2026
Typical 17 10 days 1/20/2026 2/2/2026
Typical 18 10 days 2/2/2026 2/14/2026
Typical 19 10 days 2/14/2026 2/26/2026
Typical 20 10 days 2/26/2026 3/11/2026
Typical 21 (Refuge Floor) 10 days 3/11/2026 3/23/2026
Typical 22 10 days 3/23/2026 4/3/2026
Terrace Floor 10 days 4/3/2026 4/15/2026
Granite Door Jambs ,window sill Fixing
184 days 8/29/2025 4/9/2026
and Dado in Toilets
Typical 1 8 days 8/29/2025 9/8/2025
Typical 2 8 days 9/8/2025 9/17/2025
Typical 3 8 days 9/17/2025 9/26/2025

Typical 4 8 days 9/26/2025 10/8/2025

Typical 5 8 days 10/8/2025 10/17/2025


Typical 6 8 days 10/18/2025 10/28/2025
Typical 7 (Refuge Floor) 8 days 10/28/2025 11/7/2025
Typical 8 8 days 11/7/2025 11/16/2025
Typical 9 8 days 11/16/2025 11/26/2025
Typical 10 8 days 11/26/2025 12/5/2025
Typical 11 8 days 12/5/2025 12/15/2025
Typical 12 8 days 12/15/2025 12/24/2025
Typical 13 8 days 12/24/2025 1/2/2026
Typical 14 (Refuge Floor) 8 days 1/2/2026 1/12/2026
Typical 15 8 days 1/12/2026 1/21/2026
Typical 16 8 days 1/21/2026 2/1/2026
Typical 17 8 days 2/1/2026 2/10/2026
Typical 18 8 days 2/11/2026 2/20/2026
Typical 19 8 days 2/20/2026 3/2/2026
Typical 20 8 days 3/2/2026 3/12/2026
Typical 21 (Refuge Floor) 8 days 3/12/2026 3/21/2026
Typical 22 8 days 3/21/2026 3/31/2026
Terrace Floor 8 days 3/31/2026 4/9/2026
Door & Window Frame Fixing incl alu
161 days 10/9/2025 4/21/2026
joineries fixing
Typical 1 7 days 10/9/2025 10/17/2025
Typical 2 7 days 10/18/2025 10/27/2025
Typical 3 7 days 10/27/2025 11/4/2025

Typical 4 7 days 11/4/2025 11/13/2025

Typical 5 7 days 11/13/2025 11/21/2025


Typical 6 7 days 11/21/2025 11/29/2025
Typical 7 (Refuge Floor) 7 days 11/29/2025 12/8/2025
Typical 8 7 days 12/8/2025 12/16/2025
Typical 9 7 days 12/16/2025 12/24/2025
Typical 10 7 days 12/24/2025 1/1/2026
Typical 11 7 days 1/1/2026 1/9/2026
Typical 12 7 days 1/9/2026 1/18/2026
Typical 13 7 days 1/18/2026 1/27/2026
Typical 14 (Refuge Floor) 7 days 1/27/2026 2/4/2026
Typical 15 7 days 2/5/2026 2/13/2026
Typical 16 7 days 2/13/2026 2/21/2026
Typical 17 7 days 2/21/2026 3/2/2026
Typical 18 7 days 3/2/2026 3/11/2026
Typical 19 7 days 3/11/2026 3/19/2026
Typical 20 7 days 3/19/2026 3/27/2026
Typical 21 (Refuge Floor) 7 days 3/27/2026 4/4/2026
Typical 22 7 days 4/4/2026 4/13/2026
Terrace Floor 7 days 4/13/2026 4/21/2026
Fire Fighting Works 138 days 11/14/2025 4/28/2026
Typical 1 6 days 11/14/2025 11/21/2025
Typical 2 6 days 11/21/2025 11/28/2025
Typical 3 6 days 11/28/2025 12/5/2025

Typical 4 6 days 12/5/2025 12/12/2025

Typical 5 6 days 12/12/2025 12/19/2025


Typical 6 6 days 12/19/2025 12/26/2025
Typical 7 (Refuge Floor) 6 days 12/26/2025 1/2/2026
Typical 8 6 days 1/2/2026 1/9/2026
Typical 9 6 days 1/9/2026 1/16/2026
Typical 10 6 days 1/17/2026 1/24/2026
Typical 11 6 days 1/24/2026 2/1/2026
Typical 12 6 days 2/1/2026 2/8/2026
Typical 13 6 days 2/8/2026 2/15/2026
Typical 14 (Refuge Floor) 6 days 2/15/2026 2/22/2026
Typical 15 6 days 2/23/2026 3/2/2026
Typical 16 6 days 3/2/2026 3/10/2026
Typical 17 6 days 3/10/2026 3/17/2026
Typical 18 6 days 3/17/2026 3/24/2026
Typical 19 6 days 3/24/2026 3/31/2026
Typical 20 6 days 3/31/2026 4/7/2026
Typical 21 (Refuge Floor) 6 days 4/7/2026 4/14/2026
Typical 22 6 days 4/14/2026 4/21/2026
Terrace Floor 6 days 4/21/2026 4/28/2026
Putty and Primer & 1 st coat Paint 117 days 12/13/2025 5/4/2026

Typical 1 7 days 12/13/2025 12/22/2025

Typical 2 7 days 12/19/2025 12/27/2025

Typical 3 7 days 12/25/2025 1/2/2026

Typical 4 7 days 12/31/2025 1/8/2026


Typical 5 7 days 1/6/2026 1/14/2026
Typical 6 7 days 1/12/2026 1/20/2026
Typical 7 (Refuge Floor) 7 days 1/18/2026 1/27/2026
Typical 8 7 days 1/24/2026 2/2/2026
Typical 9 7 days 1/31/2026 2/8/2026
Typical 10 7 days 2/6/2026 2/14/2026
Typical 11 7 days 2/12/2026 2/20/2026
Typical 12 7 days 2/18/2026 2/26/2026
Typical 13 7 days 2/24/2026 3/5/2026
Typical 14 (Refuge Floor) 7 days 3/2/2026 3/11/2026
Typical 15 7 days 3/9/2026 3/17/2026
Typical 16 7 days 3/14/2026 3/23/2026
Typical 17 7 days 3/20/2026 3/28/2026
Typical 18 7 days 3/26/2026 4/3/2026
Typical 19 7 days 4/1/2026 4/9/2026
Typical 20 7 days 4/7/2026 4/15/2026
Typical 21 (Refuge Floor) 7 days 4/13/2026 4/21/2026
Typical 22 7 days 4/19/2026 4/27/2026
Terrace Floor 7 days 4/25/2026 5/4/2026
Flooring and kitchen platform fixing 117 days 1/3/2026 5/25/2026
Typical 1 7 days 1/3/2026 1/12/2026
Typical 2 7 days 1/9/2026 1/18/2026

Typical 3 7 days 1/15/2026 1/24/2026

Typical 4 7 days 1/21/2026 1/31/2026


Typical 5 7 days 1/28/2026 2/6/2026
Typical 6 7 days 2/3/2026 2/12/2026
Typical 7 (Refuge Floor) 7 days 2/9/2026 2/18/2026
Typical 8 7 days 2/15/2026 2/24/2026
Typical 9 7 days 2/21/2026 3/2/2026
Typical 10 7 days 2/27/2026 3/9/2026
Typical 11 7 days 3/6/2026 3/14/2026
Typical 12 7 days 3/12/2026 3/20/2026
Typical 13 7 days 3/18/2026 3/26/2026
Typical 14 (Refuge Floor) 7 days 3/24/2026 4/1/2026
Typical 15 7 days 3/30/2026 4/7/2026
Typical 16 7 days 4/4/2026 4/13/2026
Typical 17 7 days 4/10/2026 4/18/2026
Typical 18 7 days 4/16/2026 4/24/2026
Typical 19 7 days 4/22/2026 4/30/2026
Typical 20 7 days 4/28/2026 5/7/2026
Typical 21 (Refuge Floor) 7 days 5/5/2026 5/13/2026
Typical 22 7 days 5/11/2026 5/19/2026
Terrace Floor 7 days 5/17/2026 5/25/2026

Door Shutter and window shutter fixing 93 days 1/25/2026 5/18/2026

Typical 1 5 days 1/25/2026 2/1/2026

Typical 2 5 days 1/31/2026 2/6/2026

Typical 3 5 days 2/5/2026 2/10/2026

Typical 4 5 days 2/9/2026 2/15/2026

Typical 5 5 days 2/14/2026 2/20/2026


Typical 6 5 days 2/19/2026 2/25/2026
Typical 7 (Refuge Floor) 5 days 2/24/2026 3/2/2026
Typical 8 5 days 2/28/2026 3/7/2026
Typical 9 5 days 3/6/2026 3/12/2026
Typical 10 5 days 3/11/2026 3/17/2026
Typical 11 5 days 3/16/2026 3/21/2026
Typical 12 5 days 3/20/2026 3/26/2026
Typical 13 5 days 3/25/2026 3/31/2026
Typical 14 (Refuge Floor) 5 days 3/30/2026 4/4/2026
Typical 15 5 days 4/3/2026 4/9/2026
Typical 16 5 days 4/8/2026 4/14/2026
Typical 17 5 days 4/13/2026 4/18/2026
Typical 18 5 days 4/17/2026 4/23/2026
Typical 19 5 days 4/22/2026 4/28/2026
Typical 20 5 days 4/27/2026 5/4/2026
Typical 21 (Refuge Floor) 5 days 5/3/2026 5/9/2026
Typical 22 5 days 5/8/2026 5/13/2026
Terrace Floor 5 days 5/12/2026 5/18/2026
CP Sanitary Fixing,Electrical fixtures
71 days 2/7/2026 5/4/2026
fixing
Typical 1 5 days 2/7/2026 2/13/2026
Typical 2 5 days 2/11/2026 2/16/2026

Typical 3 5 days 2/14/2026 2/20/2026

Typical 4 5 days 2/18/2026 2/24/2026


Typical 5 5 days 2/21/2026 2/27/2026
Typical 6 5 days 2/25/2026 3/3/2026
Typical 7 (Refuge Floor) 5 days 2/28/2026 3/7/2026
Typical 8 5 days 3/5/2026 3/11/2026
Typical 9 5 days 3/9/2026 3/14/2026
Typical 10 5 days 3/12/2026 3/18/2026
Typical 11 5 days 3/16/2026 3/21/2026
Typical 12 5 days 3/19/2026 3/25/2026
Typical 13 5 days 3/23/2026 3/28/2026
Typical 14 (Refuge Floor) 5 days 3/26/2026 4/1/2026
Typical 15 5 days 3/30/2026 4/4/2026
Typical 16 5 days 4/2/2026 4/8/2026
Typical 17 5 days 4/6/2026 4/11/2026
Typical 18 5 days 4/9/2026 4/15/2026
Typical 19 5 days 4/13/2026 4/18/2026
Typical 20 5 days 4/16/2026 4/22/2026
Typical 21 (Refuge Floor) 5 days 4/20/2026 4/26/2026
Typical 22 5 days 4/23/2026 4/29/2026
Terrace Floor 5 days 4/27/2026 5/4/2026
Second coat painting 49 days 2/21/2026 4/21/2026
Typical 1 5 days 2/21/2026 2/27/2026
Typical 2 5 days 2/24/2026 3/2/2026
Typical 3 5 days 2/26/2026 3/5/2026
Typical 4 5 days 2/28/2026 3/7/2026
Typical 5 5 days 3/3/2026 3/10/2026
Typical 6 5 days 3/6/2026 3/12/2026
Typical 7 (Refuge Floor) 5 days 3/9/2026 3/14/2026
Typical 8 5 days 3/11/2026 3/17/2026
Typical 9 5 days 3/13/2026 3/19/2026
Typical 10 5 days 3/16/2026 3/21/2026
Typical 11 5 days 3/18/2026 3/24/2026
Typical 12 5 days 3/20/2026 3/26/2026
Typical 13 5 days 3/23/2026 3/28/2026
Typical 14 (Refuge Floor) 5 days 3/25/2026 3/31/2026
Typical 15 5 days 3/27/2026 4/2/2026
Typical 16 5 days 3/30/2026 4/4/2026
Typical 17 5 days 4/1/2026 4/7/2026
Typical 18 5 days 4/3/2026 4/9/2026
Typical 19 5 days 4/6/2026 4/11/2026
Typical 20 5 days 4/8/2026 4/14/2026
Typical 21 (Refuge Floor) 5 days 4/10/2026 4/16/2026
Typical 22 5 days 4/13/2026 4/18/2026
Terrace Floor 5 days 4/15/2026 4/21/2026
Common Area & Lift Lobby Finishing 142 days 11/18/2025 5/7/2026

Terrace Pedestal and Bracket Fixing 14 days 2/2/2026 2/19/2026

External MS Grill Fixing in Toilet Duct


34 days 12/27/2025 2/7/2026
Areas
Basement Putty 42 days 12/25/2025 2/14/2026
Electrical Works in lift Lobby Areas - 1st
27 days 2/14/2026 3/19/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
27 days 3/19/2026 4/20/2026
Testing
Block Masonry & Plaster Work in Lift
62 days 11/18/2025 1/31/2026
Lobby Areas
Lift Area Stone Cladding 62 days 12/11/2025 2/24/2026
Door Frame Fixing of FD and other
22 days 2/25/2026 3/24/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 3/16/2026 4/8/2026

Electrical Wire Pulling and GI Box Fixing


20 days 3/27/2026 4/20/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 3/28/2026 4/21/2026
False Ceiling in Lift Lobby Area 22 days 4/3/2026 4/29/2026
Putty in Lift in Lobby Areas 22 days 4/8/2026 5/5/2026

Primer & Internal Painting 1st Coat in


20 days 4/13/2026 5/7/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 4/19/2026 5/4/2026


Switch Socket and DB Fixing in Lift
lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 4/19/2026 5/3/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 151 days 12/16/2025 6/16/2026


Staircase - Window Framing 40 days 12/16/2025 2/2/2026

Staircase - Electrical Works - Conduiting


42 days 12/16/2025 2/4/2026
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 12/22/2025 2/20/2026

Staircase - Railing Fixing 55 days 1/2/2026 3/11/2026


Staircase - Flooring 60 days 1/7/2026 3/21/2026
Staircase - Electrical Wire pulling and GI
42 days 1/2/2026 2/22/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 2/23/2026 3/31/2026

Staircase - Putty 35 days 3/7/2026 4/17/2026

Staircase - Primer & Internal Painting


34 days 3/13/2026 4/22/2026
1st Coat

Staircase - Doors and window shutter


30 days 3/25/2026 4/29/2026
fixing
Staircase - Switch Socket Fixing &
25 days 3/31/2026 4/29/2026
Electrical Fittings Fixing

2nd coat Painting 60 days 4/4/2026 6/16/2026

External Paint 80 days 2/17/2026 5/24/2026

Waterproofing above Terrace 94 days 12/27/2025 4/20/2026

Waterproofing of Lift Pit 32 days 12/27/2025 2/4/2026

Waterproofing of OH Tank 32 days 1/14/2026 2/22/2026

Waterproofing of LMR Top Slab 32 days 2/2/2026 3/13/2026

Waterproofing Terrace Slab 32 days 3/13/2026 4/20/2026

Finishing and MEP Works in Ducts 99 days 11/28/2025 3/27/2026

All rounder paint in Kitchen and toilet


43 days 11/28/2025 1/18/2026
Ducts

All rounder paint in Electrical, ELV and


38 days 12/10/2025 1/24/2026
Fire Ducts
S W R Downtake lines - Common
25 days 1/18/2026 2/18/2026
Plumbing works
Electrical Works in Ducts - Common
30 days 2/1/2026 3/10/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
30 days 2/19/2026 3/27/2026
Common Fire Fighting Works
Lift Work 123 days 12/2/2025 4/28/2026
Scaffolding in Lift Shafts 9 days 12/2/2025 12/12/2025
White Wash in Lift Shafts 9 days 12/12/2025 12/23/2025
Electrical work in Lift Shafts 11 days 12/23/2025 1/5/2026
Ladder Fixing for OHT and LMR Slab 5 days 1/5/2026 1/10/2026
All Rounder PAINT in LMR 5 days 1/11/2026 1/16/2026
Electrical work in LMR 9 days 1/17/2026 1/28/2026
Trap Door Fixing 5 days 1/17/2026 1/22/2026
Handover of LMR to Lift Agency 4 days 1/5/2026 1/9/2026
Lift Template Fixing 15 days 1/9/2026 1/28/2026
Lift Works 75 days 1/28/2026 4/28/2026
Parking Area 144 days 1/18/2026 7/10/2026
Finishing & MEP Works 144 days 1/18/2026 7/10/2026

Painting on Ceiling surfaces 25 days 1/18/2026 2/18/2026

Painting on Wall surfaces 1st Coat 45 days 1/31/2026 3/26/2026


Basement and Podium Levels
19 days 3/26/2026 4/17/2026
Electrical Works & Testing

Basement & Podium Levels Fire


fighting Hydrants and Sprinkler pipe fixing & 18 days 4/17/2026 5/10/2026
testing

Basement & Podium Levels PHE Line


15 days 5/10/2026 5/28/2026
Fixing & testing

VDF in Parking Area 50 days 4/6/2026 6/5/2026

Fixing Paver Blocks at Podium Levels 50 days 4/6/2026 6/5/2026

Driveway and Parking Area Markings 25 days 5/18/2026 6/17/2026

Fixing of Signages in Basement and


20 days 6/5/2026 6/29/2026
podium levels

Deep Cleaning 42 days 5/22/2026 7/10/2026

Snagging Desnagging & Handover 120 days 3/2/2026 7/23/2026

Building Demolition & enabling work 81 days 10/15/2023 1/20/2024


Building Demolition BL. 13 2 days 10/15/2023 10/17/2023
Debris Removal 25 days 10/17/2023 11/17/2023
Electrical Disconnection & Meter room
15 days 11/22/2023 12/9/2023
shifting of Pump Room

Temple demolition 10 days 12/4/2023 12/15/2023

Pilling works 40 days 12/4/2023 1/20/2024

Wing C 889 days 12/28/2023 12/5/2026


Sub Structure 237 days 12/28/2023 10/8/2024
Excavation level 35 days 12/28/2023 2/8/2024

Inclined Rock Anchor 30 days 1/6/2024 2/12/2024

Excavation Level 2 35 days 1/31/2024 3/12/2024

Anti Termitte 11 days 3/6/2024 3/19/2024


Plain Cement Concrete 11 days 3/6/2024 3/19/2024
Passive Rock Anchor 26 days 3/7/2024 4/8/2024
Waterproofing below raft 27 days 3/13/2024 4/15/2024
Raft Reinforcement 36 days 3/19/2024 5/3/2024
Raft Shuttering 34 days 3/24/2024 5/6/2024
Raft Concrete 12 days 4/29/2024 5/14/2024
Basement - 2 Slab Pour 1 49 days 5/16/2024 7/13/2024

Col & RW Reinforcement 19 days 5/16/2024 6/7/2024

Col & RW Shuttering 19 days 5/24/2024 6/15/2024


Col & RW Concrete 17 days 6/1/2024 6/21/2024

Slab Decking 16 days 6/10/2024 6/29/2024

Slab RF 16 days 6/22/2024 7/11/2024


Slab Concrete 1 day 7/12/2024 7/13/2024
Basement - 2 Slab Pour 2 49 days 6/10/2024 8/7/2024
Col & RW Reinforcement 19 days 6/10/2024 7/2/2024
Col & RW Shuttering 19 days 6/18/2024 7/11/2024
Col & RW Concrete 17 days 6/26/2024 7/17/2024

Slab Decking 16 days 7/5/2024 7/24/2024

Slab RF 16 days 7/17/2024 8/5/2024


Slab Concrete 1 day 8/6/2024 8/7/2024
Basement 1 Slab Pour 1 49 days 7/16/2024 9/12/2024
Col & RW Reinforcement 19 days 7/16/2024 8/7/2024
Col & RW Shuttering 19 days 7/24/2024 8/16/2024
Col & RW Concrete 17 days 8/1/2024 8/22/2024
Slab Decking 16 days 8/9/2024 8/29/2024

Slab RF 16 days 8/22/2024 9/10/2024


Slab Concrete 1 day 9/11/2024 9/12/2024
Basement 1 Slab Pour 2 49 days 8/9/2024 10/8/2024
Col & RW Reinforcement 19 days 8/9/2024 9/2/2024
Col & RW Shuttering 19 days 8/19/2024 9/10/2024
Col & RW Concrete 17 days 8/27/2024 9/16/2024

Slab Decking 16 days 9/4/2024 9/23/2024

Slab RF 16 days 9/16/2024 10/6/2024


Slab Concrete 1 day 10/7/2024 10/8/2024
Super Structure 502 days 9/15/2024 5/15/2026
GF slab Pour 1 49 days 9/15/2024 11/15/2024
Col Reinforcement 19 days 9/15/2024 10/8/2024
Col Shuttering 19 days 9/23/2024 10/18/2024
Col Concrete 17 days 10/1/2024 10/24/2024

Slab Decking 16 days 10/11/2024 11/1/2024

Slab RF 16 days 10/24/2024 11/13/2024


Slab Concrete 1 day 11/14/2024 11/15/2024
GF slab Pour 2 49 days 10/10/2024 12/9/2024
Col Reinforcement 19 days 10/10/2024 11/3/2024
Col Shuttering 19 days 10/19/2024 11/12/2024
Col Concrete 17 days 10/27/2024 11/18/2024

Slab Decking 16 days 11/6/2024 11/25/2024

Slab RF 16 days 11/18/2024 12/6/2024


Slab Concrete 1 day 12/7/2024 12/9/2024
Plinth Level Checking 15 days 12/10/2024 12/27/2024
Podium 1 Slab 37 days 12/29/2024 2/11/2025
Col Reinforcement 14 days 12/29/2024 1/14/2025
Col Shuttering 18 days 1/4/2025 1/25/2025
Col Concrete 19 days 1/8/2025 1/31/2025
Slab Decking 23 days 1/13/2025 2/10/2025
Slab RF 18 days 1/18/2025 2/8/2025
Slab Concrete 1 day 2/10/2025 2/11/2025
Typical 1 34 days 2/12/2025 3/26/2025
Vertical Reinforcement 13 days 2/12/2025 2/27/2025
Vertical Shuttering 19 days 2/16/2025 3/10/2025
Slab Decking 23 days 2/22/2025 3/22/2025
Beam & slab Reinforcement 20 days 2/26/2025 3/23/2025
Slab Concrete 1 day 3/25/2025 3/26/2025
Typical 2 34 days 3/27/2025 5/7/2025
Vertical Reinforcement 13 days 3/27/2025 4/11/2025
Vertical Shuttering 19 days 3/31/2025 4/22/2025
Slab Decking 23 days 4/5/2025 5/3/2025
Beam & slab Reinforcement 20 days 4/10/2025 5/5/2025
Slab Concrete 1 day 5/6/2025 5/7/2025
Typical 3 11 days 5/8/2025 5/21/2025
Vertical Reinforcement 4 days 5/8/2025 5/13/2025
Vertical Shuttering 5 days 5/10/2025 5/16/2025
Slab Decking 4 days 5/13/2025 5/17/2025
Beam & slab Reinforcement 3 days 5/15/2025 5/19/2025
Slab Concrete 1 day 5/20/2025 5/21/2025
Typical 4 11 days 5/22/2025 6/4/2025
Vertical Reinforcement 4 days 5/22/2025 5/27/2025
Vertical Shuttering 5 days 5/25/2025 5/30/2025
Slab Decking 4 days 5/27/2025 6/1/2025
Beam & slab Reinforcement 3 days 5/29/2025 6/2/2025
Slab Concrete 1 day 6/3/2025 6/4/2025
Typical 5 11 days 6/6/2025 6/19/2025
Vertical Reinforcement 4 days 6/6/2025 6/10/2025
Vertical Shuttering 5 days 6/8/2025 6/14/2025
Slab Decking 4 days 6/10/2025 6/15/2025
Beam & slab Reinforcement 3 days 6/13/2025 6/16/2025

Slab Concrete 1 day 6/18/2025 6/19/2025

Typical 6 11 days 6/20/2025 7/3/2025


Vertical Reinforcement 4 days 6/20/2025 6/25/2025
Vertical Shuttering 5 days 6/22/2025 6/28/2025
Slab Decking 4 days 6/25/2025 6/29/2025
Beam & slab Reinforcement 3 days 6/27/2025 7/1/2025
Slab Concrete 1 day 7/2/2025 7/3/2025
Typical 7 (Refuge Floor) 14 days 7/4/2025 7/21/2025
Vertical Reinforcement 7 days 7/4/2025 7/12/2025
Vertical Shuttering 9 days 7/7/2025 7/17/2025
Slab Decking 7 days 7/11/2025 7/19/2025
Beam & slab Reinforcement 4 days 7/14/2025 7/18/2025
Slab Concrete 1 day 7/19/2025 7/21/2025
Typical 8 14 days 7/22/2025 8/7/2025
Vertical Reinforcement 7 days 7/22/2025 7/30/2025
Vertical Shuttering 9 days 7/24/2025 8/4/2025
Slab Decking 7 days 7/29/2025 8/6/2025
Beam & slab Reinforcement 4 days 7/31/2025 8/5/2025
Slab Concrete 1 day 8/6/2025 8/7/2025
Typical 9 11 days 8/8/2025 8/22/2025
Vertical Reinforcement 4 days 8/8/2025 8/13/2025
Vertical Shuttering 5 days 8/11/2025 8/18/2025
Slab Decking 4 days 8/13/2025 8/19/2025
Beam & slab Reinforcement 3 days 8/16/2025 8/20/2025
Slab Concrete 1 day 8/21/2025 8/22/2025
Typical 10 11 days 8/24/2025 9/6/2025
Vertical Reinforcement 4 days 8/24/2025 8/28/2025
Vertical Shuttering 5 days 8/26/2025 9/1/2025
Slab Decking 4 days 8/28/2025 9/2/2025
Beam & slab Reinforcement 3 days 8/31/2025 9/3/2025
Slab Concrete 1 day 9/5/2025 9/6/2025
Typical 11 11 days 9/7/2025 9/20/2025
Vertical Reinforcement 4 days 9/7/2025 9/12/2025
Vertical Shuttering 5 days 9/9/2025 9/15/2025
Slab Decking 4 days 9/12/2025 9/16/2025
Beam & slab Reinforcement 3 days 9/14/2025 9/18/2025
Slab Concrete 1 day 9/19/2025 9/20/2025
Typical 12 11 days 9/21/2025 10/6/2025
Vertical Reinforcement 4 days 9/21/2025 9/26/2025
Vertical Shuttering 5 days 9/24/2025 9/30/2025
Slab Decking 4 days 9/26/2025 10/3/2025
Beam & slab Reinforcement 3 days 9/29/2025 10/4/2025
Slab Concrete 1 day 10/5/2025 10/6/2025
Typical 13 11 days 10/8/2025 10/22/2025
Vertical Reinforcement 4 days 10/8/2025 10/12/2025
Vertical Shuttering 5 days 10/10/2025 10/16/2025
Slab Decking 4 days 10/13/2025 10/17/2025
Beam & slab Reinforcement 3 days 10/15/2025 10/18/2025
Slab Concrete 1 day 10/20/2025 10/22/2025
Typical 14 (Refuge Floor) 14 days 10/23/2025 11/8/2025
Vertical Reinforcement 7 days 10/23/2025 10/31/2025
Vertical Shuttering 9 days 10/25/2025 11/5/2025
Slab Decking 7 days 10/30/2025 11/7/2025
Beam & slab Reinforcement 4 days 11/1/2025 11/6/2025
Slab Concrete 1 day 11/7/2025 11/8/2025
Typical 15 14 days 11/10/2025 11/26/2025
Vertical Reinforcement 7 days 11/10/2025 11/18/2025
Vertical Shuttering 9 days 11/12/2025 11/22/2025
Slab Decking 7 days 11/17/2025 11/25/2025
Beam & slab Reinforcement 4 days 11/19/2025 11/24/2025
Slab Concrete 1 day 11/25/2025 11/26/2025
Typical 16 11 days 11/27/2025 12/10/2025
Vertical Reinforcement 4 days 11/27/2025 12/2/2025
Vertical Shuttering 5 days 11/29/2025 12/5/2025
Slab Decking 4 days 12/2/2025 12/6/2025
Beam & slab Reinforcement 3 days 12/4/2025 12/8/2025
Slab Concrete 1 day 12/9/2025 12/10/2025
Typical 17 11 days 12/11/2025 12/24/2025
Vertical Reinforcement 4 days 12/11/2025 12/16/2025
Vertical Shuttering 5 days 12/14/2025 12/20/2025
Slab Decking 4 days 12/16/2025 12/21/2025
Beam & slab Reinforcement 3 days 12/19/2025 12/22/2025
Slab Concrete 1 day 12/23/2025 12/24/2025
Typical 18 11 days 12/26/2025 1/8/2026
Vertical Reinforcement 4 days 12/26/2025 12/30/2025
Vertical Shuttering 5 days 12/28/2025 1/3/2026
Slab Decking 4 days 12/31/2025 1/4/2026
Beam & slab Reinforcement 3 days 1/2/2026 1/5/2026
Slab Concrete 1 day 1/7/2026 1/8/2026
Typical 19 11 days 1/9/2026 1/22/2026
Vertical Reinforcement 4 days 1/9/2026 1/14/2026
Vertical Shuttering 5 days 1/12/2026 1/17/2026
Slab Decking 4 days 1/14/2026 1/19/2026
Beam & slab Reinforcement 3 days 1/16/2026 1/20/2026
Slab Concrete 1 day 1/21/2026 1/22/2026
Typical 20 11 days 1/23/2026 2/6/2026
Vertical Reinforcement 4 days 1/23/2026 1/29/2026
Vertical Shuttering 5 days 1/27/2026 2/2/2026
Slab Decking 4 days 1/29/2026 2/3/2026
Beam & slab Reinforcement 3 days 1/31/2026 2/4/2026
Slab Concrete 1 day 2/5/2026 2/6/2026
Typical 21 (Refuge Floor) 13 days 2/7/2026 2/23/2026
Vertical Reinforcement 7 days 2/7/2026 2/16/2026
Vertical Shuttering 9 days 2/10/2026 2/20/2026
Slab Decking 7 days 2/14/2026 2/23/2026
Beam & slab Reinforcement 3 days 2/17/2026 2/20/2026
Slab Concrete 1 day 2/21/2026 2/23/2026
Typical 22 14 days 2/24/2026 3/13/2026
Vertical Reinforcement 7 days 2/24/2026 3/5/2026
Vertical Shuttering 9 days 2/26/2026 3/10/2026
Slab Decking 8 days 3/3/2026 3/13/2026
Beam & slab Reinforcement 4 days 3/6/2026 3/11/2026
Slab Concrete 1 day 3/12/2026 3/13/2026
Terrace Floor 14 days 3/15/2026 3/31/2026
Vertical Reinforcement 7 days 3/15/2026 3/23/2026
Vertical Shuttering 9 days 3/17/2026 3/28/2026
Slab Decking 8 days 3/22/2026 3/31/2026
Beam & slab Reinforcement 4 days 3/24/2026 3/29/2026
Slab Concrete 1 day 3/30/2026 3/31/2026
OHT LMR 36 days 4/2/2026 5/15/2026
Col RF 10 days 4/2/2026 4/13/2026
Col Shuttering 14 days 4/5/2026 4/22/2026
Col Concrete 16 days 4/10/2026 4/29/2026
Beam & Slab Decking (LMR & OHT) 14 days 4/15/2026 5/2/2026
Beam & Slab RF 16 days 4/22/2026 5/12/2026

Concrete 1 day 5/14/2026 5/15/2026

Finishing Works 424 days 7/1/2025 11/25/2026


Blockwork 266 days 7/1/2025 5/19/2026

Basement 3 8 days 7/1/2025 7/10/2025

Basement 2 8 days 7/8/2025 7/17/2025

Basement 1 8 days 7/15/2025 7/24/2025

GF 8 days 7/22/2025 7/31/2025

Typical 1 9 days 8/1/2025 8/12/2025

Typical 2 9 days 8/13/2025 8/25/2025

Typical 3 9 days 8/26/2025 9/6/2025

Typical 4 9 days 9/7/2025 9/18/2025

Typical 5 9 days 9/19/2025 9/30/2025

Typical 6 9 days 10/3/2025 10/14/2025


Typical 7 (Refuge Floor) 9 days 10/15/2025 10/27/2025

Typical 8 9 days 10/28/2025 11/7/2025

Typical 9 9 days 11/8/2025 11/19/2025

Typical 10 9 days 11/20/2025 12/1/2025

Typical 11 9 days 12/2/2025 12/12/2025

Typical 12 9 days 12/14/2025 12/24/2025

Typical 13 9 days 12/26/2025 1/5/2026

Typical 14 (Refuge Floor) 9 days 1/7/2026 1/17/2026

Typical 15 9 days 1/19/2026 1/30/2026

Typical 16 9 days 1/31/2026 2/11/2026

Typical 17 9 days 2/12/2026 2/23/2026

Typical 18 9 days 2/24/2026 3/7/2026

Typical 19 9 days 3/9/2026 3/19/2026

Typical 20 9 days 3/21/2026 3/31/2026


Typical 21 (Refuge Floor) 9 days 4/2/2026 4/12/2026

Typical 22 9 days 4/14/2026 4/24/2026

Terrace Floor 9 days 4/25/2026 5/7/2026

OHT LMR 9 days 5/8/2026 5/19/2026


Plaster 267 days 7/4/2025 5/23/2026
Basement 3 9 days 7/4/2025 7/15/2025
Basement 2 9 days 7/11/2025 7/22/2025
Basement 1 9 days 7/18/2025 7/29/2025
GF 9 days 7/25/2025 8/5/2025
Typical 1 9 days 8/6/2025 8/18/2025
Typical 2 9 days 8/19/2025 8/29/2025

Typical 3 9 days 8/31/2025 9/10/2025

Typical 4 9 days 9/12/2025 9/22/2025


Typical 5 9 days 9/24/2025 10/6/2025
Typical 6 9 days 10/8/2025 10/18/2025
Typical 7 (Refuge Floor) 9 days 10/20/2025 10/31/2025
Typical 8 9 days 11/1/2025 11/12/2025
Typical 9 9 days 11/13/2025 11/24/2025
Typical 10 9 days 11/25/2025 12/5/2025
Typical 11 9 days 12/7/2025 12/17/2025
Typical 12 9 days 12/19/2025 12/29/2025
Typical 13 9 days 12/31/2025 1/10/2026
Typical 14 (Refuge Floor) 9 days 1/12/2026 1/22/2026
Typical 15 9 days 1/23/2026 2/4/2026
Typical 16 9 days 2/5/2026 2/16/2026
Typical 17 9 days 2/17/2026 2/27/2026
Typical 18 9 days 2/28/2026 3/12/2026
Typical 19 9 days 3/13/2026 3/24/2026
Typical 20 9 days 3/25/2026 4/5/2026
Typical 21 (Refuge Floor) 9 days 4/6/2026 4/17/2026
Typical 22 9 days 4/18/2026 4/29/2026
Terrace Floor 9 days 4/30/2026 5/12/2026
OHT LMR 9 days 5/13/2026 5/23/2026

Preparation of toilet waterproofing &


276 days 9/12/2025 8/11/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 9/12/2025 9/26/2025


Typical 2 12 days 9/26/2025 10/12/2025
Typical 3 12 days 10/13/2025 10/28/2025

Typical 4 12 days 10/28/2025 11/11/2025

Typical 5 12 days 11/11/2025 11/25/2025


Typical 6 12 days 11/25/2025 12/9/2025
Typical 7 (Refuge Floor) 12 days 12/9/2025 12/23/2025
Typical 8 12 days 12/23/2025 1/7/2026
Typical 9 12 days 1/7/2026 1/21/2026
Typical 10 12 days 1/21/2026 2/5/2026
Typical 11 12 days 2/5/2026 2/19/2026
Typical 12 12 days 2/19/2026 3/6/2026
Typical 13 12 days 3/6/2026 3/20/2026
Typical 14 (Refuge Floor) 12 days 3/21/2026 4/4/2026
Typical 15 12 days 4/4/2026 4/18/2026
Typical 16 12 days 4/18/2026 5/4/2026
Typical 17 12 days 5/4/2026 5/18/2026
Typical 18 12 days 5/18/2026 6/1/2026
Typical 19 12 days 6/1/2026 6/15/2026
Typical 20 12 days 6/15/2026 6/29/2026
Typical 21 (Refuge Floor) 12 days 6/29/2026 7/13/2026
Typical 22 12 days 7/14/2026 7/28/2026
Terrace Floor 12 days 7/28/2026 8/11/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 11/12/2025 8/14/2026
and Kitchen with Plaster
Typical 1 10 days 11/12/2025 11/24/2025
Typical 2 10 days 11/24/2025 12/5/2025

Typical 3 10 days 12/5/2025 12/17/2025

Typical 4 10 days 12/17/2025 12/29/2025


Typical 5 10 days 12/29/2025 1/10/2026
Typical 6 10 days 1/10/2026 1/22/2026
Typical 7 (Refuge Floor) 10 days 1/22/2026 2/4/2026
Typical 8 10 days 2/4/2026 2/16/2026
Typical 9 10 days 2/16/2026 2/27/2026
Typical 10 10 days 2/27/2026 3/12/2026
Typical 11 10 days 3/12/2026 3/24/2026
Typical 12 10 days 3/24/2026 4/5/2026
Typical 13 10 days 4/5/2026 4/17/2026
Typical 14 (Refuge Floor) 10 days 4/17/2026 4/29/2026
Typical 15 10 days 4/29/2026 5/12/2026
Typical 16 10 days 5/12/2026 5/23/2026
Typical 17 10 days 5/23/2026 6/4/2026
Typical 18 10 days 6/4/2026 6/16/2026
Typical 19 10 days 6/16/2026 6/28/2026
Typical 20 10 days 6/28/2026 7/10/2026
Typical 21 (Refuge Floor) 10 days 7/10/2026 7/22/2026
Typical 22 10 days 7/22/2026 8/3/2026
Terrace Floor 10 days 8/3/2026 8/14/2026
Granite Door Jambs ,window sill Fixing
184 days 12/19/2025 7/28/2026
and Dado in Toilets
Typical 1 8 days 12/19/2025 12/28/2025
Typical 2 8 days 12/28/2025 1/7/2026

Typical 3 8 days 1/7/2026 1/16/2026

Typical 4 8 days 1/16/2026 1/27/2026


Typical 5 8 days 1/27/2026 2/5/2026
Typical 6 8 days 2/5/2026 2/14/2026
Typical 7 (Refuge Floor) 8 days 2/14/2026 2/24/2026
Typical 8 8 days 2/24/2026 3/6/2026
Typical 9 8 days 3/6/2026 3/16/2026
Typical 10 8 days 3/16/2026 3/25/2026
Typical 11 8 days 3/25/2026 4/4/2026
Typical 12 8 days 4/4/2026 4/13/2026
Typical 13 8 days 4/14/2026 4/23/2026
Typical 14 (Refuge Floor) 8 days 4/23/2026 5/4/2026
Typical 15 8 days 5/4/2026 5/13/2026
Typical 16 8 days 5/13/2026 5/22/2026
Typical 17 8 days 5/22/2026 6/1/2026
Typical 18 8 days 6/1/2026 6/10/2026
Typical 19 8 days 6/10/2026 6/19/2026
Typical 20 8 days 6/20/2026 6/29/2026
Typical 21 (Refuge Floor) 8 days 6/29/2026 7/9/2026
Typical 22 8 days 7/9/2026 7/18/2026
Terrace Floor 8 days 7/18/2026 7/28/2026
Door & Window Frame Fixing incl alu
161 days 1/17/2026 7/30/2026
joineries fixing
Typical 1 7 days 1/17/2026 1/27/2026
Typical 2 7 days 1/27/2026 2/4/2026

Typical 3 7 days 2/4/2026 2/12/2026

Typical 4 7 days 2/12/2026 2/20/2026


Typical 5 7 days 2/20/2026 2/28/2026
Typical 6 7 days 2/28/2026 3/10/2026
Typical 7 (Refuge Floor) 7 days 3/10/2026 3/18/2026
Typical 8 7 days 3/18/2026 3/26/2026
Typical 9 7 days 3/27/2026 4/4/2026
Typical 10 7 days 4/4/2026 4/12/2026
Typical 11 7 days 4/12/2026 4/21/2026
Typical 12 7 days 4/21/2026 4/29/2026
Typical 13 7 days 4/29/2026 5/8/2026
Typical 14 (Refuge Floor) 7 days 5/8/2026 5/16/2026
Typical 15 7 days 5/16/2026 5/25/2026
Typical 16 7 days 5/25/2026 6/2/2026
Typical 17 7 days 6/2/2026 6/10/2026
Typical 18 7 days 6/10/2026 6/18/2026
Typical 19 7 days 6/18/2026 6/27/2026
Typical 20 7 days 6/27/2026 7/5/2026
Typical 21 (Refuge Floor) 7 days 7/5/2026 7/13/2026
Typical 22 7 days 7/14/2026 7/22/2026
Terrace Floor 7 days 7/22/2026 7/30/2026
Fire Fighting Works 138 days 2/13/2026 7/29/2026
Typical 1 6 days 2/13/2026 2/20/2026
Typical 2 6 days 2/20/2026 2/27/2026

Typical 3 6 days 2/27/2026 3/7/2026

Typical 4 6 days 3/7/2026 3/14/2026


Typical 5 6 days 3/15/2026 3/22/2026
Typical 6 6 days 3/22/2026 3/29/2026
Typical 7 (Refuge Floor) 6 days 3/29/2026 4/5/2026
Typical 8 6 days 4/5/2026 4/12/2026
Typical 9 6 days 4/12/2026 4/19/2026
Typical 10 6 days 4/20/2026 4/27/2026
Typical 11 6 days 4/27/2026 5/5/2026
Typical 12 6 days 5/5/2026 5/12/2026
Typical 13 6 days 5/12/2026 5/19/2026
Typical 14 (Refuge Floor) 6 days 5/19/2026 5/26/2026
Typical 15 6 days 5/26/2026 6/2/2026
Typical 16 6 days 6/2/2026 6/9/2026
Typical 17 6 days 6/9/2026 6/16/2026
Typical 18 6 days 6/16/2026 6/23/2026
Typical 19 6 days 6/23/2026 6/30/2026
Typical 20 6 days 6/30/2026 7/7/2026
Typical 21 (Refuge Floor) 6 days 7/8/2026 7/15/2026
Typical 22 6 days 7/15/2026 7/22/2026
Terrace Floor 6 days 7/22/2026 7/29/2026
Putty and Primer & 1 st coat Paint 117 days 3/9/2026 7/27/2026

Typical 1 7 days 3/9/2026 3/17/2026

Typical 2 7 days 3/15/2026 3/23/2026

Typical 3 7 days 3/21/2026 3/29/2026

Typical 4 7 days 3/27/2026 4/4/2026


Typical 5 7 days 4/2/2026 4/10/2026
Typical 6 7 days 4/8/2026 4/16/2026
Typical 7 (Refuge Floor) 7 days 4/14/2026 4/22/2026
Typical 8 7 days 4/20/2026 4/28/2026
Typical 9 7 days 4/25/2026 5/5/2026
Typical 10 7 days 5/2/2026 5/11/2026
Typical 11 7 days 5/8/2026 5/16/2026
Typical 12 7 days 5/14/2026 5/22/2026
Typical 13 7 days 5/20/2026 5/28/2026
Typical 14 (Refuge Floor) 7 days 5/26/2026 6/3/2026
Typical 15 7 days 6/1/2026 6/9/2026
Typical 16 7 days 6/6/2026 6/15/2026
Typical 17 7 days 6/12/2026 6/21/2026
Typical 18 7 days 6/18/2026 6/27/2026
Typical 19 7 days 6/24/2026 7/3/2026
Typical 20 7 days 6/30/2026 7/9/2026
Typical 21 (Refuge Floor) 7 days 7/6/2026 7/15/2026
Typical 22 7 days 7/12/2026 7/21/2026
Terrace Floor 7 days 7/18/2026 7/27/2026
Flooring and kitchen platform fixing 117 days 3/30/2026 8/18/2026
Typical 1 7 days 3/30/2026 4/7/2026
Typical 2 7 days 4/5/2026 4/13/2026

Typical 3 7 days 4/11/2026 4/19/2026

Typical 4 7 days 4/17/2026 4/25/2026


Typical 5 7 days 4/23/2026 5/2/2026
Typical 6 7 days 4/29/2026 5/8/2026
Typical 7 (Refuge Floor) 7 days 5/6/2026 5/14/2026
Typical 8 7 days 5/12/2026 5/20/2026
Typical 9 7 days 5/18/2026 5/26/2026
Typical 10 7 days 5/23/2026 6/1/2026
Typical 11 7 days 5/29/2026 6/6/2026
Typical 12 7 days 6/4/2026 6/12/2026
Typical 13 7 days 6/10/2026 6/18/2026
Typical 14 (Refuge Floor) 7 days 6/16/2026 6/24/2026
Typical 15 7 days 6/22/2026 6/30/2026
Typical 16 7 days 6/28/2026 7/6/2026
Typical 17 7 days 7/4/2026 7/12/2026
Typical 18 7 days 7/10/2026 7/18/2026
Typical 19 7 days 7/16/2026 7/24/2026
Typical 20 7 days 7/22/2026 7/30/2026
Typical 21 (Refuge Floor) 7 days 7/28/2026 8/5/2026
Typical 22 7 days 8/3/2026 8/11/2026
Terrace Floor 7 days 8/8/2026 8/18/2026
Door Shutter and window shutter fixing 93 days 4/21/2026 8/10/2026

Typical 1 5 days 4/21/2026 4/27/2026

Typical 2 5 days 4/25/2026 5/2/2026

Typical 3 5 days 4/30/2026 5/7/2026


Typical 4 5 days 5/6/2026 5/12/2026
Typical 5 5 days 5/11/2026 5/16/2026
Typical 6 5 days 5/15/2026 5/21/2026
Typical 7 (Refuge Floor) 5 days 5/20/2026 5/26/2026
Typical 8 5 days 5/25/2026 5/30/2026
Typical 9 5 days 5/29/2026 6/4/2026
Typical 10 5 days 6/3/2026 6/9/2026
Typical 11 5 days 6/8/2026 6/13/2026
Typical 12 5 days 6/12/2026 6/18/2026
Typical 13 5 days 6/17/2026 6/23/2026
Typical 14 (Refuge Floor) 5 days 6/22/2026 6/28/2026
Typical 15 5 days 6/27/2026 7/3/2026
Typical 16 5 days 7/2/2026 7/7/2026
Typical 17 5 days 7/6/2026 7/12/2026
Typical 18 5 days 7/11/2026 7/17/2026
Typical 19 5 days 7/16/2026 7/22/2026
Typical 20 5 days 7/21/2026 7/27/2026
Typical 21 (Refuge Floor) 5 days 7/25/2026 7/31/2026
Typical 22 5 days 7/30/2026 8/5/2026
Terrace Floor 5 days 8/4/2026 8/10/2026
CP Sanitary Fixing,Electrical fixtures
71 days 5/4/2026 7/27/2026
fixing
Typical 1 5 days 5/4/2026 5/9/2026

Typical 2 5 days 5/7/2026 5/13/2026

Typical 3 5 days 5/11/2026 5/16/2026


Typical 4 5 days 5/14/2026 5/20/2026
Typical 5 5 days 5/18/2026 5/23/2026
Typical 6 5 days 5/21/2026 5/27/2026
Typical 7 (Refuge Floor) 5 days 5/25/2026 5/30/2026
Typical 8 5 days 5/28/2026 6/3/2026
Typical 9 5 days 6/1/2026 6/6/2026
Typical 10 5 days 6/4/2026 6/10/2026
Typical 11 5 days 6/8/2026 6/13/2026
Typical 12 5 days 6/11/2026 6/17/2026
Typical 13 5 days 6/15/2026 6/21/2026
Typical 14 (Refuge Floor) 5 days 6/18/2026 6/24/2026
Typical 15 5 days 6/22/2026 6/28/2026
Typical 16 5 days 6/26/2026 7/1/2026
Typical 17 5 days 6/29/2026 7/5/2026
Typical 18 5 days 7/3/2026 7/9/2026
Typical 19 5 days 7/6/2026 7/12/2026
Typical 20 5 days 7/10/2026 7/16/2026
Typical 21 (Refuge Floor) 5 days 7/14/2026 7/19/2026
Typical 22 5 days 7/17/2026 7/23/2026
Terrace Floor 5 days 7/21/2026 7/27/2026
Second coat painting 49 days 5/14/2026 7/11/2026
Typical 1 5 days 5/14/2026 5/20/2026
Typical 2 5 days 5/16/2026 5/22/2026
Typical 3 5 days 5/19/2026 5/25/2026
Typical 4 5 days 5/21/2026 5/27/2026
Typical 5 5 days 5/23/2026 5/29/2026
Typical 6 5 days 5/26/2026 6/1/2026
Typical 7 (Refuge Floor) 5 days 5/28/2026 6/3/2026
Typical 8 5 days 5/30/2026 6/5/2026
Typical 9 5 days 6/2/2026 6/8/2026
Typical 10 5 days 6/4/2026 6/10/2026
Typical 11 5 days 6/6/2026 6/12/2026
Typical 12 5 days 6/9/2026 6/15/2026
Typical 13 5 days 6/11/2026 6/17/2026
Typical 14 (Refuge Floor) 5 days 6/14/2026 6/19/2026
Typical 15 5 days 6/16/2026 6/22/2026
Typical 16 5 days 6/18/2026 6/24/2026
Typical 17 5 days 6/21/2026 6/27/2026
Typical 18 5 days 6/23/2026 6/29/2026
Typical 19 5 days 6/26/2026 7/1/2026
Typical 20 5 days 6/28/2026 7/4/2026
Typical 21 (Refuge Floor) 5 days 6/30/2026 7/6/2026
Typical 22 5 days 7/3/2026 7/9/2026
Terrace Floor 5 days 7/5/2026 7/11/2026
Common Area & Lift Lobby Finishing 152 days 3/21/2026 9/18/2026

Terrace Pedestal and Bracket Fixing 14 days 7/25/2026 8/11/2026

External MS Grill Fixing in Toilet Duct


34 days 6/20/2026 7/30/2026
Areas
Basement Putty 42 days 3/21/2026 5/11/2026
Electrical Works in lift Lobby Areas - 1st
27 days 5/11/2026 6/11/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
27 days 7/30/2026 9/1/2026
Testing
Block Masonry & Plaster Work in Lift
62 days 4/2/2026 6/15/2026
Lobby Areas
Lift Area Stone Cladding 62 days 4/25/2026 7/9/2026

Door Frame Fixing of FD and other


22 days 7/10/2026 8/5/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 7/28/2026 8/21/2026

Electrical Wire Pulling and GI Box Fixing


20 days 8/8/2026 9/2/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 8/10/2026 9/3/2026
False Ceiling in Lift Lobby Area 22 days 8/17/2026 9/11/2026
Putty in Lift in Lobby Areas 22 days 8/21/2026 9/16/2026

Primer & Internal Painting 1st Coat in


20 days 8/26/2026 9/18/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 9/1/2026 9/15/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 9/1/2026 9/14/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 141 days 6/8/2026 11/25/2026


Staircase - Window Framing 40 days 6/8/2026 7/25/2026

Staircase - Electrical Works - Conduiting


42 days 6/8/2026 7/28/2026
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 6/14/2026 8/12/2026

Staircase - Railing Fixing 55 days 6/26/2026 8/31/2026


Staircase - Flooring 60 days 6/30/2026 9/10/2026
Staircase - Electrical Wire pulling and GI
42 days 6/26/2026 8/14/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 8/14/2026 9/20/2026

Staircase - Putty 35 days 8/27/2026 10/10/2026

Staircase - Primer & Internal Painting


34 days 9/2/2026 10/14/2026
1st Coat

Staircase - Doors and window shutter


30 days 9/14/2026 10/22/2026
fixing
Staircase - Switch Socket Fixing &
25 days 9/20/2026 10/22/2026
Electrical Fittings Fixing

2nd coat Painting 50 days 9/25/2026 11/25/2026


External Paint 80 days 7/27/2026 11/1/2026

Waterproofing above Terrace 90 days 6/20/2026 10/7/2026

Waterproofing of Lift Pit 30 days 6/20/2026 7/25/2026

Waterproofing of OH Tank 30 days 7/8/2026 8/12/2026

Waterproofing of LMR Top Slab 30 days 7/25/2026 8/31/2026

Waterproofing Terrace Slab 30 days 8/31/2026 10/7/2026

Finishing and MEP Works in Ducts 88 days 5/21/2026 9/3/2026

All rounder paint in Kitchen and toilet


40 days 5/21/2026 7/7/2026
Ducts

All rounder paint in Electrical, ELV and


35 days 6/2/2026 7/13/2026
Fire Ducts
S W R Downtake lines - Common
22 days 7/8/2026 8/3/2026
Plumbing works
Electrical Works in Ducts - Common
28 days 7/14/2026 8/17/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
28 days 7/31/2026 9/3/2026
Common Fire Fighting Works
Lift Work 118 days 5/27/2026 10/17/2026
Scaffolding in Lift Shafts 9 days 5/27/2026 6/6/2026
White Wash in Lift Shafts 9 days 6/6/2026 6/17/2026
Electrical work in Lift Shafts 11 days 6/17/2026 6/30/2026
Ladder Fixing for OHT and LMR Slab 5 days 6/30/2026 7/6/2026
All Rounder PAINT in LMR 5 days 7/6/2026 7/12/2026
Electrical work in LMR 9 days 7/12/2026 7/23/2026
Trap Door Fixing 5 days 7/12/2026 7/18/2026
Handover of LMR to Lift Agency 4 days 6/30/2026 7/5/2026
Lift Template Fixing 15 days 7/5/2026 7/23/2026
Lift Works 70 days 7/23/2026 10/17/2026
Parking Area 115 days 7/8/2026 11/24/2026
Finishing & MEP Works 115 days 7/8/2026 11/24/2026

Painting on Ceiling surfaces 25 days 7/8/2026 8/6/2026

Painting on Wall surfaces 1st Coat 40 days 7/25/2026 9/11/2026


Basement and Podium Levels
19 days 9/11/2026 10/6/2026
Electrical Works & Testing

Basement & Podium Levels Fire


fighting Hydrants and Sprinkler pipe fixing & 16 days 10/6/2026 10/25/2026
testing
Basement & Podium Levels PHE Line
12 days 10/25/2026 11/9/2026
Fixing & testing
VDF in Parking Area 45 days 9/17/2026 11/12/2026

Fixing Paver Blocks at Podium Levels 40 days 9/19/2026 11/7/2026

Driveway and Parking Area Markings 21 days 10/22/2026 11/16/2026

Fixing of Signages in Basement and


16 days 11/2/2026 11/20/2026
podium levels
Deep Cleaning 34 days 10/15/2026 11/24/2026

Snagging Desnagging & Handover 120 days 7/12/2026 12/5/2026

Wing B 889 days 1/17/2024 12/25/2026


Sub Structure 243 days 1/17/2024 11/7/2024
Excavation level 35 days 1/17/2024 2/28/2024

Inclined Rock Anchor 30 days 1/27/2024 3/2/2024

Excavation Level 2 35 days 2/20/2024 4/2/2024

Anti Termite 11 days 3/27/2024 4/9/2024


Plain Cement Concrete 11 days 3/27/2024 4/9/2024
Passive Rock Anchor 26 days 3/29/2024 4/29/2024
Waterproofing below raft 27 days 4/4/2024 5/7/2024
Raft Reinforcement 36 days 4/10/2024 5/23/2024
Raft Shuttering 34 days 4/14/2024 5/25/2024
Raft Concrete 12 days 5/20/2024 6/3/2024
Basement - 2 Slab Pour 1 49 days 6/5/2024 8/2/2024
Col & RW Reinforcement 19 days 6/5/2024 6/27/2024

Col & RW Shuttering 19 days 6/13/2024 7/6/2024

Col & RW Concrete 17 days 6/22/2024 7/12/2024

Slab Decking 16 days 6/30/2024 7/19/2024

Slab RF 16 days 7/12/2024 7/31/2024


Slab Concrete 1 day 8/1/2024 8/2/2024
Basement - 2 Slab Pour 2 49 days 7/8/2024 9/5/2024
Col & RW Reinforcement 19 days 7/8/2024 7/31/2024
Col & RW Shuttering 19 days 7/17/2024 8/8/2024
Col & RW Concrete 17 days 7/25/2024 8/14/2024

Slab Decking 16 days 8/2/2024 8/22/2024

Slab RF 16 days 8/14/2024 9/3/2024


Slab Concrete 1 day 9/4/2024 9/5/2024
Basement 1 Slab Pour 1 49 days 8/3/2024 10/1/2024
Col & RW Reinforcement 19 days 8/3/2024 8/27/2024
Col & RW Shuttering 19 days 8/12/2024 9/4/2024
Col & RW Concrete 17 days 8/21/2024 9/10/2024

Slab Decking 16 days 8/29/2024 9/17/2024

Slab RF 16 days 9/10/2024 9/29/2024


Slab Concrete 1 day 9/30/2024 10/1/2024
Basement 1 Slab Pour 2 49 days 9/6/2024 11/7/2024
Col & RW Reinforcement 19 days 9/6/2024 9/29/2024
Col & RW Shuttering 19 days 9/15/2024 10/8/2024
Col & RW Concrete 17 days 9/23/2024 10/15/2024

Slab Decking 16 days 10/1/2024 10/22/2024

Slab RF 16 days 10/15/2024 11/4/2024


Slab Concrete 1 day 11/6/2024 11/7/2024
Super Structure 507 days 10/5/2024 6/9/2026
GF slab Pour 1 49 days 10/5/2024 12/4/2024
Col Reinforcement 19 days 10/5/2024 10/28/2024
Col Shuttering 19 days 10/14/2024 11/7/2024
Col Concrete 17 days 10/23/2024 11/13/2024

Slab Decking 16 days 11/1/2024 11/20/2024

Slab RF 16 days 11/13/2024 12/2/2024


Slab Concrete 1 day 12/3/2024 12/4/2024
GF slab Pour 2 49 days 11/8/2024 1/5/2025
Col Reinforcement 19 days 11/8/2024 11/30/2024
Col Shuttering 19 days 11/16/2024 12/9/2024
Col Concrete 17 days 11/25/2024 12/14/2024

Slab Decking 16 days 12/3/2024 12/21/2024

Slab RF 16 days 12/14/2024 1/2/2025


Slab Concrete 1 day 1/4/2025 1/5/2025
Plinth Level Checking 15 days 1/6/2025 1/24/2025
Podium 1 Slab 37 days 1/25/2025 3/10/2025
Col Reinforcement 14 days 1/25/2025 2/11/2025
Col Shuttering 18 days 1/30/2025 2/20/2025
Col Concrete 19 days 2/4/2025 2/26/2025
Slab Decking 23 days 2/8/2025 3/8/2025
Slab RF 18 days 2/14/2025 3/8/2025
Slab Concrete 1 day 3/9/2025 3/10/2025
Typical 1 35 days 3/12/2025 4/23/2025
Vertical Reinforcement 13 days 3/12/2025 3/28/2025
Vertical Shuttering 19 days 3/16/2025 4/8/2025
Slab Decking 23 days 3/22/2025 4/18/2025
Beam & slab Reinforcement 21 days 3/27/2025 4/21/2025
Slab Concrete 1 day 4/22/2025 4/23/2025
Typical 2 35 days 4/24/2025 6/5/2025
Vertical Reinforcement 13 days 4/24/2025 5/10/2025
Vertical Shuttering 19 days 4/28/2025 5/21/2025
Slab Decking 23 days 5/5/2025 6/1/2025
Beam & slab Reinforcement 21 days 5/9/2025 6/3/2025
Slab Concrete 1 day 6/4/2025 6/5/2025
Typical 3 11 days 6/7/2025 6/20/2025
Vertical Reinforcement 4 days 6/7/2025 6/11/2025
Vertical Shuttering 5 days 6/9/2025 6/15/2025
Slab Decking 4 days 6/12/2025 6/16/2025
Beam & slab Reinforcement 3 days 6/14/2025 6/17/2025
Slab Concrete 1 day 6/19/2025 6/20/2025
Typical 4 11 days 6/21/2025 7/4/2025
Vertical Reinforcement 4 days 6/21/2025 6/26/2025
Vertical Shuttering 5 days 6/24/2025 6/29/2025
Slab Decking 4 days 6/26/2025 7/1/2025
Beam & slab Reinforcement 3 days 6/28/2025 7/2/2025
Slab Concrete 1 day 7/3/2025 7/4/2025
Typical 5 11 days 7/5/2025 7/18/2025
Vertical Reinforcement 4 days 7/5/2025 7/10/2025
Vertical Shuttering 5 days 7/8/2025 7/14/2025
Slab Decking 4 days 7/10/2025 7/15/2025
Beam & slab Reinforcement 3 days 7/12/2025 7/16/2025
Slab Concrete 1 day 7/17/2025 7/18/2025
Typical 6 11 days 7/19/2025 8/1/2025
Vertical Reinforcement 4 days 7/19/2025 7/24/2025
Vertical Shuttering 5 days 7/22/2025 7/28/2025
Slab Decking 4 days 7/24/2025 7/29/2025
Beam & slab Reinforcement 3 days 7/26/2025 7/30/2025
Slab Concrete 1 day 7/31/2025 8/1/2025
Typical 7 (Refuge Floor) 14 days 8/2/2025 8/20/2025
Vertical Reinforcement 7 days 8/2/2025 8/11/2025
Vertical Shuttering 9 days 8/5/2025 8/16/2025
Slab Decking 8 days 8/9/2025 8/20/2025
Beam & slab Reinforcement 4 days 8/12/2025 8/18/2025

Slab Concrete 1 day 8/19/2025 8/20/2025

Typical 8 14 days 8/21/2025 9/7/2025


Vertical Reinforcement 7 days 8/21/2025 8/29/2025
Vertical Shuttering 9 days 8/24/2025 9/3/2025
Slab Decking 8 days 8/28/2025 9/7/2025
Beam & slab Reinforcement 4 days 8/31/2025 9/4/2025
Slab Concrete 1 day 9/6/2025 9/7/2025
Typical 9 11 days 9/8/2025 9/21/2025
Vertical Reinforcement 4 days 9/8/2025 9/13/2025
Vertical Shuttering 5 days 9/11/2025 9/16/2025
Slab Decking 4 days 9/13/2025 9/18/2025
Beam & slab Reinforcement 3 days 9/15/2025 9/19/2025
Slab Concrete 1 day 9/20/2025 9/21/2025
Typical 10 11 days 9/23/2025 10/8/2025
Vertical Reinforcement 4 days 9/23/2025 9/27/2025
Vertical Shuttering 5 days 9/25/2025 10/3/2025
Slab Decking 4 days 9/27/2025 10/4/2025
Beam & slab Reinforcement 3 days 9/30/2025 10/5/2025
Slab Concrete 1 day 10/7/2025 10/8/2025
Typical 11 11 days 10/9/2025 10/23/2025
Vertical Reinforcement 4 days 10/9/2025 10/14/2025
Vertical Shuttering 5 days 10/11/2025 10/17/2025
Slab Decking 4 days 10/14/2025 10/18/2025
Beam & slab Reinforcement 3 days 10/16/2025 10/20/2025
Slab Concrete 1 day 10/22/2025 10/23/2025
Typical 12 11 days 10/24/2025 11/6/2025
Vertical Reinforcement 4 days 10/24/2025 10/29/2025
Vertical Shuttering 5 days 10/27/2025 11/1/2025
Slab Decking 4 days 10/29/2025 11/3/2025
Beam & slab Reinforcement 3 days 10/31/2025 11/4/2025
Slab Concrete 1 day 11/5/2025 11/6/2025
Typical 13 11 days 11/7/2025 11/20/2025
Vertical Reinforcement 4 days 11/7/2025 11/12/2025
Vertical Shuttering 5 days 11/10/2025 11/15/2025
Slab Decking 4 days 11/12/2025 11/17/2025
Beam & slab Reinforcement 3 days 11/14/2025 11/18/2025
Slab Concrete 1 day 11/19/2025 11/20/2025
Typical 14 (Refuge Floor) 14 days 11/21/2025 12/8/2025
Vertical Reinforcement 7 days 11/21/2025 11/29/2025
Vertical Shuttering 9 days 11/24/2025 12/4/2025
Slab Decking 8 days 11/28/2025 12/8/2025
Beam & slab Reinforcement 4 days 12/1/2025 12/5/2025
Slab Concrete 1 day 12/7/2025 12/8/2025
Typical 15 14 days 12/9/2025 12/26/2025
Vertical Reinforcement 7 days 12/9/2025 12/17/2025
Vertical Shuttering 9 days 12/11/2025 12/22/2025
Slab Decking 8 days 12/16/2025 12/26/2025
Beam & slab Reinforcement 4 days 12/19/2025 12/23/2025
Slab Concrete 1 day 12/25/2025 12/26/2025
Typical 16 11 days 12/27/2025 1/9/2026
Vertical Reinforcement 4 days 12/27/2025 1/1/2026
Vertical Shuttering 5 days 12/29/2025 1/4/2026
Slab Decking 4 days 1/1/2026 1/5/2026
Beam & slab Reinforcement 3 days 1/3/2026 1/7/2026
Slab Concrete 1 day 1/8/2026 1/9/2026
Typical 17 11 days 1/10/2026 1/23/2026
Vertical Reinforcement 4 days 1/10/2026 1/15/2026
Vertical Shuttering 5 days 1/13/2026 1/19/2026
Slab Decking 4 days 1/15/2026 1/20/2026
Beam & slab Reinforcement 3 days 1/17/2026 1/21/2026
Slab Concrete 1 day 1/22/2026 1/23/2026
Typical 18 11 days 1/24/2026 2/7/2026
Vertical Reinforcement 4 days 1/24/2026 1/30/2026
Vertical Shuttering 5 days 1/28/2026 2/3/2026
Slab Decking 4 days 1/30/2026 2/4/2026
Beam & slab Reinforcement 3 days 2/2/2026 2/5/2026
Slab Concrete 1 day 2/6/2026 2/7/2026
Typical 19 11 days 2/9/2026 2/21/2026
Vertical Reinforcement 4 days 2/9/2026 2/13/2026
Vertical Shuttering 5 days 2/11/2026 2/17/2026
Slab Decking 4 days 2/13/2026 2/18/2026
Beam & slab Reinforcement 3 days 2/16/2026 2/19/2026
Slab Concrete 1 day 2/20/2026 2/21/2026
Typical 20 11 days 2/23/2026 3/9/2026
Vertical Reinforcement 4 days 2/23/2026 2/27/2026
Vertical Shuttering 5 days 2/25/2026 3/3/2026
Slab Decking 4 days 2/27/2026 3/5/2026
Beam & slab Reinforcement 3 days 3/2/2026 3/6/2026
Slab Concrete 1 day 3/7/2026 3/9/2026
Typical 21 (Refuge Floor) 14 days 3/10/2026 3/26/2026
Vertical Reinforcement 7 days 3/10/2026 3/18/2026
Vertical Shuttering 9 days 3/12/2026 3/23/2026
Slab Decking 8 days 3/17/2026 3/26/2026
Beam & slab Reinforcement 4 days 3/19/2026 3/24/2026
Slab Concrete 1 day 3/25/2026 3/26/2026
Typical 22 15 days 3/28/2026 4/15/2026
Vertical Reinforcement 7 days 3/28/2026 4/5/2026
Vertical Shuttering 9 days 3/30/2026 4/10/2026
Slab Decking 8 days 4/4/2026 4/13/2026
Beam & slab Reinforcement 5 days 4/6/2026 4/12/2026
Slab Concrete 1 day 4/14/2026 4/15/2026
Terrace Floor 14 days 4/16/2026 5/4/2026
Vertical Reinforcement 7 days 4/16/2026 4/24/2026
Vertical Shuttering 9 days 4/18/2026 4/29/2026
Slab Decking 8 days 4/23/2026 5/4/2026
Beam & slab Reinforcement 4 days 4/25/2026 4/30/2026
Slab Concrete 1 day 5/2/2026 5/4/2026
OHT LMR 30 days 5/5/2026 6/9/2026
Col RF 10 days 5/5/2026 5/16/2026
Col Shuttering 12 days 5/8/2026 5/22/2026
Col Concrete 16 days 5/12/2026 5/30/2026
Beam & Slab Decking (LMR & OHT) 14 days 5/16/2026 6/2/2026
Beam & Slab RF 14 days 5/21/2026 6/6/2026

Concrete 1 day 6/8/2026 6/9/2026

Finishing Works 393 days 9/1/2025 12/20/2026


Blockwork 269 days 9/1/2025 7/23/2026

Basement 3 8 days 9/1/2025 9/10/2025

Basement 2 8 days 9/9/2025 9/19/2025

Basement 1 8 days 9/18/2025 9/27/2025

GF 8 days 9/26/2025 10/8/2025

Typical 1 9 days 10/9/2025 10/20/2025

Typical 2 9 days 10/22/2025 11/1/2025

Typical 3 9 days 11/3/2025 11/13/2025

Typical 4 9 days 11/14/2025 11/25/2025

Typical 5 9 days 11/26/2025 12/6/2025


Typical 6 9 days 12/8/2025 12/18/2025

Typical 7 (Refuge Floor) 9 days 12/20/2025 12/30/2025

Typical 8 9 days 1/1/2026 1/11/2026

Typical 9 9 days 1/13/2026 1/23/2026

Typical 10 9 days 1/24/2026 2/5/2026

Typical 11 9 days 2/6/2026 2/17/2026

Typical 12 9 days 2/18/2026 2/28/2026

Typical 13 9 days 3/2/2026 3/13/2026

Typical 14 (Refuge Floor) 9 days 3/15/2026 3/25/2026

Typical 15 9 days 3/27/2026 4/6/2026

Typical 16 9 days 4/8/2026 4/18/2026

Typical 17 9 days 4/20/2026 4/30/2026

Typical 18 9 days 5/2/2026 5/13/2026

Typical 19 9 days 5/14/2026 5/25/2026


Typical 20 9 days 5/26/2026 6/5/2026

Typical 21 (Refuge Floor) 9 days 6/6/2026 6/17/2026

Typical 22 9 days 6/18/2026 6/29/2026

Terrace Floor 9 days 6/30/2026 7/11/2026

OHT LMR 9 days 7/12/2026 7/23/2026


Plaster 271 days 9/5/2025 7/29/2026
Basement 3 10 days 9/5/2025 9/16/2025
Basement 2 10 days 9/13/2025 9/25/2025
Basement 1 10 days 9/21/2025 10/5/2025
GF 10 days 9/30/2025 10/14/2025
Typical 1 10 days 10/14/2025 10/27/2025
Typical 2 10 days 10/27/2025 11/7/2025
Typical 3 10 days 11/7/2025 11/19/2025

Typical 4 10 days 11/19/2025 12/1/2025

Typical 5 10 days 12/1/2025 12/12/2025


Typical 6 10 days 12/13/2025 12/24/2025
Typical 7 (Refuge Floor) 10 days 12/25/2025 1/5/2026
Typical 8 10 days 1/6/2026 1/17/2026
Typical 9 10 days 1/17/2026 1/30/2026
Typical 10 10 days 1/30/2026 2/11/2026
Typical 11 10 days 2/11/2026 2/23/2026
Typical 12 10 days 2/23/2026 3/7/2026
Typical 13 10 days 3/7/2026 3/19/2026
Typical 14 (Refuge Floor) 10 days 3/19/2026 3/31/2026
Typical 15 10 days 3/31/2026 4/12/2026
Typical 16 10 days 4/12/2026 4/24/2026
Typical 17 10 days 4/24/2026 5/7/2026
Typical 18 10 days 5/7/2026 5/19/2026
Typical 19 10 days 5/19/2026 5/30/2026
Typical 20 10 days 5/30/2026 6/11/2026
Typical 21 (Refuge Floor) 10 days 6/11/2026 6/23/2026
Typical 22 10 days 6/23/2026 7/5/2026
Terrace Floor 10 days 7/5/2026 7/17/2026
OHT LMR 10 days 7/17/2026 7/29/2026
Preparation of toilet waterproofing &
276 days 12/2/2025 10/31/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 12/2/2025 12/16/2025


Typical 2 12 days 12/16/2025 12/30/2025

Typical 3 12 days 12/31/2025 1/14/2026

Typical 4 12 days 1/14/2026 1/29/2026


Typical 5 12 days 1/29/2026 2/12/2026
Typical 6 12 days 2/12/2026 2/26/2026
Typical 7 (Refuge Floor) 12 days 2/26/2026 3/13/2026
Typical 8 12 days 3/13/2026 3/28/2026
Typical 9 12 days 3/28/2026 4/11/2026
Typical 10 12 days 4/11/2026 4/25/2026
Typical 11 12 days 4/25/2026 5/11/2026
Typical 12 12 days 5/11/2026 5/25/2026
Typical 13 12 days 5/25/2026 6/8/2026
Typical 14 (Refuge Floor) 12 days 6/8/2026 6/22/2026
Typical 15 12 days 6/22/2026 7/6/2026
Typical 16 12 days 7/6/2026 7/21/2026
Typical 17 12 days 7/21/2026 8/4/2026
Typical 18 12 days 8/4/2026 8/19/2026
Typical 19 12 days 8/19/2026 9/2/2026
Typical 20 12 days 9/2/2026 9/16/2026
Typical 21 (Refuge Floor) 12 days 9/16/2026 9/30/2026
Typical 22 12 days 10/3/2026 10/17/2026
Terrace Floor 12 days 10/17/2026 10/31/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 1/15/2026 10/20/2026
and Kitchen with Plaster
Typical 1 10 days 1/15/2026 1/28/2026
Typical 2 10 days 1/28/2026 2/9/2026

Typical 3 10 days 2/9/2026 2/20/2026

Typical 4 10 days 2/20/2026 3/5/2026


Typical 5 10 days 3/5/2026 3/17/2026
Typical 6 10 days 3/17/2026 3/29/2026
Typical 7 (Refuge Floor) 10 days 3/29/2026 4/10/2026
Typical 8 10 days 4/10/2026 4/22/2026
Typical 9 10 days 4/22/2026 5/5/2026
Typical 10 10 days 5/5/2026 5/16/2026
Typical 11 10 days 5/16/2026 5/28/2026
Typical 12 10 days 5/28/2026 6/9/2026
Typical 13 10 days 6/9/2026 6/21/2026
Typical 14 (Refuge Floor) 10 days 6/21/2026 7/3/2026
Typical 15 10 days 7/3/2026 7/15/2026
Typical 16 10 days 7/15/2026 7/27/2026
Typical 17 10 days 7/27/2026 8/7/2026
Typical 18 10 days 8/7/2026 8/20/2026
Typical 19 10 days 8/20/2026 9/1/2026
Typical 20 10 days 9/1/2026 9/12/2026
Typical 21 (Refuge Floor) 10 days 9/13/2026 9/24/2026
Typical 22 10 days 9/25/2026 10/8/2026
Terrace Floor 10 days 10/9/2026 10/20/2026
Granite Door Jambs ,window sill Fixing
184 days 2/21/2026 9/30/2026
and Dado in Toilets
Typical 1 8 days 2/21/2026 3/3/2026
Typical 2 8 days 3/3/2026 3/13/2026

Typical 3 8 days 3/13/2026 3/23/2026

Typical 4 8 days 3/23/2026 4/1/2026


Typical 5 8 days 4/2/2026 4/11/2026
Typical 6 8 days 4/11/2026 4/21/2026
Typical 7 (Refuge Floor) 8 days 4/21/2026 4/30/2026
Typical 8 8 days 4/30/2026 5/11/2026
Typical 9 8 days 5/11/2026 5/20/2026
Typical 10 8 days 5/20/2026 5/29/2026
Typical 11 8 days 5/29/2026 6/8/2026
Typical 12 8 days 6/8/2026 6/17/2026
Typical 13 8 days 6/17/2026 6/27/2026
Typical 14 (Refuge Floor) 8 days 6/27/2026 7/6/2026
Typical 15 8 days 7/6/2026 7/16/2026
Typical 16 8 days 7/16/2026 7/25/2026
Typical 17 8 days 7/25/2026 8/4/2026
Typical 18 8 days 8/4/2026 8/13/2026
Typical 19 8 days 8/13/2026 8/24/2026
Typical 20 8 days 8/24/2026 9/2/2026
Typical 21 (Refuge Floor) 8 days 9/2/2026 9/11/2026
Typical 22 8 days 9/11/2026 9/21/2026
Terrace Floor 8 days 9/21/2026 9/30/2026
Door & Window Frame Fixing incl alu
161 days 3/24/2026 10/5/2026
joineries fixing
Typical 1 7 days 3/24/2026 4/1/2026
Typical 2 7 days 4/2/2026 4/10/2026

Typical 3 7 days 4/10/2026 4/18/2026

Typical 4 7 days 4/18/2026 4/27/2026


Typical 5 7 days 4/27/2026 5/6/2026
Typical 6 7 days 5/6/2026 5/14/2026
Typical 7 (Refuge Floor) 7 days 5/14/2026 5/22/2026
Typical 8 7 days 5/22/2026 5/30/2026
Typical 9 7 days 5/30/2026 6/8/2026
Typical 10 7 days 6/8/2026 6/16/2026
Typical 11 7 days 6/16/2026 6/24/2026
Typical 12 7 days 6/24/2026 7/3/2026
Typical 13 7 days 7/3/2026 7/11/2026
Typical 14 (Refuge Floor) 7 days 7/11/2026 7/19/2026
Typical 15 7 days 7/20/2026 7/28/2026
Typical 16 7 days 7/28/2026 8/5/2026
Typical 17 7 days 8/5/2026 8/13/2026
Typical 18 7 days 8/13/2026 8/22/2026
Typical 19 7 days 8/22/2026 8/31/2026
Typical 20 7 days 8/31/2026 9/8/2026
Typical 21 (Refuge Floor) 7 days 9/8/2026 9/16/2026
Typical 22 7 days 9/16/2026 9/24/2026
Terrace Floor 7 days 9/25/2026 10/5/2026
Fire Fighting Works 138 days 4/20/2026 10/4/2026
Typical 1 6 days 4/20/2026 4/27/2026
Typical 2 6 days 4/27/2026 5/5/2026

Typical 3 6 days 5/5/2026 5/12/2026

Typical 4 6 days 5/12/2026 5/19/2026


Typical 5 6 days 5/19/2026 5/26/2026
Typical 6 6 days 5/26/2026 6/2/2026
Typical 7 (Refuge Floor) 6 days 6/2/2026 6/9/2026
Typical 8 6 days 6/9/2026 6/16/2026
Typical 9 6 days 6/16/2026 6/23/2026
Typical 10 6 days 6/23/2026 6/30/2026
Typical 11 6 days 6/30/2026 7/7/2026
Typical 12 6 days 7/8/2026 7/15/2026
Typical 13 6 days 7/15/2026 7/22/2026
Typical 14 (Refuge Floor) 6 days 7/22/2026 7/29/2026
Typical 15 6 days 7/29/2026 8/5/2026
Typical 16 6 days 8/5/2026 8/12/2026
Typical 17 6 days 8/12/2026 8/20/2026
Typical 18 6 days 8/20/2026 8/27/2026
Typical 19 6 days 8/27/2026 9/3/2026
Typical 20 6 days 9/3/2026 9/10/2026
Typical 21 (Refuge Floor) 6 days 9/10/2026 9/17/2026
Typical 22 6 days 9/17/2026 9/24/2026
Terrace Floor 6 days 9/25/2026 10/4/2026
Putty and Primer & 1 st coat Paint 117 days 5/13/2026 9/29/2026

Typical 1 7 days 5/13/2026 5/21/2026

Typical 2 7 days 5/19/2026 5/27/2026


Typical 3 7 days 5/25/2026 6/2/2026

Typical 4 7 days 5/30/2026 6/8/2026


Typical 5 7 days 6/5/2026 6/13/2026
Typical 6 7 days 6/11/2026 6/19/2026
Typical 7 (Refuge Floor) 7 days 6/17/2026 6/25/2026
Typical 8 7 days 6/23/2026 7/1/2026
Typical 9 7 days 6/29/2026 7/7/2026
Typical 10 7 days 7/5/2026 7/13/2026
Typical 11 7 days 7/11/2026 7/19/2026
Typical 12 7 days 7/17/2026 7/25/2026
Typical 13 7 days 7/23/2026 7/31/2026
Typical 14 (Refuge Floor) 7 days 7/29/2026 8/6/2026
Typical 15 7 days 8/4/2026 8/12/2026
Typical 16 7 days 8/10/2026 8/19/2026
Typical 17 7 days 8/17/2026 8/25/2026
Typical 18 7 days 8/22/2026 8/31/2026
Typical 19 7 days 8/28/2026 9/5/2026
Typical 20 7 days 9/3/2026 9/11/2026
Typical 21 (Refuge Floor) 7 days 9/9/2026 9/17/2026
Typical 22 7 days 9/15/2026 9/23/2026
Terrace Floor 7 days 9/21/2026 9/29/2026
Flooring and kitchen platform fixing 117 days 6/3/2026 10/23/2026
Typical 1 7 days 6/3/2026 6/11/2026
Typical 2 7 days 6/9/2026 6/17/2026

Typical 3 7 days 6/15/2026 6/23/2026

Typical 4 7 days 6/21/2026 6/29/2026


Typical 5 7 days 6/27/2026 7/5/2026
Typical 6 7 days 7/3/2026 7/11/2026
Typical 7 (Refuge Floor) 7 days 7/9/2026 7/17/2026
Typical 8 7 days 7/15/2026 7/23/2026
Typical 9 7 days 7/21/2026 7/29/2026
Typical 10 7 days 7/27/2026 8/4/2026
Typical 11 7 days 8/1/2026 8/10/2026
Typical 12 7 days 8/7/2026 8/17/2026
Typical 13 7 days 8/13/2026 8/22/2026
Typical 14 (Refuge Floor) 7 days 8/20/2026 8/28/2026
Typical 15 7 days 8/26/2026 9/3/2026
Typical 16 7 days 9/1/2026 9/9/2026
Typical 17 7 days 9/7/2026 9/15/2026
Typical 18 7 days 9/13/2026 9/21/2026
Typical 19 7 days 9/19/2026 9/27/2026
Typical 20 7 days 9/25/2026 10/5/2026
Typical 21 (Refuge Floor) 7 days 10/3/2026 10/11/2026
Typical 22 7 days 10/9/2026 10/17/2026
Terrace Floor 7 days 10/15/2026 10/23/2026

Door Shutter and window shutter fixing 71 days 6/24/2026 9/17/2026

Typical 1 5 days 6/24/2026 6/30/2026

Typical 2 5 days 6/28/2026 7/4/2026

Typical 3 5 days 7/2/2026 7/7/2026

Typical 4 5 days 7/5/2026 7/11/2026

Typical 5 5 days 7/9/2026 7/15/2026


Typical 6 5 days 7/12/2026 7/18/2026
Typical 7 (Refuge Floor) 5 days 7/16/2026 7/22/2026
Typical 8 5 days 7/20/2026 7/25/2026
Typical 9 5 days 7/23/2026 7/29/2026
Typical 10 5 days 7/27/2026 8/1/2026
Typical 11 5 days 7/30/2026 8/5/2026
Typical 12 5 days 8/3/2026 8/8/2026
Typical 13 5 days 8/6/2026 8/12/2026
Typical 14 (Refuge Floor) 5 days 8/10/2026 8/17/2026
Typical 15 5 days 8/13/2026 8/20/2026
Typical 16 5 days 8/18/2026 8/24/2026
Typical 17 5 days 8/21/2026 8/27/2026
Typical 18 5 days 8/25/2026 8/31/2026
Typical 19 5 days 8/28/2026 9/3/2026
Typical 20 5 days 9/1/2026 9/7/2026
Typical 21 (Refuge Floor) 5 days 9/4/2026 9/10/2026
Typical 22 5 days 9/8/2026 9/14/2026
Terrace Floor 5 days 9/11/2026 9/17/2026
CP Sanitary Fixing,Electrical fixtures
71 days 7/5/2026 9/28/2026
fixing
Typical 1 5 days 7/5/2026 7/11/2026
Typical 2 5 days 7/9/2026 7/15/2026

Typical 3 5 days 7/12/2026 7/18/2026

Typical 4 5 days 7/16/2026 7/22/2026


Typical 5 5 days 7/20/2026 7/25/2026
Typical 6 5 days 7/23/2026 7/29/2026
Typical 7 (Refuge Floor) 5 days 7/27/2026 8/1/2026
Typical 8 5 days 7/30/2026 8/5/2026
Typical 9 5 days 8/3/2026 8/8/2026
Typical 10 5 days 8/6/2026 8/12/2026
Typical 11 5 days 8/10/2026 8/17/2026
Typical 12 5 days 8/13/2026 8/20/2026
Typical 13 5 days 8/18/2026 8/24/2026
Typical 14 (Refuge Floor) 5 days 8/21/2026 8/27/2026
Typical 15 5 days 8/25/2026 8/31/2026
Typical 16 5 days 8/28/2026 9/3/2026
Typical 17 5 days 9/1/2026 9/7/2026
Typical 18 5 days 9/4/2026 9/10/2026
Typical 19 5 days 9/8/2026 9/14/2026
Typical 20 5 days 9/11/2026 9/17/2026
Typical 21 (Refuge Floor) 5 days 9/15/2026 9/21/2026
Typical 22 5 days 9/19/2026 9/24/2026
Terrace Floor 5 days 9/22/2026 9/28/2026
Second coat painting 49 days 7/20/2026 9/16/2026
Typical 1 5 days 7/20/2026 7/25/2026
Typical 2 5 days 7/22/2026 7/28/2026
Typical 3 5 days 7/24/2026 7/30/2026
Typical 4 5 days 7/27/2026 8/1/2026
Typical 5 5 days 7/29/2026 8/4/2026
Typical 6 5 days 7/31/2026 8/6/2026
Typical 7 (Refuge Floor) 5 days 8/3/2026 8/8/2026
Typical 8 5 days 8/5/2026 8/11/2026
Typical 9 5 days 8/7/2026 8/13/2026
Typical 10 5 days 8/10/2026 8/17/2026
Typical 11 5 days 8/12/2026 8/19/2026
Typical 12 5 days 8/14/2026 8/21/2026
Typical 13 5 days 8/18/2026 8/24/2026
Typical 14 (Refuge Floor) 5 days 8/20/2026 8/26/2026
Typical 15 5 days 8/22/2026 8/28/2026
Typical 16 5 days 8/25/2026 8/31/2026
Typical 17 5 days 8/27/2026 9/2/2026
Typical 18 5 days 8/29/2026 9/4/2026
Typical 19 5 days 9/1/2026 9/7/2026
Typical 20 5 days 9/3/2026 9/9/2026
Typical 21 (Refuge Floor) 5 days 9/5/2026 9/11/2026
Typical 22 5 days 9/8/2026 9/14/2026
Terrace Floor 5 days 9/10/2026 9/16/2026
Common Area & Lift Lobby Finishing 153 days 5/25/2026 11/25/2026

Terrace Pedestal and Bracket Fixing 14 days 8/20/2026 9/5/2026

External MS Grill Fixing in Toilet Duct


34 days 7/15/2026 8/25/2026
Areas
Basement Putty 42 days 5/25/2026 7/13/2026
Electrical Works in lift Lobby Areas - 1st
27 days 7/14/2026 8/14/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
27 days 8/25/2026 9/26/2026
Testing
Block Masonry & Plaster Work in Lift
62 days 6/6/2026 8/20/2026
Lobby Areas
Lift Area Stone Cladding 62 days 6/30/2026 9/12/2026
Door Frame Fixing of FD and other
22 days 9/14/2026 10/12/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 10/4/2026 10/28/2026

Electrical Wire Pulling and GI Box Fixing


20 days 10/16/2026 11/9/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 10/17/2026 11/10/2026
False Ceiling in Lift Lobby Area 22 days 10/23/2026 11/18/2026
Putty in Lift in Lobby Areas 22 days 10/28/2026 11/23/2026

Primer & Internal Painting 1st Coat in


20 days 11/2/2026 11/25/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 11/7/2026 11/22/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 11/7/2026 11/20/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 141 days 7/3/2026 12/20/2026


Staircase - Window Framing 40 days 7/3/2026 8/20/2026

Staircase - Electrical Works - Conduiting


42 days 7/3/2026 8/22/2026
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 7/9/2026 9/7/2026

Staircase - Railing Fixing 55 days 7/21/2026 9/24/2026


Staircase - Flooring 60 days 7/25/2026 10/7/2026
Staircase - Electrical Wire pulling and GI
42 days 7/21/2026 9/9/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 9/9/2026 10/17/2026

Staircase - Putty 35 days 9/21/2026 11/4/2026

Staircase - Primer & Internal Painting


34 days 9/27/2026 11/9/2026
1st Coat

Staircase - Doors and window shutter


30 days 10/11/2026 11/16/2026
fixing
Staircase - Switch Socket Fixing &
25 days 10/17/2026 11/16/2026
Electrical Fittings Fixing

2nd coat Painting 50 days 10/22/2026 12/20/2026

External Paint 80 days 7/12/2026 10/18/2026

Waterproofing above Terrace 90 days 7/15/2026 11/1/2026

Waterproofing of Lift Pit 30 days 7/15/2026 8/20/2026

Waterproofing of OH Tank 30 days 8/1/2026 9/7/2026

Waterproofing of LMR Top Slab 30 days 8/20/2026 9/24/2026

Waterproofing Terrace Slab 30 days 9/25/2026 11/1/2026

Finishing and MEP Works in Ducts 93 days 6/12/2026 10/4/2026

All rounder paint in Kitchen and toilet


38 days 6/12/2026 7/28/2026
Ducts

All rounder paint in Electrical, ELV and


38 days 6/24/2026 8/8/2026
Fire Ducts
S W R Downtake lines - Common
25 days 7/28/2026 8/27/2026
Plumbing works
Electrical Works in Ducts - Common
30 days 8/8/2026 9/14/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
30 days 8/27/2026 10/4/2026
Common Fire Fighting Works
Lift Work 123 days 6/21/2026 11/17/2026
Scaffolding in Lift Shafts 9 days 6/21/2026 7/1/2026
White Wash in Lift Shafts 9 days 7/2/2026 7/12/2026
Electrical work in Lift Shafts 11 days 7/12/2026 7/25/2026
Ladder Fixing for OHT and LMR Slab 5 days 7/25/2026 7/31/2026
All Rounder PAINT in LMR 5 days 7/31/2026 8/6/2026
Electrical work in LMR 9 days 8/6/2026 8/18/2026
Trap Door Fixing 5 days 8/6/2026 8/12/2026
Handover of LMR to Lift Agency 4 days 7/25/2026 7/30/2026
Lift Template Fixing 15 days 7/30/2026 8/18/2026
Lift Works 75 days 8/18/2026 11/17/2026
Parking Area 115 days 7/28/2026 12/14/2026
Finishing & MEP Works 115 days 7/28/2026 12/14/2026

Painting on Ceiling surfaces 25 days 7/28/2026 8/27/2026

Painting on Wall surfaces 1st Coat 36 days 8/18/2026 9/29/2026


Basement and Podium Levels
16 days 9/29/2026 10/20/2026
Electrical Works & Testing
Basement & Podium Levels Fire
fighting Hydrants and Sprinkler pipe fixing & 16 days 10/21/2026 11/9/2026
testing

Basement & Podium Levels PHE Line


15 days 11/9/2026 11/26/2026
Fixing & testing
VDF in Parking Area 45 days 10/5/2026 11/28/2026

Fixing Paver Blocks at Podium Levels 40 days 10/5/2026 11/22/2026

Driveway and Parking Area Markings 23 days 11/6/2026 12/4/2026

Fixing of Signages in Basement and


15 days 11/22/2026 12/10/2026
podium levels
Deep Cleaning 35 days 11/3/2026 12/14/2026

Snagging Desnagging & Handover 120 days 8/1/2026 12/25/2026

Wing A 890 days 1/20/2024 12/30/2026


Sub Structure 243 days 1/20/2024 11/10/2024
Excavation level 35 days 1/20/2024 3/2/2024

Inclined Rock Anchor 30 days 1/31/2024 3/6/2024

Excavation Level 2 35 days 2/23/2024 4/6/2024

Anti Termitte 11 days 3/31/2024 4/13/2024


Plain Cement Concrete 11 days 3/31/2024 4/13/2024
Passive Rock Anchor 26 days 4/1/2024 5/3/2024
Waterproofing below raft 27 days 4/7/2024 5/10/2024
Raft Reinforcement 36 days 4/13/2024 5/27/2024
Raft Shuttering 34 days 4/18/2024 5/29/2024
Raft Concrete 12 days 5/23/2024 6/6/2024
Basement - 2 Slab Pour 1 49 days 6/8/2024 8/6/2024
Col & RW Reinforcement 19 days 6/8/2024 7/1/2024

Col & RW Shuttering 19 days 6/17/2024 7/9/2024

Col & RW Concrete 17 days 6/25/2024 7/15/2024

Slab Decking 16 days 7/4/2024 7/23/2024

Slab RF 16 days 7/16/2024 8/3/2024


Slab Concrete 1 day 8/5/2024 8/6/2024
Basement - 2 Slab Pour 2 49 days 7/12/2024 9/9/2024
Col & RW Reinforcement 19 days 7/12/2024 8/3/2024
Col & RW Shuttering 17 days 7/20/2024 8/9/2024
Col & RW Concrete 17 days 7/29/2024 8/19/2024
Slab Decking 16 days 8/6/2024 8/26/2024

Slab RF 16 days 8/19/2024 9/6/2024


Slab Concrete 1 day 9/7/2024 9/9/2024
Basement 1 Slab Pour 1 49 days 8/7/2024 10/6/2024
Col & RW Reinforcement 19 days 8/7/2024 8/30/2024
Col & RW Shuttering 17 days 8/16/2024 9/5/2024
Col & RW Concrete 17 days 8/24/2024 9/13/2024

Slab Decking 16 days 9/2/2024 9/20/2024

Slab RF 16 days 9/13/2024 10/3/2024


Slab Concrete 1 day 10/5/2024 10/6/2024
Basement 1 Slab Pour 2 49 days 9/10/2024 11/10/2024
Col & RW Reinforcement 19 days 9/10/2024 10/3/2024
Col & RW Shuttering 17 days 9/18/2024 10/9/2024
Col & RW Concrete 17 days 9/27/2024 10/19/2024

Slab Decking 16 days 10/6/2024 10/26/2024

Slab RF 16 days 10/19/2024 11/8/2024


Slab Concrete 1 day 11/9/2024 11/10/2024
Super Structure 506 days 10/8/2024 6/11/2026
GF slab Pour 1 56 days 10/8/2024 12/16/2024
Col Reinforcement 19 days 10/8/2024 11/2/2024
Col Shuttering 17 days 10/18/2024 11/8/2024
Col Concrete 16 days 10/26/2024 11/15/2024
Slab Decking 18 days 11/5/2024 11/26/2024

Slab RF 17 days 11/13/2024 12/3/2024

Slab Concrete 1 day 12/14/2024 12/16/2024


GF slab Pour 2 51 days 11/12/2024 1/11/2025
Col Reinforcement 19 days 11/12/2024 12/4/2024
Col Shuttering 17 days 11/20/2024 12/10/2024
Col Concrete 16 days 11/28/2024 12/17/2024

Slab Decking 18 days 12/6/2024 12/27/2024

Slab RF 18 days 12/18/2024 1/8/2025


Slab Concrete 1 day 1/10/2025 1/11/2025
Plinth Level Checking 15 days 1/12/2025 1/30/2025
Podium 1 Slab 34 days 1/31/2025 3/13/2025
Col Reinforcement 14 days 1/31/2025 2/17/2025
Col Shuttering 18 days 2/4/2025 2/25/2025
Col Concrete 19 days 2/6/2025 3/1/2025
Slab Decking 21 days 2/8/2025 3/5/2025
Slab RF 20 days 2/14/2025 3/10/2025
Slab Concrete 1 day 3/12/2025 3/13/2025
Typical 1 36 days 3/15/2025 4/26/2025
Vertical Reinforcement 13 days 3/15/2025 3/30/2025
Vertical Shuttering 19 days 3/19/2025 4/10/2025
Slab Decking 23 days 3/25/2025 4/21/2025
Beam & slab Reinforcement 22 days 3/29/2025 4/24/2025
Slab Concrete 1 day 4/25/2025 4/26/2025
Typical 2 35 days 4/28/2025 6/9/2025
Vertical Reinforcement 13 days 4/28/2025 5/14/2025
Vertical Shuttering 19 days 5/2/2025 5/24/2025
Slab Decking 23 days 5/8/2025 6/4/2025
Beam & slab Reinforcement 21 days 5/13/2025 6/7/2025
Slab Concrete 1 day 6/8/2025 6/9/2025
Typical 3 11 days 6/10/2025 6/23/2025
Vertical Reinforcement 4 days 6/10/2025 6/15/2025
Vertical Shuttering 5 days 6/13/2025 6/19/2025
Slab Decking 4 days 6/15/2025 6/20/2025
Beam & slab Reinforcement 3 days 6/18/2025 6/21/2025
Slab Concrete 1 day 6/22/2025 6/23/2025
Typical 4 11 days 6/25/2025 7/8/2025
Vertical Reinforcement 4 days 6/25/2025 6/29/2025
Vertical Shuttering 5 days 6/27/2025 7/3/2025
Slab Decking 4 days 6/30/2025 7/4/2025
Beam & slab Reinforcement 3 days 7/2/2025 7/5/2025
Slab Concrete 1 day 7/7/2025 7/8/2025
Typical 5 11 days 7/9/2025 7/22/2025
Vertical Reinforcement 4 days 7/9/2025 7/14/2025
Vertical Shuttering 5 days 7/11/2025 7/17/2025
Slab Decking 4 days 7/14/2025 7/18/2025
Beam & slab Reinforcement 3 days 7/16/2025 7/19/2025
Slab Concrete 1 day 7/21/2025 7/22/2025
Typical 6 11 days 7/23/2025 8/5/2025
Vertical Reinforcement 4 days 7/23/2025 7/28/2025
Vertical Shuttering 5 days 7/25/2025 7/31/2025
Slab Decking 4 days 7/28/2025 8/1/2025
Beam & slab Reinforcement 3 days 7/30/2025 8/2/2025
Slab Concrete 1 day 8/4/2025 8/5/2025
Typical 7 (Refuge Floor) 14 days 8/6/2025 8/23/2025
Vertical Reinforcement 7 days 8/6/2025 8/14/2025
Vertical Shuttering 9 days 8/8/2025 8/20/2025
Slab Decking 8 days 8/13/2025 8/23/2025
Beam & slab Reinforcement 4 days 8/16/2025 8/21/2025

Slab Concrete 1 day 8/22/2025 8/23/2025

Typical 8 14 days 8/25/2025 9/10/2025


Vertical Reinforcement 7 days 8/25/2025 9/2/2025
Vertical Shuttering 9 days 8/27/2025 9/7/2025
Slab Decking 8 days 9/1/2025 9/10/2025
Beam & slab Reinforcement 4 days 9/3/2025 9/8/2025
Slab Concrete 1 day 9/9/2025 9/10/2025
Typical 9 11 days 9/12/2025 9/25/2025
Vertical Reinforcement 4 days 9/12/2025 9/16/2025
Vertical Shuttering 5 days 9/14/2025 9/20/2025
Slab Decking 4 days 9/17/2025 9/21/2025
Beam & slab Reinforcement 3 days 9/19/2025 9/22/2025
Slab Concrete 1 day 9/24/2025 9/25/2025
Typical 10 11 days 9/26/2025 10/11/2025
Vertical Reinforcement 4 days 9/26/2025 10/3/2025
Vertical Shuttering 5 days 9/29/2025 10/6/2025
Slab Decking 4 days 10/3/2025 10/8/2025
Beam & slab Reinforcement 3 days 10/5/2025 10/9/2025
Slab Concrete 1 day 10/10/2025 10/11/2025
Typical 11 11 days 10/13/2025 10/27/2025
Vertical Reinforcement 4 days 10/13/2025 10/17/2025
Vertical Shuttering 5 days 10/15/2025 10/22/2025
Slab Decking 4 days 10/17/2025 10/23/2025
Beam & slab Reinforcement 3 days 10/20/2025 10/24/2025
Slab Concrete 1 day 10/25/2025 10/27/2025
Typical 12 11 days 10/28/2025 11/10/2025
Vertical Reinforcement 4 days 10/28/2025 11/1/2025
Vertical Shuttering 5 days 10/30/2025 11/5/2025
Slab Decking 4 days 11/1/2025 11/6/2025
Beam & slab Reinforcement 3 days 11/4/2025 11/7/2025
Slab Concrete 1 day 11/8/2025 11/10/2025
Typical 13 11 days 11/11/2025 11/24/2025
Vertical Reinforcement 4 days 11/11/2025 11/15/2025
Vertical Shuttering 5 days 11/13/2025 11/19/2025
Slab Decking 4 days 11/15/2025 11/20/2025
Beam & slab Reinforcement 3 days 11/18/2025 11/21/2025
Slab Concrete 1 day 11/22/2025 11/24/2025
Typical 14 (Refuge Floor) 14 days 11/25/2025 12/11/2025
Vertical Reinforcement 7 days 11/25/2025 12/3/2025
Vertical Shuttering 9 days 11/27/2025 12/8/2025
Slab Decking 8 days 12/2/2025 12/11/2025
Beam & slab Reinforcement 4 days 12/4/2025 12/9/2025
Slab Concrete 1 day 12/10/2025 12/11/2025
Typical 15 14 days 12/13/2025 12/29/2025
Vertical Reinforcement 7 days 12/13/2025 12/21/2025
Vertical Shuttering 9 days 12/15/2025 12/26/2025
Slab Decking 8 days 12/20/2025 12/29/2025
Beam & slab Reinforcement 4 days 12/22/2025 12/27/2025
Slab Concrete 1 day 12/28/2025 12/29/2025
Typical 16 11 days 12/31/2025 1/13/2026
Vertical Reinforcement 4 days 12/31/2025 1/4/2026
Vertical Shuttering 5 days 1/2/2026 1/8/2026
Slab Decking 4 days 1/4/2026 1/9/2026
Beam & slab Reinforcement 3 days 1/7/2026 1/10/2026
Slab Concrete 1 day 1/12/2026 1/13/2026
Typical 17 11 days 1/14/2026 1/28/2026
Vertical Reinforcement 4 days 1/14/2026 1/19/2026
Vertical Shuttering 5 days 1/16/2026 1/22/2026
Slab Decking 4 days 1/19/2026 1/23/2026
Beam & slab Reinforcement 3 days 1/21/2026 1/24/2026
Slab Concrete 1 day 1/27/2026 1/28/2026
Typical 18 11 days 1/29/2026 2/11/2026
Vertical Reinforcement 4 days 1/29/2026 2/3/2026
Vertical Shuttering 5 days 1/31/2026 2/6/2026
Slab Decking 4 days 2/3/2026 2/7/2026
Beam & slab Reinforcement 3 days 2/5/2026 2/9/2026
Slab Concrete 1 day 2/10/2026 2/11/2026
Typical 19 11 days 2/12/2026 2/25/2026
Vertical Reinforcement 4 days 2/12/2026 2/17/2026
Vertical Shuttering 5 days 2/14/2026 2/20/2026
Slab Decking 4 days 2/17/2026 2/21/2026
Beam & slab Reinforcement 3 days 2/19/2026 2/23/2026
Slab Concrete 1 day 2/24/2026 2/25/2026
Typical 20 11 days 2/26/2026 3/12/2026
Vertical Reinforcement 4 days 2/26/2026 3/3/2026
Vertical Shuttering 5 days 2/28/2026 3/7/2026
Slab Decking 4 days 3/3/2026 3/9/2026
Beam & slab Reinforcement 3 days 3/6/2026 3/10/2026
Slab Concrete 1 day 3/11/2026 3/12/2026
Typical 21 (Refuge Floor) 14 days 3/13/2026 3/30/2026
Vertical Reinforcement 7 days 3/13/2026 3/22/2026
Vertical Shuttering 9 days 3/16/2026 3/26/2026
Slab Decking 8 days 3/21/2026 3/30/2026
Beam & slab Reinforcement 4 days 3/23/2026 3/28/2026
Slab Concrete 1 day 3/29/2026 3/30/2026
Typical 22 14 days 3/31/2026 4/17/2026
Vertical Reinforcement 7 days 3/31/2026 4/9/2026
Vertical Shuttering 9 days 4/3/2026 4/13/2026
Slab Decking 8 days 4/8/2026 4/17/2026
Beam & slab Reinforcement 4 days 4/10/2026 4/15/2026
Slab Concrete 1 day 4/16/2026 4/17/2026
Terrace Floor 14 days 4/18/2026 5/6/2026
Vertical Reinforcement 7 days 4/18/2026 4/27/2026
Vertical Shuttering 9 days 4/21/2026 5/2/2026
Slab Decking 8 days 4/25/2026 5/6/2026
Beam & slab Reinforcement 4 days 4/28/2026 5/4/2026
Slab Concrete 1 day 5/5/2026 5/6/2026
OHT LMR 30 days 5/7/2026 6/11/2026
Col RF 6 days 5/7/2026 5/14/2026
Col Shuttering 8 days 5/12/2026 5/21/2026
Col Concrete 9 days 5/18/2026 5/28/2026
Beam & Slab Decking (LMR & OHT) 11 days 5/22/2026 6/4/2026
Beam & Slab RF 10 days 5/28/2026 6/9/2026

Concrete 1 day 6/10/2026 6/11/2026

Finishing Works 392 days 9/5/2025 12/23/2026


Blockwork 269 days 9/5/2025 7/27/2026

Basement 3 8 days 9/5/2025 9/14/2025

Basement 2 8 days 9/13/2025 9/22/2025

Basement 1 8 days 9/21/2025 10/3/2025

GF 8 days 9/30/2025 10/11/2025

Typical 1 9 days 10/13/2025 10/24/2025

Typical 2 9 days 10/25/2025 11/5/2025

Typical 3 9 days 11/6/2025 11/17/2025

Typical 4 9 days 11/18/2025 11/28/2025


Typical 5 9 days 11/29/2025 12/10/2025

Typical 6 9 days 12/11/2025 12/22/2025

Typical 7 (Refuge Floor) 9 days 12/23/2025 1/3/2026

Typical 8 9 days 1/4/2026 1/15/2026

Typical 9 9 days 1/16/2026 1/28/2026

Typical 10 9 days 1/29/2026 2/9/2026

Typical 11 9 days 2/10/2026 2/20/2026

Typical 12 9 days 2/21/2026 3/5/2026

Typical 13 9 days 3/6/2026 3/17/2026

Typical 14 (Refuge Floor) 9 days 3/18/2026 3/29/2026

Typical 15 9 days 3/30/2026 4/10/2026

Typical 16 9 days 4/11/2026 4/22/2026

Typical 17 9 days 4/23/2026 5/5/2026

Typical 18 9 days 5/6/2026 5/16/2026

Typical 19 9 days 5/18/2026 5/28/2026


Typical 20 9 days 5/29/2026 6/9/2026

Typical 21 (Refuge Floor) 9 days 6/10/2026 6/21/2026

Typical 22 9 days 6/22/2026 7/3/2026

Terrace Floor 9 days 7/4/2026 7/15/2026

OHT LMR 9 days 7/16/2026 7/27/2026


Plaster 271 days 9/8/2025 8/1/2026
Basement 3 10 days 9/8/2025 9/20/2025
Basement 2 10 days 9/17/2025 9/28/2025
Basement 1 10 days 9/25/2025 10/9/2025
GF 10 days 10/5/2025 10/17/2025
Typical 1 10 days 10/17/2025 10/30/2025
Typical 2 10 days 10/30/2025 11/11/2025

Typical 3 10 days 11/11/2025 11/22/2025

Typical 4 10 days 11/22/2025 12/4/2025


Typical 5 10 days 12/4/2025 12/16/2025
Typical 6 10 days 12/16/2025 12/28/2025
Typical 7 (Refuge Floor) 10 days 12/28/2025 1/9/2026
Typical 8 10 days 1/9/2026 1/21/2026
Typical 9 10 days 1/21/2026 2/3/2026
Typical 10 10 days 2/3/2026 2/14/2026
Typical 11 10 days 2/14/2026 2/26/2026
Typical 12 10 days 2/26/2026 3/11/2026
Typical 13 10 days 3/11/2026 3/23/2026
Typical 14 (Refuge Floor) 10 days 3/23/2026 4/4/2026
Typical 15 10 days 4/4/2026 4/16/2026
Typical 16 10 days 4/16/2026 4/28/2026
Typical 17 10 days 4/28/2026 5/11/2026
Typical 18 10 days 5/11/2026 5/22/2026
Typical 19 10 days 5/22/2026 6/3/2026
Typical 20 10 days 6/3/2026 6/15/2026
Typical 21 (Refuge Floor) 10 days 6/15/2026 6/27/2026
Typical 22 10 days 6/27/2026 7/9/2026
Terrace Floor 10 days 7/9/2026 7/21/2026
OHT LMR 10 days 7/21/2026 8/1/2026
Preparation of toilet waterproofing &
276 days 11/24/2025 10/23/2026
Plumbing Pipe line fixing incl. screed laying

Typical 1 12 days 11/24/2025 12/8/2025


Typical 2 12 days 12/8/2025 12/22/2025

Typical 3 12 days 12/22/2025 1/5/2026

Typical 4 12 days 1/6/2026 1/20/2026


Typical 5 12 days 1/20/2026 2/4/2026
Typical 6 12 days 2/4/2026 2/18/2026
Typical 7 (Refuge Floor) 12 days 2/18/2026 3/5/2026
Typical 8 12 days 3/5/2026 3/19/2026
Typical 9 12 days 3/19/2026 4/3/2026
Typical 10 12 days 4/3/2026 4/17/2026
Typical 11 12 days 4/17/2026 5/2/2026
Typical 12 12 days 5/2/2026 5/16/2026
Typical 13 12 days 5/16/2026 5/30/2026
Typical 14 (Refuge Floor) 12 days 5/30/2026 6/13/2026
Typical 15 12 days 6/14/2026 6/28/2026
Typical 16 12 days 6/28/2026 7/12/2026
Typical 17 12 days 7/12/2026 7/27/2026
Typical 18 12 days 7/27/2026 8/10/2026
Typical 19 12 days 8/10/2026 8/25/2026
Typical 20 12 days 8/25/2026 9/8/2026
Typical 21 (Refuge Floor) 12 days 9/8/2026 9/22/2026
Typical 22 12 days 9/22/2026 10/8/2026
Terrace Floor 12 days 10/9/2026 10/23/2026
Ledge Wall and Wall Plumbing in Toilet
230 days 1/7/2026 10/12/2026
and Kitchen with Plaster
Typical 1 10 days 1/7/2026 1/19/2026
Typical 2 10 days 1/19/2026 1/31/2026

Typical 3 10 days 1/31/2026 2/12/2026

Typical 4 10 days 2/12/2026 2/24/2026


Typical 5 10 days 2/24/2026 3/9/2026
Typical 6 10 days 3/9/2026 3/20/2026
Typical 7 (Refuge Floor) 10 days 3/21/2026 4/1/2026
Typical 8 10 days 4/2/2026 4/13/2026
Typical 9 10 days 4/14/2026 4/25/2026
Typical 10 10 days 4/25/2026 5/8/2026
Typical 11 10 days 5/8/2026 5/20/2026
Typical 12 10 days 5/20/2026 6/1/2026
Typical 13 10 days 6/1/2026 6/12/2026
Typical 14 (Refuge Floor) 10 days 6/12/2026 6/24/2026
Typical 15 10 days 6/24/2026 7/6/2026
Typical 16 10 days 7/6/2026 7/18/2026
Typical 17 10 days 7/18/2026 7/30/2026
Typical 18 10 days 7/30/2026 8/11/2026
Typical 19 10 days 8/11/2026 8/24/2026
Typical 20 10 days 8/24/2026 9/4/2026
Typical 21 (Refuge Floor) 10 days 9/4/2026 9/16/2026
Typical 22 10 days 9/16/2026 9/28/2026
Terrace Floor 10 days 9/28/2026 10/12/2026
Granite Door Jambs ,window sill Fixing
184 days 2/13/2026 9/22/2026
and Dado in Toilets
Typical 1 8 days 2/13/2026 2/23/2026
Typical 2 8 days 2/23/2026 3/5/2026

Typical 3 8 days 3/5/2026 3/14/2026

Typical 4 8 days 3/15/2026 3/24/2026


Typical 5 8 days 3/24/2026 4/3/2026
Typical 6 8 days 4/3/2026 4/12/2026
Typical 7 (Refuge Floor) 8 days 4/12/2026 4/22/2026
Typical 8 8 days 4/22/2026 5/2/2026
Typical 9 8 days 5/2/2026 5/12/2026
Typical 10 8 days 5/12/2026 5/21/2026
Typical 11 8 days 5/21/2026 5/30/2026
Typical 12 8 days 5/30/2026 6/9/2026
Typical 13 8 days 6/9/2026 6/18/2026
Typical 14 (Refuge Floor) 8 days 6/18/2026 6/28/2026
Typical 15 8 days 6/28/2026 7/7/2026
Typical 16 8 days 7/8/2026 7/17/2026
Typical 17 8 days 7/17/2026 7/27/2026
Typical 18 8 days 7/27/2026 8/5/2026
Typical 19 8 days 8/5/2026 8/14/2026
Typical 20 8 days 8/14/2026 8/25/2026
Typical 21 (Refuge Floor) 8 days 8/25/2026 9/3/2026
Typical 22 8 days 9/3/2026 9/12/2026
Terrace Floor 8 days 9/13/2026 9/22/2026
Door & Window Frame Fixing incl alu
161 days 3/16/2026 9/24/2026
joineries fixing
Typical 1 7 days 3/16/2026 3/24/2026
Typical 2 7 days 3/24/2026 4/1/2026

Typical 3 7 days 4/2/2026 4/10/2026

Typical 4 7 days 4/10/2026 4/18/2026


Typical 5 7 days 4/18/2026 4/27/2026
Typical 6 7 days 4/27/2026 5/6/2026
Typical 7 (Refuge Floor) 7 days 5/6/2026 5/14/2026
Typical 8 7 days 5/14/2026 5/22/2026
Typical 9 7 days 5/22/2026 5/30/2026
Typical 10 7 days 5/30/2026 6/8/2026
Typical 11 7 days 6/8/2026 6/16/2026
Typical 12 7 days 6/16/2026 6/24/2026
Typical 13 7 days 6/24/2026 7/3/2026
Typical 14 (Refuge Floor) 7 days 7/3/2026 7/11/2026
Typical 15 7 days 7/11/2026 7/19/2026
Typical 16 7 days 7/20/2026 7/28/2026
Typical 17 7 days 7/28/2026 8/5/2026
Typical 18 7 days 8/5/2026 8/13/2026
Typical 19 7 days 8/13/2026 8/22/2026
Typical 20 7 days 8/22/2026 8/31/2026
Typical 21 (Refuge Floor) 7 days 8/31/2026 9/8/2026
Typical 22 7 days 9/8/2026 9/16/2026
Terrace Floor 7 days 9/16/2026 9/24/2026
Fire Fighting Works 138 days 4/11/2026 9/23/2026
Typical 1 6 days 4/11/2026 4/18/2026
Typical 2 6 days 4/18/2026 4/25/2026

Typical 3 6 days 4/25/2026 5/4/2026

Typical 4 6 days 5/4/2026 5/11/2026


Typical 5 6 days 5/11/2026 5/18/2026
Typical 6 6 days 5/18/2026 5/25/2026
Typical 7 (Refuge Floor) 6 days 5/25/2026 6/1/2026
Typical 8 6 days 6/1/2026 6/8/2026
Typical 9 6 days 6/8/2026 6/15/2026
Typical 10 6 days 6/15/2026 6/22/2026
Typical 11 6 days 6/22/2026 6/29/2026
Typical 12 6 days 6/29/2026 7/6/2026
Typical 13 6 days 7/6/2026 7/13/2026
Typical 14 (Refuge Floor) 6 days 7/14/2026 7/21/2026
Typical 15 6 days 7/21/2026 7/28/2026
Typical 16 6 days 7/28/2026 8/4/2026
Typical 17 6 days 8/4/2026 8/11/2026
Typical 18 6 days 8/11/2026 8/19/2026
Typical 19 6 days 8/19/2026 8/26/2026
Typical 20 6 days 8/26/2026 9/2/2026
Typical 21 (Refuge Floor) 6 days 9/2/2026 9/9/2026
Typical 22 6 days 9/9/2026 9/16/2026
Terrace Floor 6 days 9/16/2026 9/23/2026
Putty and Primer & 1 st coat Paint 117 days 5/5/2026 9/21/2026

Typical 1 7 days 5/5/2026 5/13/2026

Typical 2 7 days 5/11/2026 5/19/2026


Typical 3 7 days 5/16/2026 5/25/2026

Typical 4 7 days 5/22/2026 5/30/2026


Typical 5 7 days 5/28/2026 6/5/2026
Typical 6 7 days 6/3/2026 6/11/2026
Typical 7 (Refuge Floor) 7 days 6/9/2026 6/17/2026
Typical 8 7 days 6/15/2026 6/23/2026
Typical 9 7 days 6/21/2026 6/29/2026
Typical 10 7 days 6/27/2026 7/5/2026
Typical 11 7 days 7/3/2026 7/11/2026
Typical 12 7 days 7/9/2026 7/17/2026
Typical 13 7 days 7/15/2026 7/23/2026
Typical 14 (Refuge Floor) 7 days 7/21/2026 7/29/2026
Typical 15 7 days 7/27/2026 8/4/2026
Typical 16 7 days 8/1/2026 8/10/2026
Typical 17 7 days 8/7/2026 8/17/2026
Typical 18 7 days 8/13/2026 8/22/2026
Typical 19 7 days 8/20/2026 8/28/2026
Typical 20 7 days 8/26/2026 9/3/2026
Typical 21 (Refuge Floor) 7 days 9/1/2026 9/9/2026
Typical 22 7 days 9/7/2026 9/15/2026
Terrace Floor 7 days 9/13/2026 9/21/2026
Flooring and kitchen platform fixing 117 days 5/26/2026 10/14/2026
Typical 1 7 days 5/26/2026 6/3/2026
Typical 2 7 days 6/1/2026 6/9/2026

Typical 3 7 days 6/6/2026 6/15/2026

Typical 4 7 days 6/12/2026 6/21/2026


Typical 5 7 days 6/18/2026 6/27/2026
Typical 6 7 days 6/24/2026 7/3/2026
Typical 7 (Refuge Floor) 7 days 6/30/2026 7/9/2026
Typical 8 7 days 7/6/2026 7/15/2026
Typical 9 7 days 7/12/2026 7/21/2026
Typical 10 7 days 7/18/2026 7/27/2026
Typical 11 7 days 7/24/2026 8/1/2026
Typical 12 7 days 7/30/2026 8/7/2026
Typical 13 7 days 8/5/2026 8/13/2026
Typical 14 (Refuge Floor) 7 days 8/11/2026 8/20/2026
Typical 15 7 days 8/18/2026 8/26/2026
Typical 16 7 days 8/24/2026 9/1/2026
Typical 17 7 days 8/29/2026 9/7/2026
Typical 18 7 days 9/4/2026 9/12/2026
Typical 19 7 days 9/10/2026 9/18/2026
Typical 20 7 days 9/16/2026 9/24/2026
Typical 21 (Refuge Floor) 7 days 9/22/2026 9/30/2026
Typical 22 7 days 9/28/2026 10/8/2026
Terrace Floor 7 days 10/6/2026 10/14/2026

Door Shutter and window shutter fixing 71 days 6/16/2026 9/9/2026

Typical 1 5 days 6/16/2026 6/22/2026

Typical 2 5 days 6/20/2026 6/25/2026

Typical 3 5 days 6/23/2026 6/29/2026

Typical 4 5 days 6/27/2026 7/3/2026

Typical 5 5 days 6/30/2026 7/6/2026


Typical 6 5 days 7/4/2026 7/10/2026
Typical 7 (Refuge Floor) 5 days 7/8/2026 7/13/2026
Typical 8 5 days 7/11/2026 7/17/2026
Typical 9 5 days 7/15/2026 7/21/2026
Typical 10 5 days 7/18/2026 7/24/2026
Typical 11 5 days 7/22/2026 7/28/2026
Typical 12 5 days 7/25/2026 7/31/2026
Typical 13 5 days 7/29/2026 8/4/2026
Typical 14 (Refuge Floor) 5 days 8/1/2026 8/7/2026
Typical 15 5 days 8/5/2026 8/11/2026
Typical 16 5 days 8/8/2026 8/14/2026
Typical 17 5 days 8/12/2026 8/19/2026
Typical 18 5 days 8/17/2026 8/22/2026
Typical 19 5 days 8/20/2026 8/26/2026
Typical 20 5 days 8/24/2026 8/29/2026
Typical 21 (Refuge Floor) 5 days 8/27/2026 9/2/2026
Typical 22 5 days 8/31/2026 9/5/2026
Terrace Floor 5 days 9/3/2026 9/9/2026
CP Sanitary Fixing,Electrical fixtures
71 days 6/27/2026 9/20/2026
fixing
Typical 1 5 days 6/27/2026 7/3/2026
Typical 2 5 days 6/30/2026 7/6/2026

Typical 3 5 days 7/4/2026 7/10/2026

Typical 4 5 days 7/8/2026 7/13/2026


Typical 5 5 days 7/11/2026 7/17/2026
Typical 6 5 days 7/15/2026 7/21/2026
Typical 7 (Refuge Floor) 5 days 7/18/2026 7/24/2026
Typical 8 5 days 7/22/2026 7/28/2026
Typical 9 5 days 7/25/2026 7/31/2026
Typical 10 5 days 7/29/2026 8/4/2026
Typical 11 5 days 8/1/2026 8/7/2026
Typical 12 5 days 8/5/2026 8/11/2026
Typical 13 5 days 8/8/2026 8/14/2026
Typical 14 (Refuge Floor) 5 days 8/12/2026 8/19/2026
Typical 15 5 days 8/17/2026 8/22/2026
Typical 16 5 days 8/20/2026 8/26/2026
Typical 17 5 days 8/24/2026 8/29/2026
Typical 18 5 days 8/27/2026 9/2/2026
Typical 19 5 days 8/31/2026 9/5/2026
Typical 20 5 days 9/3/2026 9/9/2026
Typical 21 (Refuge Floor) 5 days 9/7/2026 9/12/2026
Typical 22 5 days 9/10/2026 9/16/2026
Terrace Floor 5 days 9/14/2026 9/20/2026
Second coat painting 49 days 7/11/2026 9/8/2026
Typical 1 5 days 7/11/2026 7/17/2026
Typical 2 5 days 7/14/2026 7/19/2026
Typical 3 5 days 7/16/2026 7/22/2026
Typical 4 5 days 7/18/2026 7/24/2026
Typical 5 5 days 7/21/2026 7/27/2026
Typical 6 5 days 7/23/2026 7/29/2026
Typical 7 (Refuge Floor) 5 days 7/25/2026 7/31/2026
Typical 8 5 days 7/28/2026 8/3/2026
Typical 9 5 days 7/30/2026 8/5/2026
Typical 10 5 days 8/1/2026 8/7/2026
Typical 11 5 days 8/4/2026 8/10/2026
Typical 12 5 days 8/6/2026 8/12/2026
Typical 13 5 days 8/8/2026 8/14/2026
Typical 14 (Refuge Floor) 5 days 8/11/2026 8/18/2026
Typical 15 5 days 8/13/2026 8/20/2026
Typical 16 5 days 8/17/2026 8/22/2026
Typical 17 5 days 8/19/2026 8/25/2026
Typical 18 5 days 8/21/2026 8/27/2026
Typical 19 5 days 8/24/2026 8/29/2026
Typical 20 5 days 8/26/2026 9/1/2026
Typical 21 (Refuge Floor) 5 days 8/28/2026 9/3/2026
Typical 22 5 days 8/31/2026 9/5/2026
Terrace Floor 5 days 9/2/2026 9/8/2026
Common Area & Lift Lobby Finishing 163 days 5/16/2026 11/29/2026

Terrace Pedestal and Bracket Fixing 14 days 8/22/2026 9/8/2026

External MS Grill Fixing in Toilet Duct


34 days 7/17/2026 8/27/2026
Areas
Basement Putty 42 days 5/16/2026 7/5/2026
Electrical Works in lift Lobby Areas - 1st
27 days 7/5/2026 8/6/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
27 days 8/27/2026 9/28/2026
Testing
Block Masonry & Plaster Work in Lift
62 days 6/10/2026 8/24/2026
Lobby Areas
Lift Area Stone Cladding 62 days 7/4/2026 9/16/2026
Door Frame Fixing of FD and other
22 days 9/17/2026 10/16/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 10/7/2026 10/31/2026

Electrical Wire Pulling and GI Box Fixing


20 days 10/19/2026 11/12/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 10/21/2026 11/13/2026
False Ceiling in Lift Lobby Area 22 days 10/27/2026 11/22/2026
Putty in Lift in Lobby Areas 22 days 10/31/2026 11/26/2026

Primer & Internal Painting 1st Coat in


20 days 11/5/2026 11/29/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 11/11/2026 11/25/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 11/11/2026 11/24/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 141 days 7/5/2026 12/23/2026


Staircase - Window Framing 40 days 7/5/2026 8/22/2026

Staircase - Electrical Works - Conduiting


42 days 7/5/2026 8/25/2026
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 7/11/2026 9/9/2026

Staircase - Railing Fixing 55 days 7/23/2026 9/27/2026


Staircase - Flooring 60 days 7/28/2026 10/10/2026
Staircase - Electrical Wire pulling and GI
42 days 7/23/2026 9/11/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 9/11/2026 10/19/2026

Staircase - Putty 35 days 9/23/2026 11/6/2026

Staircase - Primer & Internal Painting


34 days 9/29/2026 11/11/2026
1st Coat

Staircase - Doors and window shutter


30 days 10/13/2026 11/18/2026
fixing
Staircase - Switch Socket Fixing &
25 days 10/19/2026 11/18/2026
Electrical Fittings Fixing

2nd coat Painting 50 days 10/24/2026 12/23/2026

External Paint 80 days 7/4/2026 10/10/2026

Waterproofing above Terrace 94 days 7/17/2026 11/9/2026

Waterproofing of Lift Pit 32 days 7/17/2026 8/25/2026

Waterproofing of OH Tank 32 days 8/4/2026 9/11/2026

Waterproofing of LMR Top Slab 32 days 8/22/2026 9/29/2026

Waterproofing Terrace Slab 32 days 9/29/2026 11/9/2026

Finishing and MEP Works in Ducts 89 days 6/15/2026 9/29/2026

All rounder paint in Kitchen and toilet


40 days 6/15/2026 8/1/2026
Ducts

All rounder paint in Electrical, ELV and


38 days 6/24/2026 8/8/2026
Fire Ducts
S W R Downtake lines - Common
25 days 8/1/2026 9/1/2026
Plumbing works
Electrical Works in Ducts - Common
28 days 8/8/2026 9/11/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
28 days 8/27/2026 9/29/2026
Common Fire Fighting Works
Lift Work 123 days 6/23/2026 11/19/2026
Scaffolding in Lift Shafts 9 days 6/23/2026 7/4/2026
White Wash in Lift Shafts 9 days 7/4/2026 7/15/2026
Electrical work in Lift Shafts 11 days 7/15/2026 7/28/2026
Ladder Fixing for OHT and LMR Slab 5 days 7/28/2026 8/3/2026
All Rounder PAINT in LMR 5 days 8/3/2026 8/8/2026
Electrical work in LMR 9 days 8/8/2026 8/20/2026
Trap Door Fixing 5 days 8/8/2026 8/14/2026
Handover of LMR to Lift Agency 4 days 7/28/2026 8/1/2026
Lift Template Fixing 15 days 8/1/2026 8/20/2026
Lift Works 75 days 8/20/2026 11/19/2026
Parking Area 115 days 8/1/2026 12/19/2026
Finishing & MEP Works 115 days 8/1/2026 12/19/2026

Painting on Ceiling surfaces 20 days 8/1/2026 8/26/2026

Painting on Wall surfaces 1st Coat 36 days 8/22/2026 10/6/2026


Basement and Podium Levels
17 days 10/6/2026 10/26/2026
Electrical Works & Testing
Basement & Podium Levels Fire
fighting Hydrants and Sprinkler pipe fixing & 16 days 10/27/2026 11/14/2026
testing

Basement & Podium Levels PHE Line


13 days 11/15/2026 11/30/2026
Fixing & testing
VDF in Parking Area 45 days 10/12/2026 12/5/2026

Fixing Paver Blocks at Podium Levels 43 days 10/12/2026 12/2/2026

Driveway and Parking Area Markings 25 days 11/10/2026 12/10/2026

Fixing of Signages in Basement and


16 days 11/27/2026 12/16/2026
podium levels
Deep Cleaning 35 days 11/7/2026 12/19/2026

Snagging Desnagging & Handover 120 days 8/6/2026 12/30/2026

Hospital 852 days 1/20/2024 11/14/2026


Sub Structure 190 days 1/20/2024 9/5/2024

Excavation Level 20 days 1/20/2024 2/14/2024

Inclined Rock Anchor 25 days 2/2/2024 3/2/2024

Excavation Level 2 16 days 2/20/2024 3/9/2024


Anti Termitte 12 days 3/4/2024 3/18/2024
Plain Cement Concrete 11 days 3/12/2024 3/26/2024
Passive Rock Anchor 24 days 3/13/2024 4/12/2024
Waterproofing below raft 22 days 3/19/2024 4/15/2024
Raft Reinforcement 27 days 3/26/2024 4/27/2024
Raft Shuttering 23 days 3/31/2024 4/27/2024
Raft Concrete 10 days 4/22/2024 5/4/2024
Basement - 2 Slab 51 days 5/6/2024 7/5/2024
Col & RW Reinforcement 19 days 5/6/2024 5/28/2024
Col & RW Shuttering 17 days 5/11/2024 5/31/2024
Col & RW Concrete 17 days 5/16/2024 6/5/2024
Slab Decking 16 days 5/23/2024 6/11/2024
Slab RF 16 days 6/13/2024 7/2/2024
Slab Concrete 1 day 7/4/2024 7/5/2024
Basement - 1 Slab 51 days 7/6/2024 9/5/2024
Col & RW Reinforcement 19 days 7/6/2024 7/29/2024
Col & RW Shuttering 17 days 7/12/2024 8/1/2024
Col & RW Concrete 17 days 7/17/2024 8/6/2024
Slab Decking 16 days 7/24/2024 8/12/2024
Slab RF 16 days 8/14/2024 9/3/2024
Slab Concrete 1 day 9/4/2024 9/5/2024
Super Structure 399 days 9/6/2024 1/2/2026
GF Slab 35 days 9/6/2024 10/20/2024
Col & RW Reinforcement 12 days 9/6/2024 9/20/2024
Col & RW Shuttering 17 days 9/12/2024 10/3/2024
Col & RW Concrete 17 days 9/18/2024 10/9/2024
Slab Decking 16 days 9/21/2024 10/11/2024
Slab RF 16 days 9/27/2024 10/18/2024
Slab Concrete 1 day 10/19/2024 10/20/2024
Slab 1 35 days 10/21/2024 12/3/2024
Col & RW Reinforcement 12 days 10/21/2024 11/6/2024
Col & RW Shuttering 17 days 10/27/2024 11/18/2024
Col & RW Concrete 17 days 11/3/2024 11/23/2024
Slab Decking 16 days 11/6/2024 11/25/2024
Slab RF 16 days 11/12/2024 11/30/2024
Slab Concrete 1 day 12/2/2024 12/3/2024
Slab 2 35 days 12/4/2024 1/14/2025
Col & RW Reinforcement 12 days 12/4/2024 12/18/2024
Col & RW Shuttering 17 days 12/10/2024 12/30/2024
Col & RW Concrete 17 days 12/16/2024 1/5/2025
Slab Decking 16 days 12/18/2024 1/6/2025
Slab RF 16 days 12/24/2024 1/12/2025
Slab Concrete 1 day 1/13/2025 1/14/2025
Slab 3 35 days 1/16/2025 2/26/2025
Col & RW Reinforcement 12 days 1/16/2025 1/30/2025
Col & RW Shuttering 17 days 1/22/2025 2/11/2025
Col & RW Concrete 17 days 1/28/2025 2/17/2025
Slab Decking 16 days 1/30/2025 2/18/2025
Slab RF 16 days 2/5/2025 2/24/2025
Slab Concrete 1 day 2/25/2025 2/26/2025
Slab 4 35 days 2/28/2025 4/11/2025
Col & RW Reinforcement 12 days 2/28/2025 3/15/2025
Col & RW Shuttering 17 days 3/6/2025 3/27/2025
Col & RW Concrete 17 days 3/12/2025 4/2/2025
Slab Decking 16 days 3/15/2025 4/3/2025
Slab RF 16 days 3/21/2025 4/9/2025
Slab Concrete 1 day 4/10/2025 4/11/2025
Slab 5 35 days 4/12/2025 5/24/2025
Col & RW Reinforcement 12 days 4/12/2025 4/26/2025
Col & RW Shuttering 17 days 4/18/2025 5/9/2025
Col & RW Concrete 17 days 4/24/2025 5/15/2025
Slab Decking 16 days 4/26/2025 5/16/2025
Slab RF 16 days 5/3/2025 5/22/2025
Slab Concrete 1 day 5/23/2025 5/24/2025
Slab 6 35 days 5/26/2025 7/7/2025
Col & RW Reinforcement 12 days 5/26/2025 6/9/2025
Col & RW Shuttering 17 days 6/1/2025 6/21/2025
Col & RW Concrete 17 days 6/7/2025 6/27/2025
Slab Decking 16 days 6/9/2025 6/28/2025
Slab RF 16 days 6/15/2025 7/4/2025
Slab Concrete 1 day 7/5/2025 7/7/2025
Slab 7 35 days 7/8/2025 8/19/2025
Col & RW Reinforcement 12 days 7/8/2025 7/22/2025
Col & RW Shuttering 17 days 7/14/2025 8/2/2025
Col & RW Concrete 17 days 7/19/2025 8/8/2025
Slab Decking 16 days 7/22/2025 8/9/2025
Slab RF 16 days 7/28/2025 8/16/2025
Slab Concrete 1 day 8/18/2025 8/19/2025
Slab 8 35 days 8/20/2025 10/3/2025
Col & RW Reinforcement 12 days 8/20/2025 9/3/2025
Col & RW Shuttering 17 days 8/26/2025 9/15/2025
Col & RW Concrete 17 days 9/1/2025 9/21/2025
Slab Decking 16 days 9/3/2025 9/22/2025
Slab RF 16 days 9/9/2025 9/28/2025

Slab Concrete 1 day 9/30/2025 10/3/2025

Slab 9 35 days 10/4/2025 11/15/2025


Col & RW Reinforcement 12 days 10/4/2025 10/18/2025
Col & RW Shuttering 17 days 10/10/2025 10/31/2025
Col & RW Concrete 17 days 10/16/2025 11/6/2025
Slab Decking 16 days 10/18/2025 11/7/2025
Slab RF 16 days 10/25/2025 11/13/2025

Slab Concrete 1 day 11/14/2025 11/15/2025

Terrace Floor 35 days 11/17/2025 12/28/2025


Col & RW Reinforcement 12 days 11/17/2025 12/1/2025
Col & RW Shuttering 17 days 11/22/2025 12/12/2025
Col & RW Concrete 17 days 11/28/2025 12/18/2025
Slab Decking 16 days 12/1/2025 12/20/2025
Slab RF 16 days 12/7/2025 12/26/2025
Slab Concrete 1 day 12/27/2025 12/28/2025
OHT LMR 39 days 11/17/2025 1/2/2026
Col & RW Reinforcement 19 days 11/17/2025 12/9/2025
Col & RW Shuttering 20 days 11/22/2025 12/16/2025
Col & RW Concrete 21 days 11/27/2025 12/22/2025
Slab Decking 19 days 12/4/2025 12/27/2025
Slab RF 20 days 12/7/2025 12/30/2025
Slab Concrete 1 day 1/1/2026 1/2/2026

Finishing Works 318 days 10/28/2025 11/14/2026


Block Work 103 days 10/28/2025 2/27/2026

Basement 3 12 days 10/28/2025 11/11/2025

Basement 2 12 days 11/5/2025 11/19/2025


Basement 1 12 days 11/13/2025 11/27/2025

GF 12 days 11/21/2025 12/5/2025

Slab 1 12 days 11/29/2025 12/14/2025

Slab 2 12 days 12/8/2025 12/22/2025


Slab 3 12 days 12/8/2025 12/22/2025
Slab 4 12 days 12/16/2025 12/30/2025
Slab 5 12 days 12/25/2025 1/8/2026
Slab 6 12 days 1/2/2026 1/16/2026
Slab 7 12 days 1/10/2026 1/24/2026
Slab 8 12 days 1/19/2026 2/3/2026
Slab 9 12 days 1/28/2026 2/11/2026
Terrace Floor 12 days 2/5/2026 2/19/2026
OHT LMR 12 days 2/13/2026 2/27/2026
Plaster 103 days 11/8/2025 3/12/2026
Basement 3 12 days 11/8/2025 11/22/2025
Basement 2 12 days 11/17/2025 12/1/2025
Basement 1 12 days 11/25/2025 12/9/2025
GF 12 days 12/3/2025 12/17/2025

Slab 1 12 days 12/11/2025 12/26/2025

Slab 2 12 days 12/20/2025 1/3/2026


Slab 3 12 days 12/20/2025 1/3/2026
Slab 4 12 days 12/28/2025 1/11/2026
Slab 5 12 days 1/6/2026 1/20/2026
Slab 6 12 days 1/14/2026 1/29/2026
Slab 7 12 days 1/22/2026 2/6/2026
Slab 8 12 days 1/31/2026 2/14/2026
Slab 9 12 days 2/9/2026 2/23/2026
Terrace Floor 12 days 2/17/2026 3/3/2026
OHT LMR 12 days 2/25/2026 3/12/2026

Preparation of toilet waterproofing &


120 days 1/4/2026 5/29/2026
Plumbing Pipe line fixing incl. screed laying

Slab 1 12 days 1/4/2026 1/19/2026

Slab 2 12 days 1/19/2026 2/3/2026

Slab 3 12 days 2/3/2026 2/17/2026


Slab 4 12 days 2/17/2026 3/3/2026
Slab 5 12 days 3/3/2026 3/18/2026
Slab 6 12 days 3/18/2026 4/1/2026
Slab 7 12 days 4/2/2026 4/16/2026
Slab 8 12 days 4/16/2026 4/30/2026
Slab 9 12 days 4/30/2026 5/15/2026
Terrace Floor 12 days 5/15/2026 5/29/2026
Ledge Wall and Wall Plumbing in Toilet
100 days 1/31/2026 6/1/2026
and Kitchen with Plaster
Slab 1 10 days 1/31/2026 2/12/2026
Slab 2 10 days 2/12/2026 2/24/2026

Slab 3 10 days 2/24/2026 3/9/2026

Slab 4 10 days 3/9/2026 3/20/2026


Slab 5 10 days 3/21/2026 4/1/2026
Slab 6 10 days 4/2/2026 4/13/2026
Slab 7 10 days 4/14/2026 4/25/2026
Slab 8 10 days 4/25/2026 5/8/2026
Slab 9 10 days 5/8/2026 5/20/2026
Terrace Floor 10 days 5/20/2026 6/1/2026
Granite Door Jambs ,window sill Fixing
80 days 3/10/2026 6/13/2026
and Dado in Toilets
Slab 1 8 days 3/10/2026 3/19/2026

Slab 2 8 days 3/19/2026 3/29/2026

Slab 3 8 days 3/29/2026 4/7/2026


Slab 4 8 days 4/8/2026 4/17/2026
Slab 5 8 days 4/17/2026 4/27/2026
Slab 6 8 days 4/27/2026 5/7/2026
Slab 7 8 days 5/7/2026 5/16/2026
Slab 8 8 days 5/16/2026 5/26/2026
Slab 9 8 days 5/26/2026 6/4/2026
Terrace Floor 8 days 6/4/2026 6/13/2026
Door & Window Frame Fixing incl alu
70 days 3/30/2026 6/22/2026
joineries fixing
Slab 1 7 days 3/30/2026 4/7/2026

Slab 2 7 days 4/8/2026 4/16/2026

Slab 3 7 days 4/16/2026 4/24/2026


Slab 4 7 days 4/24/2026 5/4/2026
Slab 5 7 days 5/4/2026 5/12/2026
Slab 6 7 days 5/12/2026 5/20/2026
Slab 7 7 days 5/20/2026 5/28/2026
Slab 8 7 days 5/28/2026 6/5/2026
Slab 9 7 days 6/5/2026 6/13/2026
Terrace Floor 7 days 6/14/2026 6/22/2026
Fire Fighting Works 60 days 4/18/2026 6/29/2026
Slab 1 6 days 4/18/2026 4/25/2026
Slab 2 6 days 4/25/2026 5/4/2026
Slab 3 6 days 5/4/2026 5/11/2026
Slab 4 6 days 5/11/2026 5/18/2026
Slab 5 6 days 5/18/2026 5/25/2026
Slab 6 6 days 5/25/2026 6/1/2026
Slab 7 6 days 6/1/2026 6/8/2026
Slab 8 6 days 6/8/2026 6/15/2026
Slab 9 6 days 6/15/2026 6/22/2026
Terrace Floor 6 days 6/22/2026 6/29/2026
Putty and Primer & 1 st coat Paint 52 days 4/18/2026 6/19/2026

Slab 1 7 days 4/18/2026 4/27/2026

Slab 2 7 days 4/24/2026 5/4/2026


Slab 3 7 days 4/30/2026 5/9/2026
Slab 4 7 days 5/7/2026 5/15/2026
Slab 5 7 days 5/13/2026 5/21/2026
Slab 6 7 days 5/19/2026 5/27/2026
Slab 7 7 days 5/25/2026 6/2/2026
Slab 8 7 days 5/30/2026 6/8/2026
Slab 9 7 days 6/5/2026 6/13/2026
Terrace Floor 7 days 6/11/2026 6/19/2026
Flooring and kitchen platform fixing 52 days 4/29/2026 6/30/2026

Slab 1 7 days 4/29/2026 5/8/2026

Slab 2 7 days 5/6/2026 5/14/2026


Slab 3 7 days 5/12/2026 5/20/2026
Slab 4 7 days 5/18/2026 5/26/2026
Slab 5 7 days 5/23/2026 6/1/2026
Slab 6 7 days 5/29/2026 6/6/2026
Slab 7 7 days 6/4/2026 6/12/2026
Slab 8 7 days 6/10/2026 6/18/2026
Slab 9 7 days 6/16/2026 6/24/2026
Terrace Floor 7 days 6/22/2026 6/30/2026

Door Shutter and window shutter fixing 51 days 5/11/2026 7/10/2026

Slab 1 6 days 5/11/2026 5/18/2026

Slab 2 6 days 5/16/2026 5/23/2026

Slab 3 6 days 5/22/2026 5/29/2026


Slab 4 6 days 5/28/2026 6/4/2026
Slab 5 6 days 6/3/2026 6/10/2026
Slab 6 6 days 6/9/2026 6/16/2026
Slab 7 6 days 6/15/2026 6/22/2026
Slab 8 6 days 6/21/2026 6/28/2026
Slab 9 6 days 6/27/2026 7/4/2026
Terrace Floor 6 days 7/3/2026 7/10/2026
CP Sanitary Fixing,Electrical fixtures
101 days 5/25/2026 9/22/2026
fixing
Slab 1 6 days 5/25/2026 6/1/2026
Slab 2 6 days 5/30/2026 6/6/2026
Slab 3 6 days 6/5/2026 6/12/2026
Slab 4 6 days 6/11/2026 6/18/2026
Slab 5 6 days 6/17/2026 6/24/2026
Slab 6 6 days 6/23/2026 6/30/2026
Slab 7 6 days 6/29/2026 7/6/2026
Slab 8 6 days 7/5/2026 7/12/2026
Slab 9 6 days 7/11/2026 7/18/2026
Terrace Floor 6 days 7/17/2026 7/24/2026
Second Coat Painting 51 days 7/23/2026 9/22/2026
Common Area & Lift Lobby Finishing 236 days 12/7/2025 9/16/2026

Terrace Pedestal and Bracket Fixing 14 days 3/16/2026 4/1/2026

External MS Grill Fixing in Toilet Duct


34 days 2/7/2026 3/20/2026
Areas
Basement Putty 42 days 4/30/2026 6/19/2026
Electrical Works in lift Lobby Areas - 1st
27 days 6/20/2026 7/22/2026
Fix in Ceiling and Walls
Fire Fighting works in Lift lobby Areas &
27 days 7/22/2026 8/24/2026
Testing
Block Masonry & Plaster Work in Lift
62 days 12/7/2025 2/19/2026
Lobby Areas
Lift Area Stone Cladding 62 days 12/31/2025 3/16/2026
Door Frame Fixing of FD and other
22 days 3/17/2026 4/12/2026
Doors in Liftlobby Areas

Flooring in Lift Lobby Area 20 days 7/28/2026 8/21/2026

Electrical Wire Pulling and GI Box Fixing


20 days 8/8/2026 9/2/2026
in Lift Lobby Areas
FA/PA and ELV works 1st fix 20 days 8/10/2026 9/3/2026
False Ceiling in Lift Lobby Area 22 days 8/17/2026 9/11/2026
Putty in Lift in Lobby Areas 22 days 8/21/2026 9/16/2026

Primer & Internal Painting 1st Coat in


15 days 8/27/2026 9/14/2026
Lift Lobby Areas

Door shutter Fixing in Lift Lobby Areas 12 days 9/2/2026 9/16/2026

Switch Socket and DB Fixing in Lift


lobby Areas,Fixing of Fire Fighting and FA/PA
Fittings in lift Lobby Areas,Joint Filling Works in 11 days 9/2/2026 9/15/2026
Lift Lobby Areas,Electrical Fittings Fixing in Lift
Lobby Areas

Staircase Finishing & MEP 257 days 1/3/2026 11/10/2026


Staircase - Window Framing 40 days 1/3/2026 2/20/2026

Staircase - Electrical Works - Conduiting


42 days 2/20/2026 4/12/2026
and GI Box Fixing

Staircase - Gypsum Plaster - 1st Stage 50 days 3/5/2026 5/5/2026

Staircase - Railing Fixing 55 days 3/23/2026 5/28/2026

Staircase - Flooring 60 days 4/10/2026 6/21/2026


Staircase - Electrical Wire pulling and GI
42 days 6/21/2026 8/10/2026
Box Fixing

Staircase - Gypsum Plaster - 2nd Stage 30 days 8/10/2026 9/15/2026

Staircase - Putty 35 days 8/22/2026 10/5/2026

Staircase - Primer & Internal Painting


34 days 8/28/2026 10/10/2026
1st Coat

Staircase - Doors and window shutter


30 days 9/3/2026 10/11/2026
fixing
Staircase - Switch Socket Fixing &
25 days 9/3/2026 10/5/2026
Electrical Fittings Fixing
2nd coat Painting 40 days 9/9/2026 10/29/2026
External Paint 50 days 9/9/2026 11/10/2026
Waterproofing above Terrace 74 days 2/25/2026 5/26/2026
Waterproofing of Lift Pit 32 days 2/25/2026 4/5/2026
Waterproofing of OH Tank 32 days 3/3/2026 4/11/2026
Waterproofing of LMR Top Slab 32 days 3/10/2026 4/17/2026
Waterproofing Terrace Slab 32 days 4/17/2026 5/26/2026
Finishing and MEP Works in Ducts 103 days 2/25/2026 6/29/2026
All rounder paint in Kitchen and toilet
43 days 2/25/2026 4/18/2026
Ducts
All rounder paint in Electrical, ELV and
38 days 3/16/2026 4/30/2026
Fire Ducts
S W R Downtake lines - Common
25 days 4/30/2026 5/30/2026
Plumbing works
Electrical Works in Ducts - Common
30 days 5/7/2026 6/11/2026
Electrical Works
Fire Fighting Pipe fixing in Ducts -
30 days 5/25/2026 6/29/2026
Common Fire Fighting Works
Lift Work 147 days 1/20/2026 7/16/2026
Scaffolding in Lift Shafts 9 days 1/20/2026 1/31/2026
White Wash in Lift Shafts 9 days 1/31/2026 2/11/2026
Electrical work in Lift Shafts 11 days 2/11/2026 2/24/2026
Ladder Fixing for OHT and LMR Slab 5 days 2/24/2026 3/2/2026
All Rounder PAINT in LMR 5 days 3/2/2026 3/9/2026
Electrical work in LMR 9 days 3/9/2026 3/19/2026

Trap Door Fixing 5 days 3/19/2026 3/25/2026

Handover of LMR to Lift Agency 4 days 3/25/2026 3/30/2026


Lift Template Fixing 15 days 3/30/2026 4/17/2026
Lift Works 75 days 4/17/2026 7/16/2026
Parking Area 174 days 4/18/2026 11/14/2026
Finishing & MEP Works 174 days 4/18/2026 11/14/2026

Painting on Ceiling surfaces 25 days 4/18/2026 5/19/2026

Painting on Wall surfaces 1st Coat 45 days 6/5/2026 7/29/2026


Basement and Podium Levels
19 days 7/29/2026 8/21/2026
Electrical Works & Testing
Basement & Podium Levels Fire
fighting Hydrants and Sprinkler pipe fixing & 18 days 8/21/2026 9/11/2026
testing
Basement & Podium Levels PHE Line
15 days 9/11/2026 9/29/2026
Fixing & testing

VDF in Parking Area 53 days 8/31/2026 11/4/2026


Fixing Paver Blocks at Podium Levels 50 days 9/11/2026 11/12/2026

Driveway and Parking Area Markings 25 days 9/17/2026 10/19/2026

Fixing of Signages in Basement and


20 days 9/26/2026 10/22/2026
podium levels
Deep Cleaning 42 days 9/23/2026 11/14/2026
Predecessors Successors

7SS+10
223SS days,8SS+12
days,9SS+7 days

4271

4SS+10 days

4SS+12 days

4SS+7 days

229SS-45 days 39FS+1 day

231SS-30 days 40FS+1 day

232SS-30 days 41FS+1 day

301SS-45 days,41 42FS+1 day

447SS-30 days,42 43FS+1 day

649SS-30 days 44FS+1 day

649SS-30 days 45FS+1 day

673SS-30 days 46FS+1 day


673SS-30 days 47FS+1 day
625SS-30 days 48FS+1 day
601SS-30 days 49FS+1 day
601SS-30 days 50FS+1 day
601SS-30 days 51FS+1 day
697SS-30 days 52FS+1 day
697SS-30 days 53FS+1 day
601SS-30 days 54FS+1 day
601SS-30 days 55FS+1 day
601SS-30 days 56FS+1 day
601SS-30 days 57FS+1 day
601SS-30 days 58FS+1 day
601SS-30 days 59FS+1 day
697SS-30 days 60FS+1 day
697SS-30 days 61FS+1 day
697SS-30 days 62FS+1 day
697SS-30 days 63FS+1 day

13FS+1 day
14FS+1 day 230
15FS+1 day 16

16FS+1 day 17

17FS+1 day 1039


18FS+1 day 5,471,138
19FS+1 day 5,511,142
20FS+1 day 5,511,142
21FS+1 day 5,511,142
22FS+1 day 6,221,213
23FS+1 day 602
24FS+1 day 799
25FS+1 day 603
26FS+1 day 695
27FS+1 day 695
28FS+1 day 799
29FS+1 day 799
30FS+1 day 6,021,193
31FS+1 day 60,211,931,194
32FS+1 day 6,021,193
33FS+1 day 6,021,193
34FS+1 day 799
35FS+1 day 799
36FS+1 day 799
37FS+1 day 799

129SS+5 days

130

131

132SS+15 days
133SS+15 days

134SS+15 days

135SS+15 days

136SS+15 days

137SS+15 days
138SS+15 days
139SS+15 days
140SS+15 days
140

141,142

143

144SS+15 days

145SS+15 days

146SS+15 days

147SS+15 days

148SS+15 days

149SS+15 days
150SS+15 days
151SS+15 days
152SS+15 days
153SS+15 days

154

155

156SS+15 days

157SS+15 days

158SS+15 days

159SS+15 days

160SS+15 days

161SS+15 days
162SS+15 days
163SS+15 days
164SS+15 days
165SS+15 days

166

167

168SS+15 days

169SS+15 days

170SS+15 days

171SS+10 days

172SS+15 days

173SS+15 days
174SS+15 days
175SS+15 days
176SS+15 days
177FS+15 days

178FS+15 days

179FS+15 days

180FS+15 days

181FS+15 days

182FS+15 days

183FS+15 days

184FS+15 days

185FS+15 days
186FS+15 days
187FS+15 days
188FS+15 days
189SS+15 days
190SS+15 days
66SS+5 days 232

67 232

68 236

69SS+15 days 279

70SS+15 days 279


71SS+15 days 279
72SS+15 days 294

73SS+15 days 294

74SS+15 days 279


75SS+15 days 279
76SS+15 days 279
77SS+15 days,78 279
79 821

79 821

80 821

81SS+15 days 868FS-30 days

82SS+15 days 868


83SS+15 days 868
84SS+15 days 885

85SS+15 days 885

86SS+15 days 868


87SS+15 days 868
88SS+15 days 868
89SS+15 days 868
90SS+15 days 1410

91 1410

92 1410

93SS+15 days 1443

94SS+15 days 1443FS-30 days

95SS+15 days 1443FS-30 days

96SS+15 days 1458

97SS+15 days 1458

98SS+15 days 1443FS-30 days


99SS+15 days 1443FS-30 days

100SS+15 days 1443FS-30 days

101SS+15 days 1443FS-30 days

102SS+15 days 1983

103 1983

104 1983

105SS+15 days 2016

106SS+15 days 2016


107SS+15 days 2016
108SS+10 days 2016

109SS+15 days 2016

110SS+15 days 2016


111SS+15 days 2016
112SS+15 days 2016
113SS+15 days 2016
114FS+15 days

115FS+15 days

116FS+15 days

117FS+15 days

118FS+15 days

119FS+15 days

120FS+15 days

121FS+15 days

122FS+15 days
123FS+15 days
124FS+15 days
125FS+15 days
126SS+15 days
127SS+15 days

229SS-1 day 230


231SS-45 days 230
232SS-60 days 230
233SS-30 days 230
301SS-30 days
447SS-20 days 442
649SS-20 days 527
649SS-20 days 527
577SS-30 days 575
577SS-30 days 575
625SS-25 days 623
505SS-30 days
505SS-30 days
698SS-30 days 695
698SS-30 days 695
698SS-30 days,218 695
698SS-30 days 695
601SS-30 days 599
601SS-30 days 599
601SS-30 days 599
601SS-30 days 599
601SS-30 days 599
601SS-30 days 599
601SS-30 days 599
799SS-45 days 800
601SS-30 days 599
791SS-90 days 207
787SS-60 days 785

4SS,224SS+13
days
225SS+10
223SS+13 days
days,812SS
224SS+10 days 226SS+10 days
225SS+10 days 227SS+15 days
226SS+15 days 228SS+16 days
227SS+16 days 229SS

13SS-45
days,192SS-1
228SS day,230SS+1
day,231SS+5
days

40,192,193,194,195,229SS+1 day
14SS-30
days,193SS-45
229SS+5 days
days,232SS+2
days

15SS-30
days,194SS-60
231SS+2 days,129,130
days,233SS+4
days

195SS-30
232SS+4 days days,234FS-4
days
233FS-4 days 236FS+1 day

234FS+1 day,131 237SS+5 days


238SS+4
236SS+5 days days,243FS+4
days
237SS+4 days 239SS+2 days
238SS+2 days 240SS+6 days
239SS+6 days 241FS+2 days
240FS+2 days 250FS+2 days

237FS+4 days 244SS+5 days


243SS+5 days 245SS+4 days
244SS+4 days 246SS+3 days

245SS+3 days 247SS+4 days

246SS+4 days 248FS+2 days


247FS+2 days 257FS+2 days

241FS+2 days 251SS+5 days


250SS+5 days 252SS+5 days
251SS+5 days 253SS+2 days
252SS+2 days 254SS+6 days
253SS+6 days 255FS+1 day
254FS+1 day 264FS+2 days

248FS+2 days 258SS+5 days


257SS+5 days 259SS+5 days
258SS+5 days 260SS+4 days
259SS+4 days 261SS+6 days
260SS+6 days 262FS+2 days
261FS+2 days 271FS+1 day

255FS+2 days 265SS+5 days


264SS+5 days 266SS+5 days
265SS+5 days 267SS+2 days
266SS+2 days 268SS+6 days
267SS+6 days 269FS+1 day
268FS+1 day 279FS+1 day

262FS+1 day 272SS+4 days


271SS+4 days 273SS+5 days
272SS+5 days 274SS+2 days
273SS+2 days 275SS+6 days
274SS+6 days 276FS+1 day
275FS+1 day 286FS+2 days

269FS+1
280SS+4 days
day,132,133,134,137,138,139,140
279SS+4 days 281SS+5 days
280SS+5 days 282SS+2 days
281SS+2 days 283SS+6 days
282SS+6 days 284FS+1 day
283FS+1 day

276FS+2 days 287SS+5 days


286SS+5 days 288SS+5 days
287SS+5 days 289SS+2 days
288SS+2 days 290SS+6 days
289SS+6 days 291FS+1 day
290FS+1 day 292FS+1 day
291FS+1 day 294FS+1 day

292FS+1 day,135,136 295SS+3 days


294SS+3 days 296SS+2 days
295SS+2 days 297SS+2 days
296SS+2 days 298SS+5 days
297SS+5 days 299FS+1 day
298FS+1 day 301FS+1 day

16SS-45
days,196SS-30
299FS+1 day
days,302SS+3
days
301SS+3 days 303SS+5 days
302SS+5 days 304SS+4 days
303SS+4 days 305FS+1 day
304FS+1 day 307FS+1 day
305FS+1 day 308SS+3 days
307SS+3 days 309SS+5 days
308SS+5 days 310SS+4 days
309SS+4 days 311FS+1 day
310FS+1 day 313FS+1 day

311FS+1 day 314SS+2 days


313SS+2 days 315SS+2 days
314SS+2 days 316SS+2 days
315SS+2 days 317FS+1 day
316FS+1 day 319FS+1 day

317FS+1 day 320SS+2 days


319SS+2 days 321SS+2 days
320SS+2 days 322SS+2 days
321SS+2 days 323FS+1 day
322FS+1 day 325FS+1 day

323FS+1 day 326SS+2 days


325SS+2 days 327SS+2 days
326SS+2 days 328SS+2 days
327SS+2 days 329FS+1 day
328FS+1 day 331FS+1 day

329FS+1 day 332SS+2 days


331SS+2 days 333SS+2 days
332SS+2 days 334SS+2 days
333SS+2 days 335FS+1 day
334FS+1 day 337FS+1 day

335FS+1 day 338SS+2 days


337SS+2 days 339SS+4 days
338SS+4 days 340SS+2 days
339SS+2 days 341FS+1 day
343FS+1
340FS+1 day day,447FS+14
days

341FS+1 day 344SS+2 days


343SS+2 days 345SS+4 days
344SS+4 days 346SS+2 days
345SS+2 days 347FS+1 day
346FS+1 day 349FS+1 day
347FS+1 day 350SS+2 days
349SS+2 days 351SS+2 days
350SS+2 days 352SS+2 days
351SS+2 days 353FS+1 day
352FS+1 day 355FS+1 day

353FS+1 day 356SS+2 days


355SS+2 days 357SS+2 days
356SS+2 days 358SS+2 days
357SS+2 days 359FS+1 day
358FS+1 day 361FS+1 day

359FS+1 day 362SS+2 days


361SS+2 days 363SS+2 days
362SS+2 days 364SS+2 days
363SS+2 days 365FS+1 day
364FS+1 day 367FS+1 day

365FS+1 day 368SS+2 days


367SS+2 days 369SS+2 days
368SS+2 days 370SS+2 days
369SS+2 days 371FS+1 day
370FS+1 day 373FS+1 day

371FS+1 day 374SS+2 days


373SS+2 days 375SS+2 days
374SS+2 days 376SS+2 days
375SS+2 days 377FS+1 day
376FS+1 day 379FS+1 day

377FS+1 day 380SS+2 days


379SS+2 days 381SS+4 days
380SS+4 days 382SS+2 days
381SS+2 days 383FS+1 day
382FS+1 day 385FS+1 day

383FS+1 day 386SS+2 days


385SS+2 days 387SS+4 days
386SS+4 days 388SS+2 days
387SS+2 days 389FS+1 day
388FS+1 day 391FS+1 day

389FS+1 day 392SS+2 days


391SS+2 days 393SS+2 days
392SS+2 days 394SS+2 days
393SS+2 days 395FS+1 day
394FS+1 day 397FS+1 day

395FS+1 day 398SS+2 days


397SS+2 days 399SS+2 days
398SS+2 days 400SS+2 days
399SS+2 days 401FS+1 day
400FS+1 day 403FS+1 day

401FS+1 day 404SS+2 days


403SS+2 days 405SS+2 days
404SS+2 days 406SS+2 days
405SS+2 days 407FS+1 day
406FS+1 day 409FS+1 day

407FS+1 day 410SS+2 days


409SS+2 days 411SS+2 days
410SS+2 days 412SS+2 days
411SS+2 days 413FS+1 day
412FS+1 day 415FS+1 day

413FS+1 day 416SS+2 days


415SS+2 days 417SS+2 days
416SS+2 days 418SS+2 days
417SS+2 days 419FS+1 day
418FS+1 day 421FS+1 day

419FS+1 day 422SS+2 days


421SS+2 days 423SS+4 days
422SS+4 days 424SS+2 days
423SS+2 days 425FS+1 day
424FS+1 day 427FS+1 day

425FS+1 day 428SS+2 days


427SS+2 days 429SS+2 days
428SS+2 days 430SS+2 days
429SS+2 days 431FS+1 day
430FS+1 day 433FS+1 day

431FS+1 day 434SS+2 days


433SS+2 days 435SS+2 days
434SS+2 days 436SS+2 days
435SS+2 days 437FS+1 day
436FS+1 day 439FS+1 day
437FS+1 day 440SS+2 days
441SS+2
439SS+2 days days,443SS+4
days
440SS+2 days 442SS+1 day
197,441SS+1 day
440SS+4 days 444FS+1 day

745FS+60
days,762FS+20
days,776FS+30
443FS+1 day
days,781FS+5
days,787FS+10
days

17SS-30
days,197SS-20
341FS+14 days days,448SS+10
days,476FS-5
days

449SS+10
447SS+10 days days,477FS-5
days

478FS-5
448SS+10 days days,450SS+10
days

479FS-5
449SS+10 days days,451FS+1
day

452FS+1
450FS+1 day day,480FS-5
days

453FS+1
451FS+1 day day,481FS-5
days

454FS+1
452FS+1 day day,482FS-5
days

455FS+1
453FS+1 day day,483FS-5
days

456FS+1
454FS+1 day day,484FS-5
days
457FS+1
455FS+1 day day,485FS-5
days

458FS+1
456FS+1 day day,486FS-5
days

459FS+1
457FS+1 day day,487FS-5
days

460FS+1
458FS+1 day day,488FS-5
days

461FS+1
459FS+1 day day,489FS-5
days

462FS+1
460FS+1 day day,490FS-5
days

463FS+1
461FS+1 day day,491FS-5
days

464FS+1
462FS+1 day day,492FS-5
days

465FS+1
463FS+1 day day,493FS-5
days

466FS+1
464FS+1 day day,494FS-5
days

467FS+1
465FS+1 day day,495FS-5
days

468FS+1
466FS+1 day day,496FS-5
days

469FS+1
467FS+1 day day,497FS-5
days

470FS+1
468FS+1 day day,498FS-5
days
471FS+1
day,499FS-5
469FS+1 day
days,750FS+1
day

472FS+1
470FS+1 day day,500FS-5
days

473FS+1
471FS+1 day day,501FS-5
days

474FS+1
472FS+1 day day,502FS-5
days
473FS+1 day 503FS-5 days

447FS-5 days 799


448FS-5 days 799
449FS-5 days 799
450FS-5 days 799
451FS-5 days 577
452FS-5 days 578
453FS-5 days 579
505FS+1
454FS-5 days
day,580
455FS-5 days 581
456FS-5 days 582
457FS-5 days 583
458FS-5 days 584
459FS-5 days 585
460FS-5 days 586
461FS-5 days 587
462FS-5 days 588
463FS-5 days 589
464FS-5 days 590
465FS-5 days 591
466FS-5 days 592
467FS-5 days 593
468FS-5 days 594
469FS-5 days 595
470FS-5 days 596
471FS-5 days 597
472FS-5 days 598
473FS-5 days 598
474FS-5 days 598
203SS-30
483FS+1 day days,204SS-30
days,506
505 507
506 508
509,529FS+1
507
day
508 510
509 511
510 512
511 513
512 514
513 515
514 516
515 517
516 518
517 519
518 520
519 521
520 522
521 523
522 524
523 525
524 526
525 527
198,199,526

508FS+1 day 530


529 531
530 532
533,553FS+1
531
day
532 534
533 535
534 536
535 537
536 538
537 539
538 540
539 541
540 542
541 543
542 544
543 545
544 546
545 547
44,546 548
547 549
548 550
549 551
45,46,47,550

532FS+1 day 554


553 555
554 556
557,577FS+1
555
day
556 558
557 559
558 560
559 561
560 562
561 563
562 564
563 565
564 566
565 567
566 568
567 569
568 570
569 571
570 572
571 573
572 574
573 575
200,201,574

200SS-30
480,556FS+1 day days,201SS-30
days,578
481,577 579
482,578 580
581,601FS+1
483,579
day
484,580 582
485,581 583
486,582 584
487,583 585
488,584 586
489,585 587
490,586 588
491,587 589
492,588 590
493,589 591
494,590 592
495,591 593
496,592 594
497,593 595
498,594 596
499,595 597
500,596 598
501,502,503,597 599
209,210,211,212,213,000,000,000,000

23SS-30
days,24SS-30
days,25SS-30
days,28SS-30
days,29SS-30
days,30SS-30
days,31SS-30
days,32SS-30
days,33SS-30
580FS+1 day
days,209SS-30
days,210SS-30
days,211SS-30
days,212SS-30
days,213SS-30
days,214SS-30
days,215SS-30
days,217SS-30
days,602

49,56,57,58,59,601 603
51,602 604
605,625FS+1
603
day
604 606
605 607
606 608
607 609
608 610
609 611
610 612
611 613
612 614
613 615
614 616
615 617
616 618
617 619
618 620
619 621
620 622
48,621 623
202,622

22SS-30
days,202SS-25
604FS+1 day days,626FS-2
days,747SS+10
days

625FS-2 days 627FS-2 days


626FS-2 days 628FS-2 days
629FS-2
627FS-2 days days,649FS+1
day
628FS-2 days 630FS-2 days
629FS-2 days 631FS-2 days
630FS-2 days 632FS-2 days
631FS-2 days 633FS-2 days
632FS-2 days 634FS-2 days
633FS-2 days 635FS-2 days
634FS-2 days 636FS-2 days
635FS-2 days 637FS-2 days
636FS-2 days 638FS-2 days
637FS-2 days 639FS-2 days
638FS-2 days 640FS-2 days
639FS-2 days 641FS-2 days
640FS-2 days 642FS-2 days
641FS-2 days 643FS-2 days
642FS-2 days 644FS-2 days
643FS-2 days 645FS-2 days
644FS-2 days 646FS-2 days
645FS-2 days 647FS-2 days
646FS-2 days

18SS-30
days,19SS-30
days,198SS-20
628FS+1 day
days,199SS-20
days,650FS-2
days

649FS-2 days 651FS-2 days


652FS-2
650FS-2 days days,673FS+1
day
651FS-2 days 653FS-2 days
652FS-2 days 654FS-2 days
653FS-2 days 655FS-2 days
654FS-2 days 656FS-2 days
655FS-2 days 657FS-2 days
656FS-2 days 658FS-2 days
657FS-2 days 659FS-2 days
658FS-2 days 660FS-2 days
659FS-2 days 661FS-2 days
660FS-2 days 662FS-2 days
661FS-2 days 663FS-2 days
662FS-2 days 664FS-2 days
663FS-2 days 665FS-2 days
664FS-2 days 666FS-2 days
665FS-2 days 667FS-2 days
666FS-2 days 668FS-2 days
667FS-2 days 669FS-2 days
668FS-2 days 670FS-2 days
669FS-2 days 671FS-2 days
670FS-2 days

20SS-30
days,21SS-30
651FS+1 day days,674FS-1
day,697FS+1
day

673FS-1 day 675FS-1 day


674FS-1 day 676FS-1 day
677FS-1
675FS-1 day day,774FS+1
day
676FS-1 day 678FS-1 day
677FS-1 day 679FS-1 day
678FS-1 day 680FS-1 day
679FS-1 day 681FS-1 day
680FS-1 day 682FS-1 day
681FS-1 day 683FS-1 day
682FS-1 day 684FS-1 day
683FS-1 day 685FS-1 day
684FS-1 day 686FS-1 day
685FS-1 day 687FS-1 day
686FS-1 day 688FS-1 day
687FS-1 day 689FS-1 day
688FS-1 day 690FS-1 day
689FS-1 day 691FS-1 day
690FS-1 day 692FS-1 day
691FS-1 day 693FS-1 day
692FS-1 day 694FS-1 day
693FS-1 day 695FS-1 day
52,53,205,206,207,208,694FS-1 day

26SS-30
days,27SS-30
days,34SS-30
days,35SS-30
673FS+1 day
days,36SS-30
days,37SS-30
days,698FS-2
days

205SS-30
days,206SS-30
days,207SS-30
697FS-2 days
days,208SS-30
days,699FS-2
days

700FS-2
698FS-2 days days,721FS+1
day
699FS-2 days 701FS-2 days
700FS-2 days 702FS-2 days
701FS-2 days 703FS-2 days
702FS-2 days 704FS-2 days
703FS-2 days 705FS-2 days
704FS-2 days 706FS-2 days
705FS-2 days 707FS-2 days
706FS-2 days 708FS-2 days
707FS-2 days 709FS-2 days
708FS-2 days 710FS-2 days
709FS-2 days 711FS-2 days
710FS-2 days 712FS-2 days
711FS-2 days 713FS-2 days
712FS-2 days 714FS-2 days
713FS-2 days 715FS-2 days
714FS-2 days 716FS-2 days
715FS-2 days 717FS-2 days
716FS-2 days 718FS-2 days
717FS-2 days 719FS-2 days
718FS-2 days

699FS+1 day 722FS-3 days


721FS-3 days 723FS-3 days
722FS-3 days 724FS-3 days
723FS-3 days 725FS-3 days
724FS-3 days 726FS-3 days
725FS-3 days 727FS-3 days
726FS-3 days 728FS-3 days
727FS-3 days 729FS-3 days
728FS-3 days 730FS-3 days
729FS-3 days 731FS-3 days
730FS-3 days 732FS-3 days
731FS-3 days 733FS-3 days
732FS-3 days 734FS-3 days
733FS-3 days 735FS-3 days
734FS-3 days 736FS-3 days
735FS-3 days 737FS-3 days
736FS-3 days 738FS-3 days
737FS-3 days 739FS-3 days
738FS-3 days 740FS-3 days
739FS-3 days 741FS-3 days
740FS-3 days 742FS-3 days
741FS-3 days 743FS-3 days
742FS-3 days

444FS+60 days 746SS-30 days

745SS-30 days 749

625SS+10 days 748

747 749
748,746 754

470FS+1 day 751SS+20 days

750SS+20 days 752FS+1 day

751FS+1 day 753SS+15 days

752SS+15 days 754SS+10 days

753SS+10 days,749 755SS+1 day

754SS+1 day 756SS+5 days


755SS+5 days 757SS+4 days
756SS+4 days 758SS+4 days

757SS+4 days 759SS+5 days

758SS+5 days 760SS

759SS

444FS+20 days 763SS


764SS+5
762SS days,767SS+15
days

763SS+5 days 765SS+10 days

764SS+10 days 766SS+4 days


765SS+4 days 771

763SS+15 days 768

767 769SS+10 days

768SS+10 days 770SS+5 days

769SS+5 days 771SS+10 days

770SS+10 days,766 772SS+5 days

771SS+5 days 773SS+4 days

772SS+4 days 809FF-40 days


676FS+1 day 809FF-20 days
444FS+30 days 777SS+15 days
776SS+15 days 778SS+15 days
777SS+15 days 779
778 809FF-30 days

782SS+10
444FS+5 days
days,783,799

781SS+10 days 784

781 784SS+3 days

782,783SS+3 days 785SS+15 days

219,784SS+15 days

219SS-60
444FS+10 days
days,788
787 789
788 790,794
789 791
218SS-90
790
days,792
791 793SS
792SS 796FS+3 days
789 795
794 796
795,793FS+3 days 799SS+1 day

216SS-45
50,54,55,60,61,62,63,476,477,478,781,4
days,800SS+12
79,796SS+1 day
days
216,799SS+12 days 801

800 802

803,804SS-10
801 days,805SS-10
days

802 805FF-8 days

802SS-10 days 806FF+10 days

802SS-10 days,803FF-8 days 807FS+1 day


804FF+10 days 807FF+5 days

806FF+5 days,805FS+1 day 808FF+5 days

807FF+5 days 809FF+9 days


808FF+9 days,774FF-20 days,779FF-30
days,773FF-40 days

224SS 813SS+13 days


812SS+13 days 814FS-10 days
815SS+22
813FS-10 days days,1403SS+2
days
814SS+22 days 816SS+8 days
815SS+8 days 817FS-4 days
816FS-4 days 818SS
817SS 819SS+4 days
818SS+4 days 820SS+4 days
819SS+4 days 821SS+8 days
820SS+8 days,141,142,143 822SS+9 days
821SS+9 days 823SS+21 days
822SS+21 days 825FS+1 day

823FS+1 day 826SS+5 days


825SS+5 days 827SS+4 days
828SS+6
days,832FS+1
826SS+4 days
day,839FS+1
day
827SS+6 days 829SS+6 days
828SS+6 days 830FS+1 day
829FS+1 day

827FS+1 day 833SS+5 days


832SS+5 days 834SS+6 days
833SS+6 days 835SS+6 days
834SS+6 days 836SS+7 days
835SS+7 days 837FS+1 day
836FS+1 day

827FS+1 day 840SS+5 days


839SS+5 days 841SS+6 days
840SS+6 days 842SS+6 days
841SS+6 days 843SS+2 days
842SS+2 days 844FS+1 day
853FS+2
843FS+1 day days,846FS+2
days

844FS+2 days 847SS+5 days


846SS+5 days 848SS+6 days
847SS+6 days 849SS+6 days
848SS+6 days 850SS+6 days
849SS+6 days 851FS+1 day
850FS+1 day 860FS+2 days

844FS+2 days 854SS+3 days


853SS+3 days 855SS+5 days
854SS+5 days 856SS+5 days
855SS+5 days 857SS+2 days
856SS+2 days 858FS+1 day
857FS+1 day 868FS+2 days

851FS+2 days 861SS+3 days


860SS+3 days 862SS+5 days
861SS+5 days 863SS+6 days
862SS+6 days 864SS+2 days
863SS+2 days 865FS+1 day
864FS+1 day 876FS+2 days

858FS+2 days,144FS-30
869SS+3 days
days,145,146,149,150,151,152
868SS+3 days 870SS+5 days
869SS+5 days 871SS+5 days
870SS+5 days 872SS+2 days
871SS+2 days 873FS+1 day
872FS+1 day 874

873

865FS+2 days 877SS+3 days


876SS+3 days 878SS+5 days
877SS+5 days 879SS+5 days
878SS+5 days 880SS+2 days
879SS+2 days 881FS+1 day
880FS+1 day 882,883

881
881 885FS+1 day

883FS+1 day,147,148 886SS+3 days


885SS+3 days 887SS+2 days
886SS+2 days 888SS+2 days
887SS+2 days 889SS+5 days
888SS+5 days 890FS+1 day
889FS+1 day 892FS+1 day

890FS+1 day 893SS+3 days


892SS+3 days 894SS+5 days
893SS+5 days 895SS+4 days
894SS+4 days 896FS+1 day
895FS+1 day 898FS+1 day

896FS+1 day 899SS+3 days


898SS+3 days 900SS+5 days
899SS+5 days 901SS+4 days
900SS+4 days 902FS+1 day
901FS+1 day 904FS+1 day

902FS+1 day 905SS+2 days


904SS+2 days 906SS+2 days
905SS+2 days 907SS+2 days
906SS+2 days 908FS+1 day
907FS+1 day 910FS+1 day

908FS+1 day 911SS+2 days


910SS+2 days 912SS+2 days
911SS+2 days 913SS+2 days
912SS+2 days 914FS+1 day
913FS+1 day 916FS+1 day

914FS+1 day 917SS+2 days


916SS+2 days 918SS+2 days
917SS+2 days 919SS+2 days
918SS+2 days 920FS+1 day
919FS+1 day 922FS+1 day

920FS+1 day 923SS+2 days


922SS+2 days 924SS+2 days
923SS+2 days 925SS+2 days
924SS+2 days 926FS+1 day
925FS+1 day 928FS+1 day
926FS+1 day 929SS+2 days
928SS+2 days 930SS+4 days
929SS+4 days 931SS+2 days
930SS+2 days 932FS+1 day
934FS+1
931FS+1 day day,1038FS+14
days

932FS+1 day 935SS+2 days


934SS+2 days 936SS+4 days
935SS+4 days 937SS+2 days
936SS+2 days 938FS+1 day
937FS+1 day 940FS+1 day

938FS+1 day 941SS+2 days


940SS+2 days 942SS+2 days
941SS+2 days 943SS+2 days
942SS+2 days 944FS+1 day
943FS+1 day 946FS+1 day

944FS+1 day 947SS+2 days


946SS+2 days 948SS+2 days
947SS+2 days 949SS+2 days
948SS+2 days 950FS+1 day
949FS+1 day 952FS+1 day

950FS+1 day 953SS+2 days


952SS+2 days 954SS+2 days
953SS+2 days 955SS+2 days
954SS+2 days 956FS+1 day
955FS+1 day 958FS+1 day

956FS+1 day 959SS+2 days


958SS+2 days 960SS+2 days
959SS+2 days 961SS+2 days
960SS+2 days 962FS+1 day
961FS+1 day 964FS+1 day

962FS+1 day 965SS+2 days


964SS+2 days 966SS+2 days
965SS+2 days 967SS+2 days
966SS+2 days 968FS+1 day
967FS+1 day 970FS+1 day

968FS+1 day 971SS+2 days


970SS+2 days 972SS+4 days
971SS+4 days 973SS+2 days
972SS+2 days 974FS+1 day
973FS+1 day 976FS+1 day

974FS+1 day 977SS+2 days


976SS+2 days 978SS+4 days
977SS+4 days 979SS+2 days
978SS+2 days 980FS+1 day
979FS+1 day 982FS+1 day

980FS+1 day 983SS+2 days


982SS+2 days 984SS+2 days
983SS+2 days 985SS+2 days
984SS+2 days 986FS+1 day
985FS+1 day 988FS+1 day

986FS+1 day 989SS+2 days


988SS+2 days 990SS+2 days
989SS+2 days 991SS+2 days
990SS+2 days 992FS+1 day
991FS+1 day 994FS+1 day

992FS+1 day 995SS+2 days


994SS+2 days 996SS+2 days
995SS+2 days 997SS+2 days
996SS+2 days 998FS+1 day
997FS+1 day 1000FS+1 day

998FS+1 day 1001SS+2 days


1000SS+2 days 1002SS+2 days
1001SS+2 days 1003SS+2 days
1002SS+2 days 1004FS+1 day
1003FS+1 day 1006FS+1 day

1004FS+1 day 1007SS+2 days


1006SS+2 days 1008SS+2 days
1007SS+2 days 1009SS+2 days
1008SS+2 days 1010FS+1 day
1009FS+1 day 1012FS+1 day

1010FS+1 day 1013SS+2 days


1012SS+2 days 1014SS+4 days
1013SS+4 days 1015SS+2 days
1014SS+2 days 1016FS+1 day
1015FS+1 day 1018FS+1 day

1016FS+1 day 1019SS+2 days


1018SS+2 days 1020SS+2 days
1019SS+2 days 1021SS+2 days
1020SS+2 days 1022FS+1 day
1021FS+1 day 1024FS+1 day

1022FS+1 day 1025SS+2 days


1024SS+2 days 1026SS+2 days
1025SS+2 days 1027SS+2 days
1026SS+2 days 1028FS+1 day
1027FS+1 day 1030FS+1 day

1028FS+1 day 1031SS+2 days


1032SS+2
1030SS+2 days days,1034SS+4
days
1031SS+2 days 1033SS+1 day
1032SS+1 day
1031SS+4 days 1035FS+1 day

1336FS+60
days,1353FS+20
days,1367FS+30
1034FS+1 day
days,1372FS+7
days,1378FS+10
days,1607

1039SS+10
932FS+14 days days,1067FS-5
days

1040SS+10
43,1038SS+10 days days,1068FS-5
days

1069FS-5
1039SS+10 days days,1041SS+10
days

1042FS+1
1040SS+10 days day,1070FS-5
days
1043FS+1
1041FS+1 day day,1071FS-5
days

1044FS+1
1042FS+1 day day,1072FS-5
days

1045FS+1
1043FS+1 day day,1073FS-5
days

1046FS+1
1044FS+1 day day,1074FS-5
days

1047FS+1
1045FS+1 day day,1075FS-5
days

1048FS+1
1046FS+1 day day,1076FS-5
days

1049FS+1
1047FS+1 day day,1077FS-5
days

1050FS+1
1048FS+1 day day,1078FS-5
days

1051FS+1
1049FS+1 day day,1079FS-5
days

1052FS+1
1050FS+1 day day,1080FS-5
days

1053FS+1
1051FS+1 day day,1081FS-5
days

1054FS+1
1052FS+1 day day,1082FS-5
days

1055FS+1
1053FS+1 day day,1083FS-5
days

1056FS+1
1054FS+1 day day,1084FS-5
days

1057FS+1
1055FS+1 day day,1085FS-5
days
1058FS+1
1056FS+1 day day,1086FS-5
days

1059FS+1
1057FS+1 day day,1087FS-5
days

1060FS+1
1058FS+1 day day,1088FS-5
days

1061FS+1
1059FS+1 day day,1089FS-5
days

1062FS+1
day,1090FS-5
1060FS+1 day
days,1341FS+1
day

1063FS+1
1061FS+1 day day,1091FS-5
days

1064FS+1
1062FS+1 day day,1092FS-5
days

1065FS+1
1063FS+1 day day,1093FS-5
days
1064FS+1 day 1094FS-5 days

1038FS-5 days 1390


1039FS-5 days 1390
1040FS-5 days 1390
1041FS-5 days 1390
1042FS-5 days 1168
1043FS-5 days 1169
1044FS-5 days 1170
1096FS+1
1045FS-5 days
day,1171
1046FS-5 days 1172
1047FS-5 days 1173
1048FS-5 days 1174
1049FS-5 days 1175
1050FS-5 days 1176
1051FS-5 days 1177
1052FS-5 days 1178
1053FS-5 days 1179
1054FS-5 days 1180
1055FS-5 days 1181
1056FS-5 days 1182
1057FS-5 days 1183
1058FS-5 days 1184
1059FS-5 days 1185
1060FS-5 days 1186
1061FS-5 days 1187
1062FS-5 days 1188
1063FS-5 days 1189
1064FS-5 days 1189
1065FS-5 days 1189

1074FS+1 day 1097


1096 1098
1097 1099
1100,1120FS+1
1098
day
1099 1101
1100 1102
1101 1103
1102 1104
1103 1105
1104 1106
1105 1107
1106 1108
1107 1109
1108 1110
1109 1111
1110 1112
1111 1113
1112 1114
1113 1115
1114 1116
1115 1117
1116 1118
1117

1099FS+1 day 1121


1120 1122
1121 1123
1124,1144FS+1
1122
day
1123 1125
1124 1126
1125 1127
1126 1128
1127 1129
1128 1130
1129 1131
1130 1132
1131 1133
1132 1134
1133 1135
1134 1136
1135 1137
1136 1138
441,137 1139
1138 1140
1139 1141
1140 1142
45,46,47,1141

1123FS+1 day 1145


1144 1146
1145 1147
1148,1168FS+1
1146
day
1147 1149
1148 1150
1149 1151
1150 1152
1151 1153
1152 1154
1153 1155
1154 1156
1155 1157
1156 1158
1157 1159
1158 1160
1159 1161
1160 1162
1161 1163
1162 1164
1163 1165
1164 1166
1165
1071,1147FS+1 day 1169
10,721,168 1170
10,731,169 1171
1172,1192FS+1
10,741,170
day
10,751,171 1173
10,761,172 1174
10,771,173 1175
10,781,174 1176
10,791,175 1177
10,801,176 1178
10,811,177 1179
10,821,178 1180
10,831,179 1181
10,841,180 1182
10,851,181 1183
10,861,182 1184
10,871,183 1185
10,881,184 1186
10,891,185 1187
10,901,186 1188
10,911,187 1189
1,092,109,310,941,180 1190
1189

1171FS+1 day 1193


56,57,58,59,1192 1194
571,193 1195
1196,1216FS+1
1194
day
1195 1197
1196 1198
1197 1199
1198 1200
1199 1201
1200 1202
1201 1203
1202 1204
1203 1205
1204 1206
1205 1207
1206 1208
1207 1209
1208 1210
1209 1211
1210 1212
1211 1213
481,212 1214
1213

1217FS-2
1195FS+1 day days,1338SS+10
days
1216FS-2 days 1218FS-2 days
1217FS-2 days 1219FS-2 days
1220FS-2
1218FS-2 days days,1240FS+1
day
1219FS-2 days 1221FS-2 days
1220FS-2 days 1222FS-2 days
1221FS-2 days 1223FS-2 days
1222FS-2 days 1224FS-2 days
1223FS-2 days 1225FS-2 days
1224FS-2 days 1226FS-2 days
1225FS-2 days 1227FS-2 days
1226FS-2 days 1228FS-2 days
1227FS-2 days 1229FS-2 days
1228FS-2 days 1230FS-2 days
1229FS-2 days 1231FS-2 days
1230FS-2 days 1232FS-2 days
1231FS-2 days 1233FS-2 days
1232FS-2 days 1234FS-2 days
1233FS-2 days 1235FS-2 days
1234FS-2 days 1236FS-2 days
1235FS-2 days 1237FS-2 days
1236FS-2 days 1238FS-2 days
1237FS-2 days

1219FS+1 day 1241FS-2 days


1240FS-2 days 1242FS-2 days
1241FS-2 days 1243FS-2 days
1244FS-2
1242FS-2 days days,1264FS+1
day
1243FS-2 days 1245FS-2 days
1244FS-2 days 1246FS-2 days
1245FS-2 days 1247FS-2 days
1246FS-2 days 1248FS-2 days
1247FS-2 days 1249FS-2 days
1248FS-2 days 1250FS-2 days
1249FS-2 days 1251FS-2 days
1250FS-2 days 1252FS-2 days
1251FS-2 days 1253FS-2 days
1252FS-2 days 1254FS-2 days
1253FS-2 days 1255FS-2 days
1254FS-2 days 1256FS-2 days
1255FS-2 days 1257FS-2 days
1256FS-2 days 1258FS-2 days
1257FS-2 days 1259FS-2 days
1258FS-2 days 1260FS-2 days
1259FS-2 days 1261FS-2 days
1260FS-2 days 1262FS-2 days
1261FS-2 days

1265FS-1
1243FS+1 day day,1288FS+1
day
1264FS-1 day 1266FS-1 day
1265FS-1 day 1267FS-1 day
1268FS-1
1266FS-1 day day,1365FS+1
day
1267FS-1 day 1269FS-1 day
1268FS-1 day 1270FS-1 day
1269FS-1 day 1271FS-1 day
1270FS-1 day 1272FS-1 day
1271FS-1 day 1273FS-1 day
1272FS-1 day 1274FS-1 day
1273FS-1 day 1275FS-1 day
1274FS-1 day 1276FS-1 day
1275FS-1 day 1277FS-1 day
1276FS-1 day 1278FS-1 day
1277FS-1 day 1279FS-1 day
1278FS-1 day 1280FS-1 day
1279FS-1 day 1281FS-1 day
1280FS-1 day 1282FS-1 day
1281FS-1 day 1283FS-1 day
1282FS-1 day 1284FS-1 day
1283FS-1 day 1285FS-1 day
1284FS-1 day 1286FS-1 day
1285FS-1 day
1264FS+1 day 1289FS-2 days
1288FS-2 days 1290FS-2 days
1291FS-2
1289FS-2 days days,1312FS+1
day
1290FS-2 days 1292FS-2 days
1291FS-2 days 1293FS-2 days
1292FS-2 days 1294FS-2 days
1293FS-2 days 1295FS-2 days
1294FS-2 days 1296FS-2 days
1295FS-2 days 1297FS-2 days
1296FS-2 days 1298FS-2 days
1297FS-2 days 1299FS-2 days
1298FS-2 days 1300FS-2 days
1299FS-2 days 1301FS-2 days
1300FS-2 days 1302FS-2 days
1301FS-2 days 1303FS-2 days
1302FS-2 days 1304FS-2 days
1303FS-2 days 1305FS-2 days
1304FS-2 days 1306FS-2 days
1305FS-2 days 1307FS-2 days
1306FS-2 days 1308FS-2 days
1307FS-2 days 1309FS-2 days
1308FS-2 days 1310FS-2 days
1309FS-2 days

1290FS+1 day 1313FS-3 days


1312FS-3 days 1314FS-3 days
1313FS-3 days 1315FS-3 days
1314FS-3 days 1316FS-3 days
1315FS-3 days 1317FS-3 days
1316FS-3 days 1318FS-3 days
1317FS-3 days 1319FS-3 days
1318FS-3 days 1320FS-3 days
1319FS-3 days 1321FS-3 days
1320FS-3 days 1322FS-3 days
1321FS-3 days 1323FS-3 days
1322FS-3 days 1324FS-3 days
1323FS-3 days 1325FS-3 days
1324FS-3 days 1326FS-3 days
1325FS-3 days 1327FS-3 days
1326FS-3 days 1328FS-3 days
1327FS-3 days 1329FS-3 days
1328FS-3 days 1330FS-3 days
1329FS-3 days 1331FS-3 days
1330FS-3 days 1332FS-3 days
1331FS-3 days 1333FS-3 days
1332FS-3 days 1334FS-3 days
1333FS-3 days

1035FS+60 days 1337SS-30 days

1336SS-30 days 1340

1216SS+10 days 1339

1338 1340

13,391,337 1345

1061FS+1 day 1342SS+20 days

1341SS+20 days 1343FS+1 day

1342FS+1 day 1344SS+15 days

1343SS+15 days 1345SS+10 days

1346SS+1
1344SS+10 days,1340 day,1347SS+5
days
1345SS+1 day 1347SS+4 days
1345SS+5 days,1346SS+4 days 1348SS+4 days
1347SS+4 days 1349SS+4 days

1348SS+4 days 1350SS+5 days

1349SS+5 days 1351SS

1350SS

1035FS+20 days 1354SS


1355SS+5
1353SS days,1358SS+15
days

1354SS+5 days 1356SS+10 days


1355SS+10 days 1357SS+4 days
1356SS+4 days 1362

1354SS+15 days 1359

1358 1360SS+10 days

1359SS+10 days 1361SS+5 days


1362SS+10
1360SS+5 days days,1363SS+15
days

1361SS+10 days,1357 1363SS+5 days

1361SS+15 days,1362SS+5 days 1364SS+4 days

1363SS+4 days 1400FF-40 days

1267FS+1 day 1400FF-20 days

1035FS+30 days 1368SS+15 days

1367SS+15 days 1369SS+15 days

1368SS+15 days 1370

1369 1400FF-30 days

1373SS+10
1035FS+7 days
days,1374,1390

1372SS+10 days 1375

1372 1375SS+3 days

1373,1374SS+3 days 1376SS+15 days

1375SS+15 days

1035FS+10 days 1379


1378 1380
1379 13,811,385
1380 1382
1381 13,831,384
1382 1384SS
1382,1383SS 1387FS+1 day
1380 1386
1385 1387
1386,1384FS+1 day 1391SS+2 days

13,721,067,106,810,600,000 1391SS+10 days

1390SS+10 days,1387SS+2 days 1392

1391 1393

1394,1395SS-10
1392 days,1396SS-10
days

1393 1396FF-5 days

1393SS-10 days 1397FF+10 days

1393SS-10 days,1394FF-5 days 1398

1395FF+10 days 1398FF+5 days

1397FF+5 days,1396 1399FF+5 days

1398FF+5 days 1400FF+19 days

1399FF+19 days,1365FF-20
days,1364FF-40 days,1370FF-30 days

814SS+2 days 1404SS+15 days

1405FS-10
1403SS+15 days days,1976SS-6
days

1406FS-5
days,1407FS-5
1404FS-10 days
days,1978SS-10
days
1405FS-5 days
1405FS-5 days 1408SS+1 day
1407SS+1 day 1409SS+5 days
1408SS+5 days 1410SS+5 days
1409SS+5 days,153,154,155 1411SS+4 days
1410SS+4 days 1412FS-5 days
1411FS-5 days 1414FS+2 days

1412FS+2 days 1415SS+5 days


1985SS-9
days,1416SS+4
1414SS+5 days
days,1421FS+2
days
1415SS+4 days 1417SS+6 days
1416SS+6 days 1418FS+2 days
1417FS+2 days 1419FS+1 day
1418FS+1 day 1428FS+2 days

1415FS+2 days 1422SS+5 days


1421SS+5 days 1423SS+4 days
1422SS+4 days 1424SS+6 days
1423SS+6 days 1425FS+2 days
1424FS+2 days 1426FS+1 day
1425FS+1 day 1435FS+2 days

1419FS+2 days 1429SS+3 days


1428SS+3 days 1430SS+4 days
1429SS+4 days 1431SS+4 days
1430SS+4 days 1432FS+2 days
1431FS+2 days 1433FS+1 day
1432FS+1 day 1443FS+2 days

1426FS+2 days 1436SS+5 days


1435SS+5 days 1437SS+4 days
1436SS+4 days 1438SS+6 days
1437SS+6 days 1439FS+2 days
1438FS+2 days 1440FS+1 day
1439FS+1 day 1450FS+2 days

1433FS+2 days,156,157FS-30
days,158FS-30 days,161FS-30
1444SS+5 days
days,162FS-30 days,163FS-30
days,164FS-30 days
1443SS+5 days 1445SS+4 days
1444SS+4 days 1446SS+6 days
1445SS+6 days 1447FS+2 days
1446FS+2 days 1448FS+1 day
1447FS+1 day
1440FS+2 days 1451SS+5 days
1450SS+5 days 1452SS+4 days
1451SS+4 days 1453SS+4 days
1452SS+4 days 1454FS+2 days
1453FS+2 days 1455FS+1 day
1454FS+1 day 1456FS+1 day
1455FS+1 day 1458FS+1 day

1456FS+1 day,159,160 1459SS+4 days


1458SS+4 days 1460SS+4 days
1459SS+4 days 1461SS+5 days
1460SS+5 days 1462SS+5 days
1461SS+5 days 1463FS+1 day
1462FS+1 day 1465FS+1 day

1463FS+1 day 1466SS+3 days


1465SS+3 days 1467SS+5 days
1466SS+5 days 1468SS+4 days
1467SS+4 days 1469FS+1 day
1468FS+1 day 1471FS+1 day

1469FS+1 day 1472SS+3 days


1471SS+3 days 1473SS+5 days
1472SS+5 days 1474SS+4 days
1473SS+4 days 1475FS+1 day
1474FS+1 day 1477FS+1 day

1475FS+1 day 1478SS+2 days


1477SS+2 days 1479SS+2 days
1478SS+2 days 1480SS+2 days
1479SS+2 days 1481FS+1 day
1480FS+1 day 1483FS+1 day

1481FS+1 day 1484SS+2 days


1483SS+2 days 1485SS+2 days
1484SS+2 days 1486SS+2 days
1485SS+2 days 1487FS+1 day
1486FS+1 day 1489FS+1 day

1487FS+1 day 1490SS+2 days


1489SS+2 days 1491SS+2 days
1490SS+2 days 1492SS+2 days
1491SS+2 days 1493FS+1 day
1492FS+1 day 1495FS+1 day
1493FS+1 day 1496SS+2 days
1495SS+2 days 1497SS+2 days
1496SS+2 days 1498SS+2 days
1497SS+2 days 1499FS+1 day
1498FS+1 day 1501FS+1 day

1499FS+1 day 1502SS+2 days


1501SS+2 days 1503SS+4 days
1502SS+4 days 1504SS+2 days
1503SS+2 days 1505FS+1 day
1507FS+1
1504FS+1 day day,1611FS+10
days

1505FS+1 day 1508SS+2 days


1507SS+2 days 1509SS+4 days
1508SS+4 days 1510SS+2 days
1509SS+2 days 1511FS+1 day
1510FS+1 day 1513FS+1 day

1511FS+1 day 1514SS+2 days


1513SS+2 days 1515SS+2 days
1514SS+2 days 1516SS+2 days
1515SS+2 days 1517FS+1 day
1516FS+1 day 1519FS+1 day

1517FS+1 day 1520SS+2 days


1519SS+2 days 1521SS+2 days
1520SS+2 days 1522SS+2 days
1521SS+2 days 1523FS+1 day
1522FS+1 day 1525FS+1 day

1523FS+1 day 1526SS+2 days


1525SS+2 days 1527SS+2 days
1526SS+2 days 1528SS+2 days
1527SS+2 days 1529FS+1 day
1528FS+1 day 1531FS+1 day

1529FS+1 day 1532SS+2 days


1531SS+2 days 1533SS+2 days
1532SS+2 days 1534SS+2 days
1533SS+2 days 1535FS+1 day
1534FS+1 day 1537FS+1 day

1535FS+1 day 1538SS+2 days


1537SS+2 days 1539SS+2 days
1538SS+2 days 1540SS+2 days
1539SS+2 days 1541FS+1 day
1540FS+1 day 1543FS+1 day

1541FS+1 day 1544SS+2 days


1543SS+2 days 1545SS+4 days
1544SS+4 days 1546SS+2 days
1545SS+2 days 1547FS+1 day
1546FS+1 day 1549FS+1 day

1547FS+1 day 1550SS+2 days


1549SS+2 days 1551SS+4 days
1550SS+4 days 1552SS+2 days
1551SS+2 days 1553FS+1 day
1552FS+1 day 1555FS+1 day

1553FS+1 day 1556SS+2 days


1555SS+2 days 1557SS+2 days
1556SS+2 days 1558SS+2 days
1557SS+2 days 1559FS+1 day
1558FS+1 day 1561FS+1 day

1559FS+1 day 1562SS+2 days


1561SS+2 days 1563SS+2 days
1562SS+2 days 1564SS+2 days
1563SS+2 days 1565FS+1 day
1564FS+1 day 1567FS+1 day

1565FS+1 day 1568SS+2 days


1567SS+2 days 1569SS+2 days
1568SS+2 days 1570SS+2 days
1569SS+2 days 1571FS+1 day
1570FS+1 day 1573FS+1 day

1571FS+1 day 1574SS+2 days


1573SS+2 days 1575SS+2 days
1574SS+2 days 1576SS+2 days
1575SS+2 days 1577FS+1 day
1576FS+1 day 1579FS+1 day

1577FS+1 day 1580SS+2 days


1579SS+2 days 1581SS+2 days
1580SS+2 days 1582SS+2 days
1581SS+2 days 1583FS+1 day
1582FS+1 day 1585FS+1 day

1583FS+1 day 1586SS+2 days


1585SS+2 days 1587SS+4 days
1586SS+4 days 1588SS+2 days
1587SS+2 days 1589FS+1 day
1588FS+1 day 1591FS+1 day

1589FS+1 day 1592SS+2 days


1591SS+2 days 1593SS+4 days
1592SS+4 days 1594SS+2 days
1593SS+2 days 1595FS+1 day
1594FS+1 day 1597FS+1 day

1595FS+1 day 1598SS+2 days


1597SS+2 days 1599SS+4 days
1598SS+4 days 1600SS+2 days
1599SS+2 days 1601FS+1 day
1600FS+1 day 1603FS+1 day

1601FS+1 day 1604SS+3 days


1605SS+2
1603SS+3 days days,1607SS+4
days
1604SS+2 days 1606SS+1 day
1605SS+1 day
1035,1604SS+4 days 1608FS+1 day

1909FS+60
days,1926FS+20
days,1940FS+30
1607FS+1 day
days,1945FS+6
days,1951FS+10
days

1612SS+7
1505FS+10 days days,1640FS-5
days

1613SS+7
1611SS+7 days days,1641FS-5
days
1614SS+7
1612SS+7 days days,1642FS-5
days

1615FS+1
1613SS+7 days day,1643FS-5
days

1616FS+1
1614FS+1 day day,1644FS-5
days

1617FS+1
1615FS+1 day day,1645FS-5
days

1618FS+1
1616FS+1 day day,1646FS-5
days

1619FS+1
1617FS+1 day day,1647FS-5
days

1620FS+1
1618FS+1 day day,1648FS-5
days

1621FS+1
1619FS+1 day day,1649FS-5
days

1622FS+1
1620FS+1 day day,1650FS-5
days

1623FS+1
1621FS+1 day day,1651FS-5
days

1624FS+1
1622FS+1 day day,1652FS-5
days

1625FS+1
1623FS+1 day day,1653FS-5
days

1626FS+1
1624FS+1 day day,1654FS-5
days

1627FS+1
1625FS+1 day day,1655FS-5
days

1628FS+1
1626FS+1 day day,1656FS-5
days
1629FS+1
1627FS+1 day day,1657FS-5
days

1630FS+1
1628FS+1 day day,1658FS-5
days

1631FS+1
1629FS+1 day day,1659FS-5
days

1632FS+1
1630FS+1 day day,1660FS-5
days

1633FS+1
1631FS+1 day day,1661FS-5
days

1634FS+1
1632FS+1 day day,1662FS-5
days

1635FS+1
day,1914FS+1
1633FS+1 day
day,1663FS-5
days

1636FS+1
1634FS+1 day day,1664FS-5
days

1637FS+1
day,1666FS-5
1635FS+1 day
days,1665FS-5
days

1638FS+1
1636FS+1 day day,1667FS-5
days
1637FS+1 day

1611FS-5 days 1963


1612FS-5 days 1963
1613FS-5 days 1963
1614FS-5 days 1963
1615FS-5 days 1741
1616FS-5 days 1742
1617FS-5 days 1743
1669FS+1
1618FS-5 days
day,1744
1619FS-5 days 1745
1620FS-5 days 1746
1621FS-5 days 1747
1622FS-5 days 1748
1623FS-5 days 1749
1624FS-5 days 1750
1625FS-5 days 1751
1626FS-5 days 1752
1627FS-5 days 1753
1628FS-5 days 1754
1629FS-5 days 1755
1630FS-5 days 1756
1631FS-5 days 1757
1632FS-5 days 1758
1633FS-5 days 1759
1634FS-5 days 1760
1635FS-5 days 1761
1636FS-5 days 1762
1636FS-5 days 1763
1637FS-5 days

1647FS+1 day 1670


1669 1671
1670 1672
1673,1693FS+1
1671
day
1672 1674
1673 1675
1674 1676
1675 1677
1676 1678
1677 1679
1678 1680
1679 1681
1680 1682
1681 1683
1682 1684
1683 1685
1684 1686
1685 1687
1686 1688
1687 1689
1688 1690
1689 1691
1690
1672FS+1 day 1694
1693 1695
1694 1696
1697,1717FS+1
1695
day
1696 1698
1697 1699
1698 1700
1699 1701
1700 1702
1701 1703
1702 1704
1703 1705
1704 1706
1705 1707
1706 1708
1707 1709
1708 1710
1709 1711
1710 1712
1711 1713
1712 1714
1713 1715
1714

1696FS+1 day 1718


1717 1719
1718 1720
1721,1741FS+1
1719
day
1720 1722
1721 1723
1722 1724
1723 1725
1724 1726
1725 1727
1726 1728
1727 1729
1728 1730
1729 1731
1730 1732
1731 1733
1732 1734
1733 1735
1734 1736
1735 1737
1736 1738
1737 1739
1738

1720FS+1 day,1644 1742


17,411,645 1743
17,421,646 1744
1745,1765FS+1
17,431,647
day
17,441,648 1746
17,451,649 1747
17,461,650 1748
17,471,651 1749
17,481,652 1750
17,491,653 1751
17,501,654 1752
17,511,655 1753
17,521,656 1754
17,531,657 1755
17,541,658 1756
17,551,659 1757
17,561,660 1758
17,571,661 1759
17,581,662 1760
17,591,663 1761
17,601,664 1762
17,611,665 1763
17,621,666

1744FS+1 day 1766


1765 1767
1766 1768
1769,1789FS+1
1767
day
1768 1770
1769 1771
1770 1772
1771 1773
1772 1774
1773 1775
1774 1776
1775 1777
1776 1778
1777 1779
1778 1780
1779 1781
1780 1782
1781 1783
1782 1784
1783 1785
1784 1786
1785 1787
1786

1790FS-2
1768FS+1 day days,1911SS+10
days
1789FS-2 days 1791FS-2 days
1790FS-2 days 1792FS-2 days
1793FS-2
1791FS-2 days days,1813FS+1
day
1792FS-2 days 1794FS-2 days
1793FS-2 days 1795FS-2 days
1794FS-2 days 1796FS-2 days
1795FS-2 days 1797FS-2 days
1796FS-2 days 1798FS-2 days
1797FS-2 days 1799FS-2 days
1798FS-2 days 1800FS-2 days
1799FS-2 days 1801FS-2 days
1800FS-2 days 1802FS-2 days
1801FS-2 days 1803FS-2 days
1802FS-2 days 1804FS-2 days
1803FS-2 days 1805FS-2 days
1804FS-2 days 1806FS-2 days
1805FS-2 days 1807FS-2 days
1806FS-2 days 1808FS-2 days
1807FS-2 days 1809FS-2 days
1808FS-2 days 1810FS-2 days
1809FS-2 days 1811FS-2 days
1810FS-2 days

1792FS+1 day 1814FS-2 days


1813FS-2 days 1815FS-2 days
1814FS-2 days 1816FS-2 days
1817FS-2
1815FS-2 days days,1837FS+1
day
1816FS-2 days 1818FS-2 days
1817FS-2 days 1819FS-2 days
1818FS-2 days 1820FS-2 days
1819FS-2 days 1821FS-2 days
1820FS-2 days 1822FS-2 days
1821FS-2 days 1823FS-2 days
1822FS-2 days 1824FS-2 days
1823FS-2 days 1825FS-2 days
1824FS-2 days 1826FS-2 days
1825FS-2 days 1827FS-2 days
1826FS-2 days 1828FS-2 days
1827FS-2 days 1829FS-2 days
1828FS-2 days 1830FS-2 days
1829FS-2 days 1831FS-2 days
1830FS-2 days 1832FS-2 days
1831FS-2 days 1833FS-2 days
1832FS-2 days 1834FS-2 days
1833FS-2 days 1835FS-2 days
1834FS-2 days

1816FS+1 day 1838FS-1 day


1837FS-1 day 1839FS-1 day
1838FS-1 day 1840FS-1 day
1841FS-1
day,1861FS+1
1839FS-1 day
day,1938FS+1
day
1840FS-1 day 1842FS-1 day
1841FS-1 day 1843FS-1 day
1842FS-1 day 1844FS-1 day
1843FS-1 day 1845FS-1 day
1844FS-1 day 1846FS-1 day
1845FS-1 day 1847FS-1 day
1846FS-1 day 1848FS-1 day
1847FS-1 day 1849FS-1 day
1848FS-1 day 1850FS-1 day
1849FS-1 day 1851FS-1 day
1850FS-1 day 1852FS-1 day
1851FS-1 day 1853FS-1 day
1852FS-1 day 1854FS-1 day
1853FS-1 day 1855FS-1 day
1854FS-1 day 1856FS-1 day
1855FS-1 day 1857FS-1 day
1856FS-1 day 1858FS-1 day
1857FS-1 day 1859FS-1 day
1858FS-1 day

1840FS+1 day 1862FS-2 days


1861FS-2 days 1863FS-2 days
1864FS-2
1862FS-2 days days,1885FS+1
day
1863FS-2 days 1865FS-2 days
1864FS-2 days 1866FS-2 days
1865FS-2 days 1867FS-2 days
1866FS-2 days 1868FS-2 days
1867FS-2 days 1869FS-2 days
1868FS-2 days 1870FS-2 days
1869FS-2 days 1871FS-2 days
1870FS-2 days 1872FS-2 days
1871FS-2 days 1873FS-2 days
1872FS-2 days 1874FS-2 days
1873FS-2 days 1875FS-2 days
1874FS-2 days 1876FS-2 days
1875FS-2 days 1877FS-2 days
1876FS-2 days 1878FS-2 days
1877FS-2 days 1879FS-2 days
1878FS-2 days 1880FS-2 days
1879FS-2 days 1881FS-2 days
1880FS-2 days 1882FS-2 days
1881FS-2 days 1883FS-2 days
1882FS-2 days

1863FS+1 day 1886FS-3 days


1885FS-3 days 1887FS-3 days
1886FS-3 days 1888FS-3 days
1887FS-3 days 1889FS-3 days
1888FS-3 days 1890FS-3 days
1889FS-3 days 1891FS-3 days
1890FS-3 days 1892FS-3 days
1891FS-3 days 1893FS-3 days
1892FS-3 days 1894FS-3 days
1893FS-3 days 1895FS-3 days
1894FS-3 days 1896FS-3 days
1895FS-3 days 1897FS-3 days
1896FS-3 days 1898FS-3 days
1897FS-3 days 1899FS-3 days
1898FS-3 days 1900FS-3 days
1899FS-3 days 1901FS-3 days
1900FS-3 days 1902FS-3 days
1901FS-3 days 1903FS-3 days
1902FS-3 days 1904FS-3 days
1903FS-3 days 1905FS-3 days
1904FS-3 days 1906FS-3 days
1905FS-3 days 1907FS-3 days
1906FS-3 days

1608FS+60 days 1910SS-30 days

1909SS-30 days 1913

1789SS+10 days 1912

1911 1913

19,121,910 1967SS+1 day

1634FS+1 day 1915SS+20 days

1914SS+20 days 1916FS+1 day

1915FS+1 day 1917SS+15 days

1916SS+15 days 1918SS+10 days

1917SS+10 days 1919SS+1 day

1918SS+1 day 1920SS+5 days


1919SS+5 days 1921SS+4 days
1920SS+4 days 1922SS+4 days
1923SS+5
1921SS+4 days days,1924SS+5
days

1922SS+5 days 1924SS

1922SS+5 days,1923SS

1608FS+20 days 1927SS


1928SS+5
1926SS days,1931SS+15
days

1927SS+5 days 1929SS+10 days

1928SS+10 days 1930SS+4 days


1929SS+4 days 1935

1927SS+15 days 1932

1931 1933SS+10 days

1932SS+10 days 1934SS+5 days


1935SS+10
1933SS+5 days days,1936SS+15
days

1934SS+10 days,1930 1936SS+5 days

1934SS+15 days,1935SS+5 days 1937SS+4 days

1936SS+4 days 1973FF-40 days

1840FS+1 day 1973FF-20 days

1608FS+30 days 1941SS+15 days

1940SS+15 days 1942SS+15 days

1941SS+15 days 1943

1942 1973FF-30 days

1946SS+10
1608FS+6 days
days,1947,1963

1945SS+10 days 1948

1945 1948SS+4 days

1946,1947SS+4 days 1949SS+15 days

1948SS+15 days

1608FS+10 days 1952


1951 1953
1952 19,541,958
1953 1955
1954 19,561,957
1955 1957SS
1955,1956SS 1960FS+4 days
1953 1959
1958 1960
1959,1957FS+4 days 1964SS+3 days

19,451,640,164,116,400,000 1964SS+12 days

1963SS+12 days,1960SS+3 days 1965

1964 1966

1967,1968SS-10
1965 days,1969SS-10
days

1966,1913SS+1 day 1969FF-2 days

1966SS-10 days 1970FF+10 days

1966SS-10 days,1967FF-2 days 1971FS+4 days

1968FF+10 days 1971FF+5 days

1970FF+5 days,1969FS+4 days 1972FF+10 days

1971FF+10 days 1973FF+14 days

1972FF+14 days,1937FF-40
days,1938FF-20 days,1943FF-30 days

1404SS-6 days 1977SS+15 days

1976SS+15 days 1978FS-10 days

1979FS-5
1405SS-10 days,1977FS-10 days days,1980FS-5
days
1978FS-5 days
1978FS-5 days 1981SS+1 day
1980SS+1 day 1982SS+5 days
1981SS+5 days 1983SS+5 days
1982SS+5 days,165,166,167 1984SS+4 days
1983SS+4 days 1985FS-5 days
1415SS-9 days,1984FS-5 days 1987FS+2 days

1985FS+2 days 1988SS+7 days


1989SS+7
1987SS+7 days days,1994FS+2
days
1988SS+7 days 1990SS+7 days

1989SS+7 days 1991SS+10 days

1990SS+10 days 1992FS+1 day


1991FS+1 day 2001FS+2 days

1988FS+2 days 1995SS+7 days


1994SS+7 days 1996SS+7 days
1995SS+7 days 1997SS+7 days

1996SS+7 days 1998SS+10 days

1997SS+10 days 1999FS+1 day


1998FS+1 day 2008FS+2 days

1992FS+2 days 2002SS+7 days


2001SS+7 days 2003SS+7 days
2002SS+7 days 2004SS+7 days

2003SS+7 days 2005SS+10 days

2004SS+10 days 2006FS+1 day


2005FS+1 day 2016FS+2 days

1999FS+2 days 2009SS+7 days


2008SS+7 days 2010SS+7 days
2009SS+7 days 2011SS+7 days

2010SS+7 days 2012SS+10 days

2011SS+10 days 2013FS+1 day


2012FS+1 day 2023FS+2 days

2006FS+2
days,168,169,170,173,174,175,176,171, 2017SS+7 days
172
2016SS+7 days 2018SS+7 days
2017SS+7 days 2019SS+7 days

2018SS+7 days 2020SS+10 days

2019SS+10 days 2021FS+1 day


2020FS+1 day

2013FS+2 days 2024SS+7 days


2023SS+7 days 2025SS+7 days
2024SS+7 days 2026SS+7 days

2025SS+7 days 2027SS+10 days

2026SS+10 days 2028FS+1 day


2027FS+1 day 2029FS+1 day
2028FS+1 day 2031FS+1 day

2029FS+1 day 2032SS+3 days


2031SS+3 days 2033SS+2 days
2032SS+2 days 2034SS+2 days
2033SS+2 days 2035SS+5 days
2034SS+5 days 2036FS+1 day
2035FS+1 day 2038FS+1 day

2036FS+1 day 2039SS+3 days


2038SS+3 days 2040SS+5 days
2039SS+5 days 2041SS+4 days
2040SS+4 days 2042FS+1 day
2041FS+1 day 2044FS+1 day

2042FS+1 day 2045SS+3 days


2044SS+3 days 2046SS+5 days
2045SS+5 days 2047SS+4 days
2046SS+4 days 2048FS+1 day
2047FS+1 day 2050FS+1 day

2048FS+1 day 2051SS+2 days


2050SS+2 days 2052SS+2 days
2051SS+2 days 2053SS+2 days
2052SS+2 days 2054FS+1 day
2053FS+1 day 2056FS+1 day

2054FS+1 day 2057SS+2 days


2056SS+2 days 2058SS+2 days
2057SS+2 days 2059SS+2 days
2058SS+2 days 2060FS+1 day
2059FS+1 day 2062FS+1 day
2060FS+1 day 2063SS+2 days
2062SS+2 days 2064SS+2 days
2063SS+2 days 2065SS+2 days
2064SS+2 days 2066FS+1 day
2065FS+1 day 2068FS+1 day

2066FS+1 day 2069SS+2 days


2068SS+2 days 2070SS+2 days
2069SS+2 days 2071SS+2 days
2070SS+2 days 2072FS+1 day
2071FS+1 day 2074FS+1 day

2072FS+1 day 2075SS+2 days


2074SS+2 days 2076SS+4 days
2075SS+4 days 2077SS+2 days
2076SS+2 days 2078FS+1 day
2080FS+1
2077FS+1 day day,2184FS+10
days

2078FS+1 day 2081SS+2 days


2080SS+2 days 2082SS+4 days
2081SS+4 days 2083SS+2 days
2082SS+2 days 2084FS+1 day
2083FS+1 day 2086FS+1 day

2084FS+1 day 2087SS+2 days


2086SS+2 days 2088SS+2 days
2087SS+2 days 2089SS+2 days
2088SS+2 days 2090FS+1 day
2089FS+1 day 2092FS+1 day

2090FS+1 day 2093SS+2 days


2092SS+2 days 2094SS+2 days
2093SS+2 days 2095SS+2 days
2094SS+2 days 2096FS+1 day
2095FS+1 day 2098FS+1 day

2096FS+1 day 2099SS+2 days


2098SS+2 days 2100SS+2 days
2099SS+2 days 2101SS+2 days
2100SS+2 days 2102FS+1 day
2101FS+1 day 2104FS+1 day
2102FS+1 day 2105SS+2 days
2104SS+2 days 2106SS+2 days
2105SS+2 days 2107SS+2 days
2106SS+2 days 2108FS+1 day
2107FS+1 day 2110FS+1 day

2108FS+1 day 2111SS+2 days


2110SS+2 days 2112SS+2 days
2111SS+2 days 2113SS+2 days
2112SS+2 days 2114FS+1 day
2113FS+1 day 2116FS+1 day

2114FS+1 day 2117SS+2 days


2116SS+2 days 2118SS+4 days
2117SS+4 days 2119SS+2 days
2118SS+2 days 2120FS+1 day
2119FS+1 day 2122FS+1 day

2120FS+1 day 2123SS+2 days


2122SS+2 days 2124SS+4 days
2123SS+4 days 2125SS+2 days
2124SS+2 days 2126FS+1 day
2125FS+1 day 2128FS+1 day

2126FS+1 day 2129SS+2 days


2128SS+2 days 2130SS+2 days
2129SS+2 days 2131SS+2 days
2130SS+2 days 2132FS+1 day
2131FS+1 day 2134FS+1 day

2132FS+1 day 2135SS+2 days


2134SS+2 days 2136SS+2 days
2135SS+2 days 2137SS+2 days
2136SS+2 days 2138FS+1 day
2137FS+1 day 2140FS+1 day

2138FS+1 day 2141SS+2 days


2140SS+2 days 2142SS+2 days
2141SS+2 days 2143SS+2 days
2142SS+2 days 2144FS+1 day
2143FS+1 day 2146FS+1 day

2144FS+1 day 2147SS+2 days


2146SS+2 days 2148SS+2 days
2147SS+2 days 2149SS+2 days
2148SS+2 days 2150FS+1 day
2149FS+1 day 2152FS+1 day

2150FS+1 day 2153SS+2 days


2152SS+2 days 2154SS+2 days
2153SS+2 days 2155SS+2 days
2154SS+2 days 2156FS+1 day
2155FS+1 day 2158FS+1 day

2156FS+1 day 2159SS+2 days


2158SS+2 days 2160SS+4 days
2159SS+4 days 2161SS+2 days
2160SS+2 days 2162FS+1 day
2161FS+1 day 2164FS+1 day

2162FS+1 day 2165SS+2 days


2164SS+2 days 2166SS+4 days
2165SS+4 days 2167SS+2 days
2166SS+2 days 2168FS+1 day
2167FS+1 day 2170FS+1 day

2168FS+1 day 2171SS+2 days


2170SS+2 days 2172SS+4 days
2171SS+4 days 2173SS+2 days
2172SS+2 days 2174FS+1 day
2173FS+1 day 2176FS+1 day

2174FS+1 day 2177SS+3 days


2176SS+3 days 2178SS+4 days
2177SS+4 days 2179SS+4 days
2178SS+4 days 2180SS+4 days
2179SS+4 days 2181FS+1 day

2499FS+20
days,2513FS+30
days,2518FS+5
2180FS+1 day
days,2524FS+8
days,2482FS+60
days

2185SS+7
2078FS+10 days days,2213FS-5
days
2186SS+7
2184SS+7 days days,2214FS-5
days

2187SS+7
2185SS+7 days days,2215FS-5
days

2188FS+1
2186SS+7 days day,2216FS-5
days

2189FS+1
2187FS+1 day day,2217FS-5
days

2190FS+1
2188FS+1 day day,2218FS-5
days

2191FS+1
2189FS+1 day day,2219FS-5
days

2192FS+1
2190FS+1 day day,2220FS-5
days

2193FS+1
2191FS+1 day day,2221FS-5
days

2194FS+1
2192FS+1 day day,2222FS-5
days

2195FS+1
2193FS+1 day day,2223FS-5
days

2196FS+1
2194FS+1 day day,2224FS-5
days

2197FS+1
2195FS+1 day day,2225FS-5
days

2198FS+1
2196FS+1 day day,2226FS-5
days

2199FS+1
2197FS+1 day day,2227FS-5
days

2200FS+1
2198FS+1 day day,2228FS-5
days
2201FS+1
2199FS+1 day day,2229FS-5
days

2202FS+1
2200FS+1 day day,2230FS-5
days

2203FS+1
2201FS+1 day day,2231FS-5
days

2204FS+1
2202FS+1 day day,2232FS-5
days

2205FS+1
2203FS+1 day day,2233FS-5
days

2206FS+1
2204FS+1 day day,2234FS-5
days

2207FS+1
2205FS+1 day day,2235FS-5
days

2208FS+1
day,2487FS+1
2206FS+1 day
day,2236FS-5
days

2209FS+1
2207FS+1 day day,2237FS-5
days

2210FS+1
day,2239FS-5
2208FS+1 day
days,2238FS-5
days

2211FS+1
2209FS+1 day day,2240FS-5
days
2210FS+1 day

2184FS-5 days 2536


2185FS-5 days 2536
2186FS-5 days 2536
2187FS-5 days 2536
2188FS-5 days 2314
2189FS-5 days 2315
2190FS-5 days 2316
2242FS+1
2191FS-5 days
day,2317
2192FS-5 days 2318
2193FS-5 days 2319
2194FS-5 days 2320
2195FS-5 days 2321
2196FS-5 days 2322
2197FS-5 days 2323
2198FS-5 days 2324
2199FS-5 days 2325
2200FS-5 days 2326
2201FS-5 days 2327
2202FS-5 days 2328
2203FS-5 days 2329
2204FS-5 days 2330
2205FS-5 days 2331
2206FS-5 days 2332
2207FS-5 days 2333
2208FS-5 days 2334
2209FS-5 days 2335
2209FS-5 days 2336
2210FS-5 days

2220FS+1 day 2243


2242 2244
2243 2245
2246,2266FS+1
2244
day
2245 2247
2246 2248
2247 2249
2248 2250
2249 2251
2250 2252
2251 2253
2252 2254
2253 2255
2254 2256
2255 2257
2256 2258
2257 2259
2258 2260
2259 2261
2260 2262
2261 2263
2262 2264
2263

2245FS+1 day 2267


2266 2268
2267 2269
2270,2290FS+1
2268
day
2269 2271
2270 2272
2271 2273
2272 2274
2273 2275
2274 2276
2275 2277
2276 2278
2277 2279
2278 2280
2279 2281
2280 2282
2281 2283
2282 2284
2283 2285
2284 2286
2285 2287
2286 2288
2287

2269FS+1 day 2291


2290 2292
2291 2293
2294,2314FS+1
2292
day
2293 2295
2294 2296
2295 2297
2296 2298
2297 2299
2298 2300
2299 2301
2300 2302
2301 2303
2302 2304
2303 2305
2304 2306
2305 2307
2306 2308
2307 2309
2308 2310
2309 2311
2310 2312
2311

2293FS+1 day,2217 2315


23,142,218 2316
23,152,219 2317
2318,2338FS+1
23,162,220
day
23,172,221 2319
23,182,222 2320
23,192,223 2321
23,202,224 2322
23,212,225 2323
23,222,226 2324
23,232,227 2325
23,242,228 2326
23,252,229 2327
23,262,230 2328
23,272,231 2329
23,282,232 2330
23,292,233 2331
23,302,234 2332
23,312,235 2333
23,322,236 2334
23,332,237 2335
23,342,238 2336
23,352,239

2317FS+1 day 2339


2338 2340
2339 2341
2342,2362FS+1
2340
day
2341 2343
2342 2344
2343 2345
2344 2346
2345 2347
2346 2348
2347 2349
2348 2350
2349 2351
2350 2352
2351 2353
2352 2354
2353 2355
2354 2356
2355 2357
2356 2358
2357 2359
2358 2360
2359

2363FS-2
2341FS+1 day days,2484SS+10
days
2362FS-2 days 2364FS-2 days
2365FS-2
2363FS-2 days days,2386FS+1
day
2364FS-2 days 2366FS-2 days
2365FS-2 days 2367FS-2 days
2366FS-2 days 2368FS-2 days
2367FS-2 days 2369FS-2 days
2368FS-2 days 2370FS-2 days
2369FS-2 days 2371FS-2 days
2370FS-2 days 2372FS-2 days
2371FS-2 days 2373FS-2 days
2372FS-2 days 2374FS-2 days
2373FS-2 days 2375FS-2 days
2374FS-2 days 2376FS-2 days
2375FS-2 days 2377FS-2 days
2376FS-2 days 2378FS-2 days
2377FS-2 days 2379FS-2 days
2378FS-2 days 2380FS-2 days
2379FS-2 days 2381FS-2 days
2380FS-2 days 2382FS-2 days
2381FS-2 days 2383FS-2 days
2382FS-2 days 2384FS-2 days
2383FS-2 days
2364FS+1 day 2387FS-2 days
2386FS-2 days 2388FS-2 days
2389FS-2
2387FS-2 days days,2410FS+1
day
2388FS-2 days 2390FS-2 days
2389FS-2 days 2391FS-2 days
2390FS-2 days 2392FS-2 days
2391FS-2 days 2393FS-2 days
2392FS-2 days 2394FS-2 days
2393FS-2 days 2395FS-2 days
2394FS-2 days 2396FS-2 days
2395FS-2 days 2397FS-2 days
2396FS-2 days 2398FS-2 days
2397FS-2 days 2399FS-2 days
2398FS-2 days 2400FS-2 days
2399FS-2 days 2401FS-2 days
2400FS-2 days 2402FS-2 days
2401FS-2 days 2403FS-2 days
2402FS-2 days 2404FS-2 days
2403FS-2 days 2405FS-2 days
2404FS-2 days 2406FS-2 days
2405FS-2 days 2407FS-2 days
2406FS-2 days 2408FS-2 days
2407FS-2 days

2388FS+1 day 2411FS-1 day


2412FS-1
2410FS-1 day day,2434FS+1
day
2411FS-1 day 2413FS-1 day
2414FS-1
2412FS-1 day day,2511FS+1
day
2413FS-1 day 2415FS-1 day
2414FS-1 day 2416FS-1 day
2415FS-1 day 2417FS-1 day
2416FS-1 day 2418FS-1 day
2417FS-1 day 2419FS-1 day
2418FS-1 day 2420FS-1 day
2419FS-1 day 2421FS-1 day
2420FS-1 day 2422FS-1 day
2421FS-1 day 2423FS-1 day
2422FS-1 day 2424FS-1 day
2423FS-1 day 2425FS-1 day
2424FS-1 day 2426FS-1 day
2425FS-1 day 2427FS-1 day
2426FS-1 day 2428FS-1 day
2427FS-1 day 2429FS-1 day
2428FS-1 day 2430FS-1 day
2429FS-1 day 2431FS-1 day
2430FS-1 day 2432FS-1 day
2431FS-1 day

2411FS+1 day 2435FS-2 days


2434FS-2 days 2436FS-2 days
2437FS-2
2435FS-2 days days,2458FS+1
day
2436FS-2 days 2438FS-2 days
2437FS-2 days 2439FS-2 days
2438FS-2 days 2440FS-2 days
2439FS-2 days 2441FS-2 days
2440FS-2 days 2442FS-2 days
2441FS-2 days 2443FS-2 days
2442FS-2 days 2444FS-2 days
2443FS-2 days 2445FS-2 days
2444FS-2 days 2446FS-2 days
2445FS-2 days 2447FS-2 days
2446FS-2 days 2448FS-2 days
2447FS-2 days 2449FS-2 days
2448FS-2 days 2450FS-2 days
2449FS-2 days 2451FS-2 days
2450FS-2 days 2452FS-2 days
2451FS-2 days 2453FS-2 days
2452FS-2 days 2454FS-2 days
2453FS-2 days 2455FS-2 days
2454FS-2 days 2456FS-2 days
2455FS-2 days

2436FS+1 day 2459FS-3 days


2458FS-3 days 2460FS-3 days
2459FS-3 days 2461FS-3 days
2460FS-3 days 2462FS-3 days
2461FS-3 days 2463FS-3 days
2462FS-3 days 2464FS-3 days
2463FS-3 days 2465FS-3 days
2464FS-3 days 2466FS-3 days
2465FS-3 days 2467FS-3 days
2466FS-3 days 2468FS-3 days
2467FS-3 days 2469FS-3 days
2468FS-3 days 2470FS-3 days
2469FS-3 days 2471FS-3 days
2470FS-3 days 2472FS-3 days
2471FS-3 days 2473FS-3 days
2472FS-3 days 2474FS-3 days
2473FS-3 days 2475FS-3 days
2474FS-3 days 2476FS-3 days
2475FS-3 days 2477FS-3 days
2476FS-3 days 2478FS-3 days
2477FS-3 days 2479FS-3 days
2478FS-3 days 2480FS-3 days
2479FS-3 days

2181FS+60 days 2483SS-30 days

2482SS-30 days 2486

2362SS+10 days 2485

2484 2486

24,852,483 2540SS

2207FS+1 day 2488SS+20 days

2487SS+20 days 2489FS+1 day

2488FS+1 day 2490SS+15 days

2489SS+15 days 2491SS+10 days

2490SS+10 days 2492SS+1 day

2491SS+1 day 2493SS+5 days


2492SS+5 days 2494SS+4 days
2493SS+4 days 2495SS+4 days
2496SS+5
2494SS+4 days days,2497SS+5
days

2495SS+5 days 2497SS


2495SS+5 days,2496SS

2181FS+20 days 2500SS


2501SS+5
2499SS days,2504SS+15
days

2500SS+5 days 2502SS+10 days

2501SS+10 days 2503SS+4 days


2502SS+4 days 2508

2500SS+15 days 2505

2504 2506SS+10 days

2505SS+10 days 2507SS+5 days


2508SS+10
2506SS+5 days days,2509SS+15
days

2507SS+10 days,2503 2509SS+5 days

2507SS+15 days,2508SS+5 days 2510SS+4 days

2509SS+4 days 2546FF-40 days

2413FS+1 day 2546FF-20 days

2181FS+30 days 2514SS+15 days

2513SS+15 days 2515SS+15 days

2514SS+15 days 2516

2515 2546FF-30 days

2519SS+10
2181FS+5 days
days,2520,2536

2518SS+10 days 2521


2518 2521SS+11 days

2519,2520SS+11 days 2522SS+15 days

2521SS+15 days

2181FS+8 days 2525


2524 2526
2525 25,272,531
2526 2528
2527 25,292,530
2528 2530SS
2528,2529SS 2533FS+3 days
2526 2532
2531 2533
2532,2530FS+3 days 2537SS

25,182,213,221,422,100,000 2537SS+10 days

2536SS+10 days,2533SS 2538

2537 2539

2540,2541SS-10
2538 days,2542SS-10
days

2539,2486SS 2542FF-3 days

2539SS-10 days 2543FF+10 days

2539SS-10 days,2540FF-3 days 2544

2541FF+10 days 2544FF+5 days

2543FF+5 days,2542 2545FF+10 days

2544FF+10 days 2546FF+11 days

2545FF+11 days,2510FF-40
days,2511FF-20 days,2516FF-30 days

2549
2548 2550FS+4 days
2549FS+4 days 2551FS-5 days

2550FS-5 days 2552FS-10 days

2555FS-20
2551FS-10 days days,3128FS-3
days,3701,4274

2552FS-20 days 2556SS+8 days

2555SS+8 days 2557FS-10 days

2558FS-5
2556FS-10 days days,2559FS-5
days
2557FS-5 days
2557FS-5 days 2560SS+1 day
2559SS+1 day 2561SS+5 days
2560SS+5 days 2562SS+5 days
2561SS+5 days 2563SS+4 days
2562SS+4 days 2564FS-5 days
2563FS-5 days 2566FS+2 days

2567SS+7
2564FS+2 days days,2573FS+2
days
2566SS+7 days 2568SS+7 days
2567SS+7 days 2569SS+7 days

2568SS+7 days 2570SS+10 days

2569SS+10 days 2571FS+1 day


2570FS+1 day 2580FS+2 days

2566FS+2 days 2574SS+7 days


2573SS+7 days 2575SS+7 days
2574SS+7 days 2576SS+7 days

2575SS+7 days 2577SS+10 days

2576SS+10 days 2578FS+1 day


2577FS+1 day 2587FS+2 days

2571FS+2 days 2581SS+7 days


2580SS+7 days 2582SS+7 days
2581SS+7 days 2583SS+7 days
2582SS+7 days 2584SS+10 days

2583SS+10 days 2585FS+1 day


2584FS+1 day 2595FS+2 days

2578FS+2 days 2588SS+7 days


2587SS+7 days 2589SS+7 days
2588SS+7 days 2590SS+7 days

2589SS+7 days 2591SS+10 days

2590SS+10 days 2592FS+1 day


2591FS+1 day 2602FS+1 day

2585FS+2 days 2596SS+7 days


2595SS+7 days 2597SS+7 days
2596SS+7 days 2598SS+7 days

2597SS+7 days 2599SS+10 days

2598SS+10 days 2600FS+1 day


2599FS+1 day

2592FS+1 day 2603SS+7 days


2602SS+7 days 2604SS+7 days
2603SS+7 days 2605SS+7 days

2604SS+7 days 2606SS+10 days

2605SS+10 days 2607FS+1 day


2606FS+1 day 2608FS+1 day
2607FS+1 day 2610FS+1 day

2608FS+1 day 2611SS+5 days


2610SS+5 days 2612SS+4 days
2611SS+4 days 2613SS+4 days
2612SS+4 days 2614SS+4 days
2613SS+4 days 2615FS+1 day
2614FS+1 day 2617FS+1 day

2615FS+1 day 2618SS+3 days


2617SS+3 days 2619SS+5 days
2618SS+5 days 2620SS+4 days
2619SS+4 days 2621FS+1 day
2620FS+1 day 2623FS+1 day

2621FS+1 day 2624SS+3 days


2623SS+3 days 2625SS+5 days
2624SS+5 days 2626SS+4 days
2625SS+4 days 2627FS+1 day
2626FS+1 day 2629FS+1 day

2627FS+1 day 2630SS+2 days


2629SS+2 days 2631SS+2 days
2630SS+2 days 2632SS+2 days
2631SS+2 days 2633FS+1 day
2632FS+1 day 2635FS+1 day

2633FS+1 day 2636SS+2 days


2635SS+2 days 2637SS+2 days
2636SS+2 days 2638SS+2 days
2637SS+2 days 2639FS+1 day
2638FS+1 day 2641FS+1 day

2639FS+1 day 2642SS+2 days


2641SS+2 days 2643SS+2 days
2642SS+2 days 2644SS+2 days
2643SS+2 days 2645FS+1 day
2647FS+1
2644FS+1 day day,2763FS+10
days

2645FS+1 day 2648SS+2 days


2647SS+2 days 2649SS+2 days
2648SS+2 days 2650SS+2 days
2649SS+2 days 2651FS+1 day
2650FS+1 day 2653FS+1 day

2651FS+1 day 2654SS+2 days


2653SS+2 days 2655SS+4 days
2654SS+4 days 2656SS+2 days
2655SS+2 days 2657FS+1 day
2656FS+1 day 2659FS+1 day

2657FS+1 day 2660SS+2 days


2659SS+2 days 2661SS+4 days
2660SS+4 days 2662SS+2 days
2661SS+2 days 2663FS+1 day
2662FS+1 day 2665FS+1 day

2663FS+1 day 2666SS+2 days


2665SS+2 days 2667SS+2 days
2666SS+2 days 2668SS+2 days
2667SS+2 days 2669FS+1 day
2668FS+1 day 2671FS+1 day

2669FS+1 day 2672SS+2 days


2671SS+2 days 2673SS+2 days
2672SS+2 days 2674SS+2 days
2673SS+2 days 2675FS+1 day
2674FS+1 day 2677FS+1 day

2675FS+1 day 2678SS+2 days


2677SS+2 days 2679SS+2 days
2678SS+2 days 2680SS+2 days
2679SS+2 days 2681FS+1 day
2680FS+1 day 2683FS+1 day

2681FS+1 day 2684SS+2 days


2683SS+2 days 2685SS+2 days
2684SS+2 days 2686SS+2 days
2685SS+2 days 2687FS+1 day
2686FS+1 day 2689FS+1 day

2687FS+1 day 2690SS+2 days


2689SS+2 days 2691SS+2 days
2690SS+2 days 2692SS+2 days
2691SS+2 days 2693FS+1 day
2692FS+1 day 2695FS+1 day

2693FS+1 day 2696SS+2 days


2695SS+2 days 2697SS+4 days
2696SS+4 days 2698SS+2 days
2697SS+2 days 2699FS+1 day
2698FS+1 day 2701FS+1 day

2699FS+1 day 2702SS+2 days


2701SS+2 days 2703SS+4 days
2702SS+4 days 2704SS+2 days
2703SS+2 days 2705FS+1 day
2704FS+1 day 2707FS+1 day

2705FS+1 day 2708SS+2 days


2707SS+2 days 2709SS+2 days
2708SS+2 days 2710SS+2 days
2709SS+2 days 2711FS+1 day
2710FS+1 day 2713FS+1 day
2711FS+1 day 2714SS+2 days
2713SS+2 days 2715SS+2 days
2714SS+2 days 2716SS+2 days
2715SS+2 days 2717FS+1 day
2716FS+1 day 2719FS+1 day

2717FS+1 day 2720SS+2 days


2719SS+2 days 2721SS+2 days
2720SS+2 days 2722SS+2 days
2721SS+2 days 2723FS+1 day
2722FS+1 day 2725FS+1 day

2723FS+1 day 2726SS+2 days


2725SS+2 days 2727SS+2 days
2726SS+2 days 2728SS+2 days
2727SS+2 days 2729FS+1 day
2728FS+1 day 2731FS+1 day

2729FS+1 day 2732SS+2 days


2731SS+2 days 2733SS+2 days
2732SS+2 days 2734SS+2 days
2733SS+2 days 2735FS+1 day
2734FS+1 day 2737FS+1 day

2735FS+1 day 2738SS+2 days


2737SS+2 days 2739SS+4 days
2738SS+4 days 2740SS+2 days
2739SS+2 days 2741FS+1 day
2740FS+1 day 2743FS+1 day

2741FS+1 day 2744SS+2 days


2743SS+2 days 2745SS+4 days
2744SS+4 days 2746SS+2 days
2745SS+2 days 2747FS+1 day
2746FS+1 day 2749FS+1 day

2747FS+1 day 2750SS+2 days


2749SS+2 days 2751SS+4 days
2750SS+4 days 2752SS+2 days
2751SS+2 days 2753FS+1 day
2752FS+1 day 2755FS+1 day

2753FS+1 day 2756SS+3 days


2755SS+3 days 2757SS+4 days
2756SS+4 days 2758SS+4 days
2757SS+4 days 2759SS+6 days
2758SS+6 days 2760FS+2 days

3061FS+60
days,3078FS+20
days,3092FS+30
2759FS+2 days
days,3097FS+5
days,3103FS+10
days

2764SS+6
2645FS+10 days days,2792FS-5
days

2765SS+6
2763SS+6 days days,2793FS-5
days

2766SS+6
2764SS+6 days days,2794FS-5
days

2767FS+1
2765SS+6 days day,2795FS-5
days

2768FS+1
2766FS+1 day day,2796FS-5
days

2769FS+1
2767FS+1 day day,2797FS-5
days

2770FS+1
2768FS+1 day day,2798FS-5
days

2771FS+1
2769FS+1 day day,2799FS-5
days

2772FS+1
2770FS+1 day day,2800FS-5
days

2773FS+1
2771FS+1 day day,2801FS-5
days
2774FS+1
2772FS+1 day day,2802FS-5
days

2775FS+1
2773FS+1 day day,2803FS-5
days

2776FS+1
2774FS+1 day day,2804FS-5
days

2777FS+1
2775FS+1 day day,2805FS-5
days

2778FS+1
2776FS+1 day day,2806FS-5
days

2779FS+1
2777FS+1 day day,2807FS-5
days

2780FS+1
2778FS+1 day day,2808FS-5
days

2781FS+1
2779FS+1 day day,2809FS-5
days

2782FS+1
2780FS+1 day day,2810FS-5
days

2783FS+1
2781FS+1 day day,2811FS-5
days

2784FS+1
2782FS+1 day day,2812FS-5
days

2785FS+1
2783FS+1 day day,2813FS-5
days

2786FS+1
2784FS+1 day day,2814FS-5
days

2787FS+1
day,2815FS-5
2785FS+1 day
days,3066FS+1
day
2788FS+1
2786FS+1 day day,2816FS-5
days

2789FS+1
2787FS+1 day day,2817FS-5
days

2790FS+1
2788FS+1 day day,2818FS-5
days
2789FS+1 day 2819FS-5 days

2763FS-5 days 3115


2764FS-5 days 3115
2765FS-5 days 3115
2766FS-5 days 3115
2767FS-5 days 2893
2768FS-5 days 2894
2895,2821FS+1
2769FS-5 days
day
2770FS-5 days 2896
2771FS-5 days 2897
2772FS-5 days 2898
2773FS-5 days 2899
2774FS-5 days 2900
2775FS-5 days 2901
2776FS-5 days 2902
2777FS-5 days 2903
2778FS-5 days 2904
2779FS-5 days 2905
2780FS-5 days 2906
2781FS-5 days 2907
2782FS-5 days 2908
2783FS-5 days 2909
2784FS-5 days 2910
2785FS-5 days 2911
2786FS-5 days 2912
2787FS-5 days 2913
2788FS-5 days 2914
2789FS-5 days 2915
2790FS-5 days

2798FS+1 day 2822


2821 2823
2822 2824
2825,2845FS+1
2823
day
2824 2826
2825 2827
2826 2828
2827 2829
2828 2830
2829 2831
2830 2832
2831 2833
2832 2834
2833 2835
2834 2836
2835 2837
2836 2838
2837 2839
2838 2840
2839 2841
2840 2842
2841 2843
2842

2824FS+1 day 2846


2845 2847
2848,2869FS+1
2846
day
2847 2849
2848 2850
2849 2851
2850 2852
2851 2853
2852 2854
2853 2855
2854 2856
2855 2857
2856 2858
2857 2859
2858 2860
2859 2861
2860 2862
2861 2863
2862 2864
2863 2865
2864 2866
2865 2867
2866

2847FS+1 day 2870


2869 2871
2872,2893FS+1
2870
day
2871 2873
2872 2874
2873 2875
2874 2876
2875 2877
2876 2878
2877 2879
2878 2880
2879 2881
2880 2882
2881 2883
2882 2884
2883 2885
2884 2886
2885 2887
2886 2888
2887 2889
2888 2890
2889 2891
2890

2796,2871FS+1 day 2894


28,932,797 2895
2896,2917FS+1
28,942,798
day
28,952,799 2897
28,962,800 2898
28,972,801 2899
28,982,802 2900
28,992,803 2901
29,002,804 2902
29,012,805 2903
29,022,806 2904
29,032,807 2905
29,042,808 2906
29,052,809 2907
29,062,810 2908
29,072,811 2909
29,082,812 2910
29,092,813 2911
29,102,814 2912
29,112,815 2913
29,122,816 2914
29,132,817 2915
29,142,818

2895FS+1 day 2918


2917 2919
2920,2941FS+1
2918
day
2919 2921
2920 2922
2921 2923
2922 2924
2923 2925
2924 2926
2925 2927
2926 2928
2927 2929
2928 2930
2929 2931
2930 2932
2931 2933
2932 2934
2933 2935
2934 2936
2935 2937
2936 2938
2937 2939
2938

2942FS-2
2919FS+1 day days,3063SS+10
days
2941FS-2 days 2943FS-2 days
2944FS-2
2942FS-2 days days,2965FS+1
day
2943FS-2 days 2945FS-2 days
2944FS-2 days 2946FS-2 days
2945FS-2 days 2947FS-2 days
2946FS-2 days 2948FS-2 days
2947FS-2 days 2949FS-2 days
2948FS-2 days 2950FS-2 days
2949FS-2 days 2951FS-2 days
2950FS-2 days 2952FS-2 days
2951FS-2 days 2953FS-2 days
2952FS-2 days 2954FS-2 days
2953FS-2 days 2955FS-2 days
2954FS-2 days 2956FS-2 days
2955FS-2 days 2957FS-2 days
2956FS-2 days 2958FS-2 days
2957FS-2 days 2959FS-2 days
2958FS-2 days 2960FS-2 days
2959FS-2 days 2961FS-2 days
2960FS-2 days 2962FS-2 days
2961FS-2 days 2963FS-2 days
2962FS-2 days

2943FS+1 day 2966FS-2 days


2965FS-2 days 2967FS-2 days
2968FS-2
2966FS-2 days days,2989FS+1
day
2967FS-2 days 2969FS-2 days
2968FS-2 days 2970FS-2 days
2969FS-2 days 2971FS-2 days
2970FS-2 days 2972FS-2 days
2971FS-2 days 2973FS-2 days
2972FS-2 days 2974FS-2 days
2973FS-2 days 2975FS-2 days
2974FS-2 days 2976FS-2 days
2975FS-2 days 2977FS-2 days
2976FS-2 days 2978FS-2 days
2977FS-2 days 2979FS-2 days
2978FS-2 days 2980FS-2 days
2979FS-2 days 2981FS-2 days
2980FS-2 days 2982FS-2 days
2981FS-2 days 2983FS-2 days
2982FS-2 days 2984FS-2 days
2983FS-2 days 2985FS-2 days
2984FS-2 days 2986FS-2 days
2985FS-2 days 2987FS-2 days
2986FS-2 days
2967FS+1 day 2990FS-1 day
2991FS-1
2989FS-1 day day,3013FS+1
day
2990FS-1 day 2992FS-1 day
2991FS-1 day 2993FS-1 day
2992FS-1 day 2994FS-1 day
2993FS-1 day 2995FS-1 day
2994FS-1 day 2996FS-1 day
2995FS-1 day 2997FS-1 day
2996FS-1 day 2998FS-1 day
2997FS-1 day 2999FS-1 day
2998FS-1 day 3000FS-1 day
2999FS-1 day 3001FS-1 day
3000FS-1 day 3002FS-1 day
3001FS-1 day 3003FS-1 day
3002FS-1 day 3004FS-1 day
3003FS-1 day 3005FS-1 day
3004FS-1 day 3006FS-1 day
3005FS-1 day 3007FS-1 day
3006FS-1 day 3008FS-1 day
3007FS-1 day 3009FS-1 day
3008FS-1 day 3010FS-1 day
3009FS-1 day 3011FS-1 day
3010FS-1 day

2990FS+1 day 3014FS-2 days


3015FS-2
3013FS-2 days days,3037FS+1
day
3014FS-2 days 3016FS-2 days
3015FS-2 days 3017FS-2 days
3016FS-2 days 3018FS-2 days
3017FS-2 days 3019FS-2 days
3018FS-2 days 3020FS-2 days
3019FS-2 days 3021FS-2 days
3020FS-2 days 3022FS-2 days
3021FS-2 days 3023FS-2 days
3022FS-2 days 3024FS-2 days
3023FS-2 days 3025FS-2 days
3024FS-2 days 3026FS-2 days
3025FS-2 days 3027FS-2 days
3026FS-2 days 3028FS-2 days
3027FS-2 days 3029FS-2 days
3028FS-2 days 3030FS-2 days
3029FS-2 days 3031FS-2 days
3030FS-2 days 3032FS-2 days
3031FS-2 days 3033FS-2 days
3032FS-2 days 3034FS-2 days
3033FS-2 days 3035FS-2 days
3034FS-2 days

3014FS+1 day 3038FS-3 days


3037FS-3 days 3039FS-3 days
3038FS-3 days 3040FS-3 days
3039FS-3 days 3041FS-3 days
3040FS-3 days 3042FS-3 days
3041FS-3 days 3043FS-3 days
3042FS-3 days 3044FS-3 days
3043FS-3 days 3045FS-3 days
3044FS-3 days 3046FS-3 days
3045FS-3 days 3047FS-3 days
3046FS-3 days 3048FS-3 days
3047FS-3 days 3049FS-3 days
3048FS-3 days 3050FS-3 days
3049FS-3 days 3051FS-3 days
3050FS-3 days 3052FS-3 days
3051FS-3 days 3053FS-3 days
3052FS-3 days 3054FS-3 days
3053FS-3 days 3055FS-3 days
3054FS-3 days 3056FS-3 days
3055FS-3 days 3057FS-3 days
3056FS-3 days 3058FS-3 days
3057FS-3 days 3059FS-3 days
3058FS-3 days

2760FS+60 days 3062SS-30 days

3061SS-30 days 3065

2941SS+10 days 3064

3063 3065

30,643,062 3069SS-3 days

2786FS+1 day 3067SS+20 days


3066SS+20 days 3068FS+1 day
3069SS+15
3067FS+1 day days,4525SS+15
days

3068SS+15 days,3065SS-3 days 3070SS+10 days

3069SS+10 days 3071SS+1 day

3070SS+1 day 3072SS+5 days


3071SS+5 days 3073SS+4 days
3072SS+4 days 3074SS+4 days
3075SS+5
3073SS+4 days days,3076SS+5
days

3074SS+5 days 3076SS

3074SS+5 days,3075SS

2760FS+20 days 3079SS


3080SS+5
3078SS days,3083SS+15
days

3079SS+5 days 3081SS+10 days

3080SS+10 days 3082SS+4 days


3081SS+4 days 3087FS+3 days

3079SS+15 days 3084

3083 3085SS+10 days

3084SS+10 days 3086SS+5 days


3087SS+10
3085SS+5 days days,3088SS+15
days

3086SS+10 days,3082FS+3 days 3088SS+5 days

3086SS+15 days,3087SS+5 days 3089SS+4 days

3088SS+4 days 3125FF-40 days


3092FS+1 day 3125FF-20 days

3090FS+1
2760FS+30 days day,3093SS+15
days

3092SS+15 days 3094SS+15 days

3093SS+15 days 3095

3094 3125FF-30 days

3098SS+10
2760FS+5 days
days,3099,3115

3097SS+10 days 3100

3097 3100SS-5 days

3098,3099SS-5 days 3101SS+15 days

3100SS+15 days

2760FS+10 days 3104


3103 3105
3104 31,063,110
3105 3107
3106 31,083,109
3107 3109SS
3107,3108SS 3112FS+4 days
3105 3111
3110 3112
3111,3109FS+4 days 3116SS+2 days

30,972,792,279,327,900,000 3116SS+10 days

3115SS+10 days,3112SS+2 days 3117

3116 3118

3119,3120SS-14
3117 days,3121SS-13
days
3118 3121FF-7 days

3118SS-14 days 3122FF+3 days

3118SS-13 days,3119FF-7 days 3123FS-5 days

3120FF+3 days 3123FF+3 days

3122FF+3 days,3121FS-5 days 3124FF+3 days

3123FF+3 days 3125FF+9 days


3124FF+9 days,3095FF-30 days,3089FF-
40 days,3090FF-20 days

2552FS-3 days 3129SS+8 days

3128SS+8 days 3130FS-10 days

3131FS-5
3129FS-10 days days,3132FS-5
days
3130FS-5 days
3130FS-5 days 3133SS+1 day
3132SS+1 day 3134SS+5 days
3133SS+5 days 3135SS+5 days
3134SS+5 days 3136SS+4 days
3135SS+4 days 3137FS-5 days
3136FS-5 days 3139FS+2 days

3137FS+2 days 3140SS+7 days


3141SS+7
3139SS+7 days days,3146FS+2
days
3140SS+7 days 3142SS+7 days

3141SS+7 days 3143SS+10 days

3142SS+10 days 3144FS+1 day


3143FS+1 day 3153FS+1 day

3140FS+2 days 3147SS+7 days


3146SS+7 days 3148SS+7 days
3147SS+7 days 3149SS+7 days

3148SS+7 days 3150SS+10 days

3149SS+10 days 3151FS+1 day


3150FS+1 day 3160FS+1 day
3144FS+1 day 3154SS+7 days
3153SS+7 days 3155SS+7 days
3154SS+7 days 3156SS+7 days

3155SS+7 days 3157SS+10 days

3156SS+10 days 3158FS+1 day


3157FS+1 day 3168FS+2 days

3151FS+1 day 3161SS+7 days


3160SS+7 days 3162SS+7 days
3161SS+7 days 3163SS+7 days

3162SS+7 days 3164SS+10 days

3163SS+10 days 3165FS+1 day


3164FS+1 day 3175FS+1 day

3158FS+2 days 3169SS+7 days


3168SS+7 days 3170SS+7 days
3169SS+7 days 3171SS+7 days

3170SS+7 days 3172SS+10 days

3171SS+10 days 3173FS+1 day


3172FS+1 day

3165FS+1 day 3176SS+7 days


3175SS+7 days 3177SS+7 days
3176SS+7 days 3178SS+7 days

3177SS+7 days 3179SS+10 days

3178SS+10 days 3180FS+1 day


3179FS+1 day 3181FS+1 day
3180FS+1 day 3183FS+1 day

3181FS+1 day 3184SS+4 days


3183SS+4 days 3185SS+4 days
3184SS+4 days 3186SS+4 days
3185SS+4 days 3187SS+5 days
3186SS+5 days 3188FS+1 day
3187FS+1 day 3190FS+1 day

3188FS+1 day 3191SS+3 days


3190SS+3 days 3192SS+5 days
3191SS+5 days 3193SS+4 days
3192SS+4 days 3194FS+1 day
3193FS+1 day 3196FS+1 day

3194FS+1 day 3197SS+3 days


3196SS+3 days 3198SS+5 days
3197SS+5 days 3199SS+4 days
3198SS+4 days 3200FS+1 day
3199FS+1 day 3202FS+1 day

3200FS+1 day 3203SS+2 days


3202SS+2 days 3204SS+2 days
3203SS+2 days 3205SS+2 days
3204SS+2 days 3206FS+1 day
3205FS+1 day 3208FS+1 day

3206FS+1 day 3209SS+2 days


3208SS+2 days 3210SS+2 days
3209SS+2 days 3211SS+2 days
3210SS+2 days 3212FS+1 day
3211FS+1 day 3214FS+1 day

3212FS+1 day 3215SS+2 days


3214SS+2 days 3216SS+2 days
3215SS+2 days 3217SS+2 days
3216SS+2 days 3218FS+1 day
3217FS+1 day 3220FS+1 day

3218FS+1 day 3221SS+2 days


3220SS+2 days 3222SS+2 days
3221SS+2 days 3223SS+2 days
3222SS+2 days 3224FS+1 day
3223FS+1 day 3226FS+1 day

3224FS+1 day 3227SS+2 days


3226SS+2 days 3228SS+4 days
3227SS+4 days 3229SS+2 days
3228SS+2 days 3230FS+1 day
3232FS+1
3229FS+1 day day,3336FS+10
days

3230FS+1 day 3233SS+2 days


3232SS+2 days 3234SS+4 days
3233SS+4 days 3235SS+2 days
3234SS+2 days 3236FS+1 day
3235FS+1 day 3238FS+1 day

3236FS+1 day 3239SS+2 days


3238SS+2 days 3240SS+2 days
3239SS+2 days 3241SS+2 days
3240SS+2 days 3242FS+1 day
3241FS+1 day 3244FS+1 day

3242FS+1 day 3245SS+2 days


3244SS+2 days 3246SS+2 days
3245SS+2 days 3247SS+2 days
3246SS+2 days 3248FS+1 day
3247FS+1 day 3250FS+1 day

3248FS+1 day 3251SS+2 days


3250SS+2 days 3252SS+2 days
3251SS+2 days 3253SS+2 days
3252SS+2 days 3254FS+1 day
3253FS+1 day 3256FS+1 day

3254FS+1 day 3257SS+2 days


3256SS+2 days 3258SS+2 days
3257SS+2 days 3259SS+2 days
3258SS+2 days 3260FS+1 day
3259FS+1 day 3262FS+1 day

3260FS+1 day 3263SS+2 days


3262SS+2 days 3264SS+2 days
3263SS+2 days 3265SS+2 days
3264SS+2 days 3266FS+1 day
3265FS+1 day 3268FS+1 day

3266FS+1 day 3269SS+2 days


3268SS+2 days 3270SS+4 days
3269SS+4 days 3271SS+2 days
3270SS+2 days 3272FS+1 day
3271FS+1 day 3274FS+1 day

3272FS+1 day 3275SS+2 days


3274SS+2 days 3276SS+4 days
3275SS+4 days 3277SS+2 days
3276SS+2 days 3278FS+1 day
3277FS+1 day 3280FS+1 day

3278FS+1 day 3281SS+2 days


3280SS+2 days 3282SS+2 days
3281SS+2 days 3283SS+2 days
3282SS+2 days 3284FS+1 day
3283FS+1 day 3286FS+1 day

3284FS+1 day 3287SS+2 days


3286SS+2 days 3288SS+2 days
3287SS+2 days 3289SS+2 days
3288SS+2 days 3290FS+1 day
3289FS+1 day 3292FS+1 day

3290FS+1 day 3293SS+2 days


3292SS+2 days 3294SS+2 days
3293SS+2 days 3295SS+2 days
3294SS+2 days 3296FS+1 day
3295FS+1 day 3298FS+1 day

3296FS+1 day 3299SS+2 days


3298SS+2 days 3300SS+2 days
3299SS+2 days 3301SS+2 days
3300SS+2 days 3302FS+1 day
3301FS+1 day 3304FS+1 day

3302FS+1 day 3305SS+2 days


3304SS+2 days 3306SS+2 days
3305SS+2 days 3307SS+2 days
3306SS+2 days 3308FS+1 day
3307FS+1 day 3310FS+1 day

3308FS+1 day 3311SS+2 days


3310SS+2 days 3312SS+4 days
3311SS+4 days 3313SS+2 days
3312SS+2 days 3314FS+1 day
3313FS+1 day 3316FS+1 day

3314FS+1 day 3317SS+2 days


3316SS+2 days 3318SS+4 days
3317SS+4 days 3319SS+2 days
3318SS+2 days 3320FS+1 day
3319FS+1 day 3322FS+1 day

3320FS+1 day 3323SS+2 days


3322SS+2 days 3324SS+4 days
3323SS+4 days 3325SS+2 days
3324SS+2 days 3326FS+1 day
3325FS+1 day 3328FS+1 day

3326FS+1 day 3329SS+3 days


3328SS+3 days 3330SS+3 days
3329SS+3 days 3331SS+4 days
3330SS+4 days 3332SS+4 days
3331SS+4 days 3333FS+1 day

3634FS+60
days,3651FS+20
days,3665FS+30
3332FS+1 day
days,3670FS+3
days,3676FS+10
days

3337SS+7
3230FS+10 days days,3365FS-5
days

3338SS+7
3336SS+7 days days,3366FS-5
days

3339SS+7
3337SS+7 days days,3367FS-5
days

3340FS+1
3338SS+7 days day,3368FS-5
days

3341FS+1
3339FS+1 day day,3369FS-5
days

3342FS+1
3340FS+1 day day,3370FS-5
days

3343FS+1
3341FS+1 day day,3371FS-5
days

3344FS+1
3342FS+1 day day,3372FS-5
days

3345FS+1
3343FS+1 day day,3373FS-5
days
3346FS+1
3344FS+1 day day,3374FS-5
days

3347FS+1
3345FS+1 day day,3375FS-5
days

3348FS+1
3346FS+1 day day,3376FS-5
days

3349FS+1
3347FS+1 day day,3377FS-5
days

3350FS+1
3348FS+1 day day,3378FS-5
days

3351FS+1
3349FS+1 day day,3379FS-5
days

3352FS+1
3350FS+1 day day,3380FS-5
days

3353FS+1
3351FS+1 day day,3381FS-5
days

3354FS+1
3352FS+1 day day,3382FS-5
days

3355FS+1
3353FS+1 day day,3383FS-5
days

3356FS+1
3354FS+1 day day,3384FS-5
days

3357FS+1
3355FS+1 day day,3385FS-5
days

3358FS+1
3356FS+1 day day,3386FS-5
days

3359FS+1
3357FS+1 day day,3387FS-5
days
3360FS+1
day,3388FS-5
3358FS+1 day
days,3639FS+1
day

3361FS+1
3359FS+1 day day,3389FS-5
days

3362FS+1
3360FS+1 day day,3390FS-5
days

3363FS+1
3361FS+1 day day,3391FS-5
days
3362FS+1 day 3392FS-5 days

3336FS-5 days 3688


3337FS-5 days 3688
3338FS-5 days 3688
3339FS-5 days 3688
3340FS-5 days 3466
3341FS-5 days 3467
3342FS-5 days 3468
3469,3394FS+1
3343FS-5 days
day
3344FS-5 days 3470
3345FS-5 days 3471
3346FS-5 days 3472
3347FS-5 days 3473
3348FS-5 days 3474
3349FS-5 days 3475
3350FS-5 days 3476
3351FS-5 days 3477
3352FS-5 days 3478
3353FS-5 days 3479
3354FS-5 days 3480
3355FS-5 days 3481
3356FS-5 days 3482
3357FS-5 days 3483
3358FS-5 days 3484
3359FS-5 days 3485
3360FS-5 days 3486
3361FS-5 days 3487
3362FS-5 days 3488
3363FS-5 days
3372FS+1 day 3395
3394 3396
3397,3418FS+1
3395
day
3396 3398
3397 3399
3398 3400
3399 3401
3400 3402
3401 3403
3402 3404
3403 3405
3404 3406
3405 3407
3406 3408
3407 3409
3408 3410
3409 3411
3410 3412
3411 3413
3412 3414
3413 3415
3414 3416
3415

3396FS+1 day 3419


3418 3420
3421,3442FS+1
3419
day
3420 3422
3421 3423
3422 3424
3423 3425
3424 3426
3425 3427
3426 3428
3427 3429
3428 3430
3429 3431
3430 3432
3431 3433
3432 3434
3433 3435
3434 3436
3435 3437
3436 3438
3437 3439
3438 3440
3439

3420FS+1 day 3443


3442 3444
3445,3466FS+1
3443
day
3444 3446
3445 3447
3446 3448
3447 3449
3448 3450
3449 3451
3450 3452
3451 3453
3452 3454
3453 3455
3454 3456
3455 3457
3456 3458
3457 3459
3458 3460
3459 3461
3460 3462
3461 3463
3462 3464
3463

3369,3444FS+1 day 3467


34,663,370 3468
3469,3490FS+1
34,673,371
day
34,683,372 3470
34,693,373 3471
34,703,374 3472
34,713,375 3473
34,723,376 3474
34,733,377 3475
34,743,378 3476
34,753,379 3477
34,763,380 3478
34,773,381 3479
34,783,382 3480
34,793,383 3481
34,803,384 3482
34,813,385 3483
34,823,386 3484
34,833,387 3485
34,843,388 3486
34,853,389 3487
34,863,390 3488
34,873,391

3468FS+1 day 3491


3490 3492
3493,3514FS+1
3491
day
3492 3494
3493 3495
3494 3496
3495 3497
3496 3498
3497 3499
3498 3500
3499 3501
3500 3502
3501 3503
3502 3504
3503 3505
3504 3506
3505 3507
3506 3508
3507 3509
3508 3510
3509 3511
3510 3512
3511

3515FS-2
3492FS+1 day days,3636SS+10
days
3514FS-2 days 3516FS-2 days
3517FS-2
3515FS-2 days days,3538FS+1
day
3516FS-2 days 3518FS-2 days
3517FS-2 days 3519FS-2 days
3518FS-2 days 3520FS-2 days
3519FS-2 days 3521FS-2 days
3520FS-2 days 3522FS-2 days
3521FS-2 days 3523FS-2 days
3522FS-2 days 3524FS-2 days
3523FS-2 days 3525FS-2 days
3524FS-2 days 3526FS-2 days
3525FS-2 days 3527FS-2 days
3526FS-2 days 3528FS-2 days
3527FS-2 days 3529FS-2 days
3528FS-2 days 3530FS-2 days
3529FS-2 days 3531FS-2 days
3530FS-2 days 3532FS-2 days
3531FS-2 days 3533FS-2 days
3532FS-2 days 3534FS-2 days
3533FS-2 days 3535FS-2 days
3534FS-2 days 3536FS-2 days
3535FS-2 days

3516FS+1 day 3539FS-2 days


3538FS-2 days 3540FS-2 days
3541FS-2
3539FS-2 days days,3562FS+1
day
3540FS-2 days 3542FS-2 days
3541FS-2 days 3543FS-2 days
3542FS-2 days 3544FS-2 days
3543FS-2 days 3545FS-2 days
3544FS-2 days 3546FS-2 days
3545FS-2 days 3547FS-2 days
3546FS-2 days 3548FS-2 days
3547FS-2 days 3549FS-2 days
3548FS-2 days 3550FS-2 days
3549FS-2 days 3551FS-2 days
3550FS-2 days 3552FS-2 days
3551FS-2 days 3553FS-2 days
3552FS-2 days 3554FS-2 days
3553FS-2 days 3555FS-2 days
3554FS-2 days 3556FS-2 days
3555FS-2 days 3557FS-2 days
3556FS-2 days 3558FS-2 days
3557FS-2 days 3559FS-2 days
3558FS-2 days 3560FS-2 days
3559FS-2 days

3540FS+1 day 3563FS-2 days


3564FS-2
3562FS-2 days days,3586FS+1
day
3563FS-2 days 3565FS-2 days
3566FS-2
3564FS-2 days days,3663FS+1
day
3565FS-2 days 3567FS-2 days
3566FS-2 days 3568FS-2 days
3567FS-2 days 3569FS-2 days
3568FS-2 days 3570FS-2 days
3569FS-2 days 3571FS-2 days
3570FS-2 days 3572FS-2 days
3571FS-2 days 3573FS-2 days
3572FS-2 days 3574FS-2 days
3573FS-2 days 3575FS-2 days
3574FS-2 days 3576FS-2 days
3575FS-2 days 3577FS-2 days
3576FS-2 days 3578FS-2 days
3577FS-2 days 3579FS-2 days
3578FS-2 days 3580FS-2 days
3579FS-2 days 3581FS-2 days
3580FS-2 days 3582FS-2 days
3581FS-2 days 3583FS-2 days
3582FS-2 days 3584FS-2 days
3583FS-2 days

3563FS+1 day 3587FS-2 days


3586FS-2 days 3588FS-2 days
3589FS-2
3587FS-2 days days,3610FS+1
day
3588FS-2 days 3590FS-2 days
3589FS-2 days 3591FS-2 days
3590FS-2 days 3592FS-2 days
3591FS-2 days 3593FS-2 days
3592FS-2 days 3594FS-2 days
3593FS-2 days 3595FS-2 days
3594FS-2 days 3596FS-2 days
3595FS-2 days 3597FS-2 days
3596FS-2 days 3598FS-2 days
3597FS-2 days 3599FS-2 days
3598FS-2 days 3600FS-2 days
3599FS-2 days 3601FS-2 days
3600FS-2 days 3602FS-2 days
3601FS-2 days 3603FS-2 days
3602FS-2 days 3604FS-2 days
3603FS-2 days 3605FS-2 days
3604FS-2 days 3606FS-2 days
3605FS-2 days 3607FS-2 days
3606FS-2 days 3608FS-2 days
3607FS-2 days

3588FS+1 day 3611FS-3 days


3610FS-3 days 3612FS-3 days
3611FS-3 days 3613FS-3 days
3612FS-3 days 3614FS-3 days
3613FS-3 days 3615FS-3 days
3614FS-3 days 3616FS-3 days
3615FS-3 days 3617FS-3 days
3616FS-3 days 3618FS-3 days
3617FS-3 days 3619FS-3 days
3618FS-3 days 3620FS-3 days
3619FS-3 days 3621FS-3 days
3620FS-3 days 3622FS-3 days
3621FS-3 days 3623FS-3 days
3622FS-3 days 3624FS-3 days
3623FS-3 days 3625FS-3 days
3624FS-3 days 3626FS-3 days
3625FS-3 days 3627FS-3 days
3626FS-3 days 3628FS-3 days
3627FS-3 days 3629FS-3 days
3628FS-3 days 3630FS-3 days
3629FS-3 days 3631FS-3 days
3630FS-3 days 3632FS-3 days
3631FS-3 days

3333FS+60 days 3635SS-30 days

3634SS-30 days 3638

3514SS+10 days 3637


3636 3638

36,373,635

3359FS+1 day 3640SS+20 days

3639SS+20 days 3641FS+1 day

3640FS+1 day 3642SS+15 days

3641SS+15 days 3643SS+10 days

3642SS+10 days 3644SS+1 day

3643SS+1 day 3645SS+5 days


3644SS+5 days 3646SS+4 days
3645SS+4 days 3647SS+4 days
3648SS+5
3646SS+4 days days,3649SS+5
days

3647SS+5 days 3649SS

3647SS+5 days,3648SS

3333FS+20 days 3652SS


3653SS+5
3651SS days,3656SS+15
days

3652SS+5 days 3654SS+10 days

3653SS+10 days 3655SS+4 days


3654SS+4 days 3660

3652SS+15 days 3657

3656 3658SS+10 days

3657SS+10 days 3659SS+5 days


3660SS+10
3658SS+5 days days,3661SS+15
days

3659SS+10 days,3655 3661SS+5 days


3659SS+15 days,3660SS+5 days 3662SS+4 days

3661SS+4 days 3698FF-40 days

3565FS+1 day 3698FF-20 days

3333FS+30 days 3666SS+15 days

3665SS+15 days 3667SS+15 days

3666SS+15 days 3668

3667 3698FF-30 days

3671SS+10
3333FS+3 days
days,3672,3688

3670SS+10 days 3673

3670 3673SS+5 days

3671,3672SS+5 days 3674SS+15 days

3673SS+15 days

3333FS+10 days 3677


3676 3678
3677 36,793,683
3678 3680
3679 36,813,682
3680 3682SS
3680,3681SS 3685FS+4 days
3678 3684
3683 3685
3684,3682FS+4 days 3689SS

36,703,365,336,633,600,000 3689SS+10 days

3688SS+10 days,3685SS 3690

3689 3691
3692,3693SS-13
3690 days,3694SS-13
days

3691 3694FF-7 days

3691SS-13 days 3695FF+5 days

3691SS-13 days,3692FF-7 days 3696FS-5 days

3693FF+5 days 3696FF+5 days

3695FF+5 days,3694FS-5 days 3697FF+4 days

3696FF+4 days 3698FF+9 days


3697FF+9 days,3662FF-40 days,3663FF-
20 days,3668FF-30 days

2552 3702SS+8 days

3701SS+8 days 3703FS-10 days

3704FS-5
3702FS-10 days days,3705FS-5
days
3703FS-5 days
3703FS-5 days 3706SS+1 day
3705SS+1 day 3707SS+5 days
3706SS+5 days 3708SS+5 days
3707SS+5 days 3709SS+4 days
3708SS+4 days 3710FS-5 days
3709FS-5 days 3712FS+2 days

3710FS+2 days 3713SS+7 days


3714SS+7
3712SS+7 days days,3719FS+2
days
3713SS+7 days 3715SS+7 days

3714SS+7 days 3716SS+10 days

3715SS+10 days 3717FS+1 day


3716FS+1 day 3726FS+1 day

3713FS+2 days 3720SS+7 days


3719SS+7 days 3721SS+7 days
3720SS+7 days 3722SS+7 days
3721SS+7 days 3723SS+10 days

3722SS+10 days 3724FS+1 day


3723FS+1 day 3733FS+1 day

3717FS+1 day 3727SS+7 days


3726SS+7 days 3728SS+7 days
3727SS+7 days 3729SS+7 days

3728SS+7 days 3730SS+10 days

3729SS+10 days 3731FS+1 day


3730FS+1 day 3741FS+2 days

3724FS+1 day 3734SS+7 days


3733SS+7 days 3735SS+7 days
3734SS+7 days 3736SS+7 days

3735SS+7 days 3737SS+10 days

3736SS+10 days 3738FS+1 day


3737FS+1 day 3748FS+1 day

3731FS+2 days 3742SS+7 days


3741SS+7 days 3743SS+7 days
3742SS+7 days 3744SS+7 days
3743SS+7 days 3745SS+7 days

3744SS+7 days 3746FS+10 days

3745FS+10 days

3738FS+1 day 3749SS+7 days


3748SS+7 days 3750SS+7 days
3749SS+7 days 3751SS+7 days

3750SS+7 days 3752SS+10 days

3751SS+10 days 3753FS+1 day


3752FS+1 day 3754FS+1 day
3753FS+1 day 3756FS+1 day

3754FS+1 day 3757SS+3 days


3756SS+3 days 3758SS+2 days
3757SS+2 days 3759SS+2 days
3758SS+2 days 3760SS+5 days
3759SS+5 days 3761FS+1 day
3760FS+1 day 3763FS+1 day
3761FS+1 day 3764SS+3 days
3763SS+3 days 3765SS+5 days
3764SS+5 days 3766SS+4 days
3765SS+4 days 3767FS+1 day
3766FS+1 day 3769FS+1 day

3767FS+1 day 3770SS+3 days


3769SS+3 days 3771SS+5 days
3770SS+5 days 3772SS+4 days
3771SS+4 days 3773FS+1 day
3772FS+1 day 3775FS+1 day

3773FS+1 day 3776SS+2 days


3775SS+2 days 3777SS+2 days
3776SS+2 days 3778SS+2 days
3777SS+2 days 3779FS+1 day
3778FS+1 day 3781FS+1 day

3779FS+1 day 3782SS+2 days


3781SS+2 days 3783SS+2 days
3782SS+2 days 3784SS+2 days
3783SS+2 days 3785FS+1 day
3784FS+1 day 3787FS+1 day

3785FS+1 day 3788SS+2 days


3787SS+2 days 3789SS+2 days
3788SS+2 days 3790SS+2 days
3789SS+2 days 3791FS+1 day
3790FS+1 day 3793FS+1 day

3791FS+1 day 3794SS+2 days


3793SS+2 days 3795SS+2 days
3794SS+2 days 3796SS+2 days
3795SS+2 days 3797FS+1 day
3796FS+1 day 3799FS+1 day

3797FS+1 day 3800SS+2 days


3799SS+2 days 3801SS+4 days
3800SS+4 days 3802SS+2 days
3801SS+2 days 3803FS+1 day
3805FS+1
3802FS+1 day day,3909FS+10
days
3803FS+1 day 3806SS+2 days
3805SS+2 days 3807SS+4 days
3806SS+4 days 3808SS+2 days
3807SS+2 days 3809FS+1 day
3808FS+1 day 3811FS+1 day

3809FS+1 day 3812SS+2 days


3811SS+2 days 3813SS+2 days
3812SS+2 days 3814SS+2 days
3813SS+2 days 3815FS+1 day
3814FS+1 day 3817FS+1 day

3815FS+1 day 3818SS+2 days


3817SS+2 days 3819SS+2 days
3818SS+2 days 3820SS+2 days
3819SS+2 days 3821FS+1 day
3820FS+1 day 3823FS+1 day

3821FS+1 day 3824SS+2 days


3823SS+2 days 3825SS+2 days
3824SS+2 days 3826SS+2 days
3825SS+2 days 3827FS+1 day
3826FS+1 day 3829FS+1 day

3827FS+1 day 3830SS+2 days


3829SS+2 days 3831SS+2 days
3830SS+2 days 3832SS+2 days
3831SS+2 days 3833FS+1 day
3832FS+1 day 3835FS+1 day

3833FS+1 day 3836SS+2 days


3835SS+2 days 3837SS+2 days
3836SS+2 days 3838SS+2 days
3837SS+2 days 3839FS+1 day
3838FS+1 day 3841FS+1 day

3839FS+1 day 3842SS+2 days


3841SS+2 days 3843SS+4 days
3842SS+4 days 3844SS+2 days
3843SS+2 days 3845FS+1 day
3844FS+1 day 3847FS+1 day

3845FS+1 day 3848SS+2 days


3847SS+2 days 3849SS+4 days
3848SS+4 days 3850SS+2 days
3849SS+2 days 3851FS+1 day
3850FS+1 day 3853FS+1 day

3851FS+1 day 3854SS+2 days


3853SS+2 days 3855SS+2 days
3854SS+2 days 3856SS+2 days
3855SS+2 days 3857FS+1 day
3856FS+1 day 3859FS+1 day

3857FS+1 day 3860SS+2 days


3859SS+2 days 3861SS+2 days
3860SS+2 days 3862SS+2 days
3861SS+2 days 3863FS+1 day
3862FS+1 day 3865FS+1 day

3863FS+1 day 3866SS+2 days


3865SS+2 days 3867SS+2 days
3866SS+2 days 3868SS+2 days
3867SS+2 days 3869FS+1 day
3868FS+1 day 3871FS+1 day

3869FS+1 day 3872SS+2 days


3871SS+2 days 3873SS+2 days
3872SS+2 days 3874SS+2 days
3873SS+2 days 3875FS+1 day
3874FS+1 day 3877FS+1 day

3875FS+1 day 3878SS+2 days


3877SS+2 days 3879SS+2 days
3878SS+2 days 3880SS+2 days
3879SS+2 days 3881FS+1 day
3880FS+1 day 3883FS+1 day

3881FS+1 day 3884SS+2 days


3883SS+2 days 3885SS+4 days
3884SS+4 days 3886SS+2 days
3885SS+2 days 3887FS+1 day
3886FS+1 day 3889FS+1 day

3887FS+1 day 3890SS+2 days


3889SS+2 days 3891SS+4 days
3890SS+4 days 3892SS+2 days
3891SS+2 days 3893FS+1 day
3892FS+1 day 3895FS+1 day
3893FS+1 day 3896SS+2 days
3895SS+2 days 3897SS+4 days
3896SS+4 days 3898SS+2 days
3897SS+2 days 3899FS+1 day
3898FS+1 day 3901FS+1 day

3899FS+1 day 3902SS+4 days


3901SS+4 days 3903SS+5 days
3902SS+5 days 3904SS+4 days
3903SS+4 days 3905SS+5 days
3904SS+5 days 3906FS+1 day

4207FS+60
days,4224FS+20
days,4238FS+30
3905FS+1 day
days,4243FS+3
days,4249FS+10
days

3910SS+7
3803FS+10 days days,3938FS-5
days

3911SS+7
3909SS+7 days days,3939FS-5
days

3912SS+7
3910SS+7 days days,3940FS-5
days

3913FS+1
3911SS+7 days day,3941FS-5
days

3914FS+1
3912FS+1 day day,3942FS-5
days

3915FS+1
3913FS+1 day day,3943FS-5
days

3916FS+1
3914FS+1 day day,3944FS-5
days

3917FS+1
3915FS+1 day day,3945FS-5
days
3918FS+1
3916FS+1 day day,3946FS-5
days

3919FS+1
3917FS+1 day day,3947FS-5
days

3920FS+1
3918FS+1 day day,3948FS-5
days

3921FS+1
3919FS+1 day day,3949FS-5
days

3922FS+1
3920FS+1 day day,3950FS-5
days

3923FS+1
3921FS+1 day day,3951FS-5
days

3924FS+1
3922FS+1 day day,3952FS-5
days

3925FS+1
3923FS+1 day day,3953FS-5
days

3926FS+1
3924FS+1 day day,3954FS-5
days

3927FS+1
3925FS+1 day day,3955FS-5
days

3928FS+1
3926FS+1 day day,3956FS-5
days

3929FS+1
3927FS+1 day day,3957FS-5
days

3930FS+1
3928FS+1 day day,3958FS-5
days

3931FS+1
3929FS+1 day day,3959FS-5
days

3932FS+1
3930FS+1 day day,3960FS-5
days
3933FS+1
day,3961FS-5
3931FS+1 day
days,4212FS+1
day

3934FS+1
3932FS+1 day day,3962FS-5
days

3935FS+1
3933FS+1 day day,3963FS-5
days

3936FS+1
3934FS+1 day day,3964FS-5
days
3935FS+1 day 3965FS-5 days

3909FS-5 days 4261


3910FS-5 days 4261
3911FS-5 days 4261
3912FS-5 days 4261
3913FS-5 days 4039
3914FS-5 days 4040
4041,3967FS+1
3915FS-5 days
day
3916FS-5 days 4042
3917FS-5 days 4043
3918FS-5 days 4044
3919FS-5 days 4045
3920FS-5 days 4046
3921FS-5 days 4047
3922FS-5 days 4048
3923FS-5 days 4049
3924FS-5 days 4050
3925FS-5 days 4051
3926FS-5 days 4052
3927FS-5 days 4053
3928FS-5 days 4054
3929FS-5 days 4055
3930FS-5 days 4056
3931FS-5 days 4057
3932FS-5 days 4058
3933FS-5 days 4059
3934FS-5 days 4060
3935FS-5 days 4061
3936FS-5 days
3944FS+1 day 3968
3967 3969
3970,3991FS+1
3968
day
3969 3971
3970 3972
3971 3973
3972 3974
3973 3975
3974 3976
3975 3977
3976 3978
3977 3979
3978 3980
3979 3981
3980 3982
3981 3983
3982 3984
3983 3985
3984 3986
3985 3987
3986 3988
3987 3989
3988

3969FS+1 day 3992


3991 3993
3994,4015FS+1
3992
day
3993 3995
3994 3996
3995 3997
3996 3998
3997 3999
3998 4000
3999 4001
4000 4002
4001 4003
4002 4004
4003 4005
4004 4006
4005 4007
4006 4008
4007 4009
4008 4010
4009 4011
4010 4012
4011 4013
4012

3993FS+1 day 4016


4015 4017
4018,4039FS+1
4016
day
4017 4019
4018 4020
4019 4021
4020 4022
4021 4023
4022 4024
4023 4025
4024 4026
4025 4027
4026 4028
4027 4029
4028 4030
4029 4031
4030 4032
4031 4033
4032 4034
4033 4035
4034 4036
4035 4037
4036

3942,4017FS+1 day 4040


40,393,943 4041
4042,4063FS+1
40,403,944
day
40,413,945 4043
40,423,946 4044
40,433,947 4045
40,443,948 4046
40,453,949 4047
40,463,950 4048
40,473,951 4049
40,483,952 4050
40,493,953 4051
40,503,954 4052
40,513,955 4053
40,523,956 4054
40,533,957 4055
40,543,958 4056
40,553,959 4057
40,563,960 4058
40,573,961 4059
40,583,962 4060
40,593,963 4061
40,603,964

4041FS+1 day 4064


4063 4065
4066,4087FS+1
4064
day
4065 4067
4066 4068
4067 4069
4068 4070
4069 4071
4070 4072
4071 4073
4072 4074
4073 4075
4074 4076
4075 4077
4076 4078
4077 4079
4078 4080
4079 4081
4080 4082
4081 4083
4082 4084
4083 4085
4084

4088FS-2
4065FS+1 day days,4209SS+10
days
4087FS-2 days 4089FS-2 days
4090FS-2
4088FS-2 days days,4111FS+1
day
4089FS-2 days 4091FS-2 days
4090FS-2 days 4092FS-2 days
4091FS-2 days 4093FS-2 days
4092FS-2 days 4094FS-2 days
4093FS-2 days 4095FS-2 days
4094FS-2 days 4096FS-2 days
4095FS-2 days 4097FS-2 days
4096FS-2 days 4098FS-2 days
4097FS-2 days 4099FS-2 days
4098FS-2 days 4100FS-2 days
4099FS-2 days 4101FS-2 days
4100FS-2 days 4102FS-2 days
4101FS-2 days 4103FS-2 days
4102FS-2 days 4104FS-2 days
4103FS-2 days 4105FS-2 days
4104FS-2 days 4106FS-2 days
4105FS-2 days 4107FS-2 days
4106FS-2 days 4108FS-2 days
4107FS-2 days 4109FS-2 days
4108FS-2 days

4089FS+1 day 4112FS-2 days


4111FS-2 days 4113FS-2 days
4114FS-2
4112FS-2 days days,4135FS+1
day
4113FS-2 days 4115FS-2 days
4114FS-2 days 4116FS-2 days
4115FS-2 days 4117FS-2 days
4116FS-2 days 4118FS-2 days
4117FS-2 days 4119FS-2 days
4118FS-2 days 4120FS-2 days
4119FS-2 days 4121FS-2 days
4120FS-2 days 4122FS-2 days
4121FS-2 days 4123FS-2 days
4122FS-2 days 4124FS-2 days
4123FS-2 days 4125FS-2 days
4124FS-2 days 4126FS-2 days
4125FS-2 days 4127FS-2 days
4126FS-2 days 4128FS-2 days
4127FS-2 days 4129FS-2 days
4128FS-2 days 4130FS-2 days
4129FS-2 days 4131FS-2 days
4130FS-2 days 4132FS-2 days
4131FS-2 days 4133FS-2 days
4132FS-2 days

4113FS+1 day 4136FS-2 days


4137FS-2
4135FS-2 days days,4159FS+1
day
4136FS-2 days 4138FS-2 days
4139FS-2
4137FS-2 days days,4236FS+1
day
4138FS-2 days 4140FS-2 days
4139FS-2 days 4141FS-2 days
4140FS-2 days 4142FS-2 days
4141FS-2 days 4143FS-2 days
4142FS-2 days 4144FS-2 days
4143FS-2 days 4145FS-2 days
4144FS-2 days 4146FS-2 days
4145FS-2 days 4147FS-2 days
4146FS-2 days 4148FS-2 days
4147FS-2 days 4149FS-2 days
4148FS-2 days 4150FS-2 days
4149FS-2 days 4151FS-2 days
4150FS-2 days 4152FS-2 days
4151FS-2 days 4153FS-2 days
4152FS-2 days 4154FS-2 days
4153FS-2 days 4155FS-2 days
4154FS-2 days 4156FS-2 days
4155FS-2 days 4157FS-2 days
4156FS-2 days

4136FS+1 day 4160FS-2 days


4159FS-2 days 4161FS-2 days
4162FS-2
4160FS-2 days days,4183FS+1
day
4161FS-2 days 4163FS-2 days
4162FS-2 days 4164FS-2 days
4163FS-2 days 4165FS-2 days
4164FS-2 days 4166FS-2 days
4165FS-2 days 4167FS-2 days
4166FS-2 days 4168FS-2 days
4167FS-2 days 4169FS-2 days
4168FS-2 days 4170FS-2 days
4169FS-2 days 4171FS-2 days
4170FS-2 days 4172FS-2 days
4171FS-2 days 4173FS-2 days
4172FS-2 days 4174FS-2 days
4173FS-2 days 4175FS-2 days
4174FS-2 days 4176FS-2 days
4175FS-2 days 4177FS-2 days
4176FS-2 days 4178FS-2 days
4177FS-2 days 4179FS-2 days
4178FS-2 days 4180FS-2 days
4179FS-2 days 4181FS-2 days
4180FS-2 days

4161FS+1 day 4184FS-3 days


4183FS-3 days 4185FS-3 days
4184FS-3 days 4186FS-3 days
4185FS-3 days 4187FS-3 days
4186FS-3 days 4188FS-3 days
4187FS-3 days 4189FS-3 days
4188FS-3 days 4190FS-3 days
4189FS-3 days 4191FS-3 days
4190FS-3 days 4192FS-3 days
4191FS-3 days 4193FS-3 days
4192FS-3 days 4194FS-3 days
4193FS-3 days 4195FS-3 days
4194FS-3 days 4196FS-3 days
4195FS-3 days 4197FS-3 days
4196FS-3 days 4198FS-3 days
4197FS-3 days 4199FS-3 days
4198FS-3 days 4200FS-3 days
4199FS-3 days 4201FS-3 days
4200FS-3 days 4202FS-3 days
4201FS-3 days 4203FS-3 days
4202FS-3 days 4204FS-3 days
4203FS-3 days 4205FS-3 days
4204FS-3 days

3906FS+60 days 4208SS-30 days

4207SS-30 days 4211

4087SS+10 days 4210


4209 4211

42,104,208

3932FS+1 day 4213SS+20 days

4212SS+20 days 4214FS+1 day

4213FS+1 day 4215SS+15 days

4214SS+15 days 4216SS+10 days

4215SS+10 days 4217SS+1 day

4216SS+1 day 4218SS+5 days


4217SS+5 days 4219SS+4 days
4218SS+4 days 4220SS+4 days
4221SS+5
4219SS+4 days days,4222SS+5
days

4220SS+5 days 4222SS

4220SS+5 days,4221SS

3906FS+20 days 4225SS


4226SS+5
4224SS days,4229SS+15
days

4225SS+5 days 4227SS+10 days

4226SS+10 days 4228SS+4 days


4227SS+4 days 4233FS+3 days

4225SS+15 days 4230

4229 4231SS+10 days

4230SS+10 days 4232SS+5 days


4233SS+10
4231SS+5 days days,4234SS+15
days

4232SS+10 days,4228FS+3 days 4234SS+5 days


4233SS+5 days,4232SS+15 days 4235SS+4 days

4234SS+4 days 4271FF-40 days

4138FS+1 day 4271FF-20 days

3906FS+30 days 4239SS+15 days

4238SS+15 days 4240SS+15 days

4239SS+15 days 4241

4240 4271FF-30 days

4244SS+8
3906FS+3 days
days,4245,4261

4243SS+8 days 4246

4243 4246SS+5 days

4244,4245SS+5 days 4247SS+15 days

4246SS+15 days

3906FS+10 days 4250


4249 4251
4250 42,524,256
4251 4253
4252 42,544,255
4253 4255SS
4254SS,4253 4258FS+4 days
4251 4257
4256 4258
4257,4255FS+4 days 4262SS+2 days

42,433,938,393,939,400,000 4262SS+10 days

4261SS+10 days,4258SS+2 days 4263

4262 4264
4265,4266SS-12
4263 days,4267SS-12
days

4264 4267FF-7 days

4264SS-12 days 4268FF+4 days

4264SS-12 days,4265FF-7 days 4269FS-5 days

4266FF+4 days 4269FF+4 days

4268FF+4 days,4267FS-5 days 4270FF+3 days

4269FF+3 days 4271FF+9 days


4270FF+9 days,4235FF-40 days,4236FF-
5
20 days,4241FF-30 days

2552 4275SS+10 days

4274SS+10 days 4276FS-10 days

4275FS-10 days 4277FS-5 days


4276FS-5 days 4278FS-5 days
4277FS-5 days 4279SS+1 day
4278SS+1 day 4280SS+5 days
4279SS+5 days 4281SS+5 days
4280SS+5 days 4282SS+4 days
4281SS+4 days 4283FS-5 days
4282FS-5 days 4285FS+1 day

4283FS+1 day 4286SS+5 days


4285SS+5 days 4287SS+4 days
4286SS+4 days 4288SS+6 days
4287SS+6 days 4289FS+2 days
4288FS+2 days 4290FS+1 day
4289FS+1 day 4292FS+1 day

4290FS+1 day 4293SS+5 days


4292SS+5 days 4294SS+4 days
4293SS+4 days 4295SS+6 days
4294SS+6 days 4296FS+2 days
4295FS+2 days 4297FS+1 day
4296FS+1 day 4300FS+1 day
4297FS+1 day 4301SS+5 days
4300SS+5 days 4302SS+5 days
4301SS+5 days 4303SS+2 days
4302SS+2 days 4304SS+5 days
4303SS+5 days 4305FS+1 day
4304FS+1 day 4307FS+1 day

4305FS+1 day 4308SS+5 days


4307SS+5 days 4309SS+5 days
4308SS+5 days 4310SS+2 days
4309SS+2 days 4311SS+5 days
4310SS+5 days 4312FS+1 day
4311FS+1 day 4314FS+1 day

4312FS+1 day 4315SS+5 days


4314SS+5 days 4316SS+5 days
4315SS+5 days 4317SS+2 days
4316SS+2 days 4318SS+5 days
4317SS+5 days 4319FS+1 day
4318FS+1 day 4321FS+1 day

4319FS+1 day 4322SS+5 days


4321SS+5 days 4323SS+5 days
4322SS+5 days 4324SS+2 days
4323SS+2 days 4325SS+5 days
4324SS+5 days 4326FS+1 day
4325FS+1 day 4328FS+1 day

4326FS+1 day 4329SS+5 days


4328SS+5 days 4330SS+5 days
4329SS+5 days 4331SS+2 days
4330SS+2 days 4332SS+5 days
4331SS+5 days 4333FS+1 day
4332FS+1 day 4335FS+1 day

4333FS+1 day 4336SS+5 days


4335SS+5 days 4337SS+5 days
4336SS+5 days 4338SS+2 days
4337SS+2 days 4339SS+5 days
4338SS+5 days 4340FS+1 day
4339FS+1 day 4342FS+1 day

4340FS+1 day 4343SS+5 days


4342SS+5 days 4344SS+5 days
4343SS+5 days 4345SS+2 days
4344SS+2 days 4346SS+5 days
4345SS+5 days 4347FS+1 day
4346FS+1 day 4349FS+1 day

4347FS+1 day 4350SS+5 days


4349SS+5 days 4351SS+5 days
4350SS+5 days 4352SS+2 days
4351SS+2 days 4353SS+5 days
4352SS+5 days 4354FS+1 day
4353FS+1 day 4356FS+1 day

4354FS+1 day 4357SS+5 days


4356SS+5 days 4358SS+5 days
4357SS+5 days 4359SS+2 days
4358SS+2 days 4360SS+5 days
4359SS+5 days 4361FS+1 day
4363FS+1
4360FS+1 day day,4385FS+20
days

4361FS+1 day 4364SS+5 days


4363SS+5 days 4365SS+5 days
4364SS+5 days 4366SS+2 days
4365SS+2 days 4367SS+5 days
4366SS+5 days 4368FS+1 day
4377FS+1
4367FS+1 day day,4370FS+1
day

4368FS+1 day 4371SS+5 days


4370SS+5 days 4372SS+5 days
4371SS+5 days 4373SS+2 days
4372SS+2 days 4374SS+5 days
4373SS+5 days 4375FS+1 day
4374FS+1 day

4368FS+1 day 4378SS+5 days


4377SS+5 days 4379SS+4 days
4378SS+4 days 4380SS+6 days
4379SS+6 days 4381SS+2 days
4380SS+2 days 4382FS+1 day
4517FS+60
days,4534FS+1
day,4548FS+45
4381FS+1 day
days,4553FS+45
days,4559FS+15
days

4386SS+7
4361FS+20 days days,4401SS+10
days
4385SS+7 days 4387SS+7 days
4386SS+7 days 4388SS+7 days
4389SS+7
4387SS+7 days days,4522FS+1
day

4390SS+7
4388SS+7 days days,4391SS+7
days
4389SS+7 days
4389SS+7 days 4392SS+7 days
4391SS+7 days 4393SS+7 days
4392SS+7 days 4394SS+7 days
4393SS+7 days 4395SS+7 days
4394SS+7 days 4396SS+7 days
4395SS+7 days 4397SS+7 days
4396SS+7 days 4398SS+7 days
4397SS+7 days 4399SS+7 days
4398SS+7 days

4385SS+10 days 4402SS+7 days


4401SS+7 days 4403SS+7 days
4402SS+7 days 4404SS+7 days
4403SS+7 days 4405SS+7 days
4406SS+7
4404SS+7 days days,4407SS+7
days
4405SS+7 days 4417FS+1 day
4405SS+7 days 4408SS+7 days
4407SS+7 days 4409SS+7 days
4408SS+7 days 4410SS+7 days
4409SS+7 days 4411SS+7 days
4410SS+7 days 4412SS+7 days
4411SS+7 days 4413SS+7 days
4412SS+7 days 4414SS+7 days
4413SS+7 days 4415SS+7 days
4414SS+7 days

4406FS+1 day 4418


4419,4428FS-2
4417
days
4418 4420
4419 4421
4420 4422
4421 4423
4422 4424
4423 4425
4424 4426
4425

4418FS-2 days 4429


4428 4430
4431,4439FS+1
4429
day
4430 4432
4431 4433
4432 4434
4433 4435
4434 4436
4435 4437
4436

4430FS+1 day 4440


4441,4450FS+1
4439
day
4440 4442
4441 4443
4442 4444
4443 4445
4444 4446
4445 4447
4446 4448
4447
4440FS+1 day 4451
4452,4461FS+2
4450 days,4472FS+2
days
4451 4453
4452 4454
4453 4455
4454 4456
4455 4457
4456 4458
4457 4459
4458

4451FS+2 days 4462


4461 4463
4462 4464
4463 4465
4464 4466
4465 4467
4466 4468
4467 4469
4468 4470
4469

4473FS-2
days,4483FS+2
4451FS+2 days
days,4519SS+10
days
4472FS-2 days 4474FS-2 days
4473FS-2 days 4475FS-2 days
4474FS-2 days 4476FS-2 days
4475FS-2 days 4477FS-2 days
4476FS-2 days 4478FS-2 days
4477FS-2 days 4479FS-2 days
4478FS-2 days 4480FS-2 days
4479FS-2 days 4481FS-2 days
4480FS-2 days

4484FS-2
4472FS+2 days days,4494FS+2
days
4483FS-2 days 4485FS-2 days
4484FS-2 days 4486FS-2 days
4485FS-2 days 4487FS-2 days
4486FS-2 days 4488FS-2 days
4487FS-2 days 4489FS-2 days
4488FS-2 days 4490FS-2 days
4489FS-2 days 4491FS-2 days
4490FS-2 days 4492FS-2 days
4491FS-2 days

4483FS+2 days 4495FS-1 day


4496FS-1
4494FS-1 day day,4505FS+1
day
4495FS-1 day 4497FS-1 day
4496FS-1 day 4498FS-1 day
4497FS-1 day 4499FS-1 day
4498FS-1 day 4500FS-1 day
4499FS-1 day 4501FS-1 day
4500FS-1 day 4502FS-1 day
4501FS-1 day 4503FS-1 day
4502FS-1 day

4495FS+1 day 4506FS-1 day


4505FS-1 day 4507FS-1 day
4506FS-1 day 4508FS-1 day
4507FS-1 day 4509FS-1 day
4508FS-1 day 4510FS-1 day
4509FS-1 day 4511FS-1 day
4510FS-1 day 4512FS-1 day
4511FS-1 day 4513FS-1 day
4512FS-1 day 4514FS-1 day
4513FS-1 day 4515SS+5 days
4514SS+5 days

4382FS+60 days 4518SS-30 days

4517SS-30 days

4472SS+10 days 45,204,521

4519 4521

45,204,519
4388FS+1 day 4523SS+20 days

4522SS+20 days 4524FS+1 day

4523FS+1 day

3068SS+15 days 4526SS+10 days

4525SS+10 days 4527SS+1 day

4526SS+1 day 4528SS+5 days


4527SS+5 days 4529SS+4 days
4528SS+4 days 4530SS+5 days
4531SS+5
4529SS+5 days days,4532SS+5
days

4530SS+5 days

4530SS+5 days

4382FS+1 day 4535


4536SS+10
4534 days,4539SS+15
days

4535SS+10 days 4537SS+15 days

4536SS+15 days 4538SS+15 days

4537SS+15 days 4539

4535SS+15 days,4538 4540

4539 4541SS+10 days

4540SS+10 days 4542SS+5 days


4543SS+5
4541SS+5 days days,4544SS+5
days

4542SS+5 days 4546SS+5 days

4542SS+5 days 4545SS+5 days

4544SS+5 days
4543SS+5 days

4382FS+45 days 4549SS+5 days


4548SS+5 days 4550SS+5 days
4549SS+5 days 4551
4550

4554SS+15
4382FS+45 days
days,4571

4553SS+15 days 45,554,556

4554 4556SS+5 days

4554,4555SS+5 days 4557SS+15 days

4556SS+15 days

4382FS+15 days 4560


4559 4561
4560 4562
4561 4563
4562 4564
4563 45,654,566
4566,4568FS+3
4564
days
45,644,565 4567
4566 4568
4567,4565FS+3 days

4553 4572FS+15 days

4571FS+15 days 4573

4572 4574

4573 4575

4574 4576SS-10 days

4575SS-10 days 4577SS+10 days


4579SS+12
days,4578SS+5
4576SS+10 days
days,4580SS+10
days

4577SS+5 days

4577SS+12 days

4577SS+10 days