Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

B416-999-81!45!00001 REV 5_Boundary Front Availablity- Workfront Drawing- KOM

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

REF. DWG. NO.

REFERENCE DRAWING TITLE

N P
NOTES :-

1050M
The drawing, design and details given on this format are the property of ENGINEERS INDIA LIMITED. They are merely loaned on the borrower's express agreement that
they will not be reproduced, copied, exhibited or used, except in the limited way permitted by a written consent given by the lender to the borrower for the intended use.

LEGENDS:-

TO THITTAC
HERI

TO
NA
GO
RE
TEMPLE

OH
TL

OH
TL

OHTL
OHTL
TEMPLE
OHTL
OHTL
OHTL
OHTL
P

705 m
CL. OF ROAD NO.C

ROOMS
VALVE

WORKSHOP TELECOM
BATTERY ROOM UPS BATTERY ROOM

OFFICERS ROOM OFFICERS ROOM OFFICERS ROOM OFFICER ROOM


D D

TOILET D D D D

CONTROL EQUIPMENT ROOM

PANTRY
HT/LT BUILDING

V/E
TOILET SIC ROOM OFFICERS ROOM MEETING ROOM AL. PARTITION

V
TOILET TOILET

D
V
E1 V V/E

CONTROL ROOM

CONTROL BUILDING

DV

PUMP SHED
BOOSTER
MFM
STR

DISCHARGE
MANIFOLD

SUC. M/F
SF SF
MP-1

MP-2

MP-3

MP-1

MP-2

MP-3

LPG HEADERS FROM


DISCH. M/F
MLPU SHED(LPG) MLPU SHED(PRODUCT)
DV

SUC. M/F

CBR
BOOSTER PUMP
MFM

Length - 2.431 km
DV

SHED (LPG)
STR
CV CV
STATION
LIMIT VALVES
SLB PRODUCT

SLB LPG

DV
COLD FLARE
DV

Length 2.67 km
P

Length - 0.34 km
ONGC Pipeline

Length = 1.050km

Total available front = 6.491km


TL
OH

RAMP RAMP
OFFICE
BLOCK
STEP
UP

ALD A/B/C/D-TYPE A/B/C/D-TYPE


JANITOR
E/F-TYPE CABIN-2
FEMALE TOILET
WD
WC

ALD
WC WD
AHU ROOM
OFFICE BLOCK
WD
(FOR 4 E/F-TYPE CABIN-1

FORKLIFT
WC

RAMP PLC/VFD/MCC ROOM


WORKSTATION)
WC MALE TOILET

ALD
SD
(AC/FC)
+101.200 ALD
RAMP
EMPTY BAG & PALLET BATTERY CHARGER ROOM MAINTENANCE ROOM
WC FFL

20000 X 16000 D/W


RECORD
ROOM PANTRY
WD

AHU ROOM STORE 52000 X 16000 26000 X 16000


A/B/C/D-TYPE A/B/C/D-TYPE

STORAGE
10000 X 4000X6000 27000 X 16000
TOILET
WD
LADIESTOILET
WD

GENTS

16000 ALD
TL

WD
OH

BAGGING SECTION

REV. DATE REVISIONS BY CHKD APPD PM


TL
OH

BRICK WALL
RCC COLUMNS TO SUPPORT BRICK WALL
PEB STRL COLUMN

ALD ALD
ALD
STORAGE
STORE
5300 X 3100
WD
SD
A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE
WD
OFFICE BLOCK
(FOR 20 +101.200 SD
WORKSTATION) FFL
A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE
(AC/FC) KITCHEN + PANTRY

PANTRY
AHU ROOM
5300 X 9000
WD WD ALD E/F -TYPE CABIN-2
DINNING HALL

RAMP
(FOR 56 NOS.)

RAMP
TL

ALD ALD
A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE A/B/C/D-TYPE
D/W
SERVER ROOM
(AC/FC) HANDWASH CASH
E/F-TYPE CABIN-1
ALD COUNTER
ALD ALD
STEP

STEP
UP

UP

STEP
UP

OH

¨
TL
OH

CAUVERY BASIN REFINERY AND PETROCHEMICALS LIMITED


OHTL
OHTL
9 MMTPA CAUVERY BASIN REFINERY (CBR)
PROJECT AT NAGAPATTINAM, TAMIL NADU

OVERALL PLOT PLAN

SCALE JOB NO. UNIT DIVN. DEPT. DWG. NO. REV.


1:4500 B416 999 81 45 00001 5

3-1641-0500 REV.3 / 30.12.2019 A0-1189 x 841

B416-999-81-45-00001

You might also like