2.1 1.1Q
2.1 1.1Q
Questions Prepared By
#2. Which of the following will help prevent defects from reoccurring?
#3. Which testing level is primarily focused on building confidence rather than finding defects?
a. Unit testing
b. Integration testing
c. System testing
d. Acceptance testing
#4. Which characteristic must a tester possess in order to be successful when working with a project
team?
#5. If you need to add system integration testing as a test level for a particular project, what testing
level should it directly follow?
a. Component
b. Component integration
c. System
d. Acceptance
#6. In which testing level are the developers most heavily involved?
a. Compatibility
b. Acceptance
c. Component
d. Conversion
#7. If you are testing to ensure that the software will be easy to analyze and change, what type of
non-functional testing are you conducting?
a. Portability
b. Functional
c. Usability
d. Maintainability
2
#8. Which of the following is an important characteristic of tests used for regression testing?
a. They focus on testing the intricate and difficult-to-test aspects of the software
b. They require significant maintenance effort for each release
c. They are used for one release and are then discarded to keep the test set fresh
d. They are reusable for multiple releases with little maintenance
a. A new software product is being developed and defects have been found in unit testing
b. A new software product is being developed and will work across multiple platforms
c. A component of an existing production software product has been removed
d. A component of an existing production software product has received high usage
#10. Which of the following is an effective method for finding defects early in the software lifecycle?
a. Static analysis
b. System testing
c. User acceptance testing
d. Implementation validation testing
#11. If a review is being led by the author of the document, what type of review is it?
a. Inspection
b. Technical review
c. Walkthrough
d. Informal
#12. Which of the following is a key factor in the success of a work product review?
#14. Which of the following black-box testing techniques focuses on covering all combinations of
triggering conditions?
3
#15. What do use cases describe?
a. Process flows
b. Data flows
c. Control flows
d. Code flows
#16. If you are using a testing technique to identify test cases that were missed when you applied
formal testing techniques, what type of test design are you doing?
a. Experience-based
b. Informal
c. Defect-based
d. Ad hoc
#17. If you need to attain a certain level of code coverage for a particular software product your team
is testing, what type of testing should you use?
a. Specification-based
b. Structure-based
c. Experience-based
d. Defect-based
#19. At what point in the project should the test execution be scheduled?
#20. Which of the following should include the scheduling of test analysis?
a. Test approach
b. Test strategy
c. Test planning
d. Test estimation
4
#21. If the project is using highly skilled and experienced developers, what is affected by this factor?
#22. Which of the following test estimation approaches is based on typical values?
a. Risk-based
b. Value-based
c. Expert-based
d. Metrics-based
#23. For what level of testing is the following criterion appropriate? No priority 1, 2, or 3 defects are
open and all priority 4 defects must have a documented workaround and are accepted by the
business.
#24. If you want to track all changes to versions of your testware, what should you implement?
a. Tracker control
b. Configuration management
c. Test control
d. Test reporting
#25. Which of the following is a risk that could threaten the project’s objectives?
a. The software fails to detect the selection of an invalid workflow path by a user with restricted
rights
b. A data conversion is failing because of an unexpected data format
c. The test environment is not ready
d. There are several usability issues in the software
5
#27. In an incident report, what is another attribute that can be used to indicate the priority of the
incident?
a. Severity
b. Risk
c. Urgency
d. Impact
#28. Which of the following tools would be most appropriate for managing defects throughout the
software lifecycle?