Testing Assignment
Testing Assignment
9. Which testing methods are used by end-users who actually test software
before they use it.
Alpha and Beta Testing
White Box Testing
Black Box Testing
Trial and Error Testing
10. To test a function, the programmer has to write a___, which calls the
function and passes it test data.
Stub
Driver
Proxy
None of the above
13. The measure used to evaluate the correctness of a product is called the
product:
a. Policy
b. Standard
c. Procedure to do work
d. Procedure to check work
e. Guideline
15. Effective test managers are effective listeners. The type of listening in
which the tester is performing an analysis of what the speaker is saying is
called:
a. Discriminative listening
b. Comprehensive listening
c. Therapeutic listening
d. Critical listening
e. Appreciative listening
17. Which of the following are risks that testers face in performing their
test activities:
a. Not enough training
b. Lack of test tools
c. Not enough time for testing
d. Rapid change
e. All of the above
18. All of the following are methods to minimize loss due to risk. Which one
is not a method to minimize loss due to risk:
a. Reduce opportunity for error
b. Identify error prior to loss
c. Quantify loss
d. Minimize loss
e. Recover loss
21. The defect attribute that would help management determine the
importance of the defect is called:
a. Defect type
b. Defect severity
c. Defect name
d. Defect location
e. Phase in which defect occurred
22. The system test report is normally written at what point in software
development:
a. After unit testing
b. After integration testing
c. After system testing
d. After acceptance testing
30. The following is described as one of the five levels of maturing a new
technology into an IT organization’s work processes. The “People-
dependent technology” level is equivalent to what level in SEI’s
compatibility maturity model:
a. Level 1
b. Level 2
c. Level 3
d. Level 4
e. Level 5
31 : Which term defines the process of project compliance with policies and
procedures?
A. Quality control
B. Quality assurances
C. Quality audits
D. Quality control management
33: Which of the processes includes all activities of the performing organization
that determines policies and responsibilites of a project?
A. Performance quality control
B. Project quality management
C. Performance plan management
D. Quality control management
34: Which of the following are negative possibilities if quality requirements are
not met?
A. Overworking team members and poor product quality
B. Customer complaints and late product
C. Poor quality
D. Termination
35: Which of these terms apply to identifying quality standards and how to
satisfy them?
A. Quality projections
B. Quality management
C. Quality planning
D. Quality overview
Your answer:
Quality Assurance
Quality Control
38. Concerned with all of the products that will ever be produced by a
process (not just one project)
Your answer:
Quality Assurance
Quality Control
Your answer:
Quality Control
Quality Assurance
Your answer:
Quality Control
Quality Assurance
Your answer:
Quality Control
Quality Assurance
42 Concerned with a specific product or project
Your answer:
Quality Control
Quality Assurance
Your answer:
Quality Control
Quality Assurance
44 Verifies whether specific attributes are in, or not in, a specific product
or service.
Your answer:
Quality Assurance
Quality Control
Your answer:
Quality Assurance
Quality Control
Your answer:
Quality Control
Quality Assurance
Your answer:
Quality Assurance
Quality Control
Your answer:
a)Error handling
b)Security testing
c)Static testing
d)Fault based testing
Your answer:
a)best practices
b)correctness
c)maintainability
d)compliance