2024_12_28 LAH HSV-1XST1
2024_12_28 LAH HSV-1XST1
2024_12_28 LAH HSV-1XST1
Saturday 28 Dec Sunday 29 Dec Monday 30 Dec Tuesday 31 Dec Wednesday 01 Jan Thursday 02 Jan Friday 03 Jan
0:00 Shut in well for main PBU 0:00 Shut in well for main PBU 0:00 BHS Flow 0:00 MPLT flow period 0:00 Kill well and unset packer, POOH and L/D tubing 0:00 RIH w/ 5.5" DP X 3.5" DP to 3408m 0:00 POOH
1:00 1:00 1:00 1:00 1:00 1:00 1:00
2:00 2:00 2:00 2:00 2:00 2:00 2:00
3:00 3:00 3:00 3:00 Max flow 3:00 3:00 Circulate bottoms up gas free 3:00
4:00 4:00 4:00 4:00 4:00 4:00 4:00
5:00 5:00 5:00 5:00 5:00 5:00 Pump cement plug #1 5:00
6:00 6:00 6:00 6:00 Kill well and unset packer, POOH and L/D tubing 6:00 6:00 Pull out and circulate out 6:00 Rig up Baker E‐line
7:00 7:00 7:00 MPLT flow period 7:00 7:00 7:00 7:00 Run and set bridge plug
8:00 8:00 8:00 8:00 8:00 8:00 8:00
9:00 9:00 9:00 9:00 9:00 9:00 Pump cement plug #2 9:00
10:00 10:00 10:00 10:00 10:00 10:00 Pull out and circulate out 10:00 Rig down wireline
11:00 11:00 11:00 11:00 11:00 11:00 11:00 Pick up 8.5" Window Mill / Whipstock
12:00 12:00 12:00 12:00 12:00 12:00 12:00
13:00 13:00 13:00 13:00 13:00 13:00 WOC 13:00
14:00 14:00 14:00 14:00 14:00 14:00 14:00 TIH
15:00 15:00 15:00 15:00 15:00 15:00 15:00
16:00 16:00 16:00 16:00 16:00 16:00 16:00
17:00 17:00 17:00 17:00 17:00 17:00 17:00
18:00 18:00 18:00 18:00 18:00 Lay out Jar 18:00 18:00
19:00 19:00 19:00 19:00 19:00 M/U 3.5" DP CMT stinger 19:00 Tag cement and pressure test 19:00
20:00 20:00 20:00 20:00 20:00 20:00 POOH 20:00 Orient Whipstock / Set WS/Release BHA
21:00 21:00 BHS Flow 21:00 21:00 21:00 RIH w/ 5.5" DP X 3.5" DP to 3408m 21:00 21:00
22:00 22:00 22:00 22:00 22:00 22:00 22:00 Mill Window drill and sidetrack hole
23:00 23:00 23:00 23:00 23:00 23:00 23:00
Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig
Coil Tubing Equipment / N2 Equip JDC Equipment PVD Well Test Equipment/ Burner Booms
6" Fishing Tools Rubbish Skip & Hazardous Waste Skip SLB DST Equipment
PBL Sub Basket Round Trip JDC Pipe & Cargo Slickline Equipment
3‐1/2" Tubing & 4‐3/4" DC 3‐1/2" Tubing (After POOH)
Round Trip Cargo TCP Equipment & explosives
(To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig)
On Off On Off On Off On Off On Off On Off On Off
9 JDC Crew Change 9 1 Murphy Logistics Paul/Chet 1
1 Murphy HSE 1 6 JDC 6
Murphy Completion Engineer 1 3 SLB MWD/DD
2 Baker Hughes Whipstock
1 MI Mud Engineer 1
2 Baker Wireline Second Flight
PVD NOV Solids Control 4 PVD Expro Well Test 7
Second Flight SLB Well Test/DST 4
4 PVD Mud Cooler Halliburton TCP 4
Saturday 04 Jan Sunday 05 Jan Monday 06 Jan Tuesday 07 Jan Wednesday 08 Jan Thursday 09 Jan Friday 10 Jan
0:00 Mill Window drill and sidetrack hole 0:00 P/U 8‐1/2" Drilling BHA. TIH 0:00 Drill to coring point 0:00 Drill to coring point 0:00 POOH 0:00 TIH 0:00 TOH slowing down for last 200m
1:00 1:00 1:00 1:00 1:00 1:00 1:00
2:00 2:00 2:00 2:00 2:00 2:00 Core #1 54m 2:00
3:00 3:00 3:00 3:00 3:00 3:00 3:00
4:00 Circulate clean 4:00 4:00 4:00 4:00 4:00 4:00
5:00 5:00 Drill to coring point 5:00 5:00 5:00 5:00 5:00
6:00 Perform LOT 6:00 6:00 6:00 6:00 6:00 6:00
7:00 POOH L/D Window Mill 7:00 7:00 7:00 7:00 7:00 7:00
8:00 8:00 8:00 8:00 8:00 8:00 8:00
9:00 9:00 9:00 9:00 9:00 9:00 9:00
10:00 10:00 10:00 10:00 10:00 10:00 10:00 Lay down core barrels
11:00 11:00 11:00 11:00 11:00 11:00 11:00
12:00 12:00 12:00 12:00 Circulate hole clean 12:00 12:00 12:00
13:00 13:00 13:00 13:00 13:00 13:00 13:00
14:00 14:00 14:00 14:00 14:00 Pick up coring assembly 14:00 14:00 Pick up coring barrels
15:00 15:00 15:00 15:00 POOH 15:00 15:00 15:00
16:00 16:00 16:00 16:00 16:00 16:00 TOH slowing down for last 200m 16:00
17:00 P/U 8‐1/2" Drilling BHA. TIH 17:00 17:00 17:00 17:00 17:00 17:00
18:00 18:00 18:00 18:00 18:00 TIH 18:00 18:00 TIH
19:00 19:00 19:00 19:00 19:00 19:00 19:00
20:00 20:00 20:00 20:00 20:00 20:00 20:00
21:00 21:00 21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 22:00 22:00
23:00 23:00 23:00 23:00 23:00 23:00 23:00
Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig
Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig
Halliburton Coring Equipment
Contingency 7" Liner
(To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig)
On Off On Off On Off On Off On Off On Off On Off
5 Halliburton Coring Crew?? 15 JDC 13 12 JDC 12
1 PVD Mudlogger 1 1 PVD Data Engineer 1
1 SLB MWD/DD
Baker Wireline 3
1 VPI OOC
6 PVD NOV Solids Control
PVD Expro Well Test 4
14 8 0 0 0 0 16 14 0 0 12 12 0 0
POB 132 POB 132 POB 132 POB 134 POB 134 POB 134 POB 134
VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS
SM12 Arriving at rig