2024_12_08 LAH HSV-1XST1

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 2

7 Day Forecast

Well HSV‐1XST1 Max beds on rig 144


Date Sun 8‐Dec‐24 Current POB 131 Max POB next 6 days 145

Sunday 08 Dec Monday 09 Dec Tuesday 10 Dec Wednesday 11 Dec Thursday 12 Dec Friday 13 Dec Saturday 14 Dec
0:00 Drill 6" hole to TD @ 4200m~ 0:00 Drill 6" hole to TD @ 4200m~ 0:00 Drill 6" hole to TD @ 4200m~ 0:00 Drill 6" hole to TD @ 4200m~ 0:00 POOH with BHA ‐ Wiper trip if needed 0:00 R/U Wireline Logging Program , R/D 0:00 R/U Wireline Logging Program , R/D
1:00 1:00 1:00 1:00 1:00 1:00 1:00
2:00 2:00 2:00 2:00 2:00 2:00 2:00
3:00 3:00 3:00 3:00 3:00 3:00 3:00
4:00 4:00 4:00 4:00 4:00 4:00 4:00
5:00 5:00 5:00 5:00 5:00 R/U Wireline Logging Program , R/D 5:00 5:00
6:00 6:00 6:00 6:00 6:00 6:00 6:00
7:00 7:00 7:00 7:00 7:00 7:00 7:00
8:00 8:00 8:00 8:00 8:00 8:00 8:00
9:00 9:00 9:00 9:00 Circ hole clean 9:00 9:00 9:00
10:00 10:00 10:00 10:00 10:00 10:00 10:00
11:00 11:00 11:00 11:00 11:00 11:00 11:00
12:00 12:00 12:00 12:00 12:00 12:00 12:00
13:00 13:00 13:00 13:00 POOH with BHA ‐ Wiper trip if needed 13:00 13:00 13:00
14:00 14:00 14:00 14:00 14:00 14:00 14:00
15:00 15:00 15:00 15:00 15:00 15:00 15:00
16:00 16:00 16:00 16:00 16:00 16:00 16:00
17:00 17:00 17:00 17:00 17:00 17:00 17:00
18:00 18:00 18:00 18:00 18:00 18:00 18:00
19:00 19:00 19:00 19:00 19:00 19:00 19:00
20:00 20:00 20:00 20:00 20:00 20:00 20:00
21:00 21:00 21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 22:00 22:00
23:00 23:00 23:00 23:00 23:00 23:00 23:00
Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig
PVD Mud Cooler
6" BHA Equipment
6" Open Hole Fishing tools

Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig
Expro Pipe work / Iron Package 3‐1/2" PH‐6 DST Tubing
TCP Explosives 4‐3/4" DC's PH‐6
Halliburton TCP/DST/SRO Equipment Boiler / Air Compressors
Lubricator / Flow Head / ESD PDV WS Tubing Running Tools
Casing Scrapers for 7" and 9‐5/8" csg (53.5 lb/ft) Coil Tubing Equipment / N2 Equip
7" Cement Retainer (Bridge Plug) & WL Running tool PVDL Slickline Equip
?? Subject to change due to Operation ?

?? Subject to change due to Operation ?

(To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig)
On Off On Off On Off On Off On Off On Off On Off
12 JDC Crew Change 12 11 JDC Crew Change 11 4 PVD WS Tubing Crew ?
1 Murphy Geologist 1 3 Lindsay‐ Murphy ‐ Kevin & WTS 1
1 PVD Mud Logger 1 1 PVD Mud Logger 1
1 MI Mud Engineer 1 Second Flight
Second Flight 1 PVD NOV 1
1 JDC 2 1 Cement Helper 1
1 PVD NOV 1 1 JDC 2
3 Expro Well Testing ? 2 Expro Well Testing ?
6 Hallb TCP ? MI Swaco Trainee Mud Eng. 1
4 PVDL SLB Well Testing ? 2 Expro Boiler Techs ?
GAET 1 MWD/DD ‐ Chemostrat 5
0 0 0 0 30 19 0 0 22 23 0 0 4 0
POB 131 POB 131 POB 142 POB 142 POB 141 POB 141 POB 145
VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS
SM12 Arrival at rig
8 ‐ 14 Day Forecast
Well HSV‐1XST1 Max beds on rig 144
Date Sun 15‐Dec‐24 Max POB next 6 days 150

Sunday 15 Dec Monday 16 Dec Tuesday 17 Dec Wednesday 18 Dec Thursday 19 Dec Friday 20 Dec Saturday 21 Dec
0:00 R/U Wireline Logging Program , R/D 0:00 RIH w/ 5.5" DP X 3.5" DP to 3600m circ gas out 0:00 POOH 0:00 POOH L/D Clean out BHA 0:00 M/U Rih TCP, DST BHA & string, set packer, Compe 0:00 M/U Rih TCP, DST BHA & string, set packer, Compe 0:00 Clean up flow
1:00 1:00 1:00 P/U TIH w/ Clean out/scraper assy 1:00 1:00 1:00 1:00
2:00 2:00 Pump cement plug #1 2:00 2:00 2:00 2:00 2:00
3:00 3:00 Pull out and circulate out 3:00 3:00 3:00 3:00 3:00
4:00 4:00 4:00 4:00 4:00 4:00 4:00
5:00 5:00 5:00 5:00 5:00 5:00 5:00
6:00 6:00 Pump cement plug #2 6:00 6:00 6:00 6:00 6:00
7:00 7:00 Wash down and circ hole clean (wait on cement, ta 7:00 7:00 7:00 7:00 7:00
8:00 8:00 8:00 8:00 R/U 3‐1/2" Tubing Running tools 8:00 8:00 8:00
9:00 9:00 9:00 9:00 9:00 9:00 9:00
10:00 10:00 10:00 10:00 M/U Rih TCP, DST BHA & string, set packer, Compe 10:00 10:00 Firing TCP guns 10:00
11:00 11:00 11:00 11:00 11:00 11:00 11:00
12:00 12:00 12:00 12:00 12:00 12:00 12:00
13:00 M/U 3.5" DP CMT stinger 1300m long 13:00 13:00 Dress off CMT plug f/ TCP PKR 13:00 13:00 13:00 Initial flow and BPU 13:00
14:00 14:00 14:00 14:00 14:00 14:00 14:00
15:00 15:00 15:00 Circulate and cond to 15.0 ppg SBM 15:00 15:00 15:00 15:00
16:00 16:00 POOH 16:00 16:00 16:00 16:00 16:00
17:00 17:00 17:00 17:00 17:00 17:00 17:00
18:00 RIH w/ 5.5" DP X 3.5" DP to 3600m circ gas out 18:00 18:00 18:00 18:00 18:00 18:00
19:00 19:00 19:00 Tag and pressure cement 19:00 19:00 19:00 Clean up flow 19:00 Contingent N2 liftings Coil Tubing ?
20:00 20:00 20:00 POOH L/D Clean out BHA 20:00 20:00 20:00 20:00 Main flow
21:00 21:00 21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 22:00 22:00
23:00 23:00 P/U TIH w/ Clean out/scraper assy 23:00 23:00 23:00 23:00 23:00
Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig

Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig Equipment AT Rig

(To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig) (To Rig) CREWCHANGE (From Rig)
On Off On Off On Off On Off On Off On Off On Off
4 PVD Logging Slickine ? 14 JDC Crew Change 13 7 JDC Crew Change 7
1 SLB Cementer 1 1 Jason ‐ Murphy ‐ Adrian 1 1 PVD NOV 1
2 PVD Mud Logger 2

5 1 0 0 17 16 0 0 8 8 0 0 0 0
POB 149 POB 149 POB 150 POB 150 POB 150 POB 150 POB 150
VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS VESSELS