Name of the Job Site: GMP Package-3B Project, Gurugram(HR)-IKEA STORE Date:21.10.24
Activity/ Facility/ Equipment/ Substance*: Hira for the Installation of Conduit Ref. No:LTC/IKEA/JCI/HIRA/RA-012, REV-00
I have read and understood the contents (communicated down the line)
Understood and agree to
Hira Team members Prepared by with the involvement of ---- (workmen representatives names/ s/c names, etc.,) Reviewed by (Respective seniors) Approved by
comply
Staff:
Vikram Prajapati ( Sr project engineer)
Sanjay Kumar(Quality Manager)
Bitu Tiwari (HSE Manager)
Workmen representative (S/C): Soumen Das Vikram
Name & role: Soumen das (Project Manager) Soumen Das (Project Manager)
Bitu Tiwari (EHS manager ) Prajapati
Jitesh Yadav (Safety Officer )
Signature
Anticipated
Probability
Population
Severity
/Impact
Rating
Rating
at risk
Level
Risk
Risk
Sl No Sub activity Hazard Hazardous Event Possible Outcome Existing Control Measure Additional Control Measures Action By
Admin:
1.Work permit should be taken before start the work .
Admin-
1.Site Driving safety rule should be followed.
2.Speed limit should not be more than10KMPH.
3.Competent Driver only to drive the Vehicle.
4.Check the license of the Driver.
5.Breat analyser test shall be done on routine basis /when ever its Required for all
Engg
1.Ensure RPM of wheel used more than the RPM of Grinder machine.
2.Expiry date to be ensure in grinding wheel.
3.All power connection Routed through MCCB/RCCB.
Admin:-
1.Cable /cable drum stored only designated area with signage and tag
2.Materail shall be stack properly.
3.stacking area shall be barricade.
1.Excessive Height 1. Fall of material
1.Personal injury 4.Keep the proper distance between Material.
Helper
Page: 1 of 4
Anticipated
Probability
Population
Severity
/Impact
Rating
Rating
at risk
Level
Risk
Risk
Sl No Sub activity Hazard Hazardous Event Possible Outcome Existing Control Measure Additional Control Measures Action By
Engg:
1.Ensure unauthorized person not allowed to modify the scaffolding and if needed
for any change then must be modified by trained and certified scaffolder.
3.Ensure Full body harness and 100% Tie off above 1.8 m height .
Engg:-
by personnels
1.Fire 1.Burn injury 4.Good housekeeping will be maintained at workplace.
1.Fire due to combustible Material
General hazards oriented due 2.Poor Housekeeping 2.Property Damage 6 5.All material will be place at designated workplace 3
7 2.Slip /Trip 2 3 Nil Site In charge/ Site Engineer/HSEO
to activity 3.Incompetent operation 3.ill Health (M) 6.Activity shall be performed in day light only. (L)
3.Unauthorized Activity
4.Excessive working hours 7.scarpe shall be disposed site through authorized vendor.
PPE
8.Ensure usages of appropriate ppes like Helmet ,Jacket ,safety shoes goggles,
Nose mask.
Op: Opportunity for Elimination & Substitution, Er – Engineering Control, Ad & PPE – Administrative control and Personal Protective Equipment
Page: 2 of 4
Severity
No medical Illness
Illness requiring
treatment or requiring
Medical
measurable hospital
Treatment
physical effects admission
Injury requiring
First aid treatment Medical Lost Time
Only Treatment but not Accident
lost time
Likelihood 1 2 3
Most Never heard of in construction
Unlikely industry 1 1 2 3
4 5
4 5
8 10
12 15
16 20