DAR Format
DAR Format
DAR Format
IMPORTANT NOTICE
Before you move to date sheet please fill information in above "Employee information" table
Example as below…
Name :- xyz
Designation :- abc
Employee Code :- 1234
Department :- HPWD
Supervisor :- XYZ
Designation :- ABC
Month :- June, 2017
Month Start Date :- 01-June-17 (Please enter start Date only)
Branch :- Sigma
Monthly Planner
1 Monthly planner to be planned & filled for next month, which will automatically get captured on a daily basis in your DAR
2 Monthly planner must be submitted by 2nd of every month to their individual supervisor and Cc to HOD
3 Supervisors to monitor their team members (individual) monthly planner and can make corrections if necessary
1 You must plan tomorrow activity by today evening before you leave
2 You have to submit your tomorrow activity plan to your superior and dar_kathwada@doshion.com mail id before leaving office every day
You should not edit your plan activity on the same day however due to any imergency or a surprise if you are unable to complete your planned activity as per schedule then you
3
can provide that information in "STATUS / REMARKS/ADDITIONAL WORK(IF ANY)" column and put respective time in "Actual Time Spent" column.
4 Everybody are expected to plan their work activity up to 480 minute and not more so as to complete the work in time and avoid late hours
7 In column "E" you have to write actual spent time against your planned time.
8 Once you update the DAR - MIS will be automatically updated for monthly report.
MIS - Monthly
1 MIS will automatically get updated as per your daily activities in DAR. No need to fill MIS seperately.
3 You cannot edit MIS except Leave/ Tour/ Holidays. You need to update the leave/Tour/Holidays with necessary remarks
4 You must submit your MIS after monitoring & updating necessary remarks. Last date of submitting MIS is 03rd of everymonth.
2 You need to mention your supervisors observations & suggestions for corrective measures as per the MOM you receive after the meeting/review.
PROJECTS
GET / TRAINEE ENGINEER /
SR.MANAGER / MANAGER ASST. MANAGER E&I ENGINEER
ENGINEER SR.ENGINEER
Site Visit Follow Up Material Procurement Material Procurement Material Procurement
Follow Up Site Visit / Dispatch ERP / Documentation ERP / Documentation ERP / Documentation
Review (Internal) ERP / Documentation Dispatch / Follow Up Dispatch / Follow Up Dispatch / Follow Up
ENGINEERING
ASST.MANAGER ASST.MANAGER
SR.MANAGER DESIGN ENGINEER
(PLANNING) (DESIGNING)
Document / Design
ERP / BOQ Designing / Checking Designing / Checking
Checking
Site Support / Technical
Documentation Documentation Documentation
Support
Microbial / WTP Supporting Supporting Activity Supporting Activity
E&I ENGINEER VALIDATION ENGINEER MICROBIAL CAD ENGINEER
Documentation /
Documentation WTP Microbial Drawing / Corrections
Preparation
Checking Checking Client Microbial Status 3D Modelling
Supporting Activity Supporting Activity Supporting Activity Supporting Activity
COMMERCIAL PURCHASE
SR.EXECUTIVE / SR.EXECUTIVE /
MANAGER SR.MANAGER / MANAGER
EXECUTIVE EXECUTIVE
Negotiations / Deals Negotiations / Deals
11 Point Agenda 11 Point Agenda
Closed / Offer Floated Closed / Offer Floated
ERP System ERP System Follow Up - Material Due Follow Up - Material Due
Invoicing / Planning Invoicing / Planning PO / PRN PO / PRN
DOSHION WATER SOLUTION
MONTHLY PLANNER
MONTH June, 2017 Akanksha Singh Nazneen Madam
EMPLOYEE HOD
DEPT HR Hr Exeutive HR Head
June, 2017
Monday Tuesday Wednesday Thursday Friday Saturday Sunday
1 2 3 4
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Now Start
updating
DAR from
Tomorrow's
Activity
below (i.e.
1-12-2011)
Others /Training
TOTAL 20 0
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 0
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 1-Jun-17 480 480 Dept HR
Time Spare 0 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Walk in Interview with HR 200
Digitally Sacnning of Joining Documents 120
0 Coordination with Candidate for Account 30
Email Communication 30
60
Coordination with Sujit Sir regarding Project interview 20
Meeting (Int/Ext)
Others /Training
TOTAL 480 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 2-Jun-17 480 480 Dept HR
Time Spare 0 30
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR
Email Communication 20 Attendance Vrerification
- 30 Arranging interviews of naukri Portal
- 180 Schedule Interviews of Accounts
0 - 30 Candidate follow up regarding joining
- 30 Print out of Employment Application form
- 60 E-mail Check
- 20 Meeting with Sujit Sir
Meeting (Int/Ext) - - - 60 Entering Details of Candidate
- - - 20 DAR Form Fill up
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL - 450
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Walk in Interview with HR 200
Digitally Sacnning of Joining Documents 120
0 Coordination with Candidate for Account 30
Email Communication 30
60
Coordination with Sujit Sir regarding Project interview 20
Meeting (Int/Ext)
Others /Training
TOTAL 480 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 3-Jun-17 480 480 Dept HR
Time Spare 460 260
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20 20
Email Communication Email Communication -
Walk in Interview with HR - 200 200
Digitally Sacnning of Joining Documents - 120
0 Coordination with Candidate for Account - 30
Email Communication - 30
- - 60
Coordination with Sujit Sir regarding Project interview - 20
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 480 220
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 4-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 5-Jun-17 480 480 Dept HR
Time Spare 460 135
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20 20
Email Communication Email Communication - 30 E-mail
- - - 30 Interview taken of HR
- - - 120 Mail Segeration
0 - - - 20 fill Asset Requisition Form - Dilip Tiwari & Jaywant Bhange
- - - 15 follow up Candidate regarding joining - Saujanya Desai
I-Card follow with
- - - 10
vendors
- - - 20 Coordination with Dilip Tiwari regarding Leave
Meeting (Int/Ext) - - - 5 Stationery Req form
- - - 30 Print out of Rect sheets
- - - 30 flle check
- - - 15 Coordination with Ram Sir regading data of inteview.
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 345
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 6-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 7-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 8-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 9-Jun-17 480 480 Dept HR
Time Spare 460 180
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN
Scan of Documents-30
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20 20
Email Communication Email Communication - 20
- - - 30 Scan of Doc
- - - 60 Filing Check
0 - - - 30 Coordination with jugal Trivedi
- - - 10 follow up with joining candidate
- - - 60 Maintan Excel shhet of Account details of Excel
- - - 10 checking Salary of pentaaqua
Meeting (Int/Ext) - - - 60 Employee ID card separate file made
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 300
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 10-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 11-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 12-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 13-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 14-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 15-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 16-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 17-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 18-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 19-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 20-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 21-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 22-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 23-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 24-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 25-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 26-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 27-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 28-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 29-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 30-Jun-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DAILY ACTIVITY REPORT
Name Akanksha Singh Approx Time Req Total Time Taken Designation Hr Exeutive
Today's Date 1-Jul-17 480 480 Dept HR
Time Spare 460 480
TODAY'S
CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
ACTIVITY / WORK PLAN -
-
-
Planned Activities -
-
-
-
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication -
- - -
- - -
0 - - -
- - -
- - -
- - -
Meeting (Int/Ext) - - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
0 - - -
- - -
- - -
- - -
- - -
- - -
Others /Training - - -
- - -
- - -
- - -
TOTAL 20 -
TOMORROW'S ACTIVITY / WORK PLAN CUSTOMER PLANNED TIME ACTUAL TIME STATUS / REMARKS/ADDITIONAL WORK (IF ANY)
DAR Daily Activity Report Filling / Tomorrow activity planing 20
Email Communication Email Communication
Meeting (Int/Ext)
Others /Training
TOTAL 20 -
Note - 1 In Planned Time column, Mention total minutes required. For example: 1 hour-60, 2 hours-120, half hour-30. ( DO NOT WRITE MINUTES IN IT)
Note - 2 The time required for email communication is 30-45 minutes
RED CELL
DOSHION WATER SOLUTION
MANAGEMENT INFORMATION SYSTEM (MIS)
MONTH June, 2017 NAME Akanksha Singh NAME Nazneen Madam
EMPLOYEE HOD
DEPT HR DESIGNATION Hr Exeutive DESIGNATION HR Head
ACTIVITIES PERFORMED
Planned Time Actual Time Planned Time Actual Time Planned Time Actual Time Planned Time Actual Time Planned Time Actual Time Planned Time Actual Time Planned Time Actual Time
1-Jun-17 - 20 - - - - - - - - - - - - - -
4-Jun-17 - 20 - - - - - - - - - - - - - -
5-Jun-17 1 20 20 - 30 - 195 - 55 - 45 - - - - 6
6-Jun-17 - 20 - - - - - - - - - - - - - -
7-Jun-17 - 20 - - - - - - - - - - - - - -
8-Jun-17 - 20 - - - - - - - - - - - - - -
9-Jun-17 1 20 20 - 20 - 190 - 70 - - - - - - 5
10-Jun-17 - 20 - - - - - - - - - - - - - -
11-Jun-17 - 20 - - - - - - - - - - - - - -
12-Jun-17 - 20 - - - - - - - - - - - - - -
13-Jun-17 - 20 - - - - - - - - - - - - - -
14-Jun-17 - 20 - - - - - - - - - - - - - -
15-Jun-17 - 20 - - - - - - - - - - - - - -
16-Jun-17 - 20 - - - - - - - - - - - - - -
17-Jun-17 - 20 - - - - - - - - - - - - - -
18-Jun-17 - 20 - - - - - - - - - - - - - -
19-Jun-17 - 20 - - - - - - - - - - - - - -
20-Jun-17 - 20 - - - - - - - - - - - - - -
21-Jun-17 - 20 - - - - - - - - - - - - - -
22-Jun-17 - 20 - - - - - - - - - - - - - -
23-Jun-17 - 20 - - - - - - - - - - - - - -
24-Jun-17 - 20 - - - - - - - - - - - - - -
25-Jun-17 - 20 - - - - - - - - - - - - - -
26-Jun-17 - 20 - - - - - - - - - - - - - -
27-Jun-17 - 20 - - - - - - - - - - - - - -
28-Jun-17 - 20 - - - - - - - - - - - - - -
29-Jun-17 - 20 - - - - - - - - - - - - - -
30-Jun-17 - 20 - - - - - - - - - - - - - -
1-Jul-17 - 20 - - - - - - - - - - - - - -
TOTAL 3 600 60 - 70 440 915 20 225 - 45 - - - - 22 - - - -
Note 1 Working can be counted as - 1 and Sunday, Holiday, Leave shall be counted as - 0.
Note 2 Highlight Holiday, Transit and leave in their respective columns in the form of 0 / 1.
Note 3 Counter 0 :- No, 1 :- Yes, H :- Holiday, T :- Transit, L :- Leave
Prepared By Checked By Approved By
Akanksha Singh Nazneen Madam Nazneen Madam
DOSHION WATER SOLUTION
MINUTES OF MEETING (MOM)
MONTH June, 2017 NAME Akanksha Singh NAME Nazneen Madam
EMPLOYEE HOD
DEPT HR DESIGNATION Hr Exeutive DESIGNATION HR Head
Review Date Subject Immediate Supervisor's Observations Suggestions for Corrective Measures Next Review Date
1-Jun-17 - - -
2-Jun-17 - - -
Coordination with Sujit Sir
3-Jun-17 regarding Project interview
- -
4-Jun-17 - - -
5-Jun-17 - - -
6-Jun-17 - - -
7-Jun-17 - - -
8-Jun-17 - - -
9-Jun-17 - - -
10-Jun-17 - - -
11-Jun-17 - - -
12-Jun-17 - - -
13-Jun-17 - - -
14-Jun-17 - - -
15-Jun-17 - - -
16-Jun-17 - - -
17-Jun-17 - - -
18-Jun-17 - - -
19-Jun-17 - - -
20-Jun-17 - - -
21-Jun-17 - - -
22-Jun-17 - - -
23-Jun-17 - - -
24-Jun-17 - - -
25-Jun-17 - - -
26-Jun-17 - - -
27-Jun-17 - - -
28-Jun-17 - - -
29-Jun-17 - - -
30-Jun-17 - - -
Note 1 Please fill up this sheet when HOD is reviewing the MIS.
Prepared By Checked By Approved By
Akanksha Singh Nazneen Madam Nazneen Madam