Problemario-U5 2
Problemario-U5 2
Problemario-U5 2
1 1.25 C
2 1.5 110
3 2
4 3 Q (L/min) Q (m3/s)
5 4 130 0.0021666667
6 6
7 8 L (M)
8 10 1000
Diam (in) Diam (m) Long (m) Area (m2) Q (m3/s) Vel (m/s)
1.25 0.03175 1000 0.00079 0.00216 2.73417
1.5 0.0381 1000 0.00114 0.00216 1.89473
2 0.0508 1000 0.00202 0.00216 1.0693
2.5 0.0635 1000 0.00316 0.00216 0.68354
3 0.0762 1000 0.00456 0.00216 0.47368
4 0.1016 1000 0.0081 0.00216 0.26666
6 0.1524 1000 0.01824 0.00216 0.11842
8 0.2032 1000 0.03242 0.00216 0.06662
10 0.254 1000 0.05067 0.00216 0.04262
R H perd (m) COSTO ML USD COSTO TUBERIA MX H total Pot Bomba (HP) Teorica
0.00793 408.03823 2.67 56070 508.03823 10.43718
0.00952 167.16686 3.55 74550 267.16686 4.27595
0.0127 41.40319 5.49 115290 141.40319 1.05905
0.01587 13.93962 8.02 168420 113.93962 0.35656
0.01905 5.71152 11.9 249900 105.71152 0.14609
0.0254 1.40897 19.63 412230 101.40897 0.03603
0.0381 0.19526 42.61 894810 100.19526 0.00499
0.0508 0.0481 72.05 1513050 100.0481 0.00123
0.0635 0.01621 111.98 2351580 100.01621 0.00041
ALT BOMBEO (M)
100
USD MX
EFICIENCIA (%) 1 21
90 0.9
in m
PESO ESPECIFICO 1 0.0254
AGUA 1000