Process flow diagram Traces the flow of materials through a process (assembly line). Capacity Maximum rate of output from the process, and is measured in units of output per unit of time Bottleneck An operation that has the lowest effective capacity of any operation in the production system and thus limits the systems output. Cycle time (at a station) The time to produce a given number of units at that station (e.g. 1 hour for 5 cars). Manufacturing lead time The time it takes one unit (or batch) of product to go through the entire empty assembly line from start to finish. Utilization Is the ratio of the input the process actually used in creating the output to the amt of that input available for use. Capacity Utilization Is ratio of capacity actually used (i.e., the output of the process) to the total capacity available
2. What is the cycle time of the 1st baking line? The 2nd?
Figure 2
Proof
Bake
Work in Process
Finished Goods
1. What is the cycle time for the entire baking line operation?
Options: The bakery is considering replacing some of its existing equipment with more advanced and faster equipment. The choice is between: (i) purchasing two new ovens that are each capable of baking a batch of 100 loaves in hour, or (ii) purchasing a new packaging line that is capable of packaging a batch of 100 loaves in hour. Which option would allow the greatest increase in the bakerys overall capacity? What is the new overall daily capacity?
Work in Process: Dough Fill & Fold CT: 5 min/50 croissants Finished Goods Bake CT: 20 min/50 croissants Pack CT: 10 min/50 croissants
2. What is the cycle time of the combined dough making and mixing filling operations? 3. What is the cycle time of the entire croissant making process? 4. What is the overall daily capacity? 5. What is the manufacturing lead time of the croissant making process?
Figure 5
Mix Proof Roll & Cut Mix Filling Fill & Fold Bake Pack 5 10 20 30 40 TIME 50 60 70 80
Batch #1
Batch #2
Sanding
4 min./unit
Drilling
12 min./unit
Measuring
8 min./unit
Line 1 Sawing
10 min./unit
Finishing
2 min./unit
Sanding
4 min./unit
Drilling
12 min./unit
Line 2