Transformer Sizing Report for RMP-2

The document outlines the transformer sizing calculations for the Petron RMP-2 Project in Limay, Bataan, Philippines. It includes detailed specifications for various transformers, their capacities, and load summaries, indicating the calculated and selected capacities along with remarks on capacitor usage. The report is a comprehensive summary of transformer requirements for the project's electrical infrastructure.

Uploaded by

tommy yumol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views15 pages

Transformer Sizing Report for RMP-2

The document outlines the transformer sizing calculations for the Petron RMP-2 Project in Limay, Bataan, Philippines. It includes detailed specifications for various transformers, their capacities, and load summaries, indicating the calculated and selected capacities along with remarks on capacitor usage. The report is a comprehensive summary of transformer requirements for the project's electrical infrastructure.

Uploaded by

tommy yumol
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

Refinery Master Plan 2 (RMP-2) Project

Petron Corporation-Refining Division,


Limay, Bataan, Philippines CALCULATION FOR TRANSFORMER SIZING
Contract No. : BP11-0009 RMP2-C-02-00-3001
Contractor Job No. : 100481 Rev. D

CALCULATION FOR TRANSFORMER SIZING

AS-BUILT

D May.30.2014 AS-BUILT [Link] [Link] [Link]


Revision with
C Apr.1.2013 [Link] [Link] [Link]
Final load list
For
B Sep.26.2012 [Link] [Link] [Link]
Construction
A Dec.15.2011 For Approval [Link] [Link] [Link]

0 Aug.29.2011 For Approval [Link] [Link] [Link]

Prepared Cheched Approved Accepted & Date


Rev. Date Description
by by by PM Client
TRANSFORMER SIZING SUMMARY REPORT
PROJECT NAME :PETRON RMP-2 Project

Date : 14.05.30

Primary Secondary Transformer Capacity


Bus Connection Bus Connection
Transformer Selected Capacity A/B
S/S NO Calculated Capacity Remark
Tag No (OA BASE) (OA BASE)
Bus Volt. Bus Volt.
Bus No. Bus No.
[kV] [kV] A [kVA] B [kVA] [%]

1 TR-2A01A/B 34.5KV MAIN SUB 34.5[kV] MV-2A01A/B 4.16[kV] 12,057 [kVA] 15,000 [kVA] 80 [%] With 1,500×2 KVAR Capacitor

2 TR-2A02A/B 34.5KV MAIN SUB 34.5[kV] MV-2A02A/B 4.16[kV] 6,057 [kVA] 12,000 [kVA] 50 [%] With 900×2 KVAR Capacitor

3 TR-2A03A/B MV-2A01A/B 4.16[kV] LV-2A01A/B 0.48[kV] 1,771 [kVA] 2,500 [kVA] 71 [%]
2A
4 TR-2A04A/B MV-2A01A/B 4.16[kV] LV-2A02A/B 0.48[kV] 1,628 [kVA] 2,500 [kVA] 65 [%]

5 TR-2A05A/B MV-2A01A/B 4.16[kV] LV-2A03A/B 0.48[kV] 1,676 [kVA] 2,500 [kVA] 67 [%]

6 TR-2A06A/B MV-2A01A/B 4.16[kV] LV-2A04A/B 0.48[kV] 1,110 [kVA] 2,500 [kVA] 44 [%]

1 TR-2B01A/B 34.5KV MAIN SUB 34.5[kV] MV-2B01A/B 4.16[kV] 12,429 [kVA] 15,000 [kVA] 83 [%] With 1,500×2 KVAR Capacitor

2B 2 TR-2B02A/B MV-2B01A/B 4.16[kV] LV-2B01A/B 0.48[kV] 1,297 [kVA] 2,500 [kVA] 52 [%]

3 TR-2B03A/B MV-2B01A/B 4.16[kV] LV-2B02A/B 0.48[kV] 1,506 [kVA] 2,500 [kVA] 60 [%]

1 TR-2C01A/B 34.5KV MAIN SUB 34.5[kV] MV-2C01A/B 4.16[kV] 12,113 [kVA] 15,000 [kVA] 81 [%] With 1,500×2 KVAR Capacitor

2 TR-2C02A/B MV-2A01A/B 4.16[kV] LV-2A01A/B 0.48[kV] 1,415 [kVA] 2,500 [kVA] 57 [%]

3 TR-2C03A/B MV-2A01A/B 4.16[kV] LV-2A02A/B 0.48[kV] 1,818 [kVA] 2,500 [kVA] 73 [%]
2C
4 TR-2C04A/B MV-2A01A/B 4.16[kV] LV-2A03A/B 0.48[kV] 1,761 [kVA] 2,500 [kVA] 70 [%]

5 TR-2C05A/B MV-2A01A/B 4.16[kV] LV-2A04A/B 0.48[kV] 1,667 [kVA] 2,500 [kVA] 67 [%]

6 TR-2C06A/B MV-2A01A/B 4.16[kV] LV-2A05A/B 0.48[kV] 1,927 [kVA] 2,500 [kVA] 77 [%]

1 TR-2D01A/B 34.5KV MAIN SUB 34.5[kV] MV-2D01A/B 4.16[kV] 15,181 [kVA] 20,000 [kVA] 76 [%] With 1,500×2 KVAR Capacitor

2 TR-2D02A/B MV-2D01A/B 4.16[kV] LV-2D01A/B 0.48[kV] 982 [kVA] 2,500 [kVA] 39 [%]

3 TR-2D03A/B MV-2D01A/B 4.16[kV] LV-2D02A/B 0.48[kV] 1,696 [kVA] 2,500 [kVA] 68 [%]
2D
4 TR-2D04A/B MV-2D01A/B 4.16[kV] LV-2D03A/B 0.48[kV] 1,564 [kVA] 2,500 [kVA] 63 [%]

5 TR-2D05A/B MV-2D01A/B 4.16[kV] LV-2D04A/B 0.48[kV] 1,680 [kVA] 2,500 [kVA] 67 [%]

6 TR-2D06A/B MV-2D01A/B 4.16[kV] LV-2D05A/B 0.48[kV] 1,706 [kVA] 2,500 [kVA] 68 [%]

1 TR-2E01A/B 34.5KV MAIN SUB 34.5[kV] MV-2E01A/B 4.16[kV] 4,905 [kVA] 7,000 [kVA] 70 [%] With 900×2 KVAR Capacitor
2E
2 TR-2E02A/B MV-2E01A/B 4.16[kV] LV-2E01A/B 0.48[kV] 2,323 [kVA] 2,500 [kVA] 93 [%]

2/15
TRANSFORMER SIZING SUMMARY REPORT
PROJECT NAME :PETRON RMP-2 Project

Date : 14.05.30

Primary Secondary Transformer Capacity


Bus Connection Bus Connection
Transformer Selected Capacity A/B
S/S NO Calculated Capacity Remark
Tag No (OA BASE) (OA BASE)
Bus Volt. Bus Volt.
Bus No. Bus No.
[kV] [kV] A [kVA] B [kVA] [%]

1 TR-2F01A/B OSBL 34.5[kV] MV-2F01A/B 4.16[kV] 8,167 [kVA] 12,000 [kVA] 68 [%] With 900×2 KVAR Capacitor

2F 2 TR-2F02A/B 34.5KV MAIN SUB 34.5[kV] MV-2F02A/B 4.16[kV] 9,634 [kVA] 12,000 [kVA] 80 [%] INCLUDING EXISTING S/S "S" MV LOADS

3 TR-2F03A/B MV-2F01A/B 4.16[kV] LV-2F01A/B 0.48[kV] 1,557 [kVA] 2,500 [kVA] 62 [%]

2G 1 TR-2G01A/B MV-2B01A/B 4.16[kV] LV-2G01A/B 0.48[kV] 2,476 [kVA] 2,500 [kVA] 99 [%]

2H 1 TR-2H01A/B MV-2A01A/B 4.16[kV] LV-2H01A/B 0.48[kV] 1,132 [kVA] 2,000 [kVA] 57 [%] DRY TYPE

2I 1 TR-2I01A/B MV-2I01A/B 4.16[kV] LV-2I01A/B 0.48[kV] 794 [kVA] 2,000 [kVA] 40 [%] INCLUDING EXISTING S/S "I", "U" MV LOADS

OMS 1 TR-OMS01A/B MV-OMS01A/B 4.16[kV] LV-OMS01A/B 0.48[kV] 1,526 [kVA] 2,000 [kVA] 76 [%]

1 TR-A01A/B MV-A01A/B 4.16[kV] LV-A01A/B 0.48[kV] 1,021 [kVA] 2,000 [kVA] 51 [%]
A
2 TR-A02A/B MV-A01A/B 4.16[kV] LV-A02A/B 0.48[kV] 1,283 [kVA] 2,000 [kVA] 64 [%]

3/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2A)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2A01A/B MA-0001A 34.5[kV] MV-2A01A 4.16[kV] 5,356 2,449 5,890 Excluding 1500kVAR Capacitor

MA-0001B 34.5[kV] MV-2A01B 4.16[kV] 4,969 3,777 6,242 Excluding 1500kVAR Capacitor

BUS A/B SUMMARY 10,325 6,226 12,057 15,000 18,750 80.4%

2 TR-2A02A/B MA-0001A 34.5[kV] MV-2A02A 4.16[kV] 2,503 1,569 2,954 Excluding 900kVAR Capacitor

MA-0001B 34.5[kV] MV-2A02B 4.16[kV] 2,596 1,700 3,103 Excluding 900kVAR Capacitor

BUS A/B SUMMARY 5,099 3,269 6,057 12,000 15,000 50.5%

3 TR-2A03A/B MV-2A01A 4.16[kV] LV-2A01A 0.48[kV] 920 612 1,105

MV-2A01B 4.16[kV] LV-2A01B 0.48[kV] 579 331 667

BUS A/B SUMMARY 1,499 943 1,771 2,500 3,125 70.8%

4 TR-2A04A/B MV-2A01A 4.16[kV] LV-2A02A 0.48[kV] 1,136 0 1,136

MV-2A01B 4.16[kV] LV-2A02B 0.48[kV] 457 336 567

BUS A/B SUMMARY 1,593 336 1,628 2,500 3,125 65.1%

5 TR-2A05A/B MV-2A01A 4.16[kV] LV-2A03A 0.48[kV] 830 455 946

MV-2A01B 4.16[kV] LV-2A03B 0.48[kV] 620 386 731

BUS A/B SUMMARY 1,450 840 1,676 2,500 3,125 67.0%

6 TR-2A06A/B MV-2A01A 4.16[kV] LV-2A04A 0.48[kV] 411 245 478

MV-2A01B 4.16[kV] LV-2A04B 0.48[kV] 521 358 632

BUS A/B SUMMARY 931 603 1,110 2,500 3,125 44.4%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

4/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2B)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2B01A/B INCOMING BUS 34.5[kV] MV-2B01A 4.16[kV] 4,813 2,815 5,576 Excluding 1500kVAR Capacitor

INCOMING BUS 34.5[kV] MV-2B01B 4.16[kV] 6,383 2,584 6,886 Excluding 1500kVAR Capacitor

BUS A/B SUMMARY 11,196 5,399 12,429 15,000 18,750 82.9%

2 TR-2B02A/B MV-2B01A 4.16[kV] LV-2B01A 0.48[kV] 588 390 705

MV-2B01B 4.16[kV] LV-2B01B 0.48[kV] 500 316 592

BUS A/B SUMMARY 1,088 706 1,297 2,500 3,125 51.9%

3 TR-2B03A/B MV-2B01A 4.16[kV] LV-2B02A 0.48[kV] 541 392 669

MV-2B01B 4.16[kV] LV-2B02B 0.48[kV] 700 461 838

BUS A/B SUMMARY 1,241 853 1,506 2,500 3,125 60.2%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

5/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2C)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2C01A/B INCOMING BUS 34.5[kV] MV-2C01A 4.16[kV] 5,329 3,144 6,187 Excluding 1500kVAR Capacitor

INCOMING BUS 34.5[kV] MV-2C01B 4.16[kV] 4,871 3,391 5,935 Excluding 1500kVAR Capacitor

BUS A/B SUMMARY 10,200 6,534 12,113 15,000 18,750 80.8%

2 TR-2C02A/B MV-2C01A 4.16[kV] LV-2C01A 0.48[kV] 484 292 565

MV-2C01B 4.16[kV] LV-2C01B 0.48[kV] 719 453 850

BUS A/B SUMMARY 1,203 745 1,415 2,500 3,125 56.6%

3 TR-2C03A/B MV-2C01A 4.16[kV] LV-2C02A 0.48[kV] 749 439 869

MV-2C01B 4.16[kV] LV-2C02B 0.48[kV] 816 486 950

BUS A/B SUMMARY 1,566 925 1,818 2,500 3,125 72.7%

4 TR-2C04A/B MV-2C01A 4.16[kV] LV-2C03A 0.48[kV] 804 473 933

MV-2C01B 4.16[kV] LV-2C03B 0.48[kV] 714 419 828

BUS A/B SUMMARY 1,518 892 1,761 2,500 3,125 70.4%

5 TR-2C05A/B MV-2C01A 4.16[kV] LV-2C04A 0.48[kV] 726 471 866

MV-2C01B 4.16[kV] LV-2C04B 0.48[kV] 665 447 801

BUS A/B SUMMARY 1,391 918 1,667 2,500 3,125 66.7%

6 TR-2C06A/B MV-2C01A 4.16[kV] LV-2C05A 0.48[kV] 1,027 246 1,056

MV-2C01B 4.16[kV] LV-2C05B 0.48[kV] 757 482 898

BUS A/B SUMMARY 1,784 727 1,927 2,500 3,125 77.1%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

6/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2D)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2D01A/B INCOMING BUS 34.5[kV] MV-2D01A 4.16[kV] 5,190 3,110 6,050 Excluding 1500kVAR Capacitor

INCOMING BUS 34.5[kV] MV-2D01B 4.16[kV] 7,892 4,593 9,131 Excluding 1500kVAR Capacitor

BUS A/B SUMMARY 13,082 7,702 15,181 20,000 25,000 75.9%

2 TR-2D02A/B MV-2D01A 4.16[kV] LV-2D01A 0.48[kV] 373 221 433

MV-2D01B 4.16[kV] LV-2D01B 0.48[kV] 465 291 549

BUS A/B SUMMARY 838 512 982 2,500 3,125 39.3%

3 TR-2D03A/B MV-2D01A 4.16[kV] LV-2D02A 0.48[kV] 871 480 994

MV-2D01B 4.16[kV] LV-2D02B 0.48[kV] 597 369 702

BUS A/B SUMMARY 1,468 849 1,696 2,500 3,125 67.8%

4 TR-2D04A/B MV-2D01A 4.16[kV] LV-2D03A 0.48[kV] 643 400 757

MV-2D01B 4.16[kV] LV-2D03B 0.48[kV] 707 388 807

BUS A/B SUMMARY 1,351 788 1,564 2,500 3,125 62.5%

5 TR-2D05A/B MV-2D01A 4.16[kV] LV-2D04A 0.48[kV] 731 471 870

MV-2D01B 4.16[kV] LV-2D04B 0.48[kV] 687 430 810

BUS A/B SUMMARY 1,418 901 1,680 2,500 3,125 67.2%

6 TR-2D06A/B MV-2D01A 4.16[kV] LV-2D05A 0.48[kV] 793 516 946

MV-2D01B 4.16[kV] LV-2D05B 0.48[kV] 638 413 760

BUS A/B SUMMARY 1,431 929 1,706 2,500 3,125 68.2%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

7/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2E)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2E01A/B INCOMING BUS 34.5[kV] MV-2E01A 4.16[kV] 2,015 1,199 2,344 Excluding 900kVAR Capacitor

INCOMING BUS 34.5[kV] MV-2E01B 4.16[kV] 2,207 1,297 2,560 Excluding 900kVAR Capacitor

BUS A/B SUMMARY 4,222 2,496 4,905 7,000 8,750 70.1%

2 TR-2E02A/B MV-2E01A 4.16[kV] LV-2E01A 0.48[kV] 782 553 958

MV-2E01B 4.16[kV] LV-2E01B 0.48[kV] 1,121 779 1,365

BUS A/B SUMMARY 1,903 1,332 2,323 2,500 3,125 92.9%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

8/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2F)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2F01A/B OSBL 34.5[kV] MV-2F01A 4.16[kV] 4,140 2,253 4,713 Excluding 900kVAR Capacitor

OSBL 34.5[kV] MV-2F01B 4.16[kV] 3,010 1,693 3,454 Excluding 900kVAR Capacitor

BUS A/B SUMMARY 7,150 3,946 8,167 12,000 15,000 68.1% POWER FED FROM OSBL 34.5KV S/S

2 TR-2F02A/B MV-0001A 34.5[kV] MV-2F02A 4.16[kV] 5,311 3,526 6,375

MV-0001B 34.5[kV] MV-2F02B 4.16[kV] 2,770 1,719 3,260

BUS A/B SUMMARY 8,081 5,245 9,634 12,000 15,000 80.3%

3 TR-2F03A/B MV-2F01A 4.16[kV] LV-2F01A 0.48[kV] 637 403 753

MV-2F01B 4.16[kV] LV-2F01B 0.48[kV] 678 432 804

BUS A/B SUMMARY 1,314 834 1,557 2,500 3,125 62.3%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

9/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2G)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2G01A/B MV-2B01A 4.16[kV] LV-2G01A 0.48[kV] 1,047 624 1,219

MV-2B01B 4.16[kV] LV-2G01B 0.48[kV] 1,071 658 1,257

BUS A/B SUMMARY 2,118 1,283 2,476 2,500 3,125 99.0%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

10/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2H)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2H01A/B MV-2A01A 4.16[kV] LV-2H01A 0.48[kV] 480 358 599

MV-2A01B 4.16[kV] LV-2H01B 0.48[kV] 438 304 533

BUS A/B SUMMARY 919 661 1,132 2,000 2,500 56.6% DRY TYPE (AA/FA)

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

11/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-2I)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2I01A/B MV-2I01A 4.16[kV] LV-2I01A 0.48[kV] 387 225 447

MV-2I01B 4.16[kV] LV-2I01B 0.48[kV] 296 180 346

BUS A/B SUMMARY 682 405 794 2,000 2,500 39.7%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

12/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-A)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-A01A MV-A01A 4.16[kV] LV-A01A 0.48[kV] 441 246 505

TR-A01B MV-A01B 4.16[kV] LV-A01B 0.48[kV] 455 243 516

BUS A/B SUMMARY 896 489 1,021 2,000 2,500 51.1%

2 TR-A02A MV-A01A 4.16[kV] LV-A02A 0.48[kV] 498 302 583

TR-A02B MV-A01B 4.16[kV] LV-A02B 0.48[kV] 589 378 700

BUS A/B SUMMARY 1,088 680 1,283 2,000 2,500 64.2%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

13/15
TRANSFORMER SIZING SUMMARY REPORT (S/S-OMS)
PROJECT :100481 Revision : D
PROJECT NAME :PETRON RMP-2 Project Date : 14.05.30

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV] B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-OMS01A/B MV-OMS01A 4.16[kV] LV-OMS01A 0.48[kV] 654 354 744

MV-OMS01B 4.16[kV] LV-OMS01B 0.48[kV] 685 377 782

BUS A/B SUMMARY 1,339 731 1,526 2,000 2,500 76.3%

Daelim Industrial Co., LTD

NOTE : FOR THE DETAIL LOAD LIST, SEE "ELEC. LOAD SUMMARY" (DOC. No. : RMP2-R-02-00-3100)

14/15
LOAD SUMMARY REPORT (34.5/4.16kV Transformer)
PROJECT :100481
PROJECT NAME :PETRON RMP-2 Project

Primary Secondary Transformer Capacity


Load Summary
Bus Connection Bus Connection
Transformer Selected
REV NO A/B REMARK
Tag No Capacity
Bus Volt. Bus Volt.
Bus No. Bus No. [kW] [kVAr] A [kVA]
[kV] [kV]
B [kVA] (OA BASE) [kVA] (FA BASE) (OA BASE)

1 TR-2A01A/B MA-0001A 34.5[kV] MV-2A01A 4.16[kV] 5,355 2,448 5,888 1500kVAR Capacitor

MA-0001B 34.5[kV] MV-2A01B 4.16[kV] 4,965 3,774 6,236 1500kVAR Capacitor

BUS A/B SUMMARY 10,319 6,222 12,050 15,000 18,750 80.3%

2 TR-2A02A/B MA-0001A 34.5[kV] MV-2A02A 4.16[kV] 2,563 1,617 3,030 900kVAR Capacitor

MA-0001B 34.5[kV] MV-2A02B 4.16[kV] 2,492 1,622 2,973 900kVAR Capacitor

BUS A/B SUMMARY 5,055 3,239 6,004 12,000 15,000 50.0%

3 TR-2B01A/B MA-0001A 34.5[kV] MV-2B01A 4.16[kV] 4,810 2,818 5,574 1500kVAR Capacitor

MA-0001B 34.5[kV] MV-2B01B 4.16[kV] 6,370 2,580 6,873 1500kVAR Capacitor

BUS A/B SUMMARY 11,180 5,398 12,415 15,000 18,750 82.8%

4 TR-2C01A/B MA-0001A 34.5[kV] MV-2C01A 4.16[kV] 5,305 3,124 6,156 1500kVAR Capacitor

MA-0001B 34.5[kV] MV-2C01B 4.16[kV] 4,846 3,377 5,906 1500kVAR Capacitor

BUS A/B SUMMARY 10,151 6,501 12,054 15,000 18,750 80.4%

5 TR-2D01A/B MA-0001A 34.5[kV] MV-2D01A 4.16[kV] 4,931 2,947 5,745 1500kVAR Capacitor

MA-0001B 34.5[kV] MV-2D01B 4.16[kV] 7,878 4,592 9,119 1500kVAR Capacitor

BUS A/B SUMMARY 12,809 7,539 14,863 20,000 25,000 74.3%

6 TR-2E01A/B MA-0001A 34.5[kV] MV-2E01A 4.16[kV] 1,986 1,176 2,309 900kVAR Capacitor

MA-0001B 34.5[kV] MV-2E01B 4.16[kV] 2,172 1,273 2,518 900kVAR Capacitor

BUS A/B SUMMARY 4,159 2,449 4,826 7,000 8,750 68.9%

7 TR-2F02A/B MV-0001A 34.5[kV] MV-2F02A 4.16[kV] 5,321 3,533 6,387

MV-0001B 34.5[kV] MV-2F02B 4.16[kV] 2,973 1,844 3,498

BUS A/B SUMMARY 8,294 5,377 9,884 12,000 15,000 82.4%

Total Summary : 72,096 MVA (excluding Capacitor)


Total Summary : 65,921 MVA (including Capacitor)