Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
61 views2 pages

Completion Update: Maboko SNP Electrical Works

Uploaded by

ogutuisaiah1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views2 pages

Completion Update: Maboko SNP Electrical Works

Uploaded by

ogutuisaiah1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

MINISTRY OF LANDS, PUBLIC WORKS, HOUSING AND URBAN

DEVELOPMENT
State Department for Housing and Urban Development

Telephone: +254 - (0) 20 - 2718050 Ardhi


HOUSE
Fax: +254 - (0) 20 -2734886 1ST NGONG AVENUE
P.O Box 30119-00100
NAIROBI
When replying please quote:

Ref: MLPWHUD/HUD/SUD/9/3 VOL. XII (76) Date: 2nd October, 2023

Director,
M/S Glama Electrical & Mechanical Co. Ltd,
P.O Box 14615-00100,
NAIROBI.

MAVOKO SUSTAINABLE NEIGHBOURHOOD PROJECT (SNP),

Completion of Pending electrical works


Reference is made to the above project.
The project was completed, and the housing units have been allocated to various
beneficiaries who have commenced occupancy.
Installation of electricity meters for the various units and facilities is currently
underway by K.P.L.C. However, according to their records, REF No:
N21452020080001 the contractor submitted four hundred and fifty two (452)
wiring certificates. [Link].C was therefore contracted to install (452) No. of the
required (500) No. of electricity meters.
Further, it had been decided that the installation of electrical earth rods would be
carried out at a later, more suitable date, post-allocation. This decision had been
made due to concerns regarding the security of these devices during the period
following the handover and beneficiary occupation.
A meeting has been scheduled for 4th October, 2023 at K.P.L.C Mlolongo branch
office to deliberate on the matter as well as a site visit to plan on execution of the
pending works.
This is therefore to request that you’re adequately represented.

Mary W. Ndungu
Director, Slum Upgrading Department
c.c. Manager,
K.P.L.C, Mlolongo branch office