Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Spam

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

SIEMENS

Industrial Solutions & Services

Project: Thai Arylic Fibre Co.,Ltd. Page 1 of 1

MOTOR PROTECTION RELAY (SPAM 051 C)


Location : Panel : Type : Serial no : MNF : Control room 11 SPAM 130 C 500008 ABB Feeder : Motor 52 - 3

Rated voltage : 6.6 KV Aux. supply : CT Ratio : In : 80 - 265 V AC/DC 60 / 1 1 A ZCT Ratio: Ig 50 / 1 1 A

1. GENERAL INSPECTION - General condition checked : - Record setting


1

Normal

Abnormal

SG1 1 1 0 0 1 1 1 0
P(%) = a = i Is = = 50 85%

I/In t6x Io / In to sum

0.90 32.00 0.10 0.05 sec 113.00

2 3 4 5 6 7 8

40%
1.00

2. Thermal Overload Unit test (49)

Current inject Multiple 2 3 4 11 3. Earth Fault Unit (51N) Operating current Should be As found Amp 1.80 2.70 3.60 10.00

Operating time (sec) Should be 45 20 11 0.050 As found 44.98 19.86 11.06 0.058 OK Remark

Operating time (sec) Inject current 0.2 0.3 0.4 Should be 0.05 0.05 0.05 As found 0.068 0.05 0.049

0.100

0.101

4. Phase Unbalance Unit (46) Operating Time At Pick Up Level 30 % 30 % of I/In = 0.27 A Should be (sec) 2.8 As found (sec) 2.85 Operating Time At Pick Up Level 100 % 100 % of I/In = 0.90 A Should be (sec) 0.9 As found (sec) 0.935

Remark :

Description Company Signature Name Date

Tested by SIEMENS I&S IS4

Accepted by ( Customer )

Mr.Thanomkiat Shuerum 25/3/2004

SIEMENS
Industrial Solutions & Services

Project: Thai Arylic Fibre Co.,Ltd. Page 1 of 1

MOTOR PROTECTION RELAY (SPAM 051 C)


Location : Panel : Type : Serial no : MNF : Control room 10 SPAM 130 C 500009 ABB Feeder : Motor 52 - 2

Rated voltage : 6.6 KV Aux. supply : CT Ratio : In : 80 - 265 V AC/DC 60 / 1 1 A ZCT Ratio: Ig 50 / 1 1 A

1. GENERAL INSPECTION - General condition checked : - Record setting


1

Normal

Abnormal

SG1 1 1 0 0 1 1 1 0
P(%) = a = i = 50 95%

I/In t6x Io / In to sum

0.90 32.00 0.10 0.05 sec 113.00

2 3 4 5 6 7 8

40%
1.00 4.0

Is /In = I>> = 10.00 A tI>> = 0.04 I = 10%

t I = 20 sec 2. Thermal Overload Unit test (49)

Current inject Multiple 2 3 4 11 3. Earth Fault Unit (51N) Operating current Should be As found Amp 1.80 2.70 3.60 10.00

Operating time (sec) Should be 45 20 11 0.050 As found 44.96 19.82 11.05 0.058 OK Remark

Operating time (sec) Inject current 0.2 0.3 0.4 Should be 0.05 0.05 0.05 As found 0.061 0.049 0.05

0.100

0.101

4. Phase Unbalance Unit (46) Operating Time At Pick Up Level 30 % 30 % of I/In = 0.27 A Should be (sec) 2.8 As found (sec) 2.85 Operating Time At Pick Up Level 100 % 100 % of I/In = 0.90 A Should be (sec) 0.9 As found (sec) 0.940

Remark :

Description Company Signature Name Date

Tested by SIEMENS I&S IS4

Accepted by ( Customer )

Mr.Thanomkiat Shuerum 25/3/2004

You might also like