Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Standard Deviation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SHAPOORJI PALLONJI & CO. LTD.

Client

DLF

PMC

Colliers International

Concrator
Project

SPCL
DLF Westend Heights

Acceptance criteria of compressive Strength of Concrete As Per IS : 456, 2000 (Clause 16.1 & 16.3) - Standard Deviation
Grade of Concrete : M20

Month : February

Date of
Testing

28 Days
Comp.
Strength
2
in N /mm

Av. Moving Four


Consc. Comp.
2
Strength in N / mm

Sl. No.

Location

A4 - 14th Floor

Slab

2/2/2012

1/3/2012

28.56

A4 - 14th Floor

Slab

2/2/2012

1/3/2012

28.41

B6 - 10th Floor

Slab

2/2/2012

1/3/2012

28.57

B3 - 4th Floor

Slab

2/2/2012

1/3/2012

28.36

28.48

B3 -11th Floor

Slab

2/2/2012

1/3/2012

28.56

28.48

C3 - 7th Floor

Slab

3/2/2012

2/3/2012

28.13

28.41

C3 - 7th Floor

Slab

3/2/2012

2/3/2012

28.48

28.38

B1 - 17th Floor

Slab

3/2/2012

2/3/2012

28.26

28.36

B4 - 11th Floor

Slab

4/2/2012

3/3/2012

28.59

28.37

10

C2 - 8th Floor

Slab

4/2/2012

3/3/2012

28.55

28.47

11

D2 - 11th Floor

Slab

4/2/2012

3/3/2012

28.32

28.43

12

B5 - 10th Floor

Slab

6/2/2012

5/3/2012

28.25

28.43

13

B5 - 10th Floor

Slab

6/2/2012

5/3/2012

28.52

28.41

14

C1 - 8th Floor

Slab

6/2/2012

5/3/2012

28.81

28.48

15

A7 - 11th Floor

Slab

7/2/2012

6/3/2012

28.6

28.55

16

D1 - 9th Floor

Slab

8/2/2012

7/3/2012

28.41

28.59

17

A5 - 6th Floor

Slab

8/2/2012

7/3/2012

28.51

28.58

18

A3 - 15th Floor

Slab

9/2/2012

8/3/2012

28.45

28.49

19

A3 - 15th Floor

Slab

9/2/2012

8/3/2012

28.33

28.43

20

A6 - 12th Floor

Slab

9/2/2012

8/3/2012

28.44

28.43

21

A6 - 12th Floor

Slab

9/2/2012

8/3/2012

28.2

28.36

22

B2 - 17th Floor

Slab

10/2/2012

9/3/2012

30.96

28.98

23

B1 - 17th Floor

Slab

10/2/2012

9/3/2012

31.7

29.83

24

C4 - 5th Floor

Slab

10/2/2012

9/3/2012

30.81

30.42

25

C2 - 8th Floor

Slab

10/2/2012

9/3/2012

31.99

31.37

26

C2 - 8th Floor

Slab

10/2/2012

9/3/2012

31.55

31.51

27

B4 - 11th Floor

Slab

11/2/2012

10/3/2012

29.18

30.88

28

C3 - 8th Floor

Slab

11/2/2012

10/3/2012

29.47

30.55

29

C3 - 8th Floor

Slab

11/2/2012

10/3/2012

28.14

29.59

30

D2 - 8th Floor

Slab

11/2/2012

10/3/2012

30.66

29.36

(X-X)2
STANDARD DEVIATION
N-1

1.18

Remarks

Assumed Standard Deviation = 4 N / mm 2

Date of
Casting

Part
of
Structure

SHAPOORJI PALLONJI & CO. LTD.


Client

DLF

Concrator SPCL
Colliers International
PMC
Project

DLF Westend Heights

Acceptance criteria of compressive Strength of Concrete As Per IS : 456, 2000 (Clause 16.1 & 16.3) - Standard Deviation
Grade of Concrete : M20

Month : March

Date of
Testing

28 Days
Comp.
Strength
in N /mm2

Av. Moving Four


Consc. Comp.
Remarks
Strength in N / mm2

Sl. No.

Location

C4 - 6th Floor

Slab

1/3/2012

29/03/2012

28.44

A5 - 7th Floor

Slab

1/3/2012

29/03/2012

28.44

A5 - 7th Floor

Slab

1/3/2012

29/03/2012

27.99

C3 - 9th Floor

Slab

2/3/2012

30/03/2012

28.44

28.33

C3 - 9th Floor

Slab

2/3/2012

30/03/2012

27.99

28.22

A5 - 7th Floor

Slab

3/3/2012

31/03/2012

28.29

28.18

C1 - 9th Floor

Slab

3/3/2012

31/03/2012

27.55

28.07

D2 - 12th Floor

Slab

3/3/2012

31/03/2012

27.55

27.85

A6 - 13th Floor

Slab

3/3/2012

31/03/2012

28.88

28.07

10

A6 - 13th Floor

Slab

3/3/2012

31/03/2012

27.55

27.88

11

B4 - 12th Floor

Slab

5/3/2012

2/4/2012

27.99

27.99

12

C1 - 9th Floor

Slab

5/3/2012

2/4/2012

28.58

28.25

13

A2 - 16th Floor

Slab

5/3/2012

2/4/2012

28.44

28.14

14

A2 - 16th Floor

Slab

5/3/2012

2/4/2012

28.88

28.47

15

A3 - 16th Floor

Slab

6/3/2012

3/4/2012

28.44

28.59

16

A3 - 16th Floor

Slab

6/3/2012

3/4/2012

28.14

28.48

17

B2 - 18th Floor

Slab

7/3/2012

4/4/2012

30.66

29.03

18

C3 - 9th Floor

Slab

7/3/2012

4/4/2012

30.36

29.40

19

C3 - 9th Floor

Slab

7/3/2012

4/4/2012

30.07

29.81

20

B1 - 18th Floor

Slab

7/3/2012

4/4/2012

30.51

30.40

21

B6 - 11th Floor

Slab

9/3/2012

6/4/2012

29.03

29.99

22

B3 - 12th Floor

Slab

10/3/2012

7/4/2012

28.44

29.51

23

B3 - 12th Floor

Slab

10/3/2012

7/4/2012

29.18

29.29

24

C4 - 6th Floor

Slab

10/3/2012

7/4/2012

29.77

29.11

25

D2 - 12th Floor

Slab

10/3/2012

7/4/2012

29.18

29.14

26

D2 - 12th Floor

Slab

10/3/2012

7/4/2012

29.18

29.33

27

B5 - 12th Floor

Slab

12/3/2012

9/4/2012

30.51

29.66

28

B5 - 12th Floor

Slab

12/3/2012

9/4/2012

30.06

29.73

29

C2 - 10th Floor

Slab

12/3/2012

9/4/2012

30.21

29.99

30

C1 - 10th Floor

Slab

12/3/2012

9/4/2012

31.25

30.51

31

A2 - 16th Floor

Slab

12/3/2012

9/4/2012

30.21

30.43

32

A6 - 13th Floor

Slab

13/3/2012

10/4/2012

29.77

30.36

33

A6 - 13th Floor

Slab

13/3/2012

10/4/2012

28.88

30.03

34

D1 - 10th Floor

Slab

13/3/2012

10/4/2012

28.88

29.44

35

A2 - 17th Floor

Slab

14/3/2012

11/4/2012

28.73

29.07

d Standard Deviation = 4 N / mm2

Date of
Casting

Part
of
Structure

Date of
Testing

28 Days
Comp.
Strength
in N /mm2

Av. Moving Four


Consc. Comp.
Remarks
Strength in N / mm2

Sl. No.

Location

36

A2 - 17th Floor

Slab

14/3/2012

11/4/2012

29.97

29.12

37

C4 - 6th Floor

Slab

14/3/2012

11/4/2012

29.18

29.19

38

B6 - 11th Floor

Slab

15/3/2012

12/4/2012

30.07

29.49

39

A3 - 17th Floor

Slab

15/3/2012

12/4/2012

30.06

29.82

40

A3 - 17th Floor

Slab

15/3/2012

12/4/2012

30.07

29.85

41

D1 - 10th Floor

Slab

15/3/2012

12/4/2012

29.92

30.03

42

B4 - 13th Floor

Slab

16/3/2012

13/4/2012

28.88

29.73

43

B4 - 13th Floor

Slab

16/3/2012

13/4/2012

29.62

29.62

44

C2 - 10th Floor

Slab

16/3/2012

13/4/2012

28.44

29.22

45

C2 - 10th Floor

Slab

16/3/2012

13/4/2012

28.29

28.81

46

A4 - 16th Floor

Slab

16/3/2012

13/4/2012

28.88

28.81

47

B2 - 18th Floor

Slab

17/3/2012

14/4/2012

29.32

28.73

48

A7 - 13th Floor

Slab

17/3/2012

14/4/2012

29.62

29.03

49

A7 - 13th Floor

Slab

17/3/2012

14/4/2012

29.32

29.29

50

D1 - 10th Floor

Slab

17/3/2012

14/4/2012

28.88

29.29

51

C4 - 7th Floor

Slab

17/3/2012

14/4/2012

28.44

29.07

52

A2 - 17th Floor

Slab

19/3/2012

16/4/2012

28.44

28.77

53

A2 - 17th Floor

Slab

19/3/2012

16/4/2012

29.77

28.88

54

A5 - 8th Floor

Slab

19/3/2012

16/4/2012

28.44

28.77

55

A4 - 16th Floor

Slab

19/3/2012

16/4/2012

28.88

28.88

56

C3 - 10th Floor

Slab

21/3/2012

18/4/2012

28.44

28.88

57

C3 - 10th Floor

Slab

21/3/2012

18/4/2012

29.18

28.74

58

B3 - 13th Floor

Slab

21/3/2012

18/4/2012

29.62

29.03

59

A7 - 13th Floor

Slab

21/3/2012

18/4/2012

28.73

28.99

60

A3 - 17th Floor

Slab

22/3/2012

19/4/2012

30.21

29.44

61

A3 - 17th Floor

Slab

22/3/2012

19/4/2012

29.77

29.58

62

B5 - 12th Floor

Slab

22/3/2012

19/4/2012

29.32

29.51

63

B5 - 12th Floor

Slab

22/3/2012

19/4/2012

29.18

29.62

64

C1 - 10th Floor

Slab

22/3/2012

19/4/2012

29.92

29.55

65

C1 - 10th Floor

Slab

22/3/2012

19/4/2012

29.62

29.51

66

B6 - 12th Floor

Slab

24/3/2012

21/4/2012

28.88

29.40

67

A6 - 14th Floor

Slab

24/3/2012

21/4/2012

29.77

29.55

68

A6 - 14th Floor

Slab

24/3/2012

21/4/2012

28.88

29.29

69

B2 - 18th Floor

Slab

26/3/2012

23/4/2012

29.32

29.21

70

D1 - 11th Floor

Slab

26/3/2012

23/4/2012

28.44

29.10

(X-X)2

0.82

STANDARD DEVIATION
N-1

Assumed Standard Deviation = 4 N / m

Date of
Casting

Part
of
Structure

You might also like