Acceptance criteria of compressive Strength of Concrete As Per IS : 456, 2000 (Clause 16.1 & 16.3) - Standard Deviation
Grade of Concrete : M20
Month : February
Date of
Testing
28 Days
Comp.
Strength
2
in N /mm
Sl. No.
Location
A4 - 14th Floor
Slab
2/2/2012
1/3/2012
28.56
A4 - 14th Floor
Slab
2/2/2012
1/3/2012
28.41
B6 - 10th Floor
Slab
2/2/2012
1/3/2012
28.57
B3 - 4th Floor
Slab
2/2/2012
1/3/2012
28.36
28.48
B3 -11th Floor
Slab
2/2/2012
1/3/2012
28.56
28.48
C3 - 7th Floor
Slab
3/2/2012
2/3/2012
28.13
28.41
C3 - 7th Floor
Slab
3/2/2012
2/3/2012
28.48
28.38
B1 - 17th Floor
Slab
3/2/2012
2/3/2012
28.26
28.36
B4 - 11th Floor
Slab
4/2/2012
3/3/2012
28.59
28.37
10
C2 - 8th Floor
Slab
4/2/2012
3/3/2012
28.55
28.47
11
D2 - 11th Floor
Slab
4/2/2012
3/3/2012
28.32
28.43
12
B5 - 10th Floor
Slab
6/2/2012
5/3/2012
28.25
28.43
13
B5 - 10th Floor
Slab
6/2/2012
5/3/2012
28.52
28.41
14
C1 - 8th Floor
Slab
6/2/2012
5/3/2012
28.81
28.48
15
A7 - 11th Floor
Slab
7/2/2012
6/3/2012
28.6
28.55
16
D1 - 9th Floor
Slab
8/2/2012
7/3/2012
28.41
28.59
17
A5 - 6th Floor
Slab
8/2/2012
7/3/2012
28.51
28.58
18
A3 - 15th Floor
Slab
9/2/2012
8/3/2012
28.45
28.49
19
A3 - 15th Floor
Slab
9/2/2012
8/3/2012
28.33
28.43
20
A6 - 12th Floor
Slab
9/2/2012
8/3/2012
28.44
28.43
21
A6 - 12th Floor
Slab
9/2/2012
8/3/2012
28.2
28.36
22
B2 - 17th Floor
Slab
10/2/2012
9/3/2012
30.96
28.98
23
B1 - 17th Floor
Slab
10/2/2012
9/3/2012
31.7
29.83
24
C4 - 5th Floor
Slab
10/2/2012
9/3/2012
30.81
30.42
25
C2 - 8th Floor
Slab
10/2/2012
9/3/2012
31.99
31.37
26
C2 - 8th Floor
Slab
10/2/2012
9/3/2012
31.55
31.51
27
B4 - 11th Floor
Slab
11/2/2012
10/3/2012
29.18
30.88
28
C3 - 8th Floor
Slab
11/2/2012
10/3/2012
29.47
30.55
29
C3 - 8th Floor
Slab
11/2/2012
10/3/2012
28.14
29.59
30
D2 - 8th Floor
Slab
11/2/2012
10/3/2012
30.66
29.36
(X-X)2
STANDARD DEVIATION
N-1
1.18
Remarks
Date of
Casting
Part
of
Structure
DLF
Concrator SPCL
Colliers International
PMC
Project
Acceptance criteria of compressive Strength of Concrete As Per IS : 456, 2000 (Clause 16.1 & 16.3) - Standard Deviation
Grade of Concrete : M20
Month : March
Date of
Testing
28 Days
Comp.
Strength
in N /mm2
Sl. No.
Location
C4 - 6th Floor
Slab
1/3/2012
29/03/2012
28.44
A5 - 7th Floor
Slab
1/3/2012
29/03/2012
28.44
A5 - 7th Floor
Slab
1/3/2012
29/03/2012
27.99
C3 - 9th Floor
Slab
2/3/2012
30/03/2012
28.44
28.33
C3 - 9th Floor
Slab
2/3/2012
30/03/2012
27.99
28.22
A5 - 7th Floor
Slab
3/3/2012
31/03/2012
28.29
28.18
C1 - 9th Floor
Slab
3/3/2012
31/03/2012
27.55
28.07
D2 - 12th Floor
Slab
3/3/2012
31/03/2012
27.55
27.85
A6 - 13th Floor
Slab
3/3/2012
31/03/2012
28.88
28.07
10
A6 - 13th Floor
Slab
3/3/2012
31/03/2012
27.55
27.88
11
B4 - 12th Floor
Slab
5/3/2012
2/4/2012
27.99
27.99
12
C1 - 9th Floor
Slab
5/3/2012
2/4/2012
28.58
28.25
13
A2 - 16th Floor
Slab
5/3/2012
2/4/2012
28.44
28.14
14
A2 - 16th Floor
Slab
5/3/2012
2/4/2012
28.88
28.47
15
A3 - 16th Floor
Slab
6/3/2012
3/4/2012
28.44
28.59
16
A3 - 16th Floor
Slab
6/3/2012
3/4/2012
28.14
28.48
17
B2 - 18th Floor
Slab
7/3/2012
4/4/2012
30.66
29.03
18
C3 - 9th Floor
Slab
7/3/2012
4/4/2012
30.36
29.40
19
C3 - 9th Floor
Slab
7/3/2012
4/4/2012
30.07
29.81
20
B1 - 18th Floor
Slab
7/3/2012
4/4/2012
30.51
30.40
21
B6 - 11th Floor
Slab
9/3/2012
6/4/2012
29.03
29.99
22
B3 - 12th Floor
Slab
10/3/2012
7/4/2012
28.44
29.51
23
B3 - 12th Floor
Slab
10/3/2012
7/4/2012
29.18
29.29
24
C4 - 6th Floor
Slab
10/3/2012
7/4/2012
29.77
29.11
25
D2 - 12th Floor
Slab
10/3/2012
7/4/2012
29.18
29.14
26
D2 - 12th Floor
Slab
10/3/2012
7/4/2012
29.18
29.33
27
B5 - 12th Floor
Slab
12/3/2012
9/4/2012
30.51
29.66
28
B5 - 12th Floor
Slab
12/3/2012
9/4/2012
30.06
29.73
29
C2 - 10th Floor
Slab
12/3/2012
9/4/2012
30.21
29.99
30
C1 - 10th Floor
Slab
12/3/2012
9/4/2012
31.25
30.51
31
A2 - 16th Floor
Slab
12/3/2012
9/4/2012
30.21
30.43
32
A6 - 13th Floor
Slab
13/3/2012
10/4/2012
29.77
30.36
33
A6 - 13th Floor
Slab
13/3/2012
10/4/2012
28.88
30.03
34
D1 - 10th Floor
Slab
13/3/2012
10/4/2012
28.88
29.44
35
A2 - 17th Floor
Slab
14/3/2012
11/4/2012
28.73
29.07
Date of
Casting
Part
of
Structure
Date of
Testing
28 Days
Comp.
Strength
in N /mm2
Sl. No.
Location
36
A2 - 17th Floor
Slab
14/3/2012
11/4/2012
29.97
29.12
37
C4 - 6th Floor
Slab
14/3/2012
11/4/2012
29.18
29.19
38
B6 - 11th Floor
Slab
15/3/2012
12/4/2012
30.07
29.49
39
A3 - 17th Floor
Slab
15/3/2012
12/4/2012
30.06
29.82
40
A3 - 17th Floor
Slab
15/3/2012
12/4/2012
30.07
29.85
41
D1 - 10th Floor
Slab
15/3/2012
12/4/2012
29.92
30.03
42
B4 - 13th Floor
Slab
16/3/2012
13/4/2012
28.88
29.73
43
B4 - 13th Floor
Slab
16/3/2012
13/4/2012
29.62
29.62
44
C2 - 10th Floor
Slab
16/3/2012
13/4/2012
28.44
29.22
45
C2 - 10th Floor
Slab
16/3/2012
13/4/2012
28.29
28.81
46
A4 - 16th Floor
Slab
16/3/2012
13/4/2012
28.88
28.81
47
B2 - 18th Floor
Slab
17/3/2012
14/4/2012
29.32
28.73
48
A7 - 13th Floor
Slab
17/3/2012
14/4/2012
29.62
29.03
49
A7 - 13th Floor
Slab
17/3/2012
14/4/2012
29.32
29.29
50
D1 - 10th Floor
Slab
17/3/2012
14/4/2012
28.88
29.29
51
C4 - 7th Floor
Slab
17/3/2012
14/4/2012
28.44
29.07
52
A2 - 17th Floor
Slab
19/3/2012
16/4/2012
28.44
28.77
53
A2 - 17th Floor
Slab
19/3/2012
16/4/2012
29.77
28.88
54
A5 - 8th Floor
Slab
19/3/2012
16/4/2012
28.44
28.77
55
A4 - 16th Floor
Slab
19/3/2012
16/4/2012
28.88
28.88
56
C3 - 10th Floor
Slab
21/3/2012
18/4/2012
28.44
28.88
57
C3 - 10th Floor
Slab
21/3/2012
18/4/2012
29.18
28.74
58
B3 - 13th Floor
Slab
21/3/2012
18/4/2012
29.62
29.03
59
A7 - 13th Floor
Slab
21/3/2012
18/4/2012
28.73
28.99
60
A3 - 17th Floor
Slab
22/3/2012
19/4/2012
30.21
29.44
61
A3 - 17th Floor
Slab
22/3/2012
19/4/2012
29.77
29.58
62
B5 - 12th Floor
Slab
22/3/2012
19/4/2012
29.32
29.51
63
B5 - 12th Floor
Slab
22/3/2012
19/4/2012
29.18
29.62
64
C1 - 10th Floor
Slab
22/3/2012
19/4/2012
29.92
29.55
65
C1 - 10th Floor
Slab
22/3/2012
19/4/2012
29.62
29.51
66
B6 - 12th Floor
Slab
24/3/2012
21/4/2012
28.88
29.40
67
A6 - 14th Floor
Slab
24/3/2012
21/4/2012
29.77
29.55
68
A6 - 14th Floor
Slab
24/3/2012
21/4/2012
28.88
29.29
69
B2 - 18th Floor
Slab
26/3/2012
23/4/2012
29.32
29.21
70
D1 - 11th Floor
Slab
26/3/2012
23/4/2012
28.44
29.10
(X-X)2
0.82
STANDARD DEVIATION
N-1
Date of
Casting
Part
of
Structure