On the design and control of complex tunnel ventilation systems applying the HIL tunnel simulator
I. R. Riess and P. Altenburger HBI Haerter Ltd Consulting Engineers, Switzerland P. Sahlin Equa Simulation AB, Sweden
Abstract For a complex road tunnel network, the ventilation system has been designed, implemented and tested. For design and optimisation of the control system, a one-dimensional numerical model has been used. With growing system complexity and demanding constraints of time and quality, system tests become increasingly important. They have to be performed based on the assumption that it wont work if it hasnt been tested. In order to have sufficient time to perform these tests, the control system has to be tested prior to installation. For this purpose, a numerical simulation model of the tunnel, ventilation system and control system is used. For later tests, the simulated control system is replaced by a Hardware-In-the-Loop (HIL) setup connecting the simulator to the actual Programmable Logic Controller (PLC) and control code that will be installed.
INTRODUCTION
The ventilation control during normal operation as well as during incidents has become an important issue. During an incident, the ventilation operation is usually fully automatic. Any failure may lead to severe danger to tunnel users. In normal operation, meeting the pollution criteria inside and outside of the tunnel may be a challenging task, as well. Breach of pollution limits may cause severe penalties on the tunnel operator. Road tunnels especially in an urban environment tend to become very complex with several entry and exit portals, portal air extraction and forced recirculation to avoid portal discharge. The traffic flow may vary rapidly from light free-flowing to heavily congested traffic. With penalties being applied for breaches of design conditions from the first day of tunnel operation, detailed tests of the control system prior to the tunnel opening become increasingly important. As the ventilation control system is required to cover all possible scenarios from normal operation, maintenance and incident modes to partial tunnel closures, numerous
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006 operational modes and levels have to be taken into account. Tests have to cover all possible transitions between operational modes and levels. They have to be performed based on the assumption that it wont work if it hasnt been tested. Once the ventilation control system is installed, the time required to perform these tests is normally not available. The tunnel usually has to be opened to traffic as soon as possible. Therefore, the control system has to be tested prior to the installation on site. This can be done with the application of a tunnel simulator: a numerical simulation of the tunnel and ventilation system connected to a PLC running the real world control system. Thus, tests on site are minimised as much as possible. The tunnel is opened to traffic and the ventilation operation is on its optimum from day one.
VENTILATION SYSTEM
The application of a tunnel simulator for the design and commissioning of the ventilation system was tried for the first time on a very complex urban tunnel system. The tunnel consists of two separate tunnels with uni-directional traffic. The main tunnels include several entry exit ramps, so that the tunnel network has altogether eight tunnel portals. 2.1 Design conditions In this project, the design and control of the ventilation system has to meet stringent requirements for normal conditions, such as: the tunnel ventilation system must supply a sufficient amount of fresh air for pollution dilution in order to meet the in-tunnel air quality requirements; the ventilation system must enable operation of the tunnel without air discharge at the portals; the ventilation system and its control must be designed for economy of operation throughout the full range of tunnel traffic conditions.
Penalties apply in the occurrence of a breach of these conditions. The key requirements seem to be partly contradicting, such as maximum pollution dilution and economy of operation. 2.2 Ventilation concept For tunnel air discharge, a location in the vicinity of the main western tunnel portal was nominated. The ventilation is designed as a longitudinal ventilation system with fresh air entering the tunnel at all tunnel portals. In the main tunnels, the movement of air utilises the piston effect of the traffic and a series of jet fans distributed in the tunnel sections. At the eastern exit portal, the air is extracted from the eastbound tunnel and via a cross-ventilation station introduced into the westbound tunnel. Along the westbound tunnel, it mixes with additional fresh air coming from the entry portal and the two ramps before it is extracted into the main exhaust ventilation station (Figure 1).
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006
Western Portal
Tu nn el
Traffic Direction
Air Flow
Eastern Portal
Figure 1
In case of congested traffic, a slightly different concept is used. The vitiated air extracted from the eastbound tunnel is brought via a ventilation tunnel directly towards the main exhaust ventilation station, thus avoiding increased flow velocities in a congested westbound tunnel. 2.3 Operation modes In order to control the ventilation system under all traffic and operating conditions, nine different operation modes have been defined, such as normal condition, one tunnel closed for incoming traffic, maintenance of one of the three ventilation stations under traffic, as well as several incident modes. The change from one operation mode into another mode is done manually by the operator. However, it is not possible to change from each operation mode into any other mode, as some combinations do not appear reasonable, such as eastbound tunnel closed to westbound tunnel closed. 2.4 Ventilation modes Each operation mode includes up to eight ventilation modes four modes for fluid traffic and four modes for partially or fully congested traffic. Additional sub-modes have been introduced in order to cater for traffic scenarios with increased fresh air requirement in a particular ramp. However, the number of different ventilation modes is slightly reduced as not all ventilation modes are available under all operation modes. The change from one ventilation mode into another one is automatically triggered by
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006 expected power saving comparison of the number of operating jet fans in the main tunnel with the power requirement for a different exhaust flow rate; pollution levels in the main tunnel an elevated pollution level triggers the ventilation system to switch to a mode with increased fresh air supply in the main tunnel; traffic data a combination of reduced average speed with high traffic density triggers the ventilation system to switch to a ventilation mode designed for congested traffic.
In order to avoid oscillation between ventilation modes, a minimum delay between ventilation mode changes is defined. 2.5 Summary The ventilation design comprises of 56 jet fans, distributed in thirteen tunnel sections, and ten axial fans, installed in three large ventilation stations. The ventilation control system includes numerous operation modes and ventilation modes. The ventilation control system is fully automatic within each operation mode.
3.1 Ventilation design The required exhaust flow rates were calculated from the maximum fresh air requirement which occurs during congested traffic throughout the tunnel. During free flowing traffic, a reduced fresh air supply is sufficient to meet the in-tunnel air quality requirements. The required number and location of jet fans was calculated using a one-dimensional steady state network model. The number of jet fans required to operate in each tunnel section was determined for predicted traffic scenarios as well as tunnel capacity. Some scenarios assumed selected sections of the tunnel being closed for incoming traffic. These scenarios may require additional jet fan operation for maintaining air intake at all tunnel portals. This trusted inhouse model was subsequently used to validate the dynamic model. 3.2 Ventilation control system design The ventilation control system includes the operation modes described in Section 2.3 and the ventilation modes given in Section 2.4. The control logic within a ventilation mode consists of fixed exhaust flow rates for the three ventilation stations; six independent control loops for the operation of the jet fans in the tunnel sections, either controlling the air flow to a given set-point or balancing the air flow in two adjacent tunnel sections (Figure 2).
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006
EB6 EB2
A
EB1
EB3
C B
EB4
EB5
D
WB2
EVS WB5
CVS WB1
E F
WB7
Figure 2
As each control loop is governed by two parameters, numerous parameters had to be analysed and tested during design and optimisation of the control system. This was done by utilising the IDA Road Tunnel Ventilation software (IDA RTV) (1) that provides a one-dimensional network model of the tunnel network, the ventilation system, the control system, the dynamic traffic flow, including vehicle emissions as well as pollution and air flow monitors. Figure 3 shows the schematic representation of the tunnel in IDA RTV during the detailed design stage, containing the aerodynamic model of the tunnel as well as the control components. The eastbound tunnel is above, the westbound below. For both tunnels, traffic direction is from left to right. The model has a total of 20,544 variables, 154 of which belong to the control system. A typical simulation experiment covering 14 hours of system operation takes about 30 seconds of execution time. A total of 1500 time-steps have then been taken, ranging in size between 0.36 and 36 seconds. The variable time step differential-algebraic equation solver adapts automatically the step-size to the frequency content of the solution according to a tolerance parameter. Discrete events in driving functions and discontinuities in system equations are treated by special methods.
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006
Project: Description:
rtv_fire
Simulation data... RTV Invoke
Results
Vehicles
Ambient
Global
Start simulation
PI
Product2
Gain3
FirstOrder5
NSWIT CH2
Abs2
PT1
PI
k=-1
abs T =120
TABLE
ventilation station
Portal Portal Portal1 Portal6
TABLE
NSWIT CH5
Abs1
PT1
k=-1
T=120
abs
2 vsd fans
PI
Portal Product4
NSWIT CH3
Portal
Portal Portal7
NSWITCH4
Abs4 Gain1
Plenum Plenum
Portal2
Plenum Plenum1
Portal Portal5
NSWITCH13
Portal
abs k=-1
PI
TABLE Traffic
T ABLE
ModeChange
NSWITCH1
FirstOrder10
Gain2
FirstOrder
NSWITCH6
Abs
Abs6
P T1 T=120
PT1
k=-1
T=120
abs
abs
TABLE
MiniboostEB
TABLE
MiniBoostWB
2 vsd fans
TABLE
Speed_Mainline
TABLE
Speed_SideExit
PI
Gain5
k=-1
PT1
T =120
abs
Portal Portal
P ortal11 P ortal18
Portal
P ortal12
=
Portal
P ortal17
Portal
Portal10
Plenum Plenum2
Plenum Plenum3
Portal
P ortal19
PI
Portal
P ortal13
Portal
P ortal16
Portal
P ortal14
Portal
Portal15
FirstOrder14
NSWITCH9
Abs12
Product19
PT1
T=120
abs
PI
Portal
Portal
Portal27
Gain7
FirstOrder12
NSWITCH8
A bs10
P roduct17
Portal23
tunnel sections
PT1
k=-1
T=120
abs
control objects
Portal
Portal22
Portal
P ortal28
Portal
P ortal24
Plenum Plenum4
Plenum Plenum5
Portal
Portal26
Portal Portal
P ortal29 Portal21
Portal Portal
P ortal30 Portal20
Portal Portal
Portal31 Portal25
Figure 3
3.3 The HIL tunnel simulator The electro-mechanical installations usually form the last part of the tunnel construction. The time schedule is very tight as the tunnel should be opened to traffic at the earliest possible date. Especially in a toll-financed project, any delay to the tunnel opening causes additional costs as well as loss of revenue. Once the control system principles have been developed and control loops tuned in the simulation model, the code of the target PLC system can be written. This encompasses not only the ventilation related part of the control system but also a large number of other disciplines such as lighting, traffic management, CCTV surveillance etc. As with any computer programme, there will initially be a number of bugs. In addition to this, the real PLC implementation has to deal with several practical aspects of fan and damper operation, that are not worthwhile to model in the off-line control system model, such as component failure signals, position feedback loops etc. All in all, the correspondence between the conceptual control model and the real implementation cannot be taken for granted. At this stage, a HIL tunnel simulator helps debugging and optimising the control system code. The full control code is loaded on the actual (hardware) PLC to be used in the tunnel. The feedback from the tunnel is simulated by the existing dynamic model. The simulation creates all relevant signals (CO, velocity, visibility, traffic density and traffic speed) that normally would be provided by physical sensors in the tunnel. Through an interface, simulated sensor signals are transferred to the PLC. According to these inputs, the PLC will determine fan and
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006 damper operation. These requests are transferred back to the real time simulation the loop is closed.
Project: Description:
simulator
Simulation data... RTV Invoke
Gain9
Results
Vehicles
Ambient
Global
Start simulation
Fan power consumption Air-Speed_EB Air-Speed_WB CO-Concentration_WB[ppm] CO-Concentration_EB[ppm] Volume Flow AxialFans
PT1
FirstOrder11 T=NIL
RoadTunnel
Av erageWB24
k=NIL Gain11
PT 1
FirstOrder12 T=NIL
simulator
NIL
PT1
+
NIL NIL
k=NIL
FirstOrder13 T=NIL
PT1
T=NIL
P T1
Gain
T=NIL FirstOrder
k=NIL k=NIL
PT1
Portal Portal2
=
Portal Portal7
T=NIL FirstOrder1
PT1
Import SS3-to-EB
T=NIL
P T1 PT1
Portal Portal1
=
Portal
TABLE Traffic1
TABLE
Firs tOr der 41
T=NIL
T=NIL
Fir stOrder45
Portal Portal
Plenum Plenum
Plenum
Portal6
Portal Portal5
Gain4
Traffic2
2 vsd fans
Import SS1-to-EB
Gain1
PT1
=
Portal Portal3
Portal Portal8
Plenum1
P T1
RoadTunnel simulator
Gain18
Import
FirstOrder7
RoadTunnel simulator
T=NIL
k=NIL
T=NIL
SS2-to-EB
PT1
Portal Portal9
TABLE Traffic
T ABLE
ModeChange
k=NIL
PT1 Firs tOrder44
RoadTunnel simulator
FirstOrder17
T=NIL FirstOrder2
Gain19
FirstOrder6 T=NIL
P T1
FirstOrder15 T=NIL
PT1 PT1
Gain3 k=NIL
PT1
T=NIL
PT1
TABLE
MiniboostEB
TABLE
k=NIL
T=NIL FirstOrder4
FirstOrder8 T=NIL
2 vsd fans
MiniBoostWB
PT1
T=NIL
TABLE
Speed_Mainline
TABLE
Speed_SideExit
Gain6
k=NIL
FirstOrder28
Gain14
PT1
Import SS4-to-EB
k=NIL Gain13
T=NIL FirstOrder29
PT1
FirstOrder30 T=NIL
Firs tOrder53 PT1
k=NIL Gain12
interface objects
=
Portal
P ortal18
T=NIL FirstOrder31
P T1
k=NIL PT1
T=NIL
k=NIL
Portal
T=NIL
P ortal11
Fir stOrder 50
RoadTunnel
PT1
Portal
Portal10
Plenum = Plenum2
Portal
P ortal13
Plenum Plenum3
Portal
P ortal19
Portal
P ortal16
FirstOrder21
RoadTunnel
PT1
FirstOrder24
simulator
FirstOrder25
T=NIL FirstOrder36
PT1
simulator
FirstOrder19
Import SS4-to-WB
T=NIL FirstOrder22
PT1
Portal
Portal
Portal15
T=NIL FirstOrder23
PT1
RoadTunnel simulator
FirstOrder39
T=NIL FirstOrder37
P ortal14
PT1
T=NIL
PT1
T=NIL FirstOrder26
PT1
PT1
T=NIL
PT1
T=NIL FirstOrder20
Gain5
PT1
Portal
Portal17
Portal
P ortal22
Firs tOrder48
PT1
P T1
T=NIL FirstOrder27
PT1
T=NIL
PT1
T=NIL
k=NIL
T=NIL
PT1
T=NIL
Gain15
T=NIL
FirstOrder9
k=NIL Gain16
PT1
P T1
T=NIL
Firs tOrder51
Import SS1-to-WB
k=NIL Gain17
T=NIL
P T1
T=NIL
P T1
Import SS3-to-WB
T=NIL
PT1
k=NIL Gain20
T=NIL FirstOrder33
RoadTunnel simulator
Portal
PT1 Gain8
FirstOrder34 T=NIL
k=NIL
=
Portal
Portal27
PT1
interface objects
k=NIL
Portal23
T=NIL FirstOrder35
Fir stOrder52
Portal
P ortal24
Plenum Plenum4
Portal
Portal21
Plenum Plenum5
Portal
Portal26
PT1
Portal
P ortal29
PT1
T=NIL
T=NIL
Portal Portal
Portal20
=
P ortal30
Portal Portal
Portal25
Portal31
Portal Portal
P ortal28
P ortal32
Figure 4
The architecture of the tunnel simulator, interfaces and PLC control unit is shown in Figure 5. The full system includes the control code development environment, which is installed on a separate PC and the tunnel-operator interface (HMI) same as in the physical control room. The tunnel control system may be operated either using the control code development environment or the operator interface. However, the final HMI might not be available at an early stage of the control system tests. The tunnel simulator represents the physical reaction of the real tunnel, giving air flow signals and pollutions measurements according to the traffic scenario and the operation of the ventilation system. Time series of air flow, pollution and other signals as well as data on ventilation operation may be stored in the developer environment as well as in the tunnel simulator. Figure 4 shows the corresponding tunnel system model. In comparison to the model of Figure 3, control components have been replaced by real-time import and export objects, which govern data exchange with the physical PLC.
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006
Tunnel HIL Simulator Windows PC IDA Road Tunnel Ventilation Software Interface OPC Client PLC Control Unit Windows PC Control Software Developer Enviroment Windows PC Human Machine Interface HMI
Ethernet
Figure 5
The additional effort required for the HIL tunnel simulator lies in the development of the HIL interface between the dynamic software model of the tunnel and the PLC. Often, the implementation of this interface can be based on the Open Process Control (OPC) standard, thereby reducing the need for manufacturer dependent coding. A few changes to the software model of the tunnel are also required, e.g. to convert units of simulated signals to those of the PLC implementation and to artificially provide feedback signals that are not covered by the virtual tunnel model. The HIL interface of IDA manages the timestep of the numerical model and alarms if for instance the simulation model lags too far behind physical time. The numerical model sometimes has to negotiate system discontinuities using elaborate and timeconsuming methods, so that exceptions may occur even if the average progress of the simulation model is considerably faster than real time.
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006
Simulation
Ventilation Mode
14 15 16 17 18 19
8 7 6 5 4 3 2 1 0
Tunnel Measurement
Ventilation Mode
7 6 5 4 3 2 1 0
Time [h]
14
15
Time [h]
16
17
18
19
8 6 4 2 0 -2 -4 14 15
6 4 2 0 -2 -4
EB3 EB6
Time [h]
16
17
18
19
14
15
Time [h]
16
17
18
19
5 4
5 4
3 2 1 0 -1 -2 -3 14 15 16 17 18 19
3 2 1 0 -1 -2 -3 14 15 16 17 18 19
EB3 EB6 .
Time [h]
Time [h]
Figure 6
Dynamic testing of the control code can either be done in the office or on site. It makes sense to continue testing on site as soon as the equipment in the tunnel is available. Discrepancies between the desired operation and the simulation results can be communicated to the control system supplier. Alterations can be agreed and implemented. 3.4 Commissioning
Due to extensive testing of the control system prior to installation, only a minimum time is required for commissioning tests on site. The features that remain to be tested on site include
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006 the air quality and air flow monitors as well as communication between the control system and the ventilation equipment, such as jet fan selection from a particular group. Only minor adjustments to the control parameters are required on site, depending on the accuracy of the aerodynamic model (Figure 6). In this particular project, it would not have been possible to debug the control code, optimise the system parameters and run all required tests within the time frame available between the installation in the tunnel and the tunnel opening. It is expected that in any project of similar complexity, a HIL tunnel simulator would be the only measure to finalise the control system in time.
TIME SCHEDULE
Testing the ventilation control system is a rather slow process as the control parameters have to be tested in real time simulations. The time scales of a typical tunnel ventilation system range from 10 to 30 minutes. Each test scenario runs for eight to twelve hours, so several transitions from one ventilation mode to another may be tested. Simulator tests may run at night-time in order to allow a comprehensive analysis of recorded data during the day. The required amount of testing, of course, depends on the quality of the control code as well as the pre-selection of control parameters. Usually, control parameters are adapted rather easily, but for changes to the code, the control system supplier has to be involved. Table 1 gives a possible time schedule for the project. The control code has to be available at least four months prior to tunnel opening. The interface between the control system and the simulator has to be defined six months prior to tunnel opening. It is preferable for the simulator tests if a basic HMI is available at an early stage of the control code tests. Table 1 Time from tunnel opening - 6 months - 4 months - 2 months -1 month Action decision whether or not the tunnel simulator should be applied for HIL tests of the control system code tunnel simulator set up for communication with PLC and HMI (if available) begin of tests on control code control code debugged and optimised begin installation of control system hardware in the tunnel begin of tests on the ventilation system in the tunnel (optional: fine tuning of the tunnel simulator according to aerodynamic measurements in the tunnel) commissioning tests end of tests on the ventilation system tunnel opening fine tuning of control parameters according to actual traffic in the tunnel Time schedule
- 1 week +0 + 1 to 2 weeks
10
12th Int. Symp. Aerodynamics and Ventilation of Vehicle Tunnels, Portoroz 2006 One drawback of the tunnel simulator application is the shifted time schedule of project delivery. Especially the time schedule of the control system supplier has to be shifted in a way that allows for completion of the control code prior to testing. In the time schedule of a conventional project, the control code has to be finalised only a short time before the installation of the hardware in the tunnel. Thus, a decision about the application of the tunnel simulator made only six months before tunnel opening might already be too late for the control system supplier.
CONCLUSIONS The ventilation control system of a complex tunnel network has been tested prior to installation in the tunnel. Any reduction of tests and optimisations in the completed tunnel allow an earlier project completion. Once the tunnel is open to traffic, there is only minor fine-tuning required without interference to normal operation. The risk of breach of technical requirements such as continuous portal air inflow or maintaining in-tunnel air quality is greatly reduced. The control system is operating in an optimised way from day one of the tunnel operation. The decision about whether or not a HIL test of control code should be carried out should be made as early as possible in the project. As the tunnel simulator represents an additional investment, the costs have to be weighed against potential savings and reduced technical risks during commissioning. The benefits of the simulator clearly increase with the complexity of the ventilation system and the ventilation control system. At a later stage, the simulator may be used as a training tool for the tunnel operator by running a separate, but identical ventilation control system (either in a PLC or on a computer) connected to the tunnel simulator.