Drilling and Completions
Drilling and Completions
Drilling and Completions
Introduction to
Petroleum
Technology
Caught fire
Destroyed the rig
Operating
Company
Senior
Geologist
RIG
BASED
Mud
Engineer
Cementer
Mud
Loggers
Electric
Loggers
Wellhead
Specialist
Coring
Engineers
Directional
Engineer
Drilling
Superintendent
Drilling
Contractor
Drilling
Superintendent
Senior Drilling
Supervisor
Wellsite
Geologist
Drilling
Engineer
Senior
Toolpusher
Subsea
Chief
Night
Radio Barge
Medic
Engineers (2)Engineer
Toolpusher Ops (2) Captain
Drilling and
Completions
Drilling system and
equipment
Basic drilling system
for both onshore and
offshore will be the
rotary rig
Exercise
A drilling contractor wants to drill a
well
2000 m underground offshore
Pasir Puteh. The rig will stay 30 days
at the site, and will start drilling at
day 3 until day 27. 10 PDC bits are
reserved for this operation, each 1
cost 20 k USD. The operating cost is
200k USD per day. Calculate the
overall cost per foot for this drilling
program.