Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Characteristics Accountability and Verification

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 2

Characteristics Accountability and Verification

Page ___ of ___

Control No.

Part No.:

First Article/Prod. Audit

Casting S/N:

P.O.#

Dwg. Rev.:

Frame Size:

Part S/N:

MPP #

Supplier:

Date:

Prepared By:

Qual Date:

Supplier Code:

SDRs

GE Review:

Characteristics Accountability

Char.
No.

Drawing Requirement

Zone/
Location

Inspection/Test Results
Results
(Variable
Data)

Measurement
Equipment

Mfg. Planning

OP No.

How
Generated
and Controlled

Production Product
Acceptance Criteria
Accept
Plan

Justification
for <100%
Evaluation

Characteristics Accountability and Verification


Identify form use.

Page ___ of ___


Part No.:
Dwg. Rev.:
Supplier:
Supplier Code:

Establishes specific
characteristic
zone and location.

Characteristics Accountability

Char.
No.

Drawing Requirement

Record dwg requirements


for all characteristics. Omit
reference dimensions.

Assign a unique number to each


feature or characteristics on the dwg
and list here. Preferably in the order
of mfg operation or inspection
sequence.
Multiple characteristics may be
identified as sub-numbers (e.g., 9a,
9b, etc.) if needed to further establish
position.
Number should also be cross
referenced to individual notes.

Zone/
Location

Identification number
assigned by supplier

Control No.

First Article/Prod. Audit

Casting S/N:

P.O.#

Frame Size:

Part S/N:

MPP #

Date:

Prepared By:

Qual Date:

SDRs

GE Review:

Inspection/Test Results
Results
(Variable
Data)

Mfg. Planning

Measurement
Equipment

OP No.

How
Generated
and Controlled

Describe equipment used


for specific requirement.
Ref. Any special fixtures
techniques.
List actual measurements
obtained for the characteristic.
Note if dimension was measured
in a restrained condition.
For marking, supply evidence
that marking is legible, correct in
content and size, and properly
located (photos may be used).
Circle non-conformance and list
the approved non-conforming
document (e.g., SDR) for
accepting this non-conformance.
Do not include inspection for
process materials (e.g. weld wire,
braze powder, etc.)

List number and type of


operation. Note the general
control of operation. (e.g.
operator, N/C tape, die,
SPC charts, etc.)
Identify characteristics
generated by outside subtier suppliers.

Production Product
Acceptance Criteria
Accept
Plan

Justification
for <100%
Evaluation

Production Acceptance Criteria


If 100% acceptance is used,
make appropriate notation. Note
if evaluations made by sub-tier
supplier.
If less than 100% is used,
describe by general notation (e.g.
1st-last, Die, Audit).
Identify inaccessible
characteristics requiring
destructive evaluation as cut 1
piece per lot.
Justification for less than 100%
evaluation
Reference document which
justifies acceptance by less than
100% evaluation, which includes
an acceptance plan plus the
process capability study which
justifies the reduced evaluation.

You might also like