SAP Production Planning: A Workshop That Provides An Overview of The SAP R/3 Production Planning (PP) Module
SAP Production Planning: A Workshop That Provides An Overview of The SAP R/3 Production Planning (PP) Module
SAP Production Planning: A Workshop That Provides An Overview of The SAP R/3 Production Planning (PP) Module
SD
Sales &
Distribution
FI
Financial
Accounting
CO
MM
Controlling
Materials
Mgmt.
AM
PP
Production
Planning
Fixed Assets
Mgmt.
R/3
Client / Server
QA
Quality
PS
Project
System
Assurance
PM
OC
Plant Maintenance
HR
Human
Resources
IS
Office &
Communication
Industry
Solutions
Agenda
PP Organization
Bills of Material
ECM
Work Centers
Routings
Agenda (Contd)
Product Cost
Review of MM Organization
Your
Business
SAP
Enterprise
Model
Company
Purchasing
Organization
Purchasing
Group
Plant
Storage
Locations
Company
Plant
0001
0001
USA
USA
Plant
Plant11
0002
0002
Storage Location
Plant
Plant22
0003
0003
0001
0001
0002
0002
Plant
Plant33
0003
0003
0001
0001
0002
0002
0003
0003
Views
Group
Cost accounting
External logistics
Controlling areas
Purchasing
organizations
Sales organizations
Accounts
Company codes
Internal logistics
(MRP/Production)
Valuation areas
Plants
Inventory management
Storage locations/batches/special stocks
Customer
Customer
Shipment
Credit Limit
Sales Forecast / Plan
Production
Production
Planning
Planning
Sales
Sales&&
Distribution
Distribution
Transfer of Requirements
Goods Issue to SO
Invoice
Production Order
Production Order Receipt
Production Cost
Accounting Document
Materials
Materials
Management
Management
Goods Receipt
Accounts Payable
Invoice Receipt
Purchase Order
Finance
Finance&&
Controlling
Controlling
Vendor
Vendor
Industry Sector
Controls what fields appear on what screens
Unit of Measure
e.g. Piece, box, crate, pallet
Different parts of the business can measure quantities in different units
Multi-Lingual Texts
General Data
Data applicable
throughout the client
e.g.
Material number
Data relevant
for planning and
production
e.g.
e.g.
Description
Delivering plant
MRP profile
Special stock
Units of measure
Sales text
Production costs
Weight
Sales units
Planning data
Warehouse
attributes
Volume
Shipping data
Valuation
Product hierarchy
Division
Description
Service
Spare Part
Finished Product
Semi-finished Product
Trading Good
Operating Supply
Empty Containers
Non stock Item
Raw Material
Packaging
Competitor Product
Production Resources/ Tools
Finance
Engineering
Design
Sales
Product
Data
Production
Purchasing
Stock
Material description
used in reporting
Finance
Controls customer
ordering rules
for material
Sales
Product
Data
Production
Data used to
calculate MRP
lead times
Engineering
Design
Purchasing
Texts copied
to purchase orders
Stock
Production Planning
Production
Facilities
Work Centers
PP Basic Data
Inspection
Plans
Production
Resources/Tools
Capacities
Bills of Material
F06010
PP-SOP
Sales and
Operations Planning
PP-MRP
Material
Requirements Planning
PP-CRP
Capacity Requirements
Planning
PP-SFC
PP-PC
Product Costing
PP-IS
Shop Floor
Information System
MRP Overview
MRP
MRP11
Planning
PlanningData
Data
Sales
SalesDemand
Demand
MRP
MRP22
Forecast/Reqmts
Forecast/Reqmts
MRP/MPS
MRP/MPS
MRP
MRP33
Consumption
ConsumptionData
Data
Work
Work
Scheduling
Scheduling11
Work
Work
Scheduling
Scheduling22
Production
Production
Control
Control
Special Procurement identifies special planning rules which may be used for in-house
production or external procurement
MRP Type determines how the material is planned such as MRP, MPS, or consumption
based planning
Material Lead Time identifies for material planning the planned delivery days or inhouse production days
Planning Time Fence: defines a period during which MRP/MPS will not automatically
add or reschedule orders
Scheduling Margin: controls the release period, opening period for a material and
scheduling floats for production
Release period is the number of working days in the release period
Opening period is the number of working days between the order creation and
planned start date
Order floats allows for safety margin before and after production
Mat./PPC Status is used to limit the useablity of materials for certain activities such as,
purchasing, bills of material
MRP
Planning
Result
Last planning
run results
Current Stock,
Rqmts, Balances,
planned Receipts,
Issues
MRP
MRP
Planning
Planning
Process
Process
Stock Requirements
List uses current data
The MRP List displays the result of the last planning run
The Stock Requirements List displays the most up-to-date stock and
requirements situation
Requirement Types
Are directly related to or derived from the BOM structure for other items or end
products. They are automatically generated during MRP
Sales
Plan
MPS
Planned
Independent
Requirements
Offset
Customer Independent
Requirements
MRP
Demand ie
Requirements
Production
Plan
Order Proposals
Production Orders
Purchase
Requisitions
Order proposals, planned orders etc are created and adjusted by running the MRP or MPS programs.
BOM explosion
Timings
Quantity Requirements
Start
Finish
July
1
July
5
Order Proposal
Dependent Requirements:
From BOM explosion
Resource Requirements
Labor
Machinery
Raw
Materials
Stock Requirements
List
Bills of Material
Bills of Material
Simple BOM
Variant BOM
Similar materials
represented
by variants on one BOM
Multiple BOM
Area of Validity The same Bill of Material can be allocated to several plants.
Before you can allocate the BOM to a different plant, the material must exist at
the new plant, the unit of issue on the BOM item must be the same.
The validity date is determined by the system automatically to be either the next effective
from date, or 12/31/1999.
A
B
C
B
D
X----------------------------------------------------------->>>>
from 1/1/95
from 12/31/95
to 12/30/95
to 12/31/99
Assembly Scrap yield or process scrap resulting from the assembly of components into
a finished or sub-assembly. It is used for calculating material used in an assembly. MRP
increases the material requirements for all components contained in the assembly.
Example: Quantity to produce 1000 units with a 1% assembly scrap = 10 units
BOM Group is a collective number for all BOMs in a group which allows for one or several similar
products to be decribed under one number.
BOM Usage special view of the BOM which represents a specific area of the company in which the
BOM is used; for example, Engineering, Production, Costing, Sales, Plant Maintenance. The BOM
Usage allows different views to exist without separate BOMs for each usage.
Technical Type the system distinguishes BOMs according to whether they represent product
variants or production alternatives. If you create a variant for the BOM, the system marks it as a Variant
Bill . If there is more than one alternative for a material, the system marks the BOM as a Multiple Bill.
BOM Validity Bills of Material are valid over an area and effectivity period.
Area of Validity -- identifies which plants the BOM has been allocated to
Validity Period -- identifies the from and to effectivity dates. The default to date is 12/31/9999
Item Category When you enter a new Bill of Material item, an item category must be assigned.
It has important control functions such as:
Screen selection
Specific processing, such as material number required, negative values supported.
The Item Category cannot be changed once set. It must be deleted and re-added.
Sizes are maintained for variable-size items
Item categories include:
Sub-Items are typically used to represent different installation points for partial
quantities of an item.
In assembling resistors on a printed circuit board, the installation points are described.
There is no logic related to sub-items
BOM Structure
Plant Assignment
Validity Period
Release Indicator
BOM Header
Stock Items
Non-stock Items
Variable Size Items
Document Items
Text Items
Item 10
Item 20
Item 30
Sub Item 10
Sub Item 20
BOM Structure
Product
Product
Component
Component11
Component
Component22
Component
Component33
Component
Component
31
31
Component
Component
32
32
Components:
Stock material By-product
Non-stock material
Document
Variable-sized item
Part
Text item Class
Scrap/waste
(assembly)
(assembly)
Component
Component
33
33
Blue Frame/Fork
Assembly
Red Frame/Fork
Assembly
Black Frame/Fork
Assembly
Handlebar
Assembly
Gear Assembly
Blue Frame
Red Frame
Chrome Forks
Black Frame
Multiple BOM
Production Variants
Blue Paint
Solvent
Pigment 1
Water
Pigment 2
Qty. for alternative 2
BOM Reporting
BOM explosion
BOM Recursiveness
E1
E1
K1
K1
K2
K2
B3
B3
E1
E1
K3
K3
Changes to object types can be made without history which only records the
maintenance change after.
Change to object types can also be made with history which is made with
reference to a Change Master.
Change
M aster
Record
Object Types:
Sub-Types:
Task Lists
Bills of M aterial
Documents
Info
Inspection
Plans
Std Routings
Ref Oper Sets
Equip Rtngs
M ater'l BO M s
Equip BOM s
Documents
in DM S
Q uality
M anagement
Material
BOM
Routing
Document
Date
Status
Object
00000001
00000002
00000003
00000004
01/01/95
02/01/95
03/01/95
04/01/95
Obsolescence
Substitute
Address Change
Safety Council
Valid
Material
Blocked
BOM
Valid Document
Valid
Routing
Change the
Change Master
Apply Change
Number to
Objects
Reporting of
Change Objects
to a change No.
Work Centers
Work Centers
Capacity
Requirements
Planning
Machines
Cost
Center
Assembly
Line
Work
Centers
Production
Line
People
Costing
Scheduling,
Execution Times
Work Center W1
Assembly
Work Center W1
Assembly
Operation 20
Work Center W2
Finishing
Operation 30
Cost Center
Centre 200
The work center category is used to control the field and screen selection
for work centers during work center maintenance.
Work Center Category
Screen View
Basic Data
Basic Data
Default Values
Capacity Values
Scheduling
Cost Center Assignment
Set Up $70.00
Activity Rates
Mach $60.00
Labor $80.00
Overhead $70.00
Set Up (SET)
Work Center
with Activities
during production
Machine (MACH)
Labor (LAB)
Oper 0020
Oper 0030
Oper 0040
Work Center
Formulas
Set up Formula
Machine Time Formula
Teardown Formula
Oper 0020
Teardown .5 hrs
Oper 0030
Oper 0040
Planned
Downtime
Break
Time
1 hr
8 hrs
7 hrs
6 hrs
Working
Hours
Working
Hours less
Breaks
Productive
Working
Hours
Routings
Material Type
BOM
BOM
Groups
Groups
Materials
Materials
and
andPRTs
PRTs
Routing
Routing
Groups
Groups
Cost
Cost
Centers
Centers
W/C Category
Item Category
Bills
Billsofof
Material
Material
Components
Allocated to
Operations
Routings
Routings
Work
Work
Centers
Centers
Routing
Process
Resource Tool
(PRT)
Materials
Components
BOM
Operation 10
Operation 20
Work Centre:
PP-ASSEM
Control Key:
- Time Tkts
- Costing
Operation 30
Operation Text:
Pre-assemble
frame
Std Values:
Lab:10 mins
Mach:10 mins
Operation
Operation types
(Main) operation
Sub-operation
Sub-operation
HierarchyCosting
Completion confirmations
Scheduling always takes place on the
(main) operation level
group operation
combined operation
sub-operation level
(main) operation
Operation / Sub-operation
Schedule at Operation Level
Operation
Operation
0010
0010
Operation
Operation
0020
0020
Sequence Categories
Standard Seq 0000
Material
Material
02
02
Routing
Routing
Group
Group01
01
03
03
Oper
Oper10
10
Oper
Oper10
10
Branch
operations
Oper
Oper15
15
Oper
Oper20
20
Oper
Oper30
30
Oper
Oper40
40
Return
Operations
Oper
Oper20
20
Oper
Oper50
50
Oper
Oper40
40
Oper
Oper60
60
Oper
Oper50
50
Routing Types
Standard Routing
10
20
N
Material
Reference Routing
10
20
R 1
Reference Operation
Set X
Oper
Oper0024
0024
Oper
Oper0026
0026
Reference Operation
Set Y
Oper
Oper0030
0030
Oper
Oper0040
0040
Oper
Oper0045
0045
Oper
Oper0050
0050
Reference Operation
Set Z
Material Allocation
Product
Routing
BOM
Op. 10
Op. 10
Op. 20
Op. 30
Op. 30
Material-Routing Allocations
Material
Routing
Group
Routing
Group
Counter
01
02
01
02
Material
Material
Master
Master
Routing
Routing
Work
Work
Center
Center
Control Key
Standard Values
Activities
Standards Text Key
HR data
External Processing
Oper
Oper0010
0010
Oper
Oper0020
0020
Purch
PurchReqn
Reqn
Purch
PurchOrd
Ord
Vendor
VendorProc
Proc
Goods
GoodsRec
Rec
Oper
Oper0040
0040
Oper
Oper0050
0050
Float Before
Oper 0010
Oper 0020
Oper 0030
Float After
Execution Time
Interoperation
Time
Parallel
Split
Overlapped
Op. 10
Op. 20
Op. 30
Op. 90
Op. 40
MRP Features
Net requirements
calculation
Lot sizing
MRP
Internal production
and external purchasing
Forecasting
Order scheduling
and generation
Bill of Material
Explosion
MRP Overview
Purchasing
Warehouse
management
system
Master data
Goods receipt
Invoice receipt
Inventory management
Valuation
Invoice
verification
Goods
issue
Transfer
posting
Accounting
Material
Batches
Vendors
Customers
:
Forecasted
Future Consumption
Stock
Past
Consumption
Planned
Orders
Time
Today
Stock
Reorder Point
Safety Stock
Time
Order Date
Delivery Date
Release
Order Date
Purchasing
Process Time
Today
Goods Receipt
Process Time
Sales Orders
Entries
from
Planning
File
Warehouse
Stock
Reservations
Order
Proposal
Shortages
MRP Prerequisites
PLANT LEVEL
MATERIAL LEVEL
MRP Indicator: determines whether or not requirements, for a specific storage location,
are planned separately from the overall plan
MRP Types
VB
VM
VV
Forecast Planning
The latest forecast is copied as requirements which are used to create order proposals
PD
Deterministic Planning
MRP produces order proposal(s) to match the exact quantity of the requirements based on
independent and dependent demands
M0
Lot Sizing
Static
Periodic
Optimum (Cost )
Replenish up to
maximum stock
level
Flexible period
Ordered Quantity
Material
Fixed Order
Quantity
Order
Order =
Fixed Order
Quantity
Shortage
Quantity
If
Shortage Quantity
>
Fixed Order Quantity
Order
Order
MRP Control Parameter: determine whether or not MRP will automatically create
requisitions or delivery schedules
Options are:
Opening Period Parameter: allows the user to take advantage of MRPs automatic
creation features while retaining control over the number of open purchasing documents
MRP List
MRP Controller
Group of Materials
for which controller
is responsible
Controllers MRP
Listing
Goods Issues
Goods Receipt
Stock Overview
The Stock Overview shows the stock position for all locations within a
Company/Plant/Storage Location/Batch for all dispositions of material
Unrestricted
Total Company
Plant US01 Total
100
SLoc 0001Total
Batch 01 Total
Batch 02 Total
75
45
30
SLoc 0001Total
25
Quality Ins
Reserved
100
20
20
15
On Order ...
15
Date
Ref
EM
Quantity
01/01 STOCK
01/08 ORDER
Sales Order
25
01/15 PL ORD
1000
120
05
100
02/01 -----------------------------------------------------> Planning Time Fence
Stock Requirements List brings together all the supply orders, independent
and dependent demands and stock balances for the material. MRP makes
order proposals to balance the supply/demand position for the material
Available
100
75
175
Planning carried out for a single item on a BOM. Dependent requirements are only
created for materials on the next lower level
If the release date lies in the past, the system automatically switches to
forward scheduling
Calculated Order
Release Date
Purchasing
Process Time
MRP Planning
Date -- today
Goods Receipt
Process Time
Future Requirement
Date
Order
Start
Date
Order Release
Process Time
MRP Planning
Date -- today
Order
Finish
Date
In-house
Production Time
Goods Receipt
Process Time
Future
Requirement
Date
E1
= Demand
= Supply
Level 0
Planned Orders
Dependent Requirements
B1
R1
Planned Orders
B2
Planned Orders
Planned Orders
Dependent
Requirements
Dependent
Requirements
Level 1
R2
Planned Orders
R3
Planned Orders
Level 2
Production
Order
Procurement Type is
In-house Production
Planned
PlannedOrder
Order
MRP
Order
OrderQty
Qty
Order
Date
Order Date
Capacity
CapacityReqts.
Reqts.
Resource
Reqts.
Resource Reqts.
MRP
Controller
MRP Controller
Manual
Creation
Auto
Creation
Manual changes/
deletion
Planned
Planned
Order
Order
Collective Conversion
into Production Order
Individual Conversion
into Production Order
Production
Order
Production
Order Release
MRP Controller
Planned Order
Manual Creation
Manual Change/
Deletion
Auto Creation
Auto Change/Deletion
Purchase
Requisition
Purchasing Group
Manual Creation
Manual Change/Deletion
Purchase Order
Auto Creation
Auto Change/Deletion
Delivery
Schedule
Manual Change/Deletion
Source List
Quota
QuotaArrangement
Arrangement
External
ExternalSupplier
Supplier
MRP Supplier
from Source List
Scheduling Agreement
Schedule
Agreement
Schedule
Agreement
Lines
Created
Lines Created
Distribution Function
Total Requirement of 250 units for the week
50 Units
50 Units
50 Units
50 Units
50 Units
Several planned orders are created for partial quantities of the dependent
requirement quantity
The planned orders are scheduled for various dates within the
run time of the production order
SOP specifies sales quantities for the long and intermediate term to roughly
assess the feasibility of sales and operation plans
Modify the disaggregated sales planning data and create a production plan for each
member
A Product Group brings together materials according to some criteria such as similar
type or manufacturing process.
Materials and product groups can be members of more than one group for different
planning scenarios
Assignment of members from different plants to the same product group for cross-plant
planning
A product group may have a different unit of measure from its members e.g. aggregate
in cartons vs pieces
Proportional factors for disaggregation - how the product group quantitiy is distributed
to its members
Sales and Production Planning is carried out using a Planning Table which
shows the stock level that results from the sales and operations planning for
both materials and product groups
Sales Quantities
Production Quantities
Aggregates the consumption values for all the materials in the product group
Synchronize to the Sales Plan the system copies the sales quantities into
the production quantities
Zero Stock Level Use existing stock to cover sales quantities. When used
up, production quantities will synchronize with the sales quantities
Strategy parameters are used to create the production plan from the sales
plan on to a product group member
Disaggregation can be carried out for the product group or for selected
members only
Version Number
Master Planning
Demand Management
Interactive MPS
Manual Planned
Independent
Requirements
Copy from
Prodn Plan
Copy from
Forecast
Demand Management
Demand Program
MRP/MPS
Copy from
Orig Plan
Sales
Demand from
Sales Orders
Example/
Strategy Description
Planning
Reqmt Type
Sales Order
Requirement
Make to Stock
LSF
KSL
Planning with
Final Assembly
VSF
KSV
Planning without
Final Assembly
Auto -- assemble to a customer order, stop preproduction at sub-assembly level. F/A Pull
VSE
KEV
Planning with
Planning Material
Bike, plan common sub-assemblies using a Planing BOM. Planned ind reqmts drive material.
S.O initiates final assembly.
VSEF
KEVV
Planning at
Assembly Level
VSFB
Production by
Lot Size
KL
Make to Order
Production
KE
VSF
Demand Management
Planning
Warehouse Stock
Finished Product
Production Push
Planned quantities that are not consumed by sales orders result in excess
stock
Final
Assembly
to Sales Order
Sales Order
Purchase
Planning
Warehouse Stock
Finished Product
Produce
Planned Independent
Requirements
Production Push
Sales Order
Warehouse Stock
Finished Product
Purchase
Planned Independent
Requirements
Produce
Stop at level
Warehouse Stock
Assembly 01
Warehouse Stock
Assembly 02
Production Push
Sales orders for the final assembly create planned orders of the finished
product and reduce planning quantities for the planning material
Possible to plan a family of products from forecast placed on the planning bill.
The planning bill details, through percentages, the quantity required for
common parts
Sales Order
Purchase
Warehouse Stock
Assembly 01
Planning
Material
Customer Stock
Finished Product
Produce
Planning
Planned Independent
Requirements
Note: Percentages drive lower level
demands for sub assemblies
Warehouse Stock
Assembly 02
Production Push
Must maintain the Mixed MRP Indicator in the Material Master MRP2 View for
sub-assembly planning. Maintain the consumption indicator in the item screen
of demand management
Sales Order
Warehouse Stock
Finished Product
Planning
Warehouse Stock
Assembly 03
Production Push
Sales Order
Warehouse Stock
Finished Product
Example is a custom product with a unique structure such that it only applies
to a particular customers order
Sales Order
Warehouse Stock
Finished Product
Consumption Logic
Consumption mode determines either -Backward consumption requirements directly before the sales order
Forward consumption requirements directly after the sales order
Both types are allowed the system looks for the next closest planning requirements
If no consumption periods exist, then you can only consume requirements planned
on the same day.
Control
Info
----------------------------- Control Info
----------------------------- Work
Center
Operation
Operation
Times
Work
CenterTimes
Control Information
Control Information
Operation Times
Operation Times
Material
Materialatat0010
0010
----------------------------------------------------------Material
atat0010
Number
Material
0010
Material
Material
Number
----------------------------- Quantity
-----------------------------Quantity
Material
Number
Date
Material
Number
Date
Quantity
Quantity
Date
Date
Order
OrderHeader
Header
Main
MainView
View
Order
OrderHeader
Header
Master
MasterData
Data
Order Type
Order Number
Production Order Quantity
Production Order Date
For Routing
For Bill of Material
For Costing
Order
OrderHeader
Header
Allocation
Allocation Data
Data
Order
OrderHeader
Header
Acct
AcctAssignment
Assignment
For Plant
MRP Controller
Settlement
Rates
Order
OrderHeader
Header
Order
OrderMonitoring
Monitoring
Date
Quantity
Operation Sequence
Work Center
Control Key
Text
Status
Operation
Operation
General
GeneralView
View
Operation
Operation
Standard
StandardValues
Values
Operation
Operation
Dates
Dates
Base Quantity
Standard Times (Setup, Machine, Labor)
Operation
Operation
Overlap/Split
Overlap/Split
Component
Component
Overview
Overview
Material Number
Requirement Quantity
Requirement Date
Component
Component
General
GeneralData
Data
Operation
Operation
Long
LongText
Text
Reservation
Item Category
Bulk Material Indicator
Text Key
Production Order
Production Order
Bill of
Material
A
B
Routing
0010 PHNASM00
0020
0030
0040
Work Center
PHNASM00
Std Values:
Setup: 005
Prodn: 075
TDown: 005
Select
Routing
Select
BOM
Print Shop
Floor Papers
Schedule
Times & Dates
Confirmation Slip
Release
Order
Actual
Labor
Create
Order
Confirm
Completion
Issue
Materials to
Order
Production
Order
Calculate
Capacity
Check
Availability
Calculate
Planned Costs
Create
Required
Purchases
Purchase
Requisitions
Goods
Issue
Calculate
Actual Costs
Receive complete
goods into stock
Goods
Receipt
REL
CREATED
RELEASED
. Lead Time
Scheduling
. Reservations
created for
components
. Availability Check
possible, at or
before release
. Capacity Reqmts
for Work Centers
. Material issues
after oper release
CNF
DISPATCHED
CONFIRMED
. Capacity Leveling
possible for oper
. Actual Production
usage and time
captured
.
(MILE)
. Planned Order
costs created (PRC)
. Settlement Rule
Determined (SETC)
DSPT
DLV
DELIVERED
COMP
COMPLETE
Order Proposal
MRP Conversion
Determine
Order Type
Routing
Selection
Bill of Material
Selection
Component Overrides
Material Reservations
Item Categories
Material Availability
Check
Order or
Operation Release
Shop Paper
Printing Possible
On-line or in background
Pick List, Confirmation Slips,...
Material
Withdrawals Possible
Net
Available
Stock on
Hand
Reservation
for
Planned Order
for
150 Units
50 Units
200 Units
150
100
300
Requirement
for 50 Units
are Available
Dependent
Requirement
for
200 Units
100
00
Reservation
for
Planned Order
for
150 Units
50 Units
200 Units
06/01/95
Today
Net
300
100
Requirement
for 150 Units
not Available
Dependent
Requirement
for
200 Units
Material 1
Production
Material 2
Goods Issue
Consumption of
Material 1 and 2
Goods
receipt of
Material 3
Update
Reservations
Goods Issue
Posting
Cost Object
Allocation
G/L Account
Update
Accounting
Material
Document
Completion Confirmations
Confirm
Confirm
Operation
Operation0010
0010
Activities
Activities
Production
ProductionOrder
Order
Operations
Operations
0010
0010- -Assemble
AssembleBoard
Board
0020
0020- -Assemble
AssembleCase
Case
0030
0030- -Assemble
Assembleunit
unit
0040
0040- -Final
FinalTest
Test
Confirm
Confirm
Operation
Operation0020
0020
Activities
Activities
Milestone
Confirm
Confirm
Operation
Operation0030
0030
Activities
Activities
Confirm
Confirm
Operation
Operation0040
0040
Activities
Activities
Confirmation Data
Quantity
Yield
Scrap Quantity
Scrap Reason
Dates
Start date
Finish date
Work Center
Personnel Number
Qualification
Wage Group
Wage Type
Labor
Capacity
Capacity Planning
Master
Master
Data
Data
Material
Material
MRP
MRPRequirements
Requirements
Capacity
CapacityRequirements
Requirements
BOM
BOM
Routes
Routes
Capacity
CapacityEvaluation
Evaluation
Work
Work
Center
Center
Work
WorkCenter
CenterCapacity
Capacity
Capacity Leveling
to adjust capacity
periods
Standard Values
Tables
Formulas
Formulas
for
for
Scheduling
Scheduling
and
and
Capacity
Capacity
Reqmts
Reqmts
Operation
Std
StdValues
Values
Work Center
Formula
FormulaKey
Key
Formula
Formula
Constants
Constants
Set
Setupup.5.5hrs
hrs
Proc 5.5 hrs
Proc 5.5 hrs
Teardown
Teardown.5.5hrs
hrs
No.
No.Splits
Splits
Formulas
Formulas
Setup
Setup| |Process
Process| |T/D
T/D
Capacity
Capacity
Requirements
Requirements
Capacity Scheduling
Material Master Lead Time
Float Before
Oper 0010
Oper 0020
Oper 0030
Float After
Execution Time
Interoperation
Time
Float Before
Reduce
Float Time
Float Before
Queue
(1)
Set up
(1)
Use Minimum
Move Time
Optional Splitting
or Overlapping
Split Process
Split Process
T Down
(1)
Float After
Wait
(1)
Move
(1)
Reduce
Float Time
Float After
Standard Formulas
Operation Time is ....
Plant 2
Production
Fabrication
Assembly
Fabrication
Mach=16 hrs
Labor=18 hrs
Production
Assm
Line 1
Work
Center 1
Assm
Line 2
Work
Center 2
Product Costing
Costing Integration
PP
CO
PP-PC
Product Costing
SD
Sales &
Distribution
Financial
Accounting
CO
MM
PP-MRP
Mat. Requirements
Planning
Controlling
Materials
Mgmt.
AM
PP
Production
Planning
PP-BD
Basic Data
PP-IS
Shop Floor Info
System
PP-CRP
Capacity Planning
PP-SFC
Production Activity
Cntrl.
Fixed Assets
Mgmt.
R/3
Client / Server
QA
Quality
Assurance
PM
Plant Main-
PP-MPS
Demand Management
CO-PC
Product Cost Acctg.
FI
tenance
HR
Human
Resources
PS
CO-PA
Profitability Analysis
Project
System
OC
Office &
Communication
IS
Industry
Solutions
CO-PA
Profit Centers
CO-OPA
Orders
CO-CCA
Cost Center
Accounting
Chart of
accounts
GKR
Company
code PP01
Valuation
area PP01
Plant PP01
Valuation
area PP02
Plant PP02
Company
code 0001
Valuation
area PP03
Plant PP03
Controlling
area 0001
Controlling
area PP01
Valuation
area 0001
Plant 0001
Company
code 0002
Process manufacturing
Make-to-order production
Stock order
Sales order (small batch prod.)
Product
Production
Product
Period
Unit
Order/
costing
order
costing
costing
costing
project
costing
costing
Service
Costing
Trade
Costing
Cost Accounting
Cost elements
Cost centers
CO orders
Pricing
Valuation
Cost object controlling:
Preliminary and standard costing
Final costing
Profitability analysis
Controlling
Price Control S
Material Price $3.00
Bill of Material
Item 10
Item 20
ROH-1
HALB-1
2 pc * $3.00/pc
= $6.00
3 pc * $34,000/pc = $102.00
Qty 2 pcs
Qty 3 pcs
HALB-1
Price Control S
Cost 1
$4.00
Cost 2
3.00
Cost 3
17.00
Cost 4
8.00
Cost 5
2.00
Cost Components
Cost components are defined in Product Costing Customizing
Each costing variant (standard cost, current cost, ...) points to a cost component layout
There can be up to 40 cost components in a cost component layout
For each cost component identify which costs are rolled up to the next higher level
Component Cost Layout
Cost Component
Raw Materials
Component
Cost1 Layout
01
Cost Component 2
Cost Component
3
Cost Component
1
Cost Component
4
Cost Component
2
Production 3
Cost Component
Cost Component
5
Cost Component
4
Cost Component
6
Cost Component
5
Cost Component
7
Cost Component
6
..
Cost Component
7
.
.
Cost Component 15
.
Cost Component 15
02
Production
Overhead-Material
Raw Materials
OverheadProduction
Overhead-Material
Overhead-Admin
Overhead-Production
Overhead-Sales
Overhead-Admin
External Processing
Overhead-Sales
External Processing
Miscellaneous
Miscellaneous
Production Order
Bill
of
Material
Routing
Order: 73
Type: PP01
Plant: LR001
Sys Status:
CRT REL CNF DLV SETC
Quantities:
Total Produced:
100 Tons
Scrap:
.001
Confirmed:
100 Tons
Dates:
Schedule 09/15/95
Confirmed 09/16/95
STATUS:
Created, Released,
Confirmed, Delivered,
Settled
Simultaneous
Order Costing
Final
Order Costing
Routing
Formula constants
Standard values
General standard
values
Cost
Center
Formula
Activity type
Activity price
Actual time/quantity
Costs
Overhead Costing
Direct material costs
Material costs
=
+
=
Production costs
=
Manufacturing costs
Indirect management
costs
Costing
sheet
Credit
Cost element
Origin
Object
Cost center
Order
Make-to-Order Production
Order
Production memo
Delivery
Goods issue
Invoice
Reduction
of
sales order
stock
Material
requirements planning
Production
Sales order
stock
Target
Actual
Preliminary costing
Costing items
Automatic valuation
Planning aids (revalue, copy, reference)
Cost component structure
Simultaneous costing
Actual quantity used * price
Overheads
Actual yield
Calculation of target costs
Variances according to category
Work in progress
Controlling
Summarization using classifiable characteristics
Selection using classifiable characteristics
Cost object analysis
Cost Roll-up
Costs for assemblies in the low-level code with the highest number are calculated first
Upper level is production costs at this production level
Lower level is costs of all material components processed at this production level
Total costs are the sum of the costs for the upper and lower level costs
Finished
Product
Internal Activity
External Activity
Overhead
External Activity
Overhead
Semi-Finished
Product
Raw
Material
Internal Activity
External Activity
Overhead
Internal Activity
External Activity
Overhead
MPS Functions
Separate Planning Run for Master Schedule Items
MPS Item
Assembly 1
MPS level
Assembly 2
MRP level
Protects the master plan from automatic changes to the master schedule
During a planning run, no automatic change proposals are made within the
planning time fence which is determined for each item in the Material Master.
The system calculates the planning time fence starting from the planning date
Planning Date
MPS Procedure
Create
CreatePlanned
Planned
Independent
Independent
Requirements
Requirements
Carry
Carryout
out
Separate
SeparateMPS
MPS
Planning
Run
Planning Run
Make
MakeChanges
ChangesUsing
Using
Interactive
MPS
Interactive MPS
Start
StartMRP
MRPRun
Run
for
Lower
Levels
for Lower Levels
Carry-out MRP
Regenerative Planning all master schedule items are planned for a plant.
It is generally used during initial start-up to insure all items are planned or
when heavy maintenance causes most items to be re-planned.
Net Change Planning only master schedule items which have undergone a
change to the supply/demand balance, such as warehouse receipts and
issues, are re-planned. It is common to run net change MPS daily.
Net Change Planning in the Planning Horizon shortens the period over
which MPS plans to the planning horizon, which is set in Customizing. It is
typically set to the length of time of the longest lead time item. This means
that only those master schedule items which have undergone a relevant
change within the planning horizon are planned.
The Opening Period is the time required for converting planned orders into purchase
requisitions. It is subtracted from the order start date of the order. It is defined within
the Scheduling Margin in Customizing and is assigned to an item in the Material Master.
In this planning, the BOM for the master schedule item is exploded and dependent
requirements are created for assemblies and components.
Interactive MPS
In interactive planning, you can change the quantities and the dates of planned orders
and check the result in a simulative planning run.
It is useful in adjusting dates of planned orders inside the planning time fence
Carry out the MRP calculation (Planning->MRP Calculation). The system carries out net
requirements and lot sizing the same way as for automatic planning.
Carry out the ATP calculation (GoTo->Calculate ATP quantity). The Available to Promise
is the uncommitted portion of the inventory or planned production.
Change or Enter Change Proposals (Change ord proposal or Create ord proposal). The
fixing indicator is set in the Fixed field to indicate that the order proposal is fixed. Orders
can also be deleted (Edit->Del order proposal)
Display Period Totals - to show weekly and monthly period displays in column format
The system does not plan new order proposals within the planning time fence. Instead,
new requirements needed within the planning time fence are scheduled at the end of the
planning time fence, depending on the fixing type.
Order Proposals are Fixed
Planning Date
During the next planning run, the system places all order proposals that crossed over
the planning time fence at the PTF. The master scheduler needs to fix or firm these
order proposals to the correct date inside the PTF. Once fixed, the system will not change.
Orders can be firmed collectively (Planned orders->firm) through selection of MRP controller,
material, run schedule, production version, or planning id.
Availability Check
Inward movement
of goods
Stock
Purchase
Order
Purchase
Requisition
Planned
Order
Other factors to
take into account:
Safety stock
Stock in transfer
Replenishment lead time
Blocked stock in QA
Delivery
Outward movement
of goods
Sales
Order
Reservation