CSE 4313

Software Engineering: Testing

Vassilios Tzerpos
bil@cse.yorku.ca
CSEB 3024
Office hours: MW 2:45 - 3:45
Textbook
Software Testing: A Craftsmans Approach
Paul C. Jorgensen
Material will also be drawn from:
Test-driven development by example.
Testing Object-Oriented Systems: Models,
Patterns, and Tools.
Lessons learned in Software Testing.
http://www.testingeducation.org/
Evaluation
Assignments
Assignment 1: 10% - Feb 2
Assignment 2: 25% - Mar 2
Assignment 3: 25% - Apr 6
Tests (in class)
Test 1: 20% - Feb 21
Test 2: 20% - Apr 2
What is testing?

A technical investigation
done to expose
quality-related information
about the product
under test
Defining Testing
A technical
Logic, mathematics, models, tools
investigation
An organized and thorough search for
information.
We ask hard questions (aka run hard test cases)
and look carefully at the results.
done to expose quality-related
information
see the next slide
about the product under test.
Information Objectives
Find important bugs, to get them fixed
Different
Check interoperability with other products objectives
Help managers make ship/no-ship decisions require
Block premature product releases different
testing strategies
Minimize technical support costs and will yield
Assess conformance to specification different tests,
Conform to regulations different test
documentation
Minimize safety-related lawsuit risk and different test
Find safe scenarios for use of the product results.
Our goal
Learn testing techniques and the situations in
which they apply
Practice with real testing tools and
frameworks
Learn how to produce quality problem reports
Study special issues for object-oriented
systems
Understand the importance of systematic
testing
Tools - Eclipse
Best IDE for Java development
Works seamlessly with Junit for unit
testing
Open source Download from
www.eclipse.org
In the lab, do: eclipse
Try it with your own Java code
Tools - Junit
A framework for automated unit testing
of Java code
Written by Erich Gamma (of Design
Patterns fame) and Kent Beck (creator
of XP methodology)
Uses Java 5 features such as
annotations and static imports
Download from www.junit.org
A first example
Test ADDER: Screen for a test run
Adds two numbers
that the user enters ? 2
Each number should ? 3
be one or two digits 5
The program echoes
the entries, then ?
prints the sum.
Press <ENTER>
after each number
Immediate issues
Nothing shows what this program is.
You dont even know you run the right
program.
No on-screen instructions.
How do you stop the program?
The 5 should probably line up with the
2 and 3.
A first set of test cases
99 + 99 -99 + -99
99 + 56 56 + 99
99 + -14 -14 + 99
38 + -99 -99 + 38
-99 + -43 -43 + -99
9+9 0+0
0 + 23 -23 + 0
Choosing test cases
Not all test cases are significant.
Impossible to test everything (this simple
program has 39,601 possible different test
cases).
If you expect the same result from two tests,
they belong to the same class. Use only one
of them.
When you choose representatives of a class
for testing, pick the ones most likely to fail.
Further test cases
100 + 100
<Enter> + <Enter>
123456 + 0
1.2 + 5
A+b
<CTRL-C> + <CTRL-D>
<F1> + <Esc>
Other things to consider
Storage for the two inputs or the sum
127 or 128 can be an important boundary
case
Test cases with extra whitespace
Test cases involving <Backspace>
The order of the test cases might
matter
E.g. <Enter> + <Enter>
An object-oriented example
Input: Three integers, a, b, c, the
lengths of the side of a triangle
Output: Scalene, isosceles, equilateral,
invalid
Test case classes
Valid scalene, isosceles, equilateral triangle
All permutations of two equal sides
Zero or negative lengths
All permutations of a + b < c
All permutations of a + b = c
All permutations of a = b and a + b = c
MAXINT values
Non-integer inputs
Example implementation
class Triangle{
public Triangle(LineSegment a, LineSegment b,
LineSegment c)
public boolean is_isosceles()
public boolean is_scalene()
public boolean is_equilateral()
public void draw()
public void erase()
}
class LineSegment {
public LineSegment(int x1, int y1,
int x2, int y2)
}
Extra Tests
Is the constructor correct?
Is only one of the is_* methods true
in every case?
Do results repeat, e.g. when running
is_scalene twice or more?
Results change after draw or erase?
Segments that do not intersect or form
an interior triangle
Inheritance tests
Tests that apply to all
Figure
Figure objects must still
work for Triangle
objects
Tests that apply to all ClosedFigure
ClosedFigure objects
must still work for
Triangle objects
Triangle
Testing limits
Dijkstra: Program Testing can be
used to show the presence of
defects, but never their absence.
It is impossible to fully test a
software system in a reasonable
amount of time or money
When is testing complete? When
you run out of time or money.
Complete testing
What do we mean by "complete testing"?
Complete "coverage": Tested every line/path?
Testers not finding new bugs?
Test plan complete?
Complete testing must mean that, at the end
of testing, you know there are no remaining
unknown bugs.
After all, if there are more bugs, you can find
them if you do more testing. So testing
couldn't yet be "complete."
Complete coverage?
What is coverage?
Extent of testing of certain attributes or pieces of
the program, such as statement coverage or
branch coverage or condition coverage.
Extent of testing completed, compared to a
population of possible tests.
Why is complete coverage impossible?
Domain of possible inputs is too large.
Too many possible paths through the program.
Measuring and achieving high
coverage
Coverage measurement is a good tool
to show how far you are from
complete testing.
But its a lousy tool for investigating
how close you are to completion.
Testers live and breathe
tradeoffs
The time needed for test-related tasks is
infinitely larger than the time available.
Example: Time you spend on
Analyzing, troubleshooting, and effectively
describing a failure
Is time no longer available for
Designing tests Documenting tests
Executing tests Automating tests
Reviews, inspections Training other staff
The infinite set of tests
There are enormous numbers of possible
tests. To test everything, you would have to:
Test every possible input to every variable.
Test every possible combination of inputs to every
combination of variables.
Test every possible sequence through the
program.
Test every hardware / software configuration,
including configurations of servers not under your
control.
Test every way in which any user might try to use
the program.
Testing valid inputs (an example)
MASPAR is a parallel computer used for mission-
critical and life-critical applications.
To test the 32-bit integer square root function, all
4,294,967,296 values were checked. This took 6 minutes.
There were 2 (two) errors, neither of them near any
boundary.
The underlying error was that a bit was sometimes mis-set, but
in most error cases, there was no effect on the final calculated
result.
Without an exhaustive test, these errors probably wouldnt
have shown up.
What about the 64-bit integer square root? How could we
find the time to run all of these?
Testing valid inputs
There were 39,601 possible valid inputs
in ADDER
In the Triangle example, assuming only
integers from 1 to 10, there are 104
possibilities for a segment, and 1012 for
a triangle. Testing 1000 cases per
second, you would need 317 years!
Testing invalid inputs
The error handling aspect of the system
must also be triggered with invalid
inputs
Anything you can enter with a keyboard
must be tried. Letters, control
characters, combinations of these,
question marks, too long strings etc
Testing edited inputs
Need to test that editing works (if
allowed by the spec)
Test that any character can be changed
into any other
Test repeated editing
Long strings of key presses followed by
<Backspace> have been known to crash
buffered input systems
Testing input timing variations
Try entering the data very quickly, or very
slowly.
Do not wait for the prompt to appear
Enter data before, after, and during the
processing of some other event, or just as
the time-out interval for this data item is
about to expire.
Race conditions between events often leads
to bugs that are hard to reproduce
Combination testing
Example 1: a program crashed when attempting to
print preview a high resolution (back then, 600x600
dpi) output on a high resolution screen. The option
selections for printer resolution and screen resolution
were interacting.
Example 2: American Airlines couldnt print tickets if a
string concatenating the fares associated with all
segments was too long.
Example 3: Memory leak in WordStar if text was
marked Bold/Italic (rather than Italic/Bold)
What if you dont test all
possible inputs?
Based on the test cases chosen, an
implementation that passes all tests but
fails on a missed test case can be
created.
If it can be done on purpose, it can be
done accidentally too.
A word processor had trouble with large
files that were fragmented on the disk
(would suddenly lose whole paragraphs)
Testing all paths in the system
B

A F
D
G
C X EXIT
H
E
I < 20 times
through the
loop

Heres an example that shows that there are too many paths to
test in even a fairly simple program. This is from Myers, The Art
of Software Testing.
Number of paths
One path is ABX-Exit. There are 5 ways to get to X
and then to the EXIT in one pass.
Another path is ABXACDFX-Exit. There are 5 ways to
get to X the first time, 5 more to get back to X the
second time, so there are 5 x 5 = 25 cases like this.
There are 51 + 52 + ... + 519 + 520 = 1014 = 100
trillion paths through the program.
It would take only a billion years to test every path (if
one could write, execute and verify a test case every
five minutes).
Further difficulties for testers
Testing cannot verify requirements.
Incorrect or incomplete requirements
may lead to spurious tests
Bugs in test design or test drivers are
equally hard to find
Expected output for certain test cases
might be hard to determine
Conclusion
Complete testing is impossible
There is no simple answer for this.
There is no simple, easily automated,
comprehensive oracle to deal with it.

Therefore testers live and breathe


tradeoffs.