Qaqc Section: Presented To QAQC Safety Session at Jakarta MRT Project July 15, 2017
Qaqc Section: Presented To QAQC Safety Session at Jakarta MRT Project July 15, 2017
Qaqc Section: Presented To QAQC Safety Session at Jakarta MRT Project July 15, 2017
Controlling
Quality Control
Construction
Process
Inspection, Test, and
Checking
Product Control Product
Submit Material
Check & Comment,
Approval, Method
Upon satisfaction,
Statement,
Submit for Approval
Shop drawing
Comment and/or
Submit to owner Approval Return back to
SOWJ
JOINT INSPECTION
(Action of each party as per inspection Test
Plan(ITP)
Slurry
material Excavation
monitoring monitoring
Arrangement rebar and Rebar & stop Installing rebar and stop
stop joint joint material joint
check
Installation
rebar & stop
joint check
A
Sample of Inspection Flow
Construction of D-Wall
A
Pouring
concrete
monitoring
Finish
Sample of Inspection Flow
AAC Wall Work
AAC
installation
check
Plaster &
Arrangement plaster & skim skim coat Installing plaster and skim
coat material coat
check
installation
check
Finish
Sample of Document
Sample of ITP
How do we handle Non-
Conformance Before work done?
Contractor found Non-Conformance
on site
Rebar Test
Non-Corformance/ Lack of
Immediate Cause Basic Cause
accident commitment