10 LAGU Installation
10 LAGU Installation
10 LAGU Installation
LAGU INSTALLATION
9/20/18
About LAG
9/20/18
TSI cards will be interfaced with TUI in ATU frame just like as was in
case of BPU and TSU.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
S S
P P
P P
T C T T T C
S T T T T T T T T T T T T T T T T S
I / U U I /
U C C C C C C C C C C C C C C C C U
C I I I C I
I I
S S
P P
5V, 12V DC are used for driving TSI cards which is fed from ATU.
Both the cables (5V/12v) are fed from different ATU. If one ATU
fails, LAGU will not be affected as it will work in simplex mode.
Two slot chassis contains two NGTJ and two TSI cards.
9/20/18
NGTJ card
9/20/18
NGTJ variants are NGTJ-A00 (EEB integrated) and NGTJ-B00 (EEB not
integrated).
Ethernet connection
EEB connection
LED 9/20/18
16 TT cables
9/20/18
9/20/18
LAGU Chassis
LAGU Chassis
9/20/18
Bus-bar
9/20/18
9/20/18
9/20/18
AT LAGU
PC side
Minicom
9/20/18
9/20/18
Ethernet ports
9/20/18
E1 to CACU site
EEB/
EEB E1 DDF DDF E1
MLS Uplink to
/CACU core
ETHERNET E1
LAGU SYSTEM
LAGU SYSTEM
(A00)-EEB
INTEGRATED
LAGU SITE CACU SITE
9/20/18
MLS
ETHERNET ETHERNET
EEB
BM /LAG BM /LAG
V5AG/PRIAG
SG/MG
SLM
9/20/18
9/20/18
9/20/18
9/20/18
THANK YOU
Feedback :- cdotmaxng@gmail.com
9/20/18