1/ Scope of Application :
- Only for boiler
2/ Purpose:
In order to clean the welding slag, iron, dust, grease during the construction of the boiler.
Create a protective layer into metal that limits chemical corrosion to occur.
3/ Process of alkaline:
- Refer to Martech standard
- Refer to external subcontractors
4/ Request:
- Calculate the boiler’s volume.
- Provide protective equipment for working with chemicals.
- Strictly monitor and control the process of alkaline in accordance with the given process.
- Record the phenomenon, the steps of alkaline process according to reality.
- After completing the process of alkaline process, save the record.
DRY-OUT PROCESS FOR BOILER
II/ PROCESS OF DRY-OUT
450
450
450
500
400
400
400
400
400
450
350
350
350
350
350
400
300
300
300
300
300
350
Temperature (`C)
1/ Scope of application:
250
250
250
250
250
300
- Boiler.
200
200
200
200
200
250
150
150
150
150
150
200
- Oil thermal heater.
100
100
100
100
150
2/ Purpose: 100
102
104
106
108
110
112
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
6
96
12
18
24
30
36
42
48
54
60
66
72
78
84
90
3/ Dry-out process: Time (h)
- Refer to Martech standard boiler dry-out process.
- Refer to Martech standard oil thermal heater dry-out process. DRY-OUT PROCESS FOR OIL
4/ Request: THERMAL HEATER
275
275
275
300
- Do not use rice husk to perform dry-out.
250
250
250
250
225
225
225
225
- Record the boiler parameters during the boiler dry-out process. 250
200
200
200
- Record the oil thermal heater parameters during the oil heating
Temperature (`C)
175
175
175
200
150
150
150
process.
125
125
125
150
- After finish the dry-out process, check the entire boiler system.
100
100
100
100
75
75
Make sure the combustion chamber doesn't have any abnormalities. If
50
yes, fix repair. 50
25
0
102
108
114
120
126
132
138
144
150
156
162
168
174
0
6
18
36
12
24
30
42
48
54
60
66
72
78
84
90
96
Time (h)
III/ HANDBOOK GUIDE OPERATION
Scope of Application :
- Boiler.
- Oil thermal heater.
1/ BOILER EFICIENCY
a/ Formula:
𝐺. (𝐼𝒔 − 𝐼𝒘 )
𝜂= . 100%
𝑀. 𝑄𝒏𝒆𝒕