Claudine and Kai have to stuff and mail envelops
for a new marketing campaign. Claudine can do
the job alone in 6 hours while Kai can do the
same job in 12 hours. How long would it take
the both of them to finish the job?
Given:
Completed part of a job per hour:
Hours to complete the job:
1
Claudine
Claudine 6 hours 6
1
Kai 12 hours Kai
12
1
Together T Together 𝑇
Step 1: Assign variable.
1 1 1
+ =
𝑥 𝑦 𝑡
Step 3 : Solve the Equation.
1 1 1
+ = Substitute the given values.
6 12 𝑡
1 1 1
12𝑇 ( + = ) 12𝑇 Find the LCD and multiply it both sides.
6 12 𝑇
3𝑇 = 12
1 1 1
(3𝑇 = 12) Multiply both sides by
3
3 3
12
𝑇=
3
𝑇=4
Therefore, it would take 4 hours to finish their job if they work together.
Paul, Alex and Drew can finish painting the fence
in 3 hours. If Paul takes 7 hours to finish
painting the fence alone and Alex takes 9 hours.
How long will it takes for Drew to finish the job
alone?
Given:
Hours to complete the job: Completed part of a job per hour:
1
Paul 7 hours Paul
7
1
Alex 9 hours Alex
9
Andrew Z Andrew 1
𝑍
Together 3 hours Together 1
3
Step 1: Assign variable.
1 1 1 1
+ + =
𝑥 𝑦 𝑧 𝑡
Step 3 : Solve the Equation.
1 1 1 1
+ + = Substitute the given values.
7 9 𝑧 3
1 1 1 1 Find the LCD and multiply
63𝑧( + + = )63𝑧 it both sides.
7 9 𝑧 3
63 = 5𝑧
1 1 1
(63 = 5𝑧) Multiply both sides by .
5 5 5
63 3
=𝑧 𝑧 = 12 Z= 12 Hours and 36 Minutes
5 5
Therefore, it takes 12 Hours and 36 minutes in order for Drew o finish the job.
A tank can be filled by pipe A in
3 hours and by pipe B in 5
hours. When the tank is full it
takes 4 hours to drain the
water. If the tank is initially
empty and all the 3 pipes are
open, how long would it take to
fill the tank in hours?
Given:
Pipe A 3 hours
Pipe B 5 hours
Pipe C 4 hours
All Pipes T
1 1 1 1
+ + =
𝑥 𝑦 𝑧 𝑡
1 1 1 1
+ − = Substitute the given values.
3 5 4 𝑡
1 1 1
Multiply both sides by .
(17t = 60) 17
17 17
60 9
𝑡= 𝑜𝑟 𝑡 = 3 T= 3 Hours and 32 Minutes
17 17