Industrial Training Presentation: 1. Muhamad Ikmal Syafiq Bin Abdul Hamid 2. Muhammad Asyraf Bin MD Jusoh
Industrial Training Presentation: 1. Muhamad Ikmal Syafiq Bin Abdul Hamid 2. Muhammad Asyraf Bin MD Jusoh
Industrial Training Presentation: 1. Muhamad Ikmal Syafiq Bin Abdul Hamid 2. Muhammad Asyraf Bin MD Jusoh
PRESENTATION
1. MUHAMAD IKMAL SYAFIQ BIN ABDUL HAMID
2. MUHAMMAD ASYRAF BIN MD JUSOH
SYP (PLUMBING)
Green indicates the Yellow are used to carry Red indicates the secondary We must gained less than 3Ω
grounding of an electric power but are not for wiring wire in a 220-volt circuit. which meet requirement by
circuit. the outlets for common plug TNB
devices.
EXOTHERMIC WELDING
connect two earthing cable at insert metal retaining disc into pour the weld powder into
the mould case the mould the mould
make a flow or path of make some spark using the two earthing cable welded
carbide into the mould flint gun to ignite the carbide
M&E SUB-CONTRACTOR SRI KDU KLANG
SYP (PLUMBING)
TRIDENT (LIFT)
DAILY ACTIVITIES
Update the C&S work progress .
1. Column Rebar
2. Column Formwork
3. Concrete Column
4. Setting scaffold
5. Formwork (Beam)
6. Beam Rebar
7. Formwork (slab)
-Conceal Pipe (Plumbing)
8. 1st Layer Rebar
-Install Conceal Conduit (Electrical)
9. 2nd Layer Rebar
10. Inspection M&E and C&S
11. Concrete slab
Site walk with Mr. Felix (Senior Discussion with Mr. Eugene
Project Manager) for him to for ceiling opening of MV and
see the work progress by Plumbing at toilet 1 (mock
himself. up).
Sample of Request for
Information &
Confirmation (RFIC)