Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Industrial Training Presentation: 1. Muhamad Ikmal Syafiq Bin Abdul Hamid 2. Muhammad Asyraf Bin MD Jusoh

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 23

INDUSTRIAL TRAINING

PRESENTATION
1. MUHAMAD IKMAL SYAFIQ BIN ABDUL HAMID
2. MUHAMMAD ASYRAF BIN MD JUSOH

FAKUCLTY OF MECHANICAL ENGINEERING (FKM)


• Paramount Corporation Berhad (Paramount) was incorporated as a public limited company in 1969 under the name
Malaysia Rice Industries. The company was then involved in the rice milling business.
• In 1978, the company was restricted into a property development company and renamed in 1981.
• Paramount, as it is known today is listed on the Main Market of Bursa Malaysia Securities Berhad with two core
business interests which are property development and education services under the brand names of Paramount
Property and Paramount Education respectively.
• This year (2019), Paramount celebrates it golden anniversary with great pride as it reflects on its milestones and
numerous achievements over the last 50 years. Paramount is guided by its vision of “changing lives and enriching
communities for a better world”.
• A highly-respected brand, backed by a talented workforce, sound fundamentals and well-embedded corporate values,
the group is well-regarded for its outstanding track record and unwavering commitment to fulfilling market demand
for high quality homes and education.
• Having set the stage with a solid foundation in place, the group is poised for its next phase of growth as it eagerly
anticipates new challenges and exciting opportunities had will create a strong and sustainable future for generations
to come.
Paramount Property (HQ) location
M&E SUB-CONTRACTOR AT GLENMARIE

SYP (PLUMBING)

VOON ELECRICAL (ELECTRIC)

MENANG TECHNIC (FIRE FIGHTING)

NEW MALAYSIA ENGINEERING(ACMV)

THYSSENKRUPP ELEVATOR MALAYSIA


SAFETY AND OCCUPATIONAL HEALTH
TOOLBOX MEETING

Toolbox meeting will be Safety staffs demonstrate Tutorials what need to


held every Thursday at how to use fire do if somebody accident
7.45 a.m. extinguisher at the site
DAILY ACTIVITIES
UPDATE PROGRESS AT
CONSTRUCTION SITE

20 AUGUST 2019 22 AUGUST 2019 23 AUGUST 2019 26 AUGUST 2019


INSPECTION AT CONSTRUCTION
SITE
M&E PROGRESS TESTING
MEGA TEST WITH VOON
ELECTRICAL COMPANY

PURPOSE: TO ENSURE THE WIRE ARE FULLY INSULATED AND THE


WIRING CONNECTION IS CONNECTED
PRESSURE TEST WITH SYP AND
MENANG TECHNIC COMPANY

PRESSURE TEST FOR PRESSURE TEST FOR


SPRINKLER SYSTEM COLD WATER
SYSTEM
EARTH TEST WITH
VOON ELECTRICAL COMPANY

Green indicates the Yellow are used to carry Red indicates the secondary We must gained less than 3Ω
grounding of an electric power but are not for wiring wire in a 220-volt circuit. which meet requirement by
circuit. the outlets for common plug TNB
devices.
EXOTHERMIC WELDING

connect two earthing cable at insert metal retaining disc into pour the weld powder into
the mould case the mould the mould

make a flow or path of make some spark using the two earthing cable welded
carbide into the mould flint gun to ignite the carbide
M&E SUB-CONTRACTOR SRI KDU KLANG

SYP (PLUMBING)

VOON ELECRICAL (ELECTRIC)

NATAMAS (FIRE FIGHTING)

MASTER AIRCOND (ACMV)

HYDROWAVE (SWIMMING POOL)

PIPEMECH (LPG GAS)

TRIDENT (LIFT)
DAILY ACTIVITIES
Update the C&S work progress .

1. Column Rebar
2. Column Formwork
3. Concrete Column
4. Setting scaffold
5. Formwork (Beam)
6. Beam Rebar
7. Formwork (slab)
-Conceal Pipe (Plumbing)
8. 1st Layer Rebar
-Install Conceal Conduit (Electrical)
9. 2nd Layer Rebar
10. Inspection M&E and C&S
11. Concrete slab

To update work progress of M&E Sub-con.


Discussion, Meeting, Site Walk & etc.
Discussion of M&E Sub-
Site walk with M&E Sub-con con with Main-con (PPC) to
to get a clear visual regarding solve the problems.
to issue occur at site.

Site walk with Mr. Felix (Senior Discussion with Mr. Eugene
Project Manager) for him to for ceiling opening of MV and
see the work progress by Plumbing at toilet 1 (mock
himself. up).
Sample of Request for
Information &
Confirmation (RFIC)

Minute Meeting every Thursday at 3.00


pm with Mr. Felix and each of Sub-con
manager to update the site progress.

Registration of RFMA & RFIC list.

Sample of Request for


Material Approval
Toolbox Meeting every Wednesday at 8.00 (RFMA)
am handle by safety supervisor, En Amar.
INSPECTIONS
Inspection of conceal conduit for electrical wiring
(VOON) by C.O.W, En Hafiz (consultant) and PPC
staffs (M&E)
Inspection of Lift equipment after it
been delivered at site with Mr
Jagades (Trident)

Checking the electrical socket height from


FFL either meet the requirement as per
drawing or not. Inspection of Sprinkler Point
with C.O.W , Cik Mohamad, En
Zaim and Mr Peter
Checking the electrical conduit with En Hafiz
(M&E Supervisor) at Glenmarie Construction
Site.
Inspection of MEGA Test of
electrical wiring.
Checking the height of MV ducting at canteen Inspection of plumbing point with C.O.W
which should be minimum 2100 mm from to ensure it being install as per drawing
bracket to FFL

Checking with En Zaim, Mr Eric and


Inspection for CW test at Mr Peter the D.B and Generator Set at
Glenmarie Site with En Hafiz site due to some problem has been
M&E SV. issued by worker.