Jawa 1 T & I
Jawa 1 T & I
Jawa 1 T & I
DOLPHIN PLATFORM
PRESENTATION OVERVIEW
TRANSPORTATION
TRANSPORTATIONAND
ANDINSTALLATION
INSTALLATIONSUMMARY
SUMMARY
TEMPLATE DESIGN
SEAFASTENING
STOWAGE PLAN LAY OUT
PILE UPENDING
SPREADER FRAME DESIGN
LIFTING ARRANGEMENT OPTIMIZATION
TEMPLATE PRELIMINARY DESIGN
BEAM H100X100
BEAM H250X250
TEMPLATE RE-DESIGN
UC = 0.62
UC = 0.38 UC = 0.73
UC = 0.89
UC = 0.80
UC = 0.42
NOTE:
: BEAM H100X100
: BEAM H200X200
: BEAM H300X300
UC = 0.48
SEAFASTENING BERTHING DOLPHIN
PROPERTIES SEAFASTENING :
OD = 35.56 cm
T = 1.27 cm MAX UC = 0.363
SEAFASTENING MOORING DOLPHIN
PROPERTIES SEAFASTENING :
OD = 35.56 cm MAX UC = 0.528
T = 1.27 cm
SEAFASTENING OFFLOADING TOPSIDE
PROPERTIES SEAFASTENING :
OD = 35.56 cm MAX UC = 0.478
T = 1.27 cm
SEAFASTENING OFFLOADING JACKET
MAX UC = 0.279
PROPERTIES SEAFASTENING :
OD = 35.56 cm
T = 1.27 cm
STOWAGE PLAN LAYOUT
PILE UPENDING DOLPHIN
m
70.5
UPENDING 30O
UPENDING 60O
MAX UC = 0.593
MAX UC = 0.356
PILE UPENDING OFFLOADING PLATFORM
m
57.9
WEIGHT 1 PILE = 25.72 MT
PILE UPENDING OFFLOADING PLATFORM
UPENDING 30O
MAX UC = 0.825 UPENDING 60O
MAX UC = 0.492
SPREADER FRAME
9.5 m
15 m
MAX TILT
SLING 1 SLING 2 SLING 3 SLING 4
(DEG)
X = -0.031
BD 2 & 3 12.339 12.255 12.217 12.26
Y = 0.008
X = -4.102
BD 1 & 4 12.339 12.255 12.217 12.26
Y = -0.462
X = 1.587
MD 12.339 12.255 12.217 12.26
Y = -0.933
X = 0.00
TOPSIDE 19.506 19.83 20.688 20.378
Y = 0.54
X = 2.54
JACKET 19.506 19.83 20.688 20.378
Y = 1.46
OFFLOADING TOPSIDE LIFTING
Sling 1 Sling 2
Y
(0,0) Rotation X = -0.031 Deg
Sling 4 Sling 3 Rotation Y = 0.008 Deg
BD 1 & 4 LIFTING
Sling 1
Sling 2
X
X
Y
(0,0)
Rotation X = -4.102 Deg
Sling 4 Sling 3
Rotation Y = -0.462 Deg
MD LIFTING
Sling 1 Sling 2
X
Y
(0,0) Rotation X = 1.587 Deg
Rotation Y = -0.933 Deg
Sling 3
Sling 4