Powered by AI
Some key takeaways from the document are that extended reach drilling combines horizontal and directional drilling techniques and requires a depth ratio of measured depth to true vertical depth of 2:1 or more. It allows access to remote reservoirs.

Challenges of extended reach drilling include hole cleaning and hydraulics, managing equivalent circulating density (ECD), wellbore stability, torque and drag, stuck pipe avoidance, and equipment protection.

Methods used for hole cleaning in extended reach drilling include scooping cuttings on the low side of the hole at low RPM, recirculating cuttings to the high side of the hole, and establishing a 'conveyor belt' to transport cuttings to the surface. The Reelwell drilling method also aims to address hole cleaning and downhole pressure issues using a dual drillstring.

LETS BRAINSTORM

EXTENDED REACH
DRILLING
DRILLING ENGINEERING
INTRODUCTION
Geosteering ,Torque reduction and Casing
floatation have all contributed extended Reach
drilling Achievments.

 ERD = Horizontal Drilling +Directional Drilling

Condition of ERD:

DEPTH RATIO= Measured Depth/TVD>= 2:1


ERD DATABASE
RANK HORIZONTAL MEASURED TVD(FT) OPERATOR LOCATION
DISPLACEME DEPTH(FT)
NT
(FT)
1 33,182 34967 5266 BP UK

2 26,446 30308 9554 PHILLIPS SOUTH


CHINA SEA
3 26,361 28593 5285 BP UK
4 25,764 30600 NA NORSK NORTH
HYDRO SEAJK
PLANNING
BHA Design
Casing Program
Hole Cleaning
ECD Management
Geosteering Efficiency
HOW DOES IT WORKS??
CHALLENGES OF ERD
• HOLE CLEANING AND HYDRAULICS
• ECD MANAGEMENT
• WELLBORE STABILITY
• TORQUE AND DRAG
• STUCK PIPE AVOIDANCE
• EQUIPMENT PROTECTION
Hole Cleaning
Scooping: Cuttings deposited on low side of hole are
mechanically eroded at low RPM.
RECIRCULATION: Once lifted cuttings are
recirculated upto high side of hole and above the pipe.
TRANSPORTATION: Regardless of the energy input
exerted on cuttings during recirculation they travel
only a certain distance and eventually settle down due
to gravity. A “conveyor belt” has to be established to
maintain cuttings transport to surface.
Reelwell Drilling Method
This method meticulously erradicates problems
regarding Hole Cleaning and Downhole Pressure.

This method is based on DualDrillString(DDS).

DDS: Drillstring fluid flows to the bit via drillstring


annulus and return flow to surface through an inner
string.
Achievments & Records
The current World Record for the longest measured
Depth ERD well is Chavyo Z-42 well(Exxon Neftegas).
It features horizontal depth of 41,667ft and horizontal
departure of 38,514ft.

Wells with Depth ratio 12 has been reported from


western Canada.
Other Notable ERD Masterpieces
1 well drilled by Maersk Oil Qatar with Depth Ratio 11.1
2 wells drilled by BP in EN=ngland with DEPTH RATIO
6.9 TO 6.6
1 well drilled by TOTAL in Argentina with Depth Ratio
6.7
1 well drilled by Exxon Mobil in California with DEPTH
RATIO of 5.36

CASE STUDY
HORIZON MEASURE TVD OPERATO WELL LOCATIO
TAL D R N
DISPLACE DEPTH(ft)
MNENT
33,182 34,967 5266 BP M-11 UK,Wytch
Farm
CHALLENGES
The M-11 well is nicknamed as “10-km challenge”.
Location: Proximity to nature preserve frequented by
global Tourists.
Reservoir Rock of MIOCENE AGE, Reservoir Rock is
Gas caped.
Controlling Bit vibrations.
Preventing Cutting bed formation.
Torquq Drag Management.
Comparision of Deviated Wells
HIGHER PRODUCTION RATES= MORE
$$$$
PROPOSED PLAN Vs. ERD WELL
THE MAGIC OF GEOSTEERING
EXAMPLARY TORQUE AND DRAG
MANAGEMENT
CASING FLOATATION
Running a 9.625” casing to a departure beyond 8000m
is a challenge.
Possible Remedies:
Casing Floatation
Tapered Casing String
Altered Fluid Properties
Thanks to SMART ENGINEERS
EFFICIENT GEOSTEERING
ROATARY STEERABLE SYSTEM(RSS)
GLOBAL PERFORMANCE WORKFLOW “ FAST
DRILL PROCESS”.

Spectacular Success
Reserve of 238million bbl unlocked @ $150million.
Project won “Queen’s Award for Environmental
Protection”.
Production from Wytch farm 1Lakh BOPD(80% from
ERW).
PLANNING AND DESIGN: >1YR
IMPLEMENTATION: 60 DAYS(<1% NPT)
GOOD NEWS TO FOLLOW
WYTCH FARM WELL TO CONTINUE
DEVELOPMENT UPTO 42640ft.
ANOTHER EXTREME WELL WITH STEPOUT 11M IS
IN PLANNING STAGES.
SEVERAL 6 TO 8 KM MULTILATERAL WELLS ARE
UNDER CONSIDERATION.
CONCLUSION
ERD IS:
COST EFFECTIVE
ENVIRONMENTALLY FAVOURABLE
HIGHER PRODUCTION RATE
INCREASED RESERVE POTENTIAL
MAXIMISED RESERVOIR CONTACT
LOWER NPT
THANK YOU
KEEP ON ENJOY LEARNING.....
QUESTION ANSWER ROUND
LIFE ITSELF IS AN UNANSWERED QUESTION BUT
LET’S STILL BELIEVE IN THE DIGNITY AND
IMPORTANCE OF QUESTIONS.