Final Defense PPT (Wajid Ali)
Final Defense PPT (Wajid Ali)
Final Defense PPT (Wajid Ali)
Wajid Ali
15-MS-EE-18
Engr. Prof. Dr. Aftab Ahmad
Chairman, EED
• Comparison of Results
5
Method
T • Improper :
Technical of Analysis STEEPLE
Energy-mix: High cost ofmethod
generation of
• High Transmission and Distribution (T&D) Losses
analysis •
•
Insufficient Infrastructure
Postponement in Commissioning of Power Plants
E Environmental • Increasing demand due to increasing temperature
• Heavy Rains and Floods
E Economic Stagnant Growth of economy and Circular Debt
P Political Political Instability, Inter-provincial Disharmony, Water
Disputes with neighbors
L Legal • Non-execution of Environmental Laws: Deforestation
and energy crisis
• Poor mechanism for recovery of energy bills from
consumers and government offices
• Poor execution of already existing energy security laws
E Ethical • Corruption
• Power Theft
200
150000
Population Density
150
100000
100
50000
50
0
5 5 65 975 985 995 005 015 017 019
19 1 9 1 1 1 2 2 2 2 0
1950 1960 1970 1980 1990 2000 2010 2020 2030
Years Years
8
Viva-voce Exam Department of Electrical Engineering
Social Factors (Contd).: Urbanization
Rise in Urbanization rate in Rise in energy consumption per Capita
Pakistan over past years over past years in Pakistan
600
30 400
300
20
200
10
100
0 0
71 75 79 83 87 91 95 99 03 07 11
19 19 19 1 9 1 9 1 9 1 9 1 9 2 0 20 20
Years Years
400
200
0
8 1 2 7 6 9 3 8 4 9 8 8 9 5 1
5 .0 6.0 7.0 8.0 8.8 9.5 0.3 1.0 1.8 2.5 3.1 3.7 4.3 3 5.6
2 2 2 2 2 2 3 3 3 3 3 3 3 3
Urbanization Rate
9
Viva-voce Exam Department of Electrical Engineering
Technical Factors
Improper Energy-mix: High cost of generation
mixed; 0.21; 0%
Solar; 0.53; 1%
Baggase; 2.68; 3%
Wind; 2.46; 2%
HSD; 0.12; 0%
Coal; 14.14; 14%
Nuclear; 6.78; 7%
11
Viva-voce Exam Department of Electrical Engineering
Technical Factors (Contd.)
High Transmission and Distribution (T&D) Losses
Years Units 2013- 2014-2015 2015-2016 2016-2017 2017-2018
2014
Units Sold GWH 71,055 72,642 76,623 81,558 91,902
Allowed T&D Percentage 15.3 14.2 15.3 15.3 16.3
losses
Transmission 19.7
Distribution 261.8
Electricity Electricity
Imported Generated
Distribution
Government Companies
Subsidies
Electricity
Payments
Consumers
Legal Factors
Non-execution of Environmental Laws: Deforestation and energy
crisis
Poor mechanism for recovery of energy bills from consumers and
government offices
Poor execution of already existing energy security laws.
18
Viva-voce Exam Department of Electrical Engineering
Ethical Factors
Corruption
Unwise Use of Energy
Power Theft
DISCOS Area/Province Units theft in July 2017- Respective Cost
being served March 2018
GEPCO Punjab 80 million units Rs1.002 billion
21
Viva-voce Exam Department of Electrical Engineering
Objective3: Current State of Distributed
Energy Sources In AJK (in focus)
Sr.# Status Nos. Capacity (MW)
22
Viva-voce Exam Department of Electrical Engineering
How the Distributed Energy Resources (DERs) based micro-grids
are competitive?
Benefits for deploying Description of Benefits
DERs
Affordability Either they will get profit or their cumulative bill will be
reduced.
Indigenous Energy Potential Its technology, rather than fuel. It will reduce over-reliance
on foreign fuel.
Reduced Network Cost With deployment of Distributed Generation, the continuous
need of grid expansion will be reduced.
23
Viva-voce Exam Department of Electrical Engineering
Objective4: Simulation of Solar-based micro-
grid for a village
Experimental Setup: HOMER Software
Quantity Value
Average 471
KWh/day
Average 19.63
demand
Peak 58.26
Demand
Production
Quantity Value Share (in percentage)
2 41.6%
Cost of Energy (COE) $0.0880 $0.0514
3 41.54%
NPC $193,393.26 $113,054.50
4 51.2%
Carbon dioxide gas emissions 108,650kg 53,059 kg
(per year)
5 51.16%
Sulphur Dioxide (per year) 471kg 230 kg
6 51.30%
Nitrogen Oxides (per year) 230kg 112 kg
Thank you
Solar PV 85 13 731
Biomass 45 10 101
Nuclear 29 2 130
Hydroelectric 26 2 237
Wind 26 6 124