Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Vmware Tco / Roi Calculator

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 31

VMware TCO / ROI Calculator

The VMware TCO / ROI Calculator was independently developed by leading ROI and TCO
consultancy Alinean, Inc. to quantify the potential cost savings that can be obtained from
VMware solutions. This tool utilizes industry research and savings estimates based on
Alinean research and VMware case studies to quantify the savings from deploying VMware
Solutions including Infrastructure Optimization, Disaster Recovery, Application Development
and Release Management, and Desktop Virtualization.
Analysis Options

Opportunities to address in this analysis:

Infrastructure Optimization Solutions


( √ ) VMware Infrastructure (VI)
( ) Lifecycle Management (using VMware vCenter Lifecycle Manager)
( ) Disaster Recovery Solutions

Application Development and Release Management Solutions


( ) VMware vCenter Lab Manager
( ) VMware vCenter Stage Manager

Desktop Solutions
( ) Desktop Solutions (using VMware View (formerly VDI))
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Analysis Summary

This 3‑year analysis for Brinks calculates the estimated total cost of ownership
(TCO) comparison between your current (As Is) environment and implementing
the proposed VMware solution. Based upon the information provided, the following
VMware products:
VMware Infrastructure (VI) provide a potential direct savings of $402,709 and an indirect
savings of $16,632 over 3 years.
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Analysis Summary

The projected outcome of this proposed VMware project for Brinks


includes:

• $402,709 in total direct TCO savings over 3 years.


• Additional $16,632 in indirect (soft) savings over 3 years.
• Overall, an ROI of 301.5% on an initial ($56,822) investment.
• An NPV savings of $329,390 and a projected payback period of 5
months.
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Analysis Summary

DELETE THIS SLIDE

Total direct TCO savings over 3 years of: $402,709


Additional indirect (soft) savings over 3 years of: $16,632
Overall ROI of: 301.5%
Total investment of: $56,822
NPV savings of: $329,390
IRR of: 263.6%
Projected payback period of: 5 months
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Cumulative 3 Year TCO Comparison

With VMware
Cumulative 3 Year TCO Comparison Current (As Is) (Projected) Difference ($ and % savings)

Infrastructure Optimization Solutions

TCO - Direct $715,599 $312,890 $402,709 56.3%

TCO - Indirect $47,520 $30,888 $16,632 35.0%

Total TCO (3 year) $763,119 $343,778 $419,341 55.0%

App Dev and Release Management

TCO - Direct $0 $0 $0 0.0%

TCO - Indirect $0 $0 $0 0.0%

Total TCO (3 year) $0 $0 $0 0.0%

Desktop Solutions

Total TCO (3 year) $0 $0 $0 0.0%

Total TCO

TCO - Direct $715,599 $312,890 $402,709 56.3%

TCO - Indirect $47,520 $30,888 $16,632 35.0%

Total TCO (3 year) $763,119 $343,778 $419,341 55.0%

Return on Investment (ROI) 301.5%

NPV Savings (3 year, discount rate = 11.0%) $329,390

Payback Period (in months) 5

Internal Rate of Return (IRR) 263.6%


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

TCO Comparison - By Product Set


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

3 Year TCO Comparison


Infrastructure Optimization Solutions
This 3-year analysis for Brinks calculates the estimated total cost of ownership (TCO) comparison
between your current (As Is) environment and implementing the proposed VMware solution.

Total direct TCO savings over 3 years of: $402,709


Additional indirect (soft) savings over 3 years of: $16,632
Overall ROI of: 468.7%
Total investment of: $89,465
NPV savings of: $329,390
IRR of: 263.6%
Projected payback period of: 5 months
Infrastructure Optimization Solutions
Based upon the information provided for the 55 production server environment, implementing VMware
Infrastructure provides the following:
• Reduce the number of production servers through virtualization, reducing servers from 55 to 7, a
savings of 87.3% - with a target consolidation ratio of 7.9:1.
• With the reduction in overall number of production servers, reducing operating power by 12.014
kWatts, cooling power by 15.033 kWatts, and datacenter space requirements by 7 square meters.
• A reduction of 316,855 lbs (144 tons) of carbon emissions, equivalent to the average emissions of
taking 26 cars off the road per year.
ICumulative 3 Year TCO Comparison

With VMware
Infrastructure Savings
Cumulative 3 Year TCO Comparison Current (As Is) (Projected) Savings Percentage Exclude?

VMware Infrastructure (VI) Benefits

Datacenter Server Hardware $305,844 $116,476 $189,368 61.9%

Datacenter Server Storage $28,424 $78,079 ($49,655) -174.7%

Datacenter Server Networking $44,122 $8,825 $35,297 80.0%

Datacenter Server Power and Cooling Consumption $108,667 $29,264 $79,403 73.1%

Datacenter Server Space $20,871 $4,637 $16,234 77.8%

Datacenter Server Provisioning $31,654 $2,375 $29,279 92.5%

Datacenter Server Administration $176,017 $149,231 $26,786 15.2%

Disaster Recovery Site Investment $0 $0 $0 0.0% √

Datacenter Server Disaster Recovery (Indirect) $0 $0 $0 0.0% √

Datacenter Server Unplanned Downtime (Indirect) $47,520 $30,888 $16,632 35.0%


Infrastructure
Cumulative Optimization
3 Year Solutions
TCO Comparison

With VMware
Infrastructure Savings
Cumulative 3 Year TCO Comparison Current (As Is) (Projected) Savings Percentage Exclude?

Investment Required

VMware Infrastructure Software Licenses $0 $56,822 ($56,822) 0.0%

VMware Infrastructure Support and Subscription $0 $32,643 ($32,643) 0.0%

Additional Software Licensing Costs (if any) $0 $0 $0 0.0%

VMware Infrastructure Design, Plan and


Deployment Services $0 $0 $0 0.0%

VMware Infrastructure Training $0 $0 $0 0.0%


Cumulative 3 Year TCO Comparison

With VMware
Infrastructure Savings
Cumulative 3 Year TCO Comparison Current (As Is) (Projected) Savings Percentage Exclude?

Additional Benefits from VI

VMware VMotion Cost Savings for Server Planned


Maintenance $10,382

VMware Storage VMotion Cost Savings for Storage


Planned Maintenance $28,398

VMware DRS Cost Savings for Dynamic Load


Balancing $66,558

VMware vCenter Update Manager Cost Savings for


Guest/Host Patching $60,124

VMware vCenter Lifecycle Manager Decommission


Savings $0 √

VMware vCenter Lifecycle Manager Provisioning


and Change Request Savings $0 √

TCO - Direct $715,599 $312,890 $402,709 56.3%

TCO - Indirect $47,520 $30,888 $16,632 35.0%

Total TCO (3 year) $763,119 $343,778 $419,341 55.0%


Expected Benefits from VI (from Current (As Is)

Expected Benefits from VI (from Current (As Is) Year 1 Year 2 Year 3 Total

Datacenter Server Hardware $57,211 $62,932 $69,225 $189,368

Datacenter Server Storage ($15,001) ($16,502) ($18,152) ($49,655)

Datacenter Server Networking $10,664 $11,730 $12,903 $35,297

Datacenter Server Power and Cooling Consumption $23,085 $26,317 $30,001 $79,403

Datacenter Server Space $4,904 $5,395 $5,935 $16,234

Datacenter Server Provisioning $8,480 $9,701 $11,098 $29,279

Datacenter Server Administration $7,758 $8,875 $10,153 $26,786

Disaster Recovery Site Investment $0 $0 $0 $0

Datacenter Server Disaster Recovery (Indirect) $0 $0 $0 $0

Datacenter Server Unplanned Downtime (Indirect) $5,544 $5,544 $5,544 $16,632

Total Benefits $102,645 $113,992 $126,707 $343,344


Additional Benefits from VI & Expected Investment
in VMware Solution

Additional Benefits from VI Year 1 Year 2 Year 3 Total

VMware VMotion Cost Savings for Server Planned


Maintenance $3,018 $3,441 $3,923 $10,382

VMware Storage VMotion Cost Savings for Storage


Planned Maintenance $8,256 $9,412 $10,730 $28,398

VMware DRS Cost Savings for Dynamic Load Balancing $20,108 $22,119 $24,331 $66,558

VMware vCenter Update Manager Cost Savings for


Guest/Host Patching $17,480 $19,927 $22,717 $60,124

VMware vCenter Lifecycle Manager Decommission Savings $0 $0 $0 $0

VMware vCenter Lifecycle Manager Provisioning and


Change Request Savings $0 $0 $0 $0

Total Additional Benefits $48,862 $54,899 $61,701 $165,462

Expected Investment in VMware Solution Initial / Year 1 Year 2 Year 3 Total

VMware Infrastructure Software Licenses $46,960 $4,696 $5,166 $56,822

VMware Infrastructure Support and Subscription $9,862 $10,848 $11,933 $32,643

Additional Software Licensing Costs (if any) $0 $0 $0 $0

VMware Infrastructure Design, Plan and Deployment


Services $0 $0 $0 $0

VMware Infrastructure Training $0 $0 $0 $0

Total Costs $56,822 $15,544 $17,099 $89,465


Expected 3 Year Benefits
3 Year TCO Comparison
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Application Development and Release Management


Application Development not selected for this analysis

Total direct TCO savings over 3 years of: $0


Additional indirect (soft) savings over 3 years of: $0
Overall ROI of: 0.0%
Total investment of: $0
NPV savings of: $0
IRR of: 0.0%
Projected payback period of: 0 months
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Application Development and Release Management


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Cumulative 3 Year TCO Comparison


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Cumulative 3 Year TCO Comparison


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Expected Benefits from VMware vCenter Lab/Stage


Manager
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Expected Investment in VMware vCenter Lab/Stage


Manager Solution
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Expected 3 Year Benefits


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

3 Year TCO Comparison


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

VMware View

VMware View not selected for this analysis

Total direct TCO savings over 3 years of: $0


Overall ROI of: 0.0%
Total investment of: $0
NPV savings of: $0
IRR of: 0.0%
Projected payback period of: 0 months
DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Cumulative 3 Year TCO Comparison


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Expected Benefits Investment in VMware View


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

Expected 3 Year Benefits


DELETE THIS SLIDE: SECTION NOT USED IN ANALYSIS

3 Year TCO Comparison


Conclusion

Placeholder for conclusion text

You might also like