Xe-Pian Xe-Namnoy Project

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 61

Xe-Pian Xe-Namnoy Project

Overview

1
Ⅰ . General

2
I . General

General – Project overview

 Install Capacity : 410MW

 Location : Champasack and Attapue Province

in Lao PDR

 Construction Period: 73 Months (Nov.13~ Dec.19)

 Concession Period : 27 years (Feb.19 ~ Feb.46)

 Project Cost: 1,020 M.USD

 COD : 6th Dec 2019

3
I I . Project Major Structure

HM Weir

XP Dam MC

XP-XN Transfer Conduit XN Dam

Saddle Dam

Intake

LPH

SS & VS
TBM Lunching

HPT & Penstock PH

TC
TL

4
General – Project concept

Sponsors
-SK E&C (26%)
-KOWEPO (25%)
- RATCH (25%)
- LHSE (24%)
PPA
EGAT Equity LENDER
30% Debt
(KEXIM)
70%
EDL Project Company
(PNPC)
LENDER
CA
(KTB)
GOL

OE EPC CSC O&M


(TRACTEBEL ENG) (SK E&C) (RATCH) (KOWEPO)

6
General – Project concept

Sponsors
-SK E&C (26%)
-KOWEPO (25%)
- RATCH (25%)
- LHSE (24%)
PPA
EGAT Equity
30% Debt
70%
EDL Project Company LENDER
(PNPC) (KTB)

CA
GOL

OE EPC CSC O&M


(TRACTEBEL ENG) (SK E&C) (RATCH) (KOWEPO)

7
Ⅰ . General

3. General information of project – Mapping & Profile

8
Ⅰ . General

General information of project – Mapping & Profile

Longitudinal

Xe-Pian Dam Xe-Namnoy Dam Surge Shaft Power House &


(H=48m, L=1,307m) (H=73.7m, L=1,600m) (D=8m,14m, L=217m) Penstock Civil Work
• Catchment 271 ㎢ • Catchment 522 ㎢
• Concrete & Rockfill Dam • Earth Core Rockfill Dam
• Reservior 24 mil. ㎥ • Reservior 1,092mil. ㎥

HSS
(D=3.6m, L=1,209m) Delivery Point

Low Pressure Tunnel Lao


LaoPDR
PDR Thailand
Thailand
(D=4.4~5.0m, L=13,600m)
Transfer Conduit • Concrete Lining
(L=8.05 km)
TL
230kV(110km) 500kV(60km)

Vertical Shaft
Houay Makchan Intake (D=4.4m, L=458m)
(H=8.5m,)
• Concrete Lining
• Catchment 81 ㎢ Tailrace channel
• Concrete Intake Structure (L=6.33 Km)
• HMC-XP Transfer conduit High Pressure Tunnel
Xe-Kong River
L=334 m (D=3.6~4.4m, L=1,565m)

• Concrete Lining 356m Turbine


Turbine&&Generator
Generator(410MW)
(410MW)
• Steel Lining 1,209 m

SECTION -I SECTION - II SECTION - III


9
Ⅰ. Work Progress
3. Major Features of the Project

10
Ⅰ. Work Progress
3. Major Features of the Project

11
Ⅰ. Work Progress
3. Major Features of the Project

12
Ⅰ. Work Progress
3. Major Features of the Project

13
Ⅰ. Work Progress
3. Major Features of the Project

14
Ⅰ. Work Progress [25th July 2019]

Brief Description

▼ D/T Closure Date:


2/2014 ○-------------------- 29 Apr. 2017

▼ D/T Closure Date: 31


11/2013 ○----------------------- Mar. 2017
▼ TBM Boring Completed on 18th March. 2017
2/2015 ○----------------------------------------------- 
01/2014 ○----------------------------------------------------------- 
09/2014 ○------------------------------------------- 

09/2016○----------------------------------------- 
01/2016 ○------------------------------------------------------- 
6/214 ○------------------------------------------------------------------------ 
7/2015 ○--------------------------------------------------------------- 

15
Project progress Schedule for NSD [25th July 2019]
and Saddle Dam E-F

▼ D/T Closure Date:


2/2014 ○-------------------- 29 Apr. 2017

▼ D/T Closure Date: 31


11/2013 ○----------------------- Mar. 2017
▼ TBM Boring Completed on 18th March. 2017
2/2015 ○----------------------------------------------- 
01/2014 ○----------------------------------------------------------- 
09/2014 ○------------------------------------------- 

09/2016○----------------------------------------- 
01/2016 ○------------------------------------------------------- 
6/214 ○------------------------------------------------------------------------ 

16
Huay Makchan Weir:
 Over view 201712  Spill way 201802

17
Huay Makchan Weir
Huay Makchan Weir
 Size
 Size
1. Type : Weir W x H x L : 17 x 21.6 x 23.45 m
1. Type : Weir W x H x L : 17 x 21.6 x 23.45 m
 Progress
 Progress
Complete
Complete
HMC-XP Conduit
HMC-XP Conduit
 Size
 Size
1. Type : Concrete Box Culvert,
1. Type : Concrete Box Culvert,
W x H x L : 1.8 x 2.2 x 334 m
W x H x L : 1.8 x 2.2 x 334 m
 Progress
 Progress
Complete
Complete

18
Xe-Pian Dam :
 Over view 201710  Miscellaneous Building 201801

XP Spillway
Type: Concrete Gravity dam
Height: 41.5m, Length: 149.5 m
Stilling Basin length: 30.82 m
Bottom Outlet cap.: 29.6 m3/s (MOL)
45.2 m3/s (FSL)
BO service gate (WxH): 1.45 x 1.7 m

19
Xe-Pian Dam :
 Dam Structure

20
Xe-Pian Dam :
 Dam Structure

21
Xe-Pian Gallery :
 Over view 201710  BO chamber

XP gallery

22
XP dam
XP dam
 Size
 Size
1. Type : Concrete Gravity & Centered Core
1. Type : Concrete
Rock-fill Dam, HGravity
x L : 48& xCentered
1,300 m Core
Rock-fill Dam, H x L : 48 x 1,300 m
2. Embankment Volume : 898,000m^3
2. Embankment Volume : 898,000m^3
3. Concrete Volume : 142,000 m^3
3. Concrete Volume : 142,000 m^3
 Progress
 Progress
Completed
Completed

23
Xe-Namnoy Dam :  Rock fill Slope: 1V:1.9H
 Length: 1600 m, Height: 73.7 m  Dam Type: CCRD

24
Xe-Namnoy Dam :  Rock fill Slope: 1V:1.9H
 Length: 1600 m, Height: 73.7 m  Dam Type: CCRD

25
Xe-Namnoy Dam :  Type: Labyrinth Weir
 Spillway L: 415.4 m, Side wall high: 15.5 m  Flip bucket and Ungated free overflow

26
Ⅰ. Work Progress
Xe-Namnoy Diversion Tunnel :
 Length: 416.5m,Diameter: 7 m  EDP Dia.: 2100 mm

27
XN Dam
XN Dam
 Size
 Size
1. Type : Centered Core Rock-fill Dam,
1. Type : Centered Core Rock-fill Dam,
H x L: 73 x 1,600 m
H x L: 73 x 1,600 m
2. Embankment Volume : 3,747,799 m^3
2. Embankment Volume : 3,747,799 m^3
3. Concrete Volume : 68,000 m^3
3. Concrete Volume : 68,000 m^3
 Progress
 Progress
Completed
Completed

28
XP-XN Transfer Conduit

XP-XN transfer conduit


XP-XN transfer conduit
 Size
 Size
1. Type : Concrete Box Culvert,
1. Type : Concrete Box Culvert,
2. W x H x L: 4.0 x 4.0 x 7,958 m
2. W x H x L: 4.0 x 4.0 x 7,958 m
 Progress
 Progress
Completed
Completed

29
30
Saddle Dam-A

Saddle Dam-A
Saddle Dam-A
 Size
 Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 17m, Length = 83.0m
2. Height = 17m, Length = 83.0m
 Progress
 Progress
Completed
Completed

31
Saddle Dam-C

Saddle Dam-C
Saddle Dam-C
 Size
 Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 2.96m, Length = 105.62m
2. Height = 2.96m, Length = 105.62m
Progress
Progress
Completed
Completed

32
Saddle Dam-D

Saddle Dam-D
Saddle Dam-D
 Size
 Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 16.48m, Length = 773.26m
2. Height = 16.48m, Length = 773.26m
Progress
Progress
Completed
Completed

33
New Saddle Dam-D

34
New Saddle Dam-D

Dam Type: RCC


Length: 430 m
Height: 56.7 m
Dam Crest Level: 791.7 m

35
New Saddle Dam-D

36
Saddle Dam-E

Saddle Dam-E
Saddle Dam-E
 Size
 Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 12.48m, Length = 461.2m
2. Height = 12.48m, Length = 461.2m
Progress
Progress
Completed
Completed

37
Saddle Dam-F

Saddle Dam-F
Saddle Dam-F
 Size
 Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 18.1m, Length = 456.89
2. Height = 18.1m, Length = 456.89
Progress
Progress
Completed
Completed

38
Saddle Dam A,C,D,E,F
Saddle Dam A,C,D,E,F

39
Power Intake

Power Intake
Power Intake
 Size
 Size
1. Type : Single Bellmouth
1. Type : Single Bellmouth

2. Trash-rack Opening = W10.7 x H8.7m Fix


2. Trash-rack Opening
wheel gate = W10.7
= W3.0 x H8.7m Fix
x H5.0m
wheel gate = W3.0 x H5.0m
Progress
Progress
Completed
Completed

40
Surge Shaft

Surge Shaft
Surge Shaft
 Size
 Size
1. Type : Restricted orifice surge shaft
1. Type : Restricted orifice surge shaft

2. Surge Shaft Length = 217m 8.0m Inner Dia.


2. L=
Surge ShaftTransistion
168.22m Length = 217m
zone8.0m Inner
L= 2.48 m Dia.
L= 14.0m
168.22m Transistion
Inner zone L=
Dia. L= 46.00 m 2.48 m
14.0m Inner Dia. L= 46.00 m
Progress
Progress
Completed
Completed

41
Low Pressure Tunnel

 Size
 Size
1. Type : TBM+ D&B
1. Type : TBM+ D&B

2. Total Length = 13.596km TBM: L=11.5 km,


2. Lining
Total Inner
Length = 13.596km
Dia= TBM: shape)
5.0m (circular L=11.5 km,
LiningL=2.096km
NATM: Inner Dia= (Horseshoe
5.0m (circular shape)
shape)
NATM: L=2.096km (Horseshoe shape)
Progress
Progress
Completed
Completed

42
Vertical Shaft

 Size
 Size
1. Type : Circular, concrete lined (RBM +
1. Type : Circular,
NATMconcrete lined (RBM +
NATM
2. Inner Dia. 4.4m, Height 485m Concrete
2. Inner Dia. 4.4m, Height 485m Concrete
Lining
Lining
Progress
Progress
Completed
Completed

43
High Pressure Tunnel

 Size
 Size
1. Type : D&B
1. Type : D&B
2. Con'c Lining : Inner Dia. 4.4m, L = 355m
2. Con'c
Steel Lining
Lining : Inner
: Inner Dia.Dia. 4.4m,
3.6m, L =L1,209m
= 355m
Steel Lining : Inner Dia. 3.6m, L = 1,209m
Progress
Progress
90%
90%

44
High Pressure Tunnel

 Steel pipe installation at Junction # 02  Skin grouting at steel lining

 Prepare lean concrete at Junction 02  Steel pipe installation at Portal

45
LPT & Valve Chamber

 Transition zone-Shuttering work  Transition zone-Concrete Completed

 Valve chamber Upstream steel lining installation  Elbow – Preparing for Final Layer concrete.

46
Penstock
As of 25th May 2018

Activity Unit Total Accumulative %

Steel pipe installation


(Sta.15+320.0 ~ 16+067.4, M 747 747 100%
P7~P15)
Steel pipe encasement concrete
M 747 747 100%
(Sta.15+320.0 ~ 16+067.4)

Backfilling
M3 126,313 126,313 100%
(Sta.15+320.0 ~ 16+067.4)

 Completed  Steel pipe encasement concrete

47
Powerhouse

 Aerial View  Roof installation-Completed

 Aerial View  Irrigation Channel

48
SwitchYard Foundation Total. Completed. Ratio(%)
Nos 389 389 100.00%

 Aerial View  Aerial View

 Cable Trench  Control building

49
Pakse-Substation Embankment Total. Completed. (%)
M3 48,163 42,603 88.5%

 Block # 1-2 Fence Cyclone Wire Installation  Control Building – work on going

 Block # 1-1 Road # 6 Completed  Residence Building – Brick work on-going

50
Tailrace Channel

 Slope Protection  Outlet to Sekong river

 Overall Progress  Box Culvert#5

Total Plan(%) Plan accum. Actual accum. Ratio(%)


100% 72.31% 84.95% 117.4%
 Slope Protection
Slope Protection Total. Completed. (%)
M 12,200 12,200 100%

 Excavation Status
Total 1,028,435 ㎥
January 2018 86,127 ㎥ Completed
Accumulative 973,356 ㎥ Completed (94.6%)
Balance 55,079 ㎥ Remained

51
Tailrace Channel

 Sekong Outlet  TRC Labyrinth Weir

 Slope Protection Work  Check Dam#4

52
Operators’ Village

12-May-2019

53
Operators’ Village

 PNPC office  Residence B3

 VIP Guest House 1-2  Canteen

54
Irrigation System MPM n°50 (January 2018)

Additional left
6.885km

PNPC left
3km
Power House
Second canals
PNPC Right
3km

Additional Right
3.509km
Transmission Line

 115kv TL- Foundation  230kv TL- Tower Erection & Stringing work

 230kv TL- Stringing work  500kv TL- Stringing work

56
Transmission Line 500 kv. Tower#20

T020

24-Jul-2019 57
Transmission Line 500 kv. Tower#023
Risky Tower

24-Jul-2019 58
Transmission Line 500 kv. Tower#132
Lao-Thai border

06-May-2018
59
Transmission Line 230 kv. Tower#14

60