Xe-Pian Xe-Namnoy Project
Xe-Pian Xe-Namnoy Project
Xe-Pian Xe-Namnoy Project
Overview
1
Ⅰ . General
2
I . General
in Lao PDR
3
I I . Project Major Structure
HM Weir
XP Dam MC
Saddle Dam
Intake
LPH
SS & VS
TBM Lunching
TC
TL
4
General – Project concept
Sponsors
-SK E&C (26%)
-KOWEPO (25%)
- RATCH (25%)
- LHSE (24%)
PPA
EGAT Equity LENDER
30% Debt
(KEXIM)
70%
EDL Project Company
(PNPC)
LENDER
CA
(KTB)
GOL
6
General – Project concept
Sponsors
-SK E&C (26%)
-KOWEPO (25%)
- RATCH (25%)
- LHSE (24%)
PPA
EGAT Equity
30% Debt
70%
EDL Project Company LENDER
(PNPC) (KTB)
CA
GOL
7
Ⅰ . General
8
Ⅰ . General
Longitudinal
HSS
(D=3.6m, L=1,209m) Delivery Point
Vertical Shaft
Houay Makchan Intake (D=4.4m, L=458m)
(H=8.5m,)
• Concrete Lining
• Catchment 81 ㎢ Tailrace channel
• Concrete Intake Structure (L=6.33 Km)
• HMC-XP Transfer conduit High Pressure Tunnel
Xe-Kong River
L=334 m (D=3.6~4.4m, L=1,565m)
10
Ⅰ. Work Progress
3. Major Features of the Project
11
Ⅰ. Work Progress
3. Major Features of the Project
12
Ⅰ. Work Progress
3. Major Features of the Project
13
Ⅰ. Work Progress
3. Major Features of the Project
14
Ⅰ. Work Progress [25th July 2019]
Brief Description
09/2016○-----------------------------------------
01/2016 ○-------------------------------------------------------
6/214 ○------------------------------------------------------------------------
7/2015 ○---------------------------------------------------------------
15
Project progress Schedule for NSD [25th July 2019]
and Saddle Dam E-F
09/2016○-----------------------------------------
01/2016 ○-------------------------------------------------------
6/214 ○------------------------------------------------------------------------
16
Huay Makchan Weir:
Over view 201712 Spill way 201802
17
Huay Makchan Weir
Huay Makchan Weir
Size
Size
1. Type : Weir W x H x L : 17 x 21.6 x 23.45 m
1. Type : Weir W x H x L : 17 x 21.6 x 23.45 m
Progress
Progress
Complete
Complete
HMC-XP Conduit
HMC-XP Conduit
Size
Size
1. Type : Concrete Box Culvert,
1. Type : Concrete Box Culvert,
W x H x L : 1.8 x 2.2 x 334 m
W x H x L : 1.8 x 2.2 x 334 m
Progress
Progress
Complete
Complete
18
Xe-Pian Dam :
Over view 201710 Miscellaneous Building 201801
XP Spillway
Type: Concrete Gravity dam
Height: 41.5m, Length: 149.5 m
Stilling Basin length: 30.82 m
Bottom Outlet cap.: 29.6 m3/s (MOL)
45.2 m3/s (FSL)
BO service gate (WxH): 1.45 x 1.7 m
19
Xe-Pian Dam :
Dam Structure
20
Xe-Pian Dam :
Dam Structure
21
Xe-Pian Gallery :
Over view 201710 BO chamber
XP gallery
22
XP dam
XP dam
Size
Size
1. Type : Concrete Gravity & Centered Core
1. Type : Concrete
Rock-fill Dam, HGravity
x L : 48& xCentered
1,300 m Core
Rock-fill Dam, H x L : 48 x 1,300 m
2. Embankment Volume : 898,000m^3
2. Embankment Volume : 898,000m^3
3. Concrete Volume : 142,000 m^3
3. Concrete Volume : 142,000 m^3
Progress
Progress
Completed
Completed
23
Xe-Namnoy Dam : Rock fill Slope: 1V:1.9H
Length: 1600 m, Height: 73.7 m Dam Type: CCRD
24
Xe-Namnoy Dam : Rock fill Slope: 1V:1.9H
Length: 1600 m, Height: 73.7 m Dam Type: CCRD
25
Xe-Namnoy Dam : Type: Labyrinth Weir
Spillway L: 415.4 m, Side wall high: 15.5 m Flip bucket and Ungated free overflow
26
Ⅰ. Work Progress
Xe-Namnoy Diversion Tunnel :
Length: 416.5m,Diameter: 7 m EDP Dia.: 2100 mm
27
XN Dam
XN Dam
Size
Size
1. Type : Centered Core Rock-fill Dam,
1. Type : Centered Core Rock-fill Dam,
H x L: 73 x 1,600 m
H x L: 73 x 1,600 m
2. Embankment Volume : 3,747,799 m^3
2. Embankment Volume : 3,747,799 m^3
3. Concrete Volume : 68,000 m^3
3. Concrete Volume : 68,000 m^3
Progress
Progress
Completed
Completed
28
XP-XN Transfer Conduit
29
30
Saddle Dam-A
Saddle Dam-A
Saddle Dam-A
Size
Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 17m, Length = 83.0m
2. Height = 17m, Length = 83.0m
Progress
Progress
Completed
Completed
31
Saddle Dam-C
Saddle Dam-C
Saddle Dam-C
Size
Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 2.96m, Length = 105.62m
2. Height = 2.96m, Length = 105.62m
Progress
Progress
Completed
Completed
32
Saddle Dam-D
Saddle Dam-D
Saddle Dam-D
Size
Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 16.48m, Length = 773.26m
2. Height = 16.48m, Length = 773.26m
Progress
Progress
Completed
Completed
33
New Saddle Dam-D
34
New Saddle Dam-D
35
New Saddle Dam-D
36
Saddle Dam-E
Saddle Dam-E
Saddle Dam-E
Size
Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 12.48m, Length = 461.2m
2. Height = 12.48m, Length = 461.2m
Progress
Progress
Completed
Completed
37
Saddle Dam-F
Saddle Dam-F
Saddle Dam-F
Size
Size
1. Type : Earth Fill
1. Type : Earth Fill
2. Height = 18.1m, Length = 456.89
2. Height = 18.1m, Length = 456.89
Progress
Progress
Completed
Completed
38
Saddle Dam A,C,D,E,F
Saddle Dam A,C,D,E,F
39
Power Intake
Power Intake
Power Intake
Size
Size
1. Type : Single Bellmouth
1. Type : Single Bellmouth
40
Surge Shaft
Surge Shaft
Surge Shaft
Size
Size
1. Type : Restricted orifice surge shaft
1. Type : Restricted orifice surge shaft
41
Low Pressure Tunnel
Size
Size
1. Type : TBM+ D&B
1. Type : TBM+ D&B
42
Vertical Shaft
Size
Size
1. Type : Circular, concrete lined (RBM +
1. Type : Circular,
NATMconcrete lined (RBM +
NATM
2. Inner Dia. 4.4m, Height 485m Concrete
2. Inner Dia. 4.4m, Height 485m Concrete
Lining
Lining
Progress
Progress
Completed
Completed
43
High Pressure Tunnel
Size
Size
1. Type : D&B
1. Type : D&B
2. Con'c Lining : Inner Dia. 4.4m, L = 355m
2. Con'c
Steel Lining
Lining : Inner
: Inner Dia.Dia. 4.4m,
3.6m, L =L1,209m
= 355m
Steel Lining : Inner Dia. 3.6m, L = 1,209m
Progress
Progress
90%
90%
44
High Pressure Tunnel
45
LPT & Valve Chamber
Valve chamber Upstream steel lining installation Elbow – Preparing for Final Layer concrete.
46
Penstock
As of 25th May 2018
Backfilling
M3 126,313 126,313 100%
(Sta.15+320.0 ~ 16+067.4)
47
Powerhouse
48
SwitchYard Foundation Total. Completed. Ratio(%)
Nos 389 389 100.00%
49
Pakse-Substation Embankment Total. Completed. (%)
M3 48,163 42,603 88.5%
Block # 1-2 Fence Cyclone Wire Installation Control Building – work on going
50
Tailrace Channel
Excavation Status
Total 1,028,435 ㎥
January 2018 86,127 ㎥ Completed
Accumulative 973,356 ㎥ Completed (94.6%)
Balance 55,079 ㎥ Remained
51
Tailrace Channel
52
Operators’ Village
12-May-2019
53
Operators’ Village
54
Irrigation System MPM n°50 (January 2018)
Additional left
6.885km
PNPC left
3km
Power House
Second canals
PNPC Right
3km
Additional Right
3.509km
Transmission Line
115kv TL- Foundation 230kv TL- Tower Erection & Stringing work
56
Transmission Line 500 kv. Tower#20
T020
24-Jul-2019 57
Transmission Line 500 kv. Tower#023
Risky Tower
24-Jul-2019 58
Transmission Line 500 kv. Tower#132
Lao-Thai border
06-May-2018
59
Transmission Line 230 kv. Tower#14
60
Organization Chart
61