Lecture 4 (Work Study)
Lecture 4 (Work Study)
10/31/2021 2
Difference between Method study and Work Measurement
10/31/2021 3
Relationship between method study and work measurement
Method Study
(Simplified Work Method)
Work
Study High
Productivity
Work Measurement
(Standard Operation time)
10/31/2021 4
Objectives of work study
10/31/2021 5
Principles of motion economy
10/31/2021 6
Principles related to the use of Human Body
Both hands should start and complete their movements at the same time.
The hands should not be idle at the same time. The motion of hands should be
symmetrical and opposite in direction.
The momentum should be exploited to assist the motions.
Continuous movements are preferred over straight line movements with sharp turns.
Ballistic movements are faster than controlled movements.
Rhythm are necessary for easy and smooth operations.
10/31/2021 7
Principles related to the layout of workplace.
There should be fixed and definite place for all tools and materials.
Tools, materials and controls should be lactated close to and directly in front of the
operator.
Gravity feed bins and containers should be used to deliver materials close to the point of
use.
Drop delivers should be used whenever possible.
Materials and tools should be located in accordance with best sequence of motion.
Provision should be made for adequate condition for seeing. Glare should be avoided and
contrast should be created for better visibility.
Height of the workplace and the chair should be preferably be arranged.
A chair of the type and the height to permit good posture should be provided for every
worker.
10/31/2021 8
Principles related to the Design of Tools and Equipment
Hands should be relieved of all work that can be held in jigs or fixtures.
Two or more tools should be combined whenever possible.
Tools and materials should be pre-positioned.
When fingers do the job, the load should match the capability of fingers.
Handles should match the force requirement and the capability of the operator.
The levers, cross bars and handles should be provided in the convenient positions.
10/31/2021 9
Method Study
10/31/2021 10
Procedure of Method Study
10/31/2021 11
Economic analysis
10/31/2021 12
b) Record the facts and data
The most commonly used techniques for recording of facts and data are charts and
diagram. These charts can be classified into three types.
i. Travel charts
Movement charts ii. Flow diagram
iii. String diagrams
10/31/2021 13
Symbols used for activities
Operation
Inspection
Transport
Delay
storage
10/31/2021 14
i. Operation process chart (outline process chart)
10/31/2021 15
ii. Flow process charts
10/31/2021 16
iii. Man- Machine charts or activity charts
10/31/2021 17
iv. Left-hand Right-hands charts
10/31/2021 18
v. Travel chart
10/31/2021 19
vi. Flow diagrams
10/31/2021 20
vii. String Diagrams
10/31/2021 21
c) Analyze
The data regarding the existing method is examined symmetrically. The areas of
investigation include:
The investigation gathers the information about best possible alternative in each area
of all activities one by one.
10/31/2021 22
d) Develop
10/31/2021 23
e) Define
10/31/2021 24
f) Install
10/31/2021 25
g) Maintain
10/31/2021 26
Work Measurement
Time Study
Normal Time
Rating
Standard Time
10/31/2021 27
Time study
10/31/2021 28
Normal time
10/31/2021 29
Rating
10/31/2021 30
Rating
10/31/2021 31
Standard Time
10/31/2021 32
Standard Time
10/31/2021 33
Standard Time
10/31/2021 34
Use of Standard Time
10/31/2021 35