MEP Coordination
MEP Coordination
MEP Coordination
Jahfer Olambil
What is MEP...?
Mechanical Electrical Plumbing in full form.
Priority Services
1. Drainage
2. HVAC
3. Electrical & ELV installations.
4. Water supply & Fire Fighting Pipes
HVAC : Acceptable changes for clash free MEP
Coordination
1. Aspect ratio
2. Offsets
3. Rerouting
4. FCU position
5. CHWP
Plumbing: Acceptable Changes for clash free MEP
Coordination
Drainage (should be done only in case there is no other
option)
Lowering
Rerouting
Water Supply
Forced system,
Fire Fighting
Forced system-branches
Rain Water
Electrical & ELV: Acceptable changes for clash
free MEP Coordination
RCP Support
The MEP final fixes (like HVAC supply & retun grills, Fire Alarm
detectors, Sprinklers, Lights etc) are to be arranged well with false
ceiling design and alignment. This is called RCP co-ordination.
MEP priority
Symmetry
Access doors
AP-5310-CO-6-PR-101.pdf
SHEET- 1 OF 2.pdf
Thank You
HVAC- (Heating, Ventilation &Air Contitioning)
HVAC systems are used for heating and cooling in homes, building, vehicles
along with indoor climate control.
Components:
Chillers & Chilled Water Pumps.
Piping's & valves
Air Handling Units
Ducts- Supply ducts, Return ducts, Exhaust ducts, etc.
Diffusers & Grills, Etc.