Field Visit Report
Field Visit Report
Field Visit Report
D AT E O F V I S I T: 0 7 / 1 0 / 2 0 2 2 - 1 8 - 1 1 - 2 0 2 2
CONTENTS
2
GENERAL INFORMATION OF THE SITE
Site is located at the 5th floor of SIR M VISHVESWARAYYA BLOCK, REVA UNIVERSITY. It is
a roof terrace and is an open, wide, flat area over that building. The flat roof is made of reinforced
concrete with a 3 feet full brick wall construction as a parapet wall above the roof, along the edge of
roof that surrounding its perimeter,
extension of exterior wall.
3
MAJOR ACTIVITIES
4
MINOR ACTIVITIES
There are markings with respect to all the points to add columns.
Concrete at the roof beam level is hacked and removed to expose the reinforcements.
5
OBSERVATION
1. It was observed that Built-up members were used in many structures, such as compression
members of supporting columns.
2. They are composed from two rolled U-sections or four rolled angles. The distance between
them were fixed by lacing or battening. And thus,
3. It was noticed that T - section and square section of steel are used.
6
GENERAL INFORMATION OF THE SITE
7
MAJOR ACTIVITIES:
8
The mix sand and aggregate are filled
automatically in the bucket and reach upward to the
mixture with the help of pulley system, All the
ingredients of the ready-mix concrete are the mixed and
filled in the Transits.
9
MINOR ACTIVITIES
1. The capacity of the plant of making mix in one time is (0.5 cubic meter) and the
capacity of the Transit Mixture is 7 cubic meters. It takes up to 20-25 minutes to
fill one Transit Mixture of 7 cubic meter. The plant is completely based on
software working system which is regulatory under the observation of Operator.
Operator simply fills the data on the software according to requirement of the
client and the machines starts working accordingly.
10
OBSERVATION OF THE STUDENT AT SITE
11
12
THANK YOU