Procedure:
1. Set the multi-tester selector knob to
continuity/resistance X10.
Procedure:
2. Place the negative test probe to solenoid
body and the positive test probe to solenoid
“S-terminal”.
Procedure:
3. The tester should read.
Take Note:
If the tester does not read, the circuit is
open. Replace the solenoid assembly.
Perform
Hold-in Test
Procedure:
1. Disconnect the field coil lead wire from the
M terminal of solenoid switch.
Procedure:
2. Connect the positive terminal of battery to
the S terminal of solenoid switch.
Procedure:
3. Connect the negative terminal of battery to
the field coil lead wire and body ground of
starter motor.
Take Note:
Check that the pinion gear remains out. But
if the pinion gear returns inward, it means that
you need to replace the solenoid switch.
Test Contact Plate
for
Open Circuit
Procedure:
1. Set the multi-tester selector knob to
continuity/resistance X10.
Procedure:
2. Place any tester probe to “B” or battery
terminal and the other tester probe to “M” or
motor terminal.
Procedure:
3. Push/Compress the solenoid plunger all the
way to the end.
Procedure:
4. The tester should read.
Take Note:
If the tester does not read, the contact
plate is open. Replace the solenoid assembly.
Take Note:
If the tester does read when the plunger is
not pressed, the contact plate is grounded.
Replace the solenoid assembly.
Test Armature Assembly
for
Open Circuit/Ground
Inspect Commutator
for
Open Circuit
Procedure:
1. Using an ohmmeter or multi-tester (set in
X1). Connect the probes of tester in between
the segments of the commutator. Check if there
is continuity.
Take Note:
If there is no continuity between any
segment, replace the armature.
Inspect Commutator
for
Ground
Procedure:
1. Using an ohmmeter or multi-tester (set in
X1). Connect the probes of tester in between
the commutator and armature coil core. Check
if there is no continuity.
Take Note:
If there is continuity, replace the armature.
Test Field Coil Windings
for
Open Circuit/Ground
Inspect Field Coil
Windings
for
Open Circuit
Procedure:
1. Using an ohmmeter or multi-tester (set in
X1). Connect the probes of tester between the
lead wire and carbon brush lead. Check if
there is a continuity.
Take Note:
If there is no continuity, you may replace
the field coil housing.
Inspect Field Coil
Windings
for
Ground
Procedure:
1. Using an ohmmeter or multi-tester (set in
X1). Connect the probes of tester to the lead
wires of field coil windings and to the field
coil housing. Check that there is no continuity.
Take Note:
If there is continuity, you may replace the
field coil housing.
Test Carbon Brush
Holder
for
Open Circuit
Procedure:
1. Using an ohmmeter or multi-tester (set in
X1). Connect the probes of tester to the
positive (+) and negative (-) of carbon brush
holder. Check that there is no continuity.
Take Note:
If there is continuity, you may replace the
carbon brush holder..
Test Voltage Drops in
Positive Cable
Test Voltage Drop in Positive Cable