SCM3 - Perancangan Produk
SCM3 - Perancangan Produk
SCM3 - Perancangan Produk
Perspektif SCM
• Beberapa tahun yang lalu, suatu model kamera digital dan camcorder Sony
bisa bertahan selama 10 – 12 bulan di pasar sebelum digantikan oleh model-
model yang lain. Dewasa ini, siklus tersebut berkurang hingga sampai 2 – 3
bulan saja (Jiang, 2003).
PRODUCT
SUPPLY
PROCESS CHAIN
DFM – key to efficient manufacturing process
Pujawan, I N., and Mahendrawathi Er. (2017), Supply Chain Ma
nagement 3rd. Ed, Penerbit Andi
Spectrum on Approaches to Product Design
• Traditional over-the-wall design: supplier plays no role in design
• Informal collaboration: includes information from conversations or
informal consultation with suppliers
• Formal collaboration: involves representatives of the suppliers in a
formal collaboration
• Supplier design: the supplier designs the product based on general
specification from the buyer.
Meliputi kegiatan:
• Idea generation
• Business / technical assessment
• Concept development
• Engineering & Design
• Prototype / ramp-up
Biaya perubahan
rancangan
Fleksibillitas rancangan
Fase/Waktu
Sumber: Handfield & Nichols, 2002
etc.
Second Stage in the
Design Activity
etc.
Pujawan, I N., and Mahendrawathi Er. (2017), Supply Chain
Management 3rd. Ed, Penerbit Andi
Supplier Integration
• Secara tradisional, supplier sering dipilih setelah rancangan produk selesai dibuat
dan siap diproduksi.
• Saat ini, supplier dipilih lebih awal dan dilibatkan dalam perancangan produk
baru.
Business /
Idea Concept Engineering
Generation
Technical
Development
Prototype
Assessment And design
EARLY LATER
• Suppliers of complex items • Suppliers of simpler items
• Suppliers of systems / • Suppliers of single
subsystems components
• Suppliers of critical items or • Suppliers of less critical items
technologies or technologies
• Strategic alliance suppliers • Non-allied suppliers
Compact Logistics
design postponement
Integration
Modularity & between SC
Design reusability and product
design function
Distribusi
Pabrik Pusat
Distribusi
(a) sebelum
Distribusi &
lokalisasi
Manufaktur
Pabrik Pusat
Distribusi
(b) sesudah
CS1
2000
1500
1000 943
500
229 229
49 82
13
0
>300 101-300 51-100 21-50 11-20 2-10 1
Lower
Better economies inventory
of scale for investment
purchasing
Lower price
per unit
More
responsive
Shorter SC
purchasing lead
Pujawan, I N., and Mahendrawathi Er. (2017), Supply Chain time
Management 3rd. Ed, Penerbit Andi
Quantifying Impact of Component Commonality
• If all those components are standardized into one, what would be the
safety stock level needed?
• Thus, the total of safety stock for 4 items would be 4 * 164.5 = 658
units.