REVIEW Week_38 PLAN WEEK_39
14 SEPTEMBER – 20 SEPTEMBER 2020 21 SEPTEMBER – 27 SEPTEMBER 2020
PHYSICAL AVAILABILITY
PA Actual Week-38
CODE FORECAST PA ACTUAL PA
REMARK
UNIT Week-38 Week-38
501 80,00% 73,63% Problem DiscClutch & Fabrikasi
502 80,00% 0% Engine
503 80,00% 73,37% Problem DiscClutch
504 0,00% 0,00% Engine
505 80,00% 74,68% Problem DiscClutch
506 80,00% 0,00% Engine
507 0,00% 0,00% Engine
508 0,00% 0,00% Engine
509 80,00% 91,43%
510 80,00% 0,00% Engine
511 92,00% 94,46%
512 92,00% 98,77%
513 65,71% 0,00% Transmisi
514 95,00% 98,36%
515 95,00% 98,86%
551 50,00% 56,52%
554 0,00% 0,00% Engine
555 0,00% 0,00% Engine
81% 84%
Total %
58% 42%
Down Time Schedule Unit PT.SBS Week-38
COMPONENT GROUP OTHERS
Component, Power
(Periodical Service)
PLAN SCHEDULE
Sistem Intake dan
Kabin, Mounting,
Total BD Time
Filter Udara, Air
SAFETY DEVICE
Steering, Joint
Pasca Insident
Mesin/Engine
Spring, Shock
Waiting Part
Steering (All
Spakboard)
APAR, P3K)
CODE UNIT
Front Axle
Solar, FIP)
Transmisi
Rear Axle
Absorber
Steering)
Radiator
Exhaust
Elektrik
Kopling
Tire
501 1,47 - 0,50 - 24,00 - - - 2,50 4,50 - - - - - 7,50 - - - - 40,47 20,50
502 - - - - - - - - - - - - - - - - - - - 0,00 20,50
503 - - - - - - - - - - - - - - - - - - - - 0,00 20,50
504 - - - - - - - - - - - - - - - - - - - 0,00 119,77
505 2,00 7,50 0,50 - 5,50 - - - 1,00 1,00 - - - - - - - - - - 17,50 20,50
506 - - - - - - - - - - - - - - - - - - - 0,00 20,50
507 - - - - - - - - - - - - - - - - - - - 0,00 119,77
508 - - - - - - - - - - - - - - - - - - - 0,00 119,77
509 1,50 - 0,50 - 8,90 - - - - - - - 3,50 - - - - - - - 14,40 20,50
510 - - - - - - - - - - - - - - - - 168,00 - - 168,00 20,50
511 - - 0,50 - 5,28 - - - - 1,00 - - 1,00 - - - - - - - 7,78 7,50
512 - - 0,02 - - - - - - - - - - - - - - - - - 0,02 7,50
513 - - - - - - - - - - - - - - - - - - 0,00 39,58
514 1,00 - 0,50 - - - - - - - - - - - - - - - - - 1,50 5,30
515 - - 0,50 - - - - - - 0,67 - - - - - - - - - - 1,17 5,30
551 1,20 0,50 0,50 0,38 - - - - 1,47 68,44 - - - - - - - 72,49 53,00
554 - - - - - - - - - - - - - - - - - - - 0,00 119,77
555 - - - - - - - - - - - - - - - - - - - 0,00 119,77
Total 7,17 8,00 3,52 0,38 43,68 0,00 0,00 0,00 4,97 75,61 0,00 0,00 4,50 0,00 0,00 7,50 0,00 168,00 0,00 0,00 323,33 860,53
% 2,22% 2,47% 1,09% 0,12% 13,51% 0,00% 0,00% 0,00% 1,54% 23,39% 0,00% 0,00% 1,39% 0,00% 0,00% 2,32% 0,00% 51,96% 0,00% 0,00%
Frequency 5 2 8 1 4 0 0 0 3 5 0 0 2 0 0 1 0 1 0 0 32
Down Time Unschedule Unit PT.SBS Week-38
COMPONENT GROUP OTHERS
PLAN UNSCHEDULE
Ganjal, APAR, P3K)
Fabrikasi (Vessel &
Rem/Brake Utama
(Tangki Solar, FIP)
Kabin, Mounting,
Total BD Time
Waiting Bengkel
Power Steering,
SAFETY DEVICE
(Rotary, Radio,
Joint Steering)
Pasca Insident
Mesin/Engine
Spring, Shock
Waiting Part
Component,
Steering (All
Fuel System
Spakboard)
CODE UNIT
Pelumasan
(Overhaul)
Cross Join
Greasing/
Transmisi
Rear Axle
Absorber
Radiator
Trunion
Exhaust
Elektrik
Kopling
Turbo
Tyre
Luar
501 - - - - 3,83 - - - - - - - - - - - - - - - - 3,83 8,20
502 - - - - - - - - - - - - - - - - - - 168,00 - - 168,00 8,20
503 - 14,50 - - 20,86 3,50 - - - - 0,57 - 0,25 2,20 - - 2,86 - - - - 44,74 8,20
504 - - - - - - - - - - - - - - - - - - 168,00 - - 168,00 48,23
505 - 14,50 - - 5,65 - - - - - 2,54 - 0,50 1,85 - - - - - - - 25,04 8,20
506 - - - - - - - - - - - - - - - - - - 168,00 - 168,00 8,20
507 - - - - - - - - - - - - - - - - - - 168,00 - - 168,00 48,23
508 - - - - - - - - - - - - - - - - - - 168,00 - - 168,00 48,23
509 - - - - - - - - - - - - - - - - - - - - - 0,00 8,20
510 - - - - - - - - - - - - - - - - - - - - - 0,00 8,20
511 - - - - - - 0,70 0,50 - - - - - - - 1,20 3,00
512 - - - - - - - - - - - - 0,75 1,00 - - - - - - - 1,75 3,00
513 - - - - - 168,00 - - - - - - - - - - - - - - - 168,00 15,92
514 - - - - - - - - - - 0,75 - - 0,50 - - - - - - - 1,25 2,12
515 - - - - - - - - - - 0,75 - - - - - - - - - - 0,75 2,12
551 - - - - - - - - - - - - 0,33 - 0,22 - - - - - - 0,55 21,20
554 - - - - - - - - - - - - - - - - - - - 168,00 - 168,00 48,23
555 - - - - - - - - - - - - - - - - - - 168,00 - 168,00 48,23
Total 0,00 29,00 0,00 0,00 30,34 171,50 0,00 0,00 0,00 0,00 4,61 0,00 2,53 6,05 0,22 0,00 2,86 0,00 672,00 504,00 0,00 1423,11 345,91
% 0,00% 2,04% 0,00% 0,00% 2,13% 12,05% 0,00% 0,00% 0,00% 0,00% 0,32% 0,00% 0,18% 0,43% 0,02% 0,00% 0,20% 0,00% 47,22% 35,42% 0,00% 100,00%
Frequency 0 2 0 0 3 2 0 0 0 0 4 0 5 5 1 0 1 0 4 3 0 30
Waterflow Breakdown Schedule & Unschedule W_38
SCHEDULE UNSCHEDULE
UNIT DT
PLAN ACTUAL PLAN ACTUAL
DT 501 20,50 40,47 8,20 3,83
DT 502 20,50 0,00 8,20 168,00
DT 503 20,50 0,00 8,20 44,49
DT 504 119,77 0,00 48,23 168,00
DT 505 20,50 17,50 8,20 24,54
DT 506 20,50 0,00 8,20 168,00
DT 507 119,77 0,00 48,23 168,00
DT 508 119,77 0,00 48,23 168,00
DT 509 20,50 14,40 8,20 0,00
DT 510 20,50 168,00 8,20 0,00
DT 511 7,50 7,78 3,00 0,50
DT 512 7,50 0,02 3,00 1,00
DT 513 39,58 0,00 15,92 168,00
DT 514 5,30 1,50 2,12 1,25
DT 515 5,30 1,17 2,12 0,75
DT 551 53,00 72,49 21,20 0,22
DT 554 119,77 0,00 48,23 168,00
DT 555 119,77 0,00 48,23 168,00
TOTAL 860,53 323,33 345,91 1.420,58
Estimasi
Code Unit Problem Hours Caused Of Problem Corrective Action PIC Status Remark
Date
Ring Syncromize & Reinduksi Driver Pengoperasian Unit & Overhaul Operasional &
DT-513 Transmisi 840,00 TBC Continue Overhaul Transmisi/ Waiting Part
Main Gear broken Engine, Change Part Team Plant
ALL Brake 75,61 Road Conditions Pengecekan Rem Setiap 2 Rit Continue Team Plant SBS Continue
Plant Departement
DAILY HOURS ZAXIS 370-5G (E-135)
Plant Departement
DAILY HOURS ZAXIS 220-5G (E-129)
Plant Departement
DAILY HOURS ZAXIS 220-5G (E-131)
DS 13465,9 13467,0 1,1 10,7 0,2 12,0 85% 9% 98% Padamkan api
16
NS 13467,0 13470,5 3,5 8,3 0,2 12,0 95% 30% 98% Padamkan api
DS 13470,5 13473,6 3,1 8,7 0,2 12,0 94% 26% 98% Padamkan api
17
NS 13473,6 13475,8 2,2 9,6 0,2 12,0 92% 19% 98% Padamkan api
DS 13475,8 13476,9 1,1 10,7 0,2 12,0 85% 9% 98% Padamkan api
18
NS 13476,9 13478,0 1,1 10,7 0,2 12,0 85% 9% 98% Padamkan api
DS 13478,0 13479,2 1,2 6,8 4,0 12,0 23% 15% 67% Padamkan api
19
NS 13479,2 13481,6 2,4 9,4 0,2 12,0 92% 20% 98% Padamkan api
DS 13481,6 13489,3 7,7 4,1 0,2 12,0 97% 65% 98% Padamkan api
20
NS 13489,3 13497,4 8,1 3,7 0,2 12,0 98% 69% 98% Padamkan api
Total 53,7 107,7 6,6 168,0 87,05% 32,85% 96,07%
Plant Departement
DAILY HOURS ZAXIS 370-5G (E-133)
DS 9234,1 9234,6 0,5 11,3 0,2 12,0 71% 4% 98% General job
16
NS 9234,6 9234,8 0,2 11,6 0,2 12,0 50% 2% 98% Coal Triming
DS 9234,8 9238,2 3,4 8,4 0,2 12,0 94% 29% 98% Tunggu Job
17
NS 9238,2 9238,2 0,0 11,8 0,2 12,0 0% 0% 98% Tunggu Job
DS 9238,2 9238,6 0,4 11,4 0,2 12,0 67% 3% 98% Tunggu Job
18
NS 9238,6 9238,6 0,0 11,8 0,2 12,0 0% 0% 98% Tunggu job
DS 9238,6 9242,1 3,5 8,3 0,2 12,0 95% 30% 98% Triming Prodak HS
19
NS 9242,1 9242,1 0,0 11,8 0,2 12,0 0% 0% 98% Tunggu Job
DS 9242,1 9248,8 6,7 5,1 0,2 12,0 97% 57% 98% Coal loading
20
NS 9248,8 9257,5 8,7 3,1 0,2 12,0 98% 74% 98% Coal loading
Total 37,6 127,6 2,8 168,0 59,50% 22,76% 98,33%
Plant Departement
DAILY HOURS ZAXIS 370-5G (E-134)
DS 5842,5 5850,1 7,6 4,2 0,2 12,0 97% 64% 98% Mud Loading
16
NS 5850,1 5850,1 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 5850,1 5857,6 7,5 4,3 0,2 12,0 97% 64% 98% Loading Soil
17
NS 5857,6 5857,6 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 5857,7 5863,8 6,1 5,7 0,2 12,0 97% 52% 98% Mud Loading
18
NS 5863,8 5863,8 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 5863,8 5863,8 0,0 11,8 0,2 12,0 0% 0% 98% No Job
19
NS 5863,8 5863,8 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 5863,8 5863,8 0,0 11,8 0,2 12,0 0% 0% 98% Cut Floor
20
NS 5863,8 5863,8 0,0 11,8 0,2 12,0 0% 0% 98% Cut Floor
Total 34,5 130,7 2,8 168,0 34,70% 20,88% 98,33%
Plant Departement
DAILY HOURS ZAXIS 220-5G (E-136)
DS 1953,6 1960,0 6,4 5,4 0,2 12,0 97% 54% 98% Drainage
16
NS 1960,0 1960,0 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 1960,0 1967,0 7,0 4,8 0,2 12,0 97% 59% 98% Drainage
17
NS 1967,0 1967,0 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 1967,0 1973,4 6,4 5,4 0,2 12,0 97% 54% 98% Drainage
18
NS 1973,4 1973,4 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 1973,4 1973,4 0,0 11,8 0,2 12,0 0% 0% 98% Drainage
19
NS 1973,4 1973,4 0,0 11,8 0,2 12,0 0% 0% 98% No Job
DS 1973,5 1980,7 7,2 4,6 0,2 12,0 97% 61% 98% Drainage
20
NS 1980,7 1980,7 0,0 11,8 0,2 12,0 0% 0% 98% No Job
Total 39,7 125,5 2,8 168,0 41,59% 24,03% 98,33%
Plant Departement
PA ACTUAL A2B W_38 _ PLAN W_39
Plant Departement
PLAN FORECAST PA DT WEEK 39
Plan PA Week-39
CODE ACTUAL PA FORECAST PA UPDATE PA
REMARK
UNIT Week-38 WEEK-39 WEEK-39
501 73,63% 80,00% 80,00%
502 0% 80,00% 0,00% Engine Noise / Progress Dismounting Part
503 73,37% 80,00% 80,00%
504 0,00% 0,00% 0,00% Engine Noise
505 74,68% 80,00% 80,00%
506 0,00% 80,00% 0,00% Engine Block Broken
507 0,00% 0,00% 0,00% Engine Noise
508 0,00% 0,00% 0,00% Engine Noise
509 91% 80,00% 80,00%
510 0,00% 80,00% 0,00% Schedule : Engine Overhaul (W/P)
511 94,46% 92,00% 92,00%
512 98,77% 92,00% 92,00%
513 0,00% 92,00% 50,00% Trial Transmisi (DS Only)
514 98,36% 95,00% 95,00%
515 98,86% 95,00% 95,00%
551 56,52% 50,00% 50,00%
554 0,00% 0,00% 0,00% Engine Block Broken
555 0,00% 0,00% 0,00% Engine Noise
84% 83% 79%