Value Stream Mapping
Value Stream Mapping
Value Stream Mapping
Introduction
Value stream mapping (VSM) can be an extremely powerful tool, combining material processing steps with information flow as well as other important related data. VSM is one of the most powerful lean tools for an organization wanting to plan, implement and improve on its lean journey. Value Stream Mapping is a method of creating a one page picture of all the processes that occur in a company, from the time a customer places an order for a product, until the customer has received that product (lead time). A value stream map is a simple picture that helps to focus on flow and eliminate waste.
Defects Overproduction Waiting Not Utilizing Employees Transportation Inventory Motion Excess Processing
An Exercise
Place the activities in appropriate column
Symbols / Icons
There are a number of common icons used in value stream maps, but icons can also be customized to best serve a value stream map. Icons help distinguish different elements of a product line from another. For example, different arrows should be used to distinguish between product and information movement. The figures in next slides contains commonly used icons in value stream mapping
Dead zones - places where work gets held up or lost Lost time - people looking for work and / or re-work loops to correct errors
16
17
18
19
Press Process Type L + S = 2,250 pieces (1,000 + 1,250) Duration = 3.5 days (2,250/640)
21
22
Total Pieces / Day / Shift = 640 Operating Time or Working Time = 25,200 sec Takt Time = Operating Time / Shift Customer Requirment / Shift 25,200 640
=
Takt Time =
39 seconds
23
60 Seconds
24
Number of Operators
35 35 30 Seconds 25 20 15 10 5 0 Press Pierce & Form Process Finish Grind 3 22
26
Incoming Orders
Weekly Fax
Receive Order
IN
MRP
All orders will be processed within one hour Review & Checkof receipt (6 Enter Order processed each hour). Credit Reconcile Order Confirm Order orders
IN IN IN IN
Finalize Order
IN
Fax
FIN
MRP
MRP
Phone
MRP
How often will we check our P/T = 1 min P/T = performance min customer needs? min 1 min P/T = 10 to P/T =7 %C&A = 75% % Accept = 90% % C&A = 60% %C&A = 85%
Batch = 4 hours Batch = 1.6 hours Batch = 1.6 hours Batch = 2 hours
.5 days
Each hour.
10 min 1 min
.2 days
.2 days 7 min
1 day
Takt Time =
= 10 minutes/order
Total Lead Time = 2.65 days Total Processing Time= 24.5 min
27
Incoming Orders
Phone Or WEB
Weekly Fax
Receive Order
MRP
Fax
Rework
Review & Enter Order
IN IN
Over Processing
Confirm Order
IN IN
Reconcile Order
Finalize Order
Waste
MRP MRP Phone
Waste
MRP
IN
Which = 10 min create min steps value?P/T =7 min P/T = 1 P/T %C&A = 75% % C&A = 60% %C&A = 85% Which are waste? Batch = 1.6 Batch = 1.6 Batch = 2 hours
hours hours
.5 days 10 min
.2 days 1 min
.2 days 7 min
1 day
Takt Time =
= 10 minutes/order
Total Lead Time = 2.65 days Total Processing Time= 24.5 min
28
MRP
Reconcile Order
IN
Confirm Order
IN
Finalize Order
IN
Fax
FIN
MRP
MRP
Phone
MRP
Auto Confirm
.2 days 7 min
1 day
1 min
Takt Time =
Total Lead Time = 1.25 days Total Processing Time= 11.5 min
29
Incoming Orders
Phone / Web
Receive / Credit Check / Reconcile Confirm
MRP
Implement Kanban Kanban will: Schedule Production to real time demand. Optimize (level) and Control Inventory. Link Production to Customer Demand.
Incoming Orders
Phone / Web
Receive / Credit Check / Reconcile Confirm
MRP
FG kanban determines the amount of a product to be kept on hand at any given time. Removal of material from the Finished Goods Kanban acts as a signal for more of that product to be manufactured.
Incoming Orders
Phone / Web
Receive / Credit Check / Reconcile Confirm
MRP
Shipping
32
Software Tools
One main purpose is to deepen one's understanding of a value stream by drawing a map of it. In current-state mapping this is done while observing the actual value stream in situation. Value stream maps are often drawn by hand in pencil; to keep the mapping process simple and iterative by allowing for simple correction. However, software tools can also be used. A variety are available either as stand alone products or stencils/addons to products such as Microsoft Visio, Dia and IGrafx.
33