Risk assessment and plugging them is key to the success of business processes. Construction companies are exposed to many kinds of risks. Correct identification of these risks is necessary for the management of such risks. We have prepared these risk assessment questionnaires from the perspective of construction companies. The coverage of issues is adequate. Hopefully, these questionnaires will be helpful in plugging key risks and drive successful business operations of construction companies. We welcome comments for improvements. Thank you.
Report
Share
Report
Share
1 of 39
Download to read offline
More Related Content
Internal Control Questionnaires for Construction Companies
2. (1/38)
Contents
1. General Issues.............................................................................................................................................2
2. Strategic Business Risks Management...................................................................................................3
3. Operating Risks Management.................................................................................................................5
4. Quality Management Systems (QMS)....................................................................................................7
5. Document Controlling and Handling.....................................................................................................8
6. Contract Order and Management ..........................................................................................................9
7. Communication Systems ........................................................................................................................10
8. Customer Satisfaction.............................................................................................................................10
9. Project Design and Design Control.......................................................................................................11
10. Tendering and Accepting a Project..................................................................................................12
11. Contract Development and Review ..................................................................................................14
12. Construction Work Planning, Scheduling, Execution, Control, and Management .................20
13. Contract Billing and Cost Related Accounts ..................................................................................23
14. Subcontractor Evaluation, Approval, Management and Control...............................................24
15. Supplier Evaluation, Selection and Approval.................................................................................27
16. Employee Performance Evaluation ..................................................................................................28
17. Company and Project-wise Budgets.................................................................................................29
18. Revenue Recording..............................................................................................................................30
19. Project Cost Accumulation ................................................................................................................32
20. Accounts Receivable............................................................................................................................34
21. Accounts Payable.................................................................................................................................35
22. Fixed Assets ..........................................................................................................................................36
23. Inventory...............................................................................................................................................37
24. Cash and Bank.....................................................................................................................................38
3. (2/38)
1. General Issues
# Description Ref. Y/N N/A
A Risk Consciousness
1
Is the management fully considering risk factors in taking the
best course of action?
2
Is management communicating these risk factors to employees
appropriately?
B Board of Directors
3
Is the board exercising management, technical, and other
expertise, along with the mindset that is necessary to perform
its oversight responsibilities effectively and efficiently?
4
Is the board asking about scrutinizing management's activities,
present alternative views, and act in the face of a failure?
C Objective Setting
5
Are business objectives appropriately communicated to all
levels of the organization?
Company level
Division level
Department level
D Adherence to Ethics
6
Does the company’s standards of behavior reflect integrity and
ethical values?
7
Are ethical values communicated to everyone through explicit
guidance?
4. (3/38)
8
Have integrity and ethical values conveyed to everyone through
a formal code of conduct?
9
Are communications channels existing where employees feel
comfortable by bringing relevant information?
10
Have integrity and ethical values communicated through
management actions and the examples set by them?
2. Strategic Business Risks Management
# Description Ref. Y/N N/A
1
Are new entrants (companies) increasing risks to the business
of the company?
2
Is price competition in the construction industry making the
achievement of the revenue targets difficult?
3
Are unexpected actions of the competitors increasing risks for
the company's competitive position?
4
Are unexpected changes in the market challenging the
competitive position of the company?
5
Are immature risk management processes and lack of
accountability impacting the achievement of objectives?
6
Is there a significant exposure of sensitive data entrusted to a
company’s management that may publicly disclose security
weaknesses or outsider intrusion?
7
Is the employer asked to sign a non-disclosure agreement
before all documents are shared with them?
5. (4/38)
8
Are the advancements in technology not capitalized upon due to
the company's reliance on current paradigms?
9
Is the service failures increasing risks for the company's ability
to maintain customer satisfaction and expand its market share?
10
Is there a risk that the company will not optimize business
performance by not effectively prioritizing and balancing its
business targets?
11
Is there an ineffective strategic planning process that adversely
affects the company's capacity to formulate viable business
strategies?
12
Is there a risk that the company employees are not being led
effectively, resulting in a lack of direction, customer focus,
motivation, management credibility, and trust?
13
Is there a risk that the company may lose customers, key
employees, or its ability to compete due to perceptions
impacting the company’s reputation in the marketplace?
14
Is there any risk for the company of being unable to implement
process or service improvements quickly enough to keep pace
with changes in the marketplace?
6. (5/38)
3. Operating Risks Management
# Description Ref. Y/N N/A
1
Are the company's processes consistently meeting customer
expectations and increasing earnings potential?
2
Is there a failure to manage outsourced activities that may result
in the third parties not acting within the intended limit of
authority or not performing in a manner that is consistent with
the company's strategies, objectives, or regulatory
requirements?
3
Is the company's resource allocation process not sustaining
competitive advantage or maximizing returns?
4
Does the company adequately provide for physical security and
other aspects of a conducive work environment that is
necessary to ensure continued employee safety?
5
Is there a lack of training, knowledge, skills, career
opportunities, or experiences of key personnel that may hinder
the achievement of the business objectives?
6
Is there any risk of ineffective lines of authority and/or failure
to establish clear policies or limits of authority that cause
managers or employees to do things they should not do?
7
Are unrealistic, misunderstood, subjective, or non-actionable
performance measures causing managers and employees to act
in a manner that is inconsistent with the company's objectives,
strategies, ethical standards, and prudent business practices?
8
Are the company's physical, financial, or information assets
used for unauthorized purposes by employees or others?
9
Is there a lack of relevant and/or reliable information supporting
pricing decisions that may result in unprofitable contractual
revenues?
7. (6/38)
10
Does the company's organizational structure negatively impact
its ability to react to change?
11
Does the company's organizational structure negatively impact
its ability to optimize its business strategies?
12
Are poorly designed operations and unnecessarily slow
processes negatively impacting the company's ability to achieve
its business objectives?
13
Are poor communication channels resulting in messages that
are inconsistent with the designated responsibilities and are not
effectively conveying information as planned?
14
Are the current practices resulting in under-utilized resource
capacity, thus, driving higher costs and lower profit margins; or
inadequate resource capacity resulting in an inability to satisfy
customer demands?
15
Are the problems with the main supplier adversely affecting the
company's ability to provide quality service at competitive
prices?
16
Are IT controls effective in ensuring that only approved
application programs are loaded into the information system?
17
Are the company's access controls effective in preventing
inappropriate access to data or systems?
18
Is information distributed in a way that stops its use for an
unintended purpose?
19
Is there a risk that the company is exposed to financial loss as a
result of cash/funds shortage?
20
Is there a risk that the company may not be able to fulfill its
operational or financial obligations on time?
21
Is the company exposed to a loss as a result of the default by an
entity with which the company does business?
22
Is there a risk that the company processes are not ensuring that
funds will be used for increasing future earnings?
8. (7/38)
23
Is there a risk that hardware, networks, software, people, and
processes are not effectively and efficiently supporting the
current and future processing needs of the company?
4. Quality Management Systems (QMS)
# Description Ref. Y/N N/A
1
Have quality objectives been set, documented and
communicated to the organization by the management?
2 Is quality always on the agenda at management meetings?
3
Has management set clear, documented strategies for QMS
development?
4 Have QMS processes been determined and documented?
5
Has the quality policy been familiarized and displayed and
posted in selected places?
6
Is the quality policy subject to regular reviews for the latest
developments in the industry?
7 Are QMS processes analyzed for effectiveness?
8
Does the organization include a dedicated specialist quality
assurance resource?
9
Does the dedicated quality assurance resource report directly to
the senior and/or top management?
10 Is the QMS certified?
11
If certified: Has certification been retained for more than 3
years?
12
Is QMS published/made accessible through efficient electronic
systems?
13
Are Quality Control and Testing (QC&T) activities covered by
documented plans and procedures?
9. (8/38)
14 Does the organization include a separate QC&T department?
15
Are personnel involved in QC&T obtaining specialist training
to enhance their skills?
16 Are customers routinely informed of the testing milestones?
5. Document Controlling and Handling
# Description Ref. Y/N N/A
1 Is QMS related documentation subject to systematic control?
Is there a separate file for each project under construction?
Is the contract file containing the following information?
Agreement, up-to-date – duly signed by all parties
Contact details of the employer
Contact details of all subcontractors
Contact details of consultants
Contact details of all government persons involved in
the project as inspectors or otherwise
Original estimates of the project
Other pertinent data
Revenue and cost data for the current period, year-to-
date, and project to-date projections
Billing and revenue recognition methods
2
Is document control based on a well-functioning and up-to-date
electronic systems?
3
Is document control supported and managed by specialist
personnel?
4
Does the organization utilize an up-to-date electronic system for
document storing and handling?
5 Are QMS documents systematically distributed to the users?
10. (9/38)
6
Are records systematically controlled (storing, protection,
retrieval, legibility)?
6. Contract Order and Management
# Description Ref. Y/N N/A
1
Does the company operate a system for contracts and order
registration and management?
2
If yes: Is the system electronically driven (e.g. MRP or ERP
system)?
3 Are contracts and orders subject to contract/order review?
4
Is a capability evaluation conducted complementary to the
contract/order review?
5
Does contract and order management include the use of a
quality plan?
11. (10/38)
7. Communication Systems
# Description Ref. Y/N N/A
1
Does the company routinely establish structured
communication with employees, management, banks, suppliers
and customers?
2
Does communication include routine documented progress
reporting?
3 Are communication records archived electronically?
4
Has there been a meeting between the project manager, project
engineer, IT personnel and management to discuss internal
controls, job communication, etc.?
5
Is there adequate check that company communication is not
subject to any sabotage or can be accessed by anyone outside
the company?
8. Customer Satisfaction
# Description Ref. Y/N N/A
1 Does the company handle customer's feedback and complaints?
2 If yes: Is the system electronically driven?
3
Is there a process owner assigned for handling customer
complaints?
4
Is there a report available from the system that reflects all
customer complaints have been addressed properly?
5 Does the system generates a report on customer feedback?
12. (11/38)
6
Does the system provide a report on how effectively and
efficiently complaints are addressed by departments or
individuals?
9. Project Design and Design Control
# Description Ref. Y/N N/A
1
Does the organization include a Design & Engineering (D&E)
department?
2 Is D&E based on up-to-date design systems and tools?
3
Have efficient systems for electronic storing of D&E
documents been established?
4
Does the company operate a system for efficient design
control?
5 If yes: Does the system focus on both design input and output?
6
Are various types of checking (e.g. self-checking, discipline
check, etc.) being carried out?
7 Are designs subject to review at one or more defined stages?
8 Are designs subject to validation?
9 Does the system include control of design changes?
13. (12/38)
10. Tendering and Accepting a Project
# Description Ref. Y/N N/A
1
Is management supervising the progress of the tenders in
progress themselves?
2
Due to capacity constraints, is management choosing the
projects that would be delivered the best, in terms of both
margins and time of completion?
3
Are all risks identified, recorded and translated into their cost
impact in the quoted price of a contract?
4
Does a project has a high execution risks due to its specialized
nature?
5
Has someone worked out the part of work to be executed by
sub-contractors?
6
Has the cost impact of subcontractor work been included
accurately in the quote?
7 Has the sustainable margin included in the quote?
8
Has the contractor made his fitness test in terms of all resources
required for the execution of a project before going for the
tendering process?
9
Has there been a capacity and capability evaluation done for the
skills and resources required for the completion of a project
before competing for a project?
10
For the riskiest projects, has there been a special study made to
ensure timely completion?
11
For the riskiest projects, has there been high return or profit
expected?
12
For the riskiest projects, has the track record for such projects
been studied?
13 If yes: What has been the success percentage in those projects?
14. (13/38)
14
Has there been any resource change since the last project of
similar risks was carried out?
15
If yes: Has the fresh evaluation of skills and resources been
made?
16
Has the board been informed about the risks associated with a
project to ensure the bid is profitable?
17
Has the market changed in terms of cost and other factors
related to a project?
18
Have all factors been considered before bidding for such a
project?
19
Are all supply chain partners willing to work at the same terms
and conditions that the company used to have when a similar
project was carried out last time?
20
Has the expert advice been taken in case of a dispute happening
with the employer?
21
Are there special provisions given in the contract about the
change orders or variations orders in terms of their impact on
the cost of a project?
22
Is the proper approval procedure mentioned for change orders
or variation orders in the contract?
23
Have the contract value been studied in the light of external
factors?
24
Has the sensitivity analysis been carried out to know the profit
at different levels of cost achieving before going for bidding?
25
Has it been ensured that under the worst-case scenario company
may get a sustainable margin on a given project?
26
Has it been ensured that the employment contract is covering all
necessary clauses and leaving no room for confusion between
the parties at the execution stages?
15. (14/38)
11. Contract Development and Review
# Description Ref. Y/N N/A
1
Has a full set of the contract documents been provided for
review?
2
Are there inconsistencies or any potential for inconsistencies
between the contract documents?
3
Have all areas of the contract that need to be checked by a
technical adviser been identified in the review,
e.g.:
technical aspects;
employer obligations;
rely on information;
performance tests;
all limits on liabilities; and
levels of liquidated damages?
4
Is there or has there previously been an interim arrangement in
place between the employer and the contractor, e.g., work may
have commenced under a letter of intent?
5
If so, what are the implications of this ongoing or previous
arrangement?
6 What law governs the contract?
7 Is there advice taken on the implications of this choice of law?
8
Does the contract identify "performance criteria" in which the
project when completed is required to meet?
9
Is the contractor's obligation to meet these criteria from an
overriding obligation or is it subject to a contractor's duty only
to use reasonable skill and care if such a duty of care is
specified in the contract?
10
What responsibility does the employer assume in respect of any
designs, plans or technical information provided by them to the
contractor?
16. (15/38)
11
As regards any design/information provided by the employer,
does the contract require the contractor to check this
information and to assume responsibility for errors that could
have been discovered by an experienced contractor?
12
Is the contractor entitled to rely on the accuracy of any of this
information?
13
If so, does the employer have adequate recourse against the
third parties who may have provided this information
originally?
14
Is there adequate time provided in the contract for the employer
to carry out such a review?
15
If the detailed design is to be reviewed by the employer, by
reference to what criteria is such approval to be made?
16
Does the contract provisions in respect of any design review
and generally that approval by the employer does not release
the contractor from any liability which he might otherwise have
in respect of the design?
17
If the review is to be carried out by a third party, such as an
independent engineer, on behalf of the employer, is there
provision elsewhere for care to be executed by that third party
in favor of the contractor?
18
Does the contract provide for performance tests to be performed
to check (inter alia) that the project is capable of achieving the
performance criteria above)?
19
Is the passing of the performance tests a condition precedent to
handover?
20
What does the contract provide for if there is a failure in the
performance tests?
17. (16/38)
21
Does the contract provide for the employer to choose between
the following remedies:
unlimited remedying of the defect by the contractor and
retesting;
termination of the contract and recovery of damages
from the contractor;
handover of the project nevertheless to take place and
for the contractor to pay "buy down" liquidated
damages?
22
Does the contract provide for the payment of liquidated
damages in the event of delay? If so, at what rate and up to
what maximum limits?
23
What is "completion" to establish the payment of liquidated
damages?
Ideally, the performance tests should have been completed
before completion can take place.
24
Are there unusual terms contained in the liquidated damages
clause, e.g., liquidated damages calculated as
being a percentage of the unfinished part of the
work or only payable if the other parts of the
project are already in place?
25
Does the contract entitle the contractor to claim for extensions
of time for the employer's default?
(If not, the liquidated damages provision may not be
enforceable).
What other matters entitle the contractor to claim an extension
of time?
26
Have you considered the impact of the governing law on
liquidated damages?
27
Does the contract provide for a clear right of the employer to
terminate for prolonged delay (i.e., when the maximum limit of
liquidated damages has been reached)?
18. (17/38)
28
If the employer is entitled to terminate the contract for
prolonged delay, what damages are recoverable
from the contractor following such
termination?
29 Is any element of consequential loss recoverable?
30
Is there a clause in the contract requiring the contractor to
catch-up any delay which arises and providing
that failure to do so amounts to a breach of the
contract?
31 Is the payment of the contract price front-end loaded?
32
What is the duty of care imposed by the contract in respect of
materials and workmanship?
33
Does the contract provide for the employer or engineer to be
able to inspect the works as they are performed and to require
the contractor to put right any defective work?
34
Is there a defects liability period mentioned in the contract and,
if so, for what period?
35
Does the contract draw any distinction between different
aspects of the work (e.g., between engineering and civil
works)?
36
What is the effect of any final certificate issued at the end of the
defects liability period?
37
Does the contractor try to exclude his liability in any way for
any defects arising after the end of this period (e.g., is there an
exclusive remedies clause)?
38
What does the local law provide as regards a contractor's
residual liability for latent defects?
39
If the contractor fails to remedy any work for which he is
responsible, does the contract entitle the employer to employ a
substitute contractor to do this work and then for the employer
to recover his costs from the original contractor?
40
Are there any caps on the liability of the contractor to put right
any defective work?
19. (18/38)
41
Does this cap apply to any re-performance requirements
imposed on the contractor before handover?
42
What does the contract provide for in respect of defects
remedied during the defects liability period, i.e., does a new
defects period start to run in respect of the replaced part and/or
is the overall defects liability period extended by the time
during which the works were put out of use due to that
particular defect?
43
How does the contract deal with the responsibility for costs in
the situation where the employer requires the contractor to
uncover work because he has a reasonable suspicion that there
may be a defect, having identified a similar defect elsewhere in
the works? It is not necessarily logical simply to allocate the
costs of uncovering work by reference to whether or not a
defect is discovered.
44
Does the contract require the contractor to notify the
employer/engineer before any work being covered up?
45
Does the contract exclude liability for consequential and/or
economic loss?
46
Is the employer entitled to deduct sums from interim invoices in
respect of defective work?
47
If a force majeure event arises, is the contractor entitled to any
monetary claim or only to extensions of time?
48
Does the time of prolonged force majeure need to be continuous
periods or are cumulative periods occurring within a fixed time
also taken into account?
49
Does the contract provide for termination for prolonged force
majeure? If so, after how long and at whose option?
50
Is the contract price expressed to include all contingencies and
not to be subject to revision to take account of any fluctuations?
51
If payment is by milestones, does the contract deal with what is
to happen where progress is delayed due to the employer's
default?
20. (19/38)
52
Is payment by reference to a pre-agreed payment schedule? If
so, in what circumstances is the employer entitled to adjust this
schedule?
53
Is the employer entitled to deduct sums for defective work or
the cost of repairs carried out by a replacement contractor?
54
Does the contract provide for the contractor to supply sufficient
evidence of work done with interim invoices for the employer
to be able to check that payments are due under the contract?
55
Does the contract provide for any retentions from payments to
be made to the contractor?
56
Is the employer responsible for any taxes otherwise payable by
the contractor?
57
If the employer is responsible for payment of such taxes, does
the contract expressly exclude penalties payable by the
contractor and is there provision for the contractor to reimburse
the employer any tax credits subsequently recovered?
58
Does the contract provide for business interruption insurance
covering the loss of construction due to delay caused by force
majeure or employer's risks, or to top up the liquidated damages
payable by the contractor for delay?
59
Is there provision in the contract for the contractor to take out
defects liability insurance?
60
Does the contract provide for the contractor to indemnify the
employer against any claims brought by third parties for
infringement of intellectual property rights?
61
Does the contract provide that subcontracting of the contractor's
obligations may only be done with the consent of the employer?
62
Is the identity of all subcontractors subject to the approval of
the employer?
63
Does the contract require the contractor to ensure the terms of
the subcontracts reflect the terms of the main contract?
64 Is any form of dispute resolution specified?
65 If not, will the courts of UAE have jurisdiction by default?
21. (20/38)
66
Is the contractor obliged to comply with all local and
international environmental regulations?
67
Does the contract provide for the contractor to supply the
employer with weekly, monthly and/or annual reports covering:
progress of the works;
details of events affecting the progress of the work;
accident reports; and
security reports?
68 Is the contractor responsible for site security?
69
In respect of variations, is the contractor obliged to maintain
detailed records of work done and to allow the employer to
inspect these?
70
Does the contract provide that the lenders and representatives of
the lenders are to have the same rights of access and the same
rights of attendance at all tests and inspections as the employer?
71
Apart from the above, does the contract provide a right of
access on the part of the lenders or their advisers to documents
and to the site at any time?
12. Construction Work Planning, Scheduling,
Execution, Control, and Management
# Description Ref. Y/N N/A
1
Does the company operate a structured system for construction
planning?
2
Is construction planning conducted through specialized project
management soft wares like Primavera 6 or Prince 13.1 or
another software?
22. (21/38)
3
Does construction planning involve resource planning
(equipment, personnel, instructions, etc.)?
4
Does personnel resource planning address the availability of
required competence and qualification?
5
Does the company operate a structured system for construction
control?
6 Does construction control involve the use of a quality plan?
7
Does construction control include routine segregation of
deviating /non-conforming materials and equipment?
8
Is the quality of services ensured through structured and
documented control systems?
9
Are relevant construction tools and equipment subject to
scheduled calibration?
10
Are construction tools, machinery, and equipment subject to
routine preventive maintenance?
11
Are there proper time and cost budgets in place for each
construction activity?
12 Are these budgets followed strictly?
13
Are budget deviations reported to the construction manager and
finance manager on time?
14 Are all out of budget costs approved before they are incurred?
15 Are budgets prepared on a rolling basis?
16
Is management kept aware of an increase in cost impact due to
any factor whatsoever?
17 Are budget deviations reported to management regularly?
18
Have all change or variation orders been approved by the
employer at the time of their intimation to the contractor?
19
Has the cost and time impact of each change order been
discussed with the employer in detail and agreed upon by them
in writing?
20
Has the cost and time impact because of change orders been
added to the contract value and delivery time of a project?
23. (22/38)
21
Has the employer been informed about the escalation of
material prices as per the contract?
22 Has the impact of such escalation included in the project value?
23
Is the financial accounting and reporting system reliable,
consistent, accurate and up-to-date?
24
Is the reporting system providing all the required information
when needed?
25
Is there any audit of the financial accounting and reporting
system done regularly by an external auditor?
26
Are corrections suggested by the auditor incorporated into the
system immediately?
27
Are there reasonably accurate estimates available for the cost to
completion during the progress of a project?
28
Have the latest cost estimates been included in the cost of
completion of a project?
29
Have the cost to completion estimates been compared with the
initial budgets?
30
Have the reasons for deviations noted and communicated to the
management regularly?
31
Is there a framework for contingencies made that would address
relevant delivery risk areas and are these areas being examined
regularly?
32
Are there efficient and effective review process of operations in
place?
33
Are the liquidated damages and other close-out risks and
obligations adequately addressed?
34
Have the list of learning points made from the delivery of the
project for future work on a similar project?
24. (23/38)
13. Contract Billing and Cost Related Accounts
# Description Ref. Y/N N/A
1
Do all contracts, subcontracts and change orders include an
adequate description of the work to be completed, timetable,
billing arrangements, etc.?
2
Is an over/under billings report generated and reviewed by the
project manager or other appropriate person?
3
Are subcontractor billings approved by the project manager and
compared to subcontractor terms before they are paid?
4
Do the recorded amounts of subcontractor charges include
retainage amounts withheld from payments to subcontractors?
5
Are persons preparing payroll independent of other payroll and
personnel duties (e.g., timekeeping, distribution of checks and
hiring employees) and restricted from access to other payroll
data or cash?
6
Is there a comparison of current payrolls with previous payrolls
made?
7 Are variances investigated and documented?
8
Have the types of indirect costs being allocated to contracts
been reviewed for compliance company policy and procedures?
9
Is the percentage-of-completion calculation verified by a
second person based on costs incurred to date and the estimate
to complete?
25. (24/38)
14. Subcontractor Evaluation, Approval,
Management and Control
# Description Ref. Y/N N/A
1 Is a subcontractor financially stable and sound?
2 Are they able to take the financial burden of the job?
3
Has a subcontractor been approved by the employer in case it is
provided in the main contractor agreement?
4
Does the legal status (sole trader; limited liability company or
partnership; charity; public body etc) of the subcontractor and
its governance have implications for the proposed contract and
its delivery?
5 Has the subcontractor disclosed all contracts it holds?
6
Has the subcontractor provided the list of terminated
agreements/contracts?
7
If yes, have they mentioned the reasons for the termination of
those agreements?
8
Has the subcontractor mentioned the range of services offered
by them?
9
Has the number of jobs the subcontractor is working on
checked to determine if they can handle our job?
10
How long the subcontractor been serving in the given service
category?
11
Has the subcontractor worked with our company before this
project?
12 How was the experience of working with the subcontractor?
26. (25/38)
13
Is the subcontractor a party in any litigation which might affect
its ability to deliver the proposed contract? For example, any
action in the civil or criminal courts, or an employment
tribunal?
14
Has the subcontractor disclosed the names of its directors (or
trustees) and senior managers together with details of their
previous appointments along with the names of the companies?
15
Has the subcontractor sufficient capacity to deliver its
commitments under the proposed contract whilst still meeting
its other commitments?
16
To what extent do the main contractor’s business strategies (e.g.
for growth, diversification) match to those of the subcontractor?
17
Does the subcontractor comply with health and safety
legislation?
18
Has it carried out health and safety risk assessments covering
the proposed subcontracted learners?
19
Has the subcontractor declared to the main contractor reportable
injuries, diseases and dangerous occurrences covered by the
UAE regulations, together with the actions they have
implemented to prevent re-occurrences?
20
Does the subcontractor comply with legislation on employment
(labor laws in UAE)?
21
Does the subcontractor comply with legislation on
immigration?
22
Does the subcontractor adhere to a policy for preventing and
dealing effectively with bullying and harassment?
23
Does the subcontractor has appropriate data protection and
security systems for the exchange of personal and financial data
with the main contractor?
24
Does the subcontractor intend to subcontract any part of the
work to another contractor?
25
Does the subcontractor hire appropriately qualified and trained
staff to deliver the proposed contract effectively and efficiently?
27. (26/38)
26
Does the subcontractor follow a policy of promoting the health,
safety, and well-being of workers?
27
Does the subcontractor devise a policy for dealing effectively
with complaints?
28
How effective are the subcontractor’s arrangements for
communicating with the employer?
29
How effective are the subcontractor’s arrangements for
communicating with workers?
30
Does the subcontractor formulate a policy on environmental
sustainability?
31
Has the subcontractor a track record of implementing,
reviewing and improving policies?
32 Does this review focus on the impact of policies on workers?
33
Does the subcontractor have appropriate quality assurance
arrangements: audits, self-assessment reports and improvement
plans, internal and external verification of assessment?
34
Can the subcontractor provide evidence and verification (for
example, references) to support their assertions?
35
Has the subcontractor taken advice from its legal advisers and
accountants about the proposed contract and the implications of
subcontracting?
36
Does the subcontractor understand fully all clauses in the
proposed contract?
37
Has the subcontractor reviewed all the implications of the
contract in its entirety?
38
Have the proof of insurance from the subcontractors taken and
checked its expiry date?
28. (27/38)
15. Supplier Evaluation, Selection and Approval
# Description Ref. Y/N N/A
1
Is a structured system for supplier selection, evaluation, and
approval in operation?
2 Does the system also include prospective suppliers?
3 Does the company operate a list of approved suppliers?
4
Does the company actively seek alternative suppliers of Health,
Safety, Environment and Quality (HSEQ) critical goods?
5
Are technical requirements and quality requirements accurately
specified in the purchase contracts and POs?
6 Is purchasing assisted by an ERP system?
7 Have suppliers and contractors been categorized by criticality?
8
Does the company operate a formal system for scheduled
quality assurance auditing of suppliers?
9
If yes: Are such audits carried out by qualified and trained
personnel?
10
Are supplier quality assurance audits subject to reporting,
efficient follow-up and verification of effects from audit
results?
29. (28/38)
16. Employee Performance Evaluation
# Description Ref. Y/N N/A
1
Is the competence of the employee reflecting the knowledge
and skills needed to perform assigned tasks?
2
Is management focusing its attention on acquiring and retaining
the skill levels necessary to accomplish the company's goals
and objectives?
3
Does the company’s organizational structure define key areas of
responsibility and establishes accountability for everyone?
4
Does the company's assignment of authority and responsibility
establish the degree to which individuals and teams are
authorized and encouraged to act to address issues, solve
problems and take advantage of the challenges?
5
Does the company’s assignment of authority and responsibility
establish limits of authority?
6
Do individuals know how their actions interrelate and
contribute to the achievement of the company’s overall
objectives?
7
Does the human resources department appropriately address
hiring, orientation, training, evaluating, counseling, promoting,
compensation, and remedial actions, driving expected levels of
integrity, ethical behavior, and competence?
8 Is the company’s staff subject to an annual appraisal?
9
Does the appraisal system comprise all staff levels and
categories?
10
Are appraisals carried out and recorded using a structured and
standardized format?
11
Does the appraisal meeting agenda include competence and
training needs?
30. (29/38)
12 Does management put focus on appraisals follow-up?
13
Are personnel training needs and competence enhancement
systematically identified?
14
Are well-functioning tools (e.g. matrix) used for qualification
and skills follow-up?
15
Is personnel management based on an up-to-date electronic
system?
17. Company and Project-wise Budgets
# Description Ref. Y/N N/A
1 Are budgets for both company level and project level prepared?
2
Are these budgets updated according to the changing scenario,
the progress of the projects and change in factors of
construction?
3
Are the deviations from the budgets calculated regularly and
sent to responsible persons for comments and corrective actions
in the future?
4 Are change orders accounted for by a separate person?
5
Are budgets revised following the change order impact on
them?
6
Is management reviewing and approving bids, estimated job
costs and updated estimates as the job progresses?
7
Are gross profits being analyzed on a job-by-job basis for
unauthorized costs and to determine if costs are being shifted to
other jobs?
8
Has there been a special examination made into the costs that
are affecting project profitability?
31. (30/38)
9
Is someone from management performing surprise visits to job
sites regularly to ensure procedures are being followed in
entirety?
10
Are job site equipment and materials secured when there are no
employees present to protect these assets from theft?
18. Revenue Recording
# Description Ref. Y/N N/A
1
Is the following information available before recording
revenues:
Method of accounting for the project
Type of the contract – fixed-price or cost-plus
Recognition of the prospective losses
Application of the matching principle
Use of appropriate completion levels during interim
periods?
2
Are the project profits measured through the percentage of
completion method?
3
Has a loss made in a given period been accounted for in the
same period?
4
Has the correct cost been booked against the revenue
recognized for a given period in compliance with the matching
principle?
5
Is there a fresh forecast prepared for the factors to be used in
the execution of a project?
6
Is there any change foreseen in the estimates or budgets under
the changing scenario, if any?
32. (31/38)
7
Has the cost impact of the changing scenario been noted and
shared with the finance manager, construction manager, and
project manager?
8
Is there a projection of project revenues prepared quarterly after
discussion with the project managers and directors?
9
Has a billing test been performed by reviewing the procedure
for applying the accurate markups on unbilled costs?
10
Has the time log between the incurrence of the cost and
preparation of the bills or invoices been examined?
11
Have all costs been converted into invoices or bills following
the agreement signed with the employer?
12
Have the time of incurring cost and its recording in a period and
its conversion into invoices been reviewed following the
agreement signed with the employer?
13
Is there any unusual delaying happening in the preparation of
invoices as there are excessive supporting documents awaited?
14 Is the billing system working efficiently and effectively?
15
Are all bills approved by project management before issuing
them to the employers?
16
Is the accounting department maintaining records on the status
of unbilled costs?
33. (32/38)
19. Project Cost Accumulation
# Description Ref. Y/N N/A
1 Have all POs been prepared after taking necessary approvals?
2
Have prices been compared that are taken from all the allowed
suppliers?
3
Has the lowest price supplier chosen from the list of approved
suppliers?
4
Is price comparison statement available for later examinations,
audit and reviews?
5
Have all materials or goods purchased recorded in a proper
receiving report?
6
Has the accounting department compared prices paid to
suppliers to the ones given in the estimates or budgets?
7
Are there deviations happening from these estimates or
budgets?
8
Are these deviations noted and communicated to project
managers or project directors?
9
Is appropriate action taken on the deviations reported to the
project management?
10
Have the vendor invoices been matched with the underlying
documents like POs, receiving reports and other documents
with the amount paid to suppliers or vendors?
11
Are all supporting documents available in the original form and
not in their photocopies?
12
If there are deviations found in invoices and documents from
payments made to the supplier, have appropriate corrective
action taken?
13
Is there someone checking project costs with the original
estimates?
34. (33/38)
14 Are all purchase transactions recorded on time?
15
Is it seen as if one-month purchase transactions are recorded in
the next month?
16 Are all overheads correctly appropriated to projects?
17
Is there a calculation mechanism in place for the appropriation
of overheads to all projects?
18
Is the correct method for overhead recovery applied for each
element of the overheads?
19 Is there a time card given to each employee?
20 Is this time card punched by every employee in the morning?
21 Is payroll prepared from the time card records?
22
Is someone verifying the employees physically to the one given
in the payroll regularly to ensure no ghost employees found in
the payroll?
23
Is there a monitoring on each time card punching place to make
sure that a genuine person is punching the card and no proxy
punching is happening?
24
Is there a CCTV near the time card machine to ensure fool-
proof punching of time for each employee?
25
Is the time card approved by the employee’s immediate
supervisor?
26
Is the flow of information from time card to time records
through time accumulation and eventually to job cost summary
verifiable?
27
Is someone testing regularly that time punching machine
reflects accurate time for the staff and labor in the cost
summary?
28
In the case of senior staff, time may be allocated to different
departments, has there been an accurate system in place to
record the time of each senior staff to different departments?
29
Is department head verifying monthly overtime for the
employees reporting to them by signing monthly overhead
reports?
35. (34/38)
30
Is the payroll preparation segregated from the payroll
disbursement?
31 Is the payroll disbursement segregated from payroll recording?
32
Is the payroll summary checked and approved by someone who
is not preparing it?
33
Are general expenses been recorded in the same project for
which they are incurred?
34
Are all expenses approved separately from the one who
disbursed?
35
All documentation of expenses incurred maintained on-time
and not kept pending for any reason whatsoever?
36 Is cash handling staff rotated on quarterly or semiannually?
20. Accounts Receivable
# Description Ref. Y/N N/A
1 Are all receivable balances up-to-date at each month's end?
2
Is someone reviewing the ageing analysis of all receivables
monthly?
3
Any amount exceeding 90 days period should be asked for
explanation?
4
Are receivable write-offs authorized and approved by the board
in writing?
5
Are there investigations triggered before writing offs of such
receivable balances?
6
Are project managers making any help in the collection process
through regular follow-ups with the clients?
7
Is the collection staff efficient in the recovery of receivable
balances?
8
Is there a need for a formal collection agent in the case of
inordinate delay happening in the collection of the receivable
balances?
36. (35/38)
21. Accounts Payable
# Description Ref. Y/N N/A
1 Are all POs pre-numbered like sales invoices?
2
Are POs reflected in the system including used, voided and
available to ensure proper sequence?
3 Is there any gap in the numerical sequence of the POs?
4
If yes, have you find out and documented the reasons for such a
gap?
5
Are all POs supported by underlying documents like receiving
reports, shipping documents (original documents and not
photocopies)?
6 Are POs approved by someone other than who prepared them?
7
Are the payments system separated from the POs preparing
staff?
8
Is anybody reviewing the system to identify when materials are
delivered to a location other than the job site?
9
Is the company issuing a cheque that is modified?
(Company should not issue any modified cheque to anyone to
have a common control on modified cheques)
10
If employees are given company credit cards for making small
payments to vendors, see if the receipts of payments and
invoices are provided to the accounts department the same day?
37. (36/38)
22. Fixed Assets
# Description Ref. Y/N N/A
1
Are reconciliations between physical assets and detail fixed
asset records (fixed asset register) reviewed by the manager or
other responsible person?
2
Are logs maintained of equipment used on contracts so that
depreciation can be charged to the appropriate contracts?
3
Are the estimated useful lives and deprecation methods initially
approved and periodically reviewed by the manager?
4 Is there a fixed asset register prepared by the company?
5
Is the fixed asset register linked with the fixed asset module of
the accounting information system?
6
If not, anybody preparing reconciliation of fixed asset register
and the main ledger for all asset types?
7
Is there someone keeping complete track of assets transferred
between job sites and head office?
8
Are there verifiable records available for accurate transfer of
assets from one job site to another?
9
Is someone performing a calculation of asset use on different
job sites and allocating costs accurately to the projects?
10 Is someone taking physical verification of assets regularly?
38. (37/38)
23. Inventory
# Description Ref. Y/N N/A
1
Does an appropriate person periodically assess whether excess,
slow-moving, obsolete and defective inventory items are
identified and accounted for appropriately?
2
Is unused inventory returned from a project priced at the lower
of cost or net realizable value?
3
Is someone carrying out monthly physical verification of
inventory on selection at random basis?
4
Is the verifier of inventory independent of the staff that is
recording all inventory related transactions?
5
Are all receipts and issuances of materials recorded at the same
time when they are received or issued?
6
Is someone checking who is independent of inventory recording
staff that there are no unrecorded transactions at each day end?
7
Is someone checking that are materials in job sites are properly
stacked?
39. (38/38)
24. Cash and Bank
# Description Ref. Y/N N/A
1
Are cheques signing independent of the initiator of purchases,
approver of purchases, receiving, shipping, preparer of cheques,
cash receipts, accounts payable and cash book-keeping?
2
Are canceled cheques reviewed for unfamiliar or unauthorized
payees, forged signatures and unusually large amounts?
3
If canceled cheques are returned with the bank statement, check for
evidence of alterations to the cheques?
4
Are bank accounts reconciled monthly by a person who is
independent of the cash receipts and disbursements functions?
5
Is cash on hand reconciled with the books of entry before
closing of the day every day?
6
Is someone reviewing the purpose, authorization, and
implementation of an imprest fund regularly?
7
Is someone verifying deposits to the fund by an analysis of
disbursements from the general operating account?
8 Are all disbursements recorded on the same day?
9
Is someone scrutinizing all disbursements from funds through
authorization and back up documentation?