3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Current State
• Two stand alone facilities - without
renewal, the existing facilities would
not last for the next generation.
Proposed Actions
• KTHR, the MOH and the Kelvington
and area steering committee agree
to pursue a project to add the
hospital and primary health care
clinic to the existing LTC, with
renovations to LTC
• Project is approved for a Lean 3P
process for March 2013
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Project Metric
• $15M Project Budget
Future State
• Pursue “right size” integrated services to include Acute
Care, ER/outpatient, Lab and Diagnostics, Support
Services, Primary Health Care Clinic
• Create efficiencies to find savings to reinvest into
significant LTC renovations.
• Together with patients, providers and community,
design a patient-centred facility that will provide the
flexibility to meet the needs of Kelvington and area
residents into the future.
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better health
• Family Focus
• Long Term Care Connection
• Health and Wellness
Education
• Patients & Families at the
Centre of the Process
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better teams
Design:
• facilitates communication
• improves flows
• breaks down professional
barriers
• improves patient care
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better care
• Design focuses on the real
physical needs for the spaces
• Design will allow providers to
spend more time with patients
• Integration of services and
providers will improve the
care for the Patients and
Residents
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
7 Ways
better health
• Long Term Care Connection
better teams
• Integrated Team with LTC
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
7 Ways – Option 3
better health
• Long Term Care Connection
better teams
• Integrated Team with LTC
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better health
better teams
better care
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better health
• Health Education and
Wellness
• Family Focus
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better teams
• Facilitates
communication
• Breaks down
professional barriers
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better teams
• Improves Flows
• Improves Patient
Care
• Release Time to Care
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better care
• Design focuses on the real
physical needs for the spaces
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
3P Event Week
better care
• Design will allow
providers to spend more
time with patients
• Integration of services
and providers will
improve the care for the
Patients and Residents
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
30/60 Day Work
7Flows / 7Wastes
• Trace all 7 Flows
• Patients
• Family
• Clinicians
• Medication
• Supplies
• Equipment
• Information
• Evaluate the Waste
• Edit the Design
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
30/60 Day Work
7Flows / 7Wastes
• Evaluate the Waste
• Edit the Design
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
30/60 Day Work
7Flows / 7Wastes
• 30/60/90 Day work
included the design of 3P
Sub-teams in a 2 day event
focussed on the 7
Flow/7Wastes.
• This event design,
developed by our team has
become the standard work
for our 30/60/90 Day work.
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Results
better value
• Primary Care Clinic
rooms 40% larger
than typical for
Collaborative
Primary Care
• Staff flows greatly
reduced.
• The 12hr Nurse shift reduced travel
distance by 18%, and the 8 hour
nurse reduced travel by 55% for a
savings of over 4700 steps in daily
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
Results
better value
• Construction budget for
addition from $12.5M to
$9.1M
• Capital dollars freed
for desperately
needed renovations
to the existing LTC
facility
3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
better health
better teams
better care
better value

More Related Content

Kelvington Integrated Health Facility Addition and Removal

  • 1. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY
  • 2. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY Current State • Two stand alone facilities - without renewal, the existing facilities would not last for the next generation. Proposed Actions • KTHR, the MOH and the Kelvington and area steering committee agree to pursue a project to add the hospital and primary health care clinic to the existing LTC, with renovations to LTC • Project is approved for a Lean 3P process for March 2013
  • 3. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY Project Metric • $15M Project Budget Future State • Pursue “right size” integrated services to include Acute Care, ER/outpatient, Lab and Diagnostics, Support Services, Primary Health Care Clinic • Create efficiencies to find savings to reinvest into significant LTC renovations. • Together with patients, providers and community, design a patient-centred facility that will provide the flexibility to meet the needs of Kelvington and area residents into the future.
  • 4. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY better health • Family Focus • Long Term Care Connection • Health and Wellness Education • Patients & Families at the Centre of the Process
  • 5. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY better teams Design: • facilitates communication • improves flows • breaks down professional barriers • improves patient care
  • 6. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY better care • Design focuses on the real physical needs for the spaces • Design will allow providers to spend more time with patients • Integration of services and providers will improve the care for the Patients and Residents
  • 7. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 7 Ways better health • Long Term Care Connection better teams • Integrated Team with LTC
  • 8. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 7 Ways – Option 3 better health • Long Term Care Connection better teams • Integrated Team with LTC
  • 9. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 3P Event Week better health better teams better care
  • 10. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 3P Event Week better health • Health Education and Wellness • Family Focus
  • 11. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 3P Event Week better teams • Facilitates communication • Breaks down professional barriers
  • 12. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 3P Event Week better teams • Improves Flows • Improves Patient Care • Release Time to Care
  • 13. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 3P Event Week better care • Design focuses on the real physical needs for the spaces
  • 14. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 3P Event Week better care • Design will allow providers to spend more time with patients • Integration of services and providers will improve the care for the Patients and Residents
  • 15. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 30/60 Day Work 7Flows / 7Wastes • Trace all 7 Flows • Patients • Family • Clinicians • Medication • Supplies • Equipment • Information • Evaluate the Waste • Edit the Design
  • 16. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 30/60 Day Work 7Flows / 7Wastes • Evaluate the Waste • Edit the Design
  • 17. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY 30/60 Day Work 7Flows / 7Wastes • 30/60/90 Day work included the design of 3P Sub-teams in a 2 day event focussed on the 7 Flow/7Wastes. • This event design, developed by our team has become the standard work for our 30/60/90 Day work.
  • 18. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY Results better value • Primary Care Clinic rooms 40% larger than typical for Collaborative Primary Care • Staff flows greatly reduced. • The 12hr Nurse shift reduced travel distance by 18%, and the 8 hour nurse reduced travel by 55% for a savings of over 4700 steps in daily
  • 19. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY Results better value • Construction budget for addition from $12.5M to $9.1M • Capital dollars freed for desperately needed renovations to the existing LTC facility
  • 20. 3P & BEYOND KELVINGTON INTEGRATED HEALTH FACILITY better health better teams better care better value