Agenda and Topics
•   Opening
•   The Internal and External Assessors Community
•   The Challenge Statement
•   The ‘Project’ Goals / Success Factors
•   Tool DEMO And Short Walkthrough
•   Results and Benefits
•   Conclusions and Recommendations
•   Future Plans
•   Discussion Points

3

Opening
• As for today most of major industries mainly defense and
  aerospace, as well as armed forces
• Which runs and mange large and complex programs
• Need to comply with more than just one quality standards
  in many disciplines (e.g. HW, optics, software)
• They use large groups of internal and external assessors
  that perform implementation checks, progress checks,
  readiness reviews and formal appraisals.
• These communities are typically composed from groups of
  very experienced and professional individuals
• These individuals have the best knowledge in their
  professional domain but not necessarily on how to conduct
  an efficient and effective appraisal which provide
  meaningful results.

4

The Internal and External
          Assessors Community
•   ~450 auditors (internal military staff and externals reserves)
•   ~80 externals (contractors, that perform audits for and on the XYZ
    ORG)
•   Few tens that are the contractors internal audits and assessments teams
    (quality wise)
•   ~200 quality engineers (full time)
•   ~150 quality practitioners / trustees (part time)
•   ~X00 project / program and acquisitions officers

5

The Challenge Statement
• The combination of the effort and expected
  resources increase the risks on qualification
  of auditors, domain knowledge, and
  calibration of results and findings
  effectiveness.
• When I have initial try to map the risks and
  challenges, I have discovered that the main
  ones are:

6

The Challenge Statement
• Large diversity in tailoring the methods for ‘of the
  same’ appraisal (such as scope, coverage, rating
  understanding)
• Inconsistency in ratings
• Inconsistency of interpretations
• Reports calibration for the same unit / group and
  on organizational level is very difficult if not
  impassible
• Performing quality assurance of the performed
  process is very challenging

7

The ‘Project’ Goals / Success
               Factors
•   Role based profile and criteria
•   Role development path
•   Calibration mechanism and criteria
•   Evaluation mechanism and criteria
•   Leveling the different quality engineers and
    ‘auditors’ in the XYZ ORG by specific
    performances and graduations

8

The ‘Project’ Goals / Success
             Factors
• Flowing specific trainings (on different levels) as
  personal development and qualification criteria
• Listing specific performances as indicators for
  leveling justifications
• Structuring the different audits and reporting
  guidelines in a single mandatory to follow (based
  on MDD and SLA-BOK) process, to increase
  calibration and quality of professional conduct and
  results (for process and meaningfully
  improvements)

9

3/14/2013

10

Assuring assessments leaders  team member’s quality and qualification

11

Assuring assessments leaders  team member’s quality and qualification

12

ISO 9000:2008 Correlation Snapshot
                                                                      20 are covered
                             Management
                             Responsibility

                       Measurement
                        Analysis &
                       Improvement

               Product
              Realization

        Resource
       Management

  Quality
Management
  System




                            REQM               SSD         OPP        DAR      RSKM

                       CAM              OT           QPM     M&A            IRP

              SAM             OPD              SST        PPQA        SCON

       PMC             OPF            IPM           OID          SD

 PP           CM             STSM             CAR

13

PMBOK Correlation Snapshot
                                                                           15 PAs are covered

                            Integration    Procurement       Risk    Communications    Human
                                                                                       Resource
                         Scope


                 Time


          Cost


Quality




                          REQM             SSD         OPP        DAR        RSKM

                        CAM          OT          QPM     M&A            IRP

             SAM              OPD          SST        PPQA          SCON

     PMC                OPF        IPM          OID          SD

PP               CM           STSM        CAR

14

ITIL           – CMMI Correlation Snapshot
                                    Service Delivery
                                   Financial Management
                                             for
                                        IT Services

                              Capacity
                             Management

                      IT Service
                Continuity Management


        Availability
        Management

Service Level
 Management




                                        REQM               SSD         OPP        DAR     RSKM

                                   CAM              OT           QPM     M&A            IRP

                          SAM              OPD             SST        PPQA        SCON

                 PMC              OPF             IPM           OID          SD

       PP                 CM              STSM            CAR

15

ITIL – CMMI Correlation Snapshot
                                               Service Support

                                               The Service Desk



                                     Incident Management



                          Problem Management


                     Configuration
                     Management


        Change Management



Release Management

                                     REQM                    SSD        OPP         DAR     RSKM

                                CAM               OT              QPM      M&A            IRP

                      SAM               OPD                SST          PPQA        SCON

           PMC                  OPF             IPM               OID          SD

    PP                 CM              STSM             CAR

16

ISO 20000 – CMMI
                                                 Correlation Snapshot
                                            Control processes          Planning and   Resolution processes    Release process
                                                                      implementing
                                                                service management
                               new or changed
                                  services

                         Service delivery
                             process


         Requirements for a
         management system


Relationship processes




                                      REQM                      SSD              OPP            DAR             RSKM

                                CAM                  OT                QPM            M&A                    IRP

                     SAM                    OPD                 SST           PPQA                SCON

           PMC                  OPF                IPM               OID                  SD

    PP                   CM             STSM              CAR

17

Assuring assessments leaders  team member’s quality and qualification

18

Assuring assessments leaders  team member’s quality and qualification

19

Assuring assessments leaders  team member’s quality and qualification

20

Assuring assessments leaders  team member’s quality and qualification

21

Supporting Tools for
   High Maturity

22

HLM ATM Training agenda

23

High Level Maturity Appraisal
  Team Member References

24

Statistical Methods
High Level Maturity   Chi-Square ..................................................................................................................................................... 4

                         Chi-Square Test for Goodness of Fit ......................................................................................................... 4

  Appraisal Team         Chi-Square Test for Independence ........................................................................................................... 5

                         Assumptions and Accuracy of the Chi-Square Test .................................................................................. 7

     Member           Common Cause of Variation ......................................................................................................................... 8

                      Continuous Probability Distribution ........................................................................................................... 11

    References        Control Chart ............................................................................................................................................... 14

                         Control Charts for Variables .................................................................................................................... 15

                      Design of Experiments (DOE) ...................................................................................................................... 19

                         Description .............................................................................................................................................. 19

                         When to Use DOE.................................................................................................................................... 19

                         DOE Procedure ........................................................................................................................................ 20

                      Discrete Probability Distributions ............................................................................................................... 22

                      One-sided Test ............................................................................................................................................ 22

                         Example ................................................................................................................................................... 23

                         Example ................................................................................................................................................... 24

                      One Sample t-test ....................................................................................................................................... 25

                      Two Sample t-test ....................................................................................................................................... 25

                      P-Value ........................................................................................................................................................ 26

                      Discrete Data ............................................................................................................................................... 26

                      Exponential Distribution ............................................................................................................................. 26

                             Probability density function ................................................................................................................ 26

                      Hypothesis Testing ...................................................................................................................................... 28

                         Null Hypothesis ....................................................................................................................................... 29

                         Alternative Hypothesis ............................................................................................................................ 29

                         Simple Hypothesis ................................................................................................................................... 29

                         Composite Hypothesis ............................................................................................................................ 30

25

Acknowledgments............................................................................................................................ 1


High Level Maturity
                  Table of Content .............................................................................................................................. 1
                  Abstract ............................................................................................................................................ 1


  Appraisal Team      1.1.
                      1.2.
                                 Purpose ............................................................................................................................ 2
                                 Objectives......................................................................................................................... 2
                      1.3.       CMMI Terminology .......................................................................................................... 2
     Member           1.4.       Industry Terminology ....................................................................................................... 2
                      1.5.       Terms and definitions ...................................................................................................... 2

    References        1.6.       Process Performance Models References in the CMMI Suite ......................................... 2
                      1.7.       Process Performance Models relationships with Measurements in the CMMI Suite ..... 2
                      1.8.       Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2
                      1.1        high level listen for in process performance models ....................................................... 4
                         1.1.1           Overview .................................................................................................................. 4
                         1.1.2           In Small Setting Organizations ................................................................................. 4
                         1.1.3           In Agile like development and teams ....................................................................... 4
                         1.1.4           In different type Organizations ................................................................................ 4
                         1.1.5           At Level 2 & 3 Organizations .................................................................................... 4
                         1.1.6           At Level 4 & 5 Organizations .................................................................................... 4
                      1.2        Business Objectives; quantitative objectives, Needs and Between ................................ 4
                         1.2.1           Business Objectives .................................................................................................. 4
                         1.2.2           Quantitative objectives ............................................................................................ 4
                      1.3        Analyzing the organization lifecycle and process ............................................................ 4
                         1.3.1           Key players in the process ........................................................................................ 4
                         1.3.2           Key users of performance models ........................................................................... 4
                         1.3.3           Key elements (building blocks) of the process......................................................... 4
                         1.3.4           Domain Specific Perspective .................................................................................... 4
                         1.3.5           Process perspective.................................................................................................. 4
                         1.3.6           Organizational Role Perspective .............................................................................. 4
                      3.1        Project Management Process Areas ................................................................................ 5
                  3.1.1       Project Planning (PP)                 5

26

PROCESS PERFORMANCE MODELS ........................................................................................................... 1

          APPLICATION AND APPROPRIATE USAGE (METHODOLOGY) .................................................................... 1


PPM-BOK      ACKNOWLEDGMENTS ....................................................................................................................................... 1
             TABLE OF CONTENT .......................................................................................................................................... 1
             ABSTRACT ...................................................................................................................................................... 6

          INTRODUCTION ........................................................................................................................................ 7

                 1.1.        Purpose ...................................................................................................................................... 7
                 1.2.        Objectives .................................................................................................................................. 7
                 1.3.        CMMI Terminology .................................................................................................................... 7
                 1.4.        Industry Terminology ................................................................................................................. 7
                 1.5.        Process Performance Models References in the CMMI Suite .................................................... 7
                 1.6.        Process Performance Models relationships with Measurements in the CMMI Suite ................ 7
                 1.7.        Relationships from PSP and TSP to support CMMI Measurements and high maturity ............. 7

          INTRODUCTION TO PROCESS PERFORMANCE MODELS ............................................................................ 8

                 1.1         Why to Measure the process performance ............................................................................... 8
                 1.2         What is all about? ..................................................................................................................... 8
                 1.3         Benefits from using process performance models ..................................................................... 9
                     1.3.1    Overview .............................................................................................................................................. 9
                     1.3.2    Application in Small Setting Organizations ........................................................................................... 9
                     1.3.3    Application in Agile like development and teams ................................................................................ 9
                     1.3.4    Application in different type Organizations ......................................................................................... 9
                        1.3.4.1     Software ..................................................................................................................................... 9
                        1.3.4.2     System ........................................................................................................................................ 9
                        1.3.4.3     Services ....................................................................................................................................... 9
                        1.3.4.4     Acquisition .................................................................................................................................. 9
                        1.3.4.5     Maintenance ............................................................................................................................... 9
                        1.3.4.6     Support ....................................................................................................................................... 9
                     1.3.5    Application and support low maturity organization ............................................................................. 9
                     1.3.6    At Level 2 & 3 Organizations ................................................................................................................ 9
                     1.3.7    At Level 4 & 5 Organizations ................................................................................................................ 9
                 1.4         The Measurements and Analysis Team ................................................................................... 10
                     1.4.1    As Organizational Level Functional Team ........................................................................................... 10
                        1.4.1.1     Position in the Organizational Structure ................................................................................... 10
                        1.4.1.2     Team Suggested Structure ........................................................................................................ 10
                        1.4.1.3     Team Roles, Responsibilities and authority .............................................................................. 10
                           1.4.1.3.1 Roles ..................................................................................................................................... 10
                           1.4.1.3.2 Responsibilities ..................................................................................................................... 10
                           1.4.1.3.3 Authority .............................................................................................................................. 10
                        1.4.1.4     Principles of Professional Conduct............................................................................................ 10
                        1.4.1.5     Basic Activities .......................................................................................................................... 10
                        1.4.1.6     Additional Activities .................................................................................................................. 10
                        1.4.1.7     Knowledge and Skills ................................................................................................................ 10
                        1.4.1.8     Personal Development Path ..................................................................................................... 10
                     1.4.2    As Group of Individuals ...................................................................................................................... 11
                        1.4.2.1     Position in the Business Organization Structure ....................................................................... 11
                        1.4.2.2     Position in the Quality Organization Structure ......................................................................... 11

27

Acknowledgments............................................................................................................................ 1
                      Table of Content .............................................................................................................................. 1
                      Abstract ............................................................................................................................................ 1
                         1.1.        Purpose ............................................................................................................................ 2
                         1.2.        Objectives......................................................................................................................... 2
                         1.3.        CMMI Terminology .......................................................................................................... 2
                         1.4.        Industry Terminology ....................................................................................................... 2
                         1.5.        Terms and definitions ...................................................................................................... 2
                         1.6.        Process Performance Models References in the CMMI Suite ......................................... 2
                         1.7.        Process Performance Models relationships with Measurements in the CMMI Suite ..... 2


High Level Maturity      1.8.
                         1.1
                                     Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2
                                     High level SCAMPI scripts for process performance models ........................................... 4
                             1.1.1           Overview .................................................................................................................. 4

  Lead Appraisal             1.1.2
                             1.1.3
                                             In Small Setting Organizations ................................................................................. 4
                                             In Agile like development and teams ....................................................................... 4

     Guideline               1.1.4
                             1.1.5
                                             In different type Organizations ................................................................................ 4
                                             At Level 2 & 3 Organizations .................................................................................... 4
                             1.1.6           At Level 4 & 5 Organizations .................................................................................... 4
                         1.2         SCAMPI scripts for Business Objectives; quantitative objectives, Needs and Between .. 4
                             1.2.1           Business Objectives .................................................................................................. 4
                             1.2.2           Quantitative objectives ............................................................................................ 4
                         1.3         SCAMPI scripts for analyzing the organization lifecycle and process .............................. 4
                             1.3.1           Key players in the process ........................................................................................ 4
                             1.3.2           Key users of performance models ........................................................................... 4
                             1.3.3           Key elements (building blocks) of the process......................................................... 4
                             1.3.4           Domain Specific Perspective .................................................................................... 4
                             1.3.5           Process perspective.................................................................................................. 4
                             1.3.6           Organizational Role Perspective .............................................................................. 4
                         3.1         Project Management Process Areas ................................................................................ 6
                      3.1.1       Project Planning (PP)                 6

28

Results and Benefits
Methodology conclusions.
• Model formulation is complex, but evaluation is straightforward.
• Standard tools, easy to integrate on domain cases.
• Method is better at capturing SMEs insights and project dynamics.
• Opportunity to further include additional domains


SME related conclusions (preliminary).
• Small units have better acceptance for audits
• Engineering related organizations have a good case for higher maturity levels
• Critical dependency on allowed investment horizon.
• Appraisal costs impacts on overall investment not dominant.
• Benefits for organizations operating at volatile (uncertain) segments.

29

Conclusions and Recommendations

• Method can be implemented in order to develop a decision
  support system in the management of new product
  development domain
• This model addresses various aspects of new product
  development over multiple stages, and easily can be
  adjusted to other domains
• The model can deal with quantitative and qualitative input
  and missing data
• Method can be implemented to address our managerial
  problems and to support our managers with strong ‘gate
  keepers’
• The implementation of a graphical user interface hiding the
  complexities of the method and model is significant

30

Future Plans
• Continue refinement of model.
   • Parameter ranges.
   • Roadmap involving multiple SCAMPI activities.
   • Complete Validation and Verification.
• Integrate work and receive feed from other
  initiatives.
• Continue sharing with other domains

31

Discussion Points
• Performance data
• Cost of poor planning
• Quantifying the operational impact
• Effecting and effected stakeholders
  mapping
• Quantifying the impact of support planning
  on the development teams
• Appling this model on other domains

32

Questions ?

33

Contact
      Kobi Vider
   K.V.P Consulting
Kobi.Vider@hotmail.com
   KobiVP@aol.com
 Phone: +972522946676

More Related Content

Assuring assessments leaders team member’s quality and qualification

  • 1. Assuring Our Assessments, Leaders and Team Member’s Quality and Qualification Process and Quality Kobi Vider K.V.P Consulting Kobi.vider@hotmail.com kobivp@aol.com +972522946676
  • 2. Agenda and Topics • Opening • The Internal and External Assessors Community • The Challenge Statement • The ‘Project’ Goals / Success Factors • Tool DEMO And Short Walkthrough • Results and Benefits • Conclusions and Recommendations • Future Plans • Discussion Points
  • 3. Opening • As for today most of major industries mainly defense and aerospace, as well as armed forces • Which runs and mange large and complex programs • Need to comply with more than just one quality standards in many disciplines (e.g. HW, optics, software) • They use large groups of internal and external assessors that perform implementation checks, progress checks, readiness reviews and formal appraisals. • These communities are typically composed from groups of very experienced and professional individuals • These individuals have the best knowledge in their professional domain but not necessarily on how to conduct an efficient and effective appraisal which provide meaningful results.
  • 4. The Internal and External Assessors Community • ~450 auditors (internal military staff and externals reserves) • ~80 externals (contractors, that perform audits for and on the XYZ ORG) • Few tens that are the contractors internal audits and assessments teams (quality wise) • ~200 quality engineers (full time) • ~150 quality practitioners / trustees (part time) • ~X00 project / program and acquisitions officers
  • 5. The Challenge Statement • The combination of the effort and expected resources increase the risks on qualification of auditors, domain knowledge, and calibration of results and findings effectiveness. • When I have initial try to map the risks and challenges, I have discovered that the main ones are:
  • 6. The Challenge Statement • Large diversity in tailoring the methods for ‘of the same’ appraisal (such as scope, coverage, rating understanding) • Inconsistency in ratings • Inconsistency of interpretations • Reports calibration for the same unit / group and on organizational level is very difficult if not impassible • Performing quality assurance of the performed process is very challenging
  • 7. The ‘Project’ Goals / Success Factors • Role based profile and criteria • Role development path • Calibration mechanism and criteria • Evaluation mechanism and criteria • Leveling the different quality engineers and ‘auditors’ in the XYZ ORG by specific performances and graduations
  • 8. The ‘Project’ Goals / Success Factors • Flowing specific trainings (on different levels) as personal development and qualification criteria • Listing specific performances as indicators for leveling justifications • Structuring the different audits and reporting guidelines in a single mandatory to follow (based on MDD and SLA-BOK) process, to increase calibration and quality of professional conduct and results (for process and meaningfully improvements)
  • 12. ISO 9000:2008 Correlation Snapshot 20 are covered Management Responsibility Measurement Analysis & Improvement Product Realization Resource Management Quality Management System REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 13. PMBOK Correlation Snapshot 15 PAs are covered Integration Procurement Risk Communications Human Resource Scope Time Cost Quality REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 14. ITIL – CMMI Correlation Snapshot Service Delivery Financial Management for IT Services Capacity Management IT Service Continuity Management Availability Management Service Level Management REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 15. ITIL – CMMI Correlation Snapshot Service Support The Service Desk Incident Management Problem Management Configuration Management Change Management Release Management REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 16. ISO 20000 – CMMI Correlation Snapshot Control processes Planning and Resolution processes Release process implementing service management new or changed services Service delivery process Requirements for a management system Relationship processes REQM SSD OPP DAR RSKM CAM OT QPM M&A IRP SAM OPD SST PPQA SCON PMC OPF IPM OID SD PP CM STSM CAR
  • 21. Supporting Tools for High Maturity
  • 23. High Level Maturity Appraisal Team Member References
  • 24. Statistical Methods High Level Maturity Chi-Square ..................................................................................................................................................... 4 Chi-Square Test for Goodness of Fit ......................................................................................................... 4 Appraisal Team Chi-Square Test for Independence ........................................................................................................... 5 Assumptions and Accuracy of the Chi-Square Test .................................................................................. 7 Member Common Cause of Variation ......................................................................................................................... 8 Continuous Probability Distribution ........................................................................................................... 11 References Control Chart ............................................................................................................................................... 14 Control Charts for Variables .................................................................................................................... 15 Design of Experiments (DOE) ...................................................................................................................... 19 Description .............................................................................................................................................. 19 When to Use DOE.................................................................................................................................... 19 DOE Procedure ........................................................................................................................................ 20 Discrete Probability Distributions ............................................................................................................... 22 One-sided Test ............................................................................................................................................ 22 Example ................................................................................................................................................... 23 Example ................................................................................................................................................... 24 One Sample t-test ....................................................................................................................................... 25 Two Sample t-test ....................................................................................................................................... 25 P-Value ........................................................................................................................................................ 26 Discrete Data ............................................................................................................................................... 26 Exponential Distribution ............................................................................................................................. 26 Probability density function ................................................................................................................ 26 Hypothesis Testing ...................................................................................................................................... 28 Null Hypothesis ....................................................................................................................................... 29 Alternative Hypothesis ............................................................................................................................ 29 Simple Hypothesis ................................................................................................................................... 29 Composite Hypothesis ............................................................................................................................ 30
  • 25. Acknowledgments............................................................................................................................ 1 High Level Maturity Table of Content .............................................................................................................................. 1 Abstract ............................................................................................................................................ 1 Appraisal Team 1.1. 1.2. Purpose ............................................................................................................................ 2 Objectives......................................................................................................................... 2 1.3. CMMI Terminology .......................................................................................................... 2 Member 1.4. Industry Terminology ....................................................................................................... 2 1.5. Terms and definitions ...................................................................................................... 2 References 1.6. Process Performance Models References in the CMMI Suite ......................................... 2 1.7. Process Performance Models relationships with Measurements in the CMMI Suite ..... 2 1.8. Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2 1.1 high level listen for in process performance models ....................................................... 4 1.1.1 Overview .................................................................................................................. 4 1.1.2 In Small Setting Organizations ................................................................................. 4 1.1.3 In Agile like development and teams ....................................................................... 4 1.1.4 In different type Organizations ................................................................................ 4 1.1.5 At Level 2 & 3 Organizations .................................................................................... 4 1.1.6 At Level 4 & 5 Organizations .................................................................................... 4 1.2 Business Objectives; quantitative objectives, Needs and Between ................................ 4 1.2.1 Business Objectives .................................................................................................. 4 1.2.2 Quantitative objectives ............................................................................................ 4 1.3 Analyzing the organization lifecycle and process ............................................................ 4 1.3.1 Key players in the process ........................................................................................ 4 1.3.2 Key users of performance models ........................................................................... 4 1.3.3 Key elements (building blocks) of the process......................................................... 4 1.3.4 Domain Specific Perspective .................................................................................... 4 1.3.5 Process perspective.................................................................................................. 4 1.3.6 Organizational Role Perspective .............................................................................. 4 3.1 Project Management Process Areas ................................................................................ 5 3.1.1 Project Planning (PP) 5
  • 26. PROCESS PERFORMANCE MODELS ........................................................................................................... 1 APPLICATION AND APPROPRIATE USAGE (METHODOLOGY) .................................................................... 1 PPM-BOK ACKNOWLEDGMENTS ....................................................................................................................................... 1 TABLE OF CONTENT .......................................................................................................................................... 1 ABSTRACT ...................................................................................................................................................... 6 INTRODUCTION ........................................................................................................................................ 7 1.1. Purpose ...................................................................................................................................... 7 1.2. Objectives .................................................................................................................................. 7 1.3. CMMI Terminology .................................................................................................................... 7 1.4. Industry Terminology ................................................................................................................. 7 1.5. Process Performance Models References in the CMMI Suite .................................................... 7 1.6. Process Performance Models relationships with Measurements in the CMMI Suite ................ 7 1.7. Relationships from PSP and TSP to support CMMI Measurements and high maturity ............. 7 INTRODUCTION TO PROCESS PERFORMANCE MODELS ............................................................................ 8 1.1 Why to Measure the process performance ............................................................................... 8 1.2 What is all about? ..................................................................................................................... 8 1.3 Benefits from using process performance models ..................................................................... 9 1.3.1 Overview .............................................................................................................................................. 9 1.3.2 Application in Small Setting Organizations ........................................................................................... 9 1.3.3 Application in Agile like development and teams ................................................................................ 9 1.3.4 Application in different type Organizations ......................................................................................... 9 1.3.4.1 Software ..................................................................................................................................... 9 1.3.4.2 System ........................................................................................................................................ 9 1.3.4.3 Services ....................................................................................................................................... 9 1.3.4.4 Acquisition .................................................................................................................................. 9 1.3.4.5 Maintenance ............................................................................................................................... 9 1.3.4.6 Support ....................................................................................................................................... 9 1.3.5 Application and support low maturity organization ............................................................................. 9 1.3.6 At Level 2 & 3 Organizations ................................................................................................................ 9 1.3.7 At Level 4 & 5 Organizations ................................................................................................................ 9 1.4 The Measurements and Analysis Team ................................................................................... 10 1.4.1 As Organizational Level Functional Team ........................................................................................... 10 1.4.1.1 Position in the Organizational Structure ................................................................................... 10 1.4.1.2 Team Suggested Structure ........................................................................................................ 10 1.4.1.3 Team Roles, Responsibilities and authority .............................................................................. 10 1.4.1.3.1 Roles ..................................................................................................................................... 10 1.4.1.3.2 Responsibilities ..................................................................................................................... 10 1.4.1.3.3 Authority .............................................................................................................................. 10 1.4.1.4 Principles of Professional Conduct............................................................................................ 10 1.4.1.5 Basic Activities .......................................................................................................................... 10 1.4.1.6 Additional Activities .................................................................................................................. 10 1.4.1.7 Knowledge and Skills ................................................................................................................ 10 1.4.1.8 Personal Development Path ..................................................................................................... 10 1.4.2 As Group of Individuals ...................................................................................................................... 11 1.4.2.1 Position in the Business Organization Structure ....................................................................... 11 1.4.2.2 Position in the Quality Organization Structure ......................................................................... 11
  • 27. Acknowledgments............................................................................................................................ 1 Table of Content .............................................................................................................................. 1 Abstract ............................................................................................................................................ 1 1.1. Purpose ............................................................................................................................ 2 1.2. Objectives......................................................................................................................... 2 1.3. CMMI Terminology .......................................................................................................... 2 1.4. Industry Terminology ....................................................................................................... 2 1.5. Terms and definitions ...................................................................................................... 2 1.6. Process Performance Models References in the CMMI Suite ......................................... 2 1.7. Process Performance Models relationships with Measurements in the CMMI Suite ..... 2 High Level Maturity 1.8. 1.1 Relationships from PSP and TSP to support CMMI Measurements and high maturity ... 2 High level SCAMPI scripts for process performance models ........................................... 4 1.1.1 Overview .................................................................................................................. 4 Lead Appraisal 1.1.2 1.1.3 In Small Setting Organizations ................................................................................. 4 In Agile like development and teams ....................................................................... 4 Guideline 1.1.4 1.1.5 In different type Organizations ................................................................................ 4 At Level 2 & 3 Organizations .................................................................................... 4 1.1.6 At Level 4 & 5 Organizations .................................................................................... 4 1.2 SCAMPI scripts for Business Objectives; quantitative objectives, Needs and Between .. 4 1.2.1 Business Objectives .................................................................................................. 4 1.2.2 Quantitative objectives ............................................................................................ 4 1.3 SCAMPI scripts for analyzing the organization lifecycle and process .............................. 4 1.3.1 Key players in the process ........................................................................................ 4 1.3.2 Key users of performance models ........................................................................... 4 1.3.3 Key elements (building blocks) of the process......................................................... 4 1.3.4 Domain Specific Perspective .................................................................................... 4 1.3.5 Process perspective.................................................................................................. 4 1.3.6 Organizational Role Perspective .............................................................................. 4 3.1 Project Management Process Areas ................................................................................ 6 3.1.1 Project Planning (PP) 6
  • 28. Results and Benefits Methodology conclusions. • Model formulation is complex, but evaluation is straightforward. • Standard tools, easy to integrate on domain cases. • Method is better at capturing SMEs insights and project dynamics. • Opportunity to further include additional domains SME related conclusions (preliminary). • Small units have better acceptance for audits • Engineering related organizations have a good case for higher maturity levels • Critical dependency on allowed investment horizon. • Appraisal costs impacts on overall investment not dominant. • Benefits for organizations operating at volatile (uncertain) segments.
  • 29. Conclusions and Recommendations • Method can be implemented in order to develop a decision support system in the management of new product development domain • This model addresses various aspects of new product development over multiple stages, and easily can be adjusted to other domains • The model can deal with quantitative and qualitative input and missing data • Method can be implemented to address our managerial problems and to support our managers with strong ‘gate keepers’ • The implementation of a graphical user interface hiding the complexities of the method and model is significant
  • 30. Future Plans • Continue refinement of model. • Parameter ranges. • Roadmap involving multiple SCAMPI activities. • Complete Validation and Verification. • Integrate work and receive feed from other initiatives. • Continue sharing with other domains
  • 31. Discussion Points • Performance data • Cost of poor planning • Quantifying the operational impact • Effecting and effected stakeholders mapping • Quantifying the impact of support planning on the development teams • Appling this model on other domains