ACTIVITY NAME
Vapor Intrusion Mitigation
Former Naval Air Station Moffett Field
Restoration Advisory Board Meeting
May 11, 2017
Wilson Doctor
Navy Project Manager
5 BRAC Program Management Office.
Vapor Intrusion Mitigation
Schematic of Vapor Intrusion Pathway
6 BRAC Program Management Office.
Vapor Intrusion Mitigation Methods
Vapor Intrusion Mitigation Methods
– Eliminate preferential pathways
– Increase ventilation inside the building
– Active sub-slab ventilation (depressurization)
7 BRAC Program Management Office.
Vapor Intrusion Mitigation Methods
Eliminate Preferential Pathways
– Fill subsurface vaults
– Seal cracks/expansion joints in floor slabs
– Seal pipe penetrations/floor drains
Sealing floor cracks Sealing floor drains
5 BRAC Program Management Office.
Vapor Intrusion Mitigation
Schematic of Vapor Intrusion Pathway
6 BRAC Program Management Office.
Vapor Intrusion Mitigation Methods
Vapor Intrusion Mitigation Methods
– Eliminate preferential pathways
– Increase ventilation inside the building
– Active sub-slab ventilation (depressurization)
7 BRAC Program Management Office.
Vapor Intrusion Mitigation Methods
Eliminate Preferential Pathways
– Fill subsurface vaults
– Seal cracks/expansion joints in floor slabs
– Seal pipe penetrations/floor drains
Sealing floor cracks Sealing floor drains
8 BRAC Program Management Office.
Vapor Intrusion Mitigation Methods
Increase Ventilation Inside the Building
– Fresh air intake
– Increased air exchange rate
9 BRAC Program Management Office.
Vapor Intrusion Mitigation Methods
Active Sub-slab Ventilation
– Sub-slab depressurization system creates a negative
pressure field below the building preventing soil gas
from entering the building
Schematic Sub-Slab Depressurization System Sub-Slab Depressurization Blower and Vent
10 BRAC Program Management Office.
Confirmation Sampling
ROD Amendment for the Vapor Intrusion Pathway (EPA, 2010) for long-term exposure
Chemical of Concern
Indoor Air Cleanup
Level (µg/m3)
Commercial
Trichloroethene (TCE) 5
Perchloroethylene (PCE) 2
cis-1,2-Dichloroethene 210
trans-1,2-Dichloroethene 210
Vinyl Chloride 2
1,1-Dichloroethane 6
1,1-Dichloroethene 700
Following implementation of mitigation measures, conduct
air sampling to verify effectiveness.
11 BRAC Program Management Office.
Current Status and Schedule
• Vapor Intrusion Mitigation Work Plan
– Draft submitted March 17, 2017
– Final scheduled for Summer 2017
• Vapor Intrusion Mitigation Field Work
– Scheduled for Fall 2017 through Spring 2018
• Completion Report
– Draft scheduled for Summer 2018
– Final Scheduled for Winter 2018
12 BRAC Program Management Office.
Vapor Intrusion Mitigation
QUESTIONS ?

More Related Content

RAB Vapor Intrusion Mitigation

  • 1. ACTIVITY NAME Vapor Intrusion Mitigation Former Naval Air Station Moffett Field Restoration Advisory Board Meeting May 11, 2017 Wilson Doctor Navy Project Manager
  • 2. 5 BRAC Program Management Office. Vapor Intrusion Mitigation Schematic of Vapor Intrusion Pathway
  • 3. 6 BRAC Program Management Office. Vapor Intrusion Mitigation Methods Vapor Intrusion Mitigation Methods – Eliminate preferential pathways – Increase ventilation inside the building – Active sub-slab ventilation (depressurization)
  • 4. 7 BRAC Program Management Office. Vapor Intrusion Mitigation Methods Eliminate Preferential Pathways – Fill subsurface vaults – Seal cracks/expansion joints in floor slabs – Seal pipe penetrations/floor drains Sealing floor cracks Sealing floor drains
  • 5. 5 BRAC Program Management Office. Vapor Intrusion Mitigation Schematic of Vapor Intrusion Pathway
  • 6. 6 BRAC Program Management Office. Vapor Intrusion Mitigation Methods Vapor Intrusion Mitigation Methods – Eliminate preferential pathways – Increase ventilation inside the building – Active sub-slab ventilation (depressurization)
  • 7. 7 BRAC Program Management Office. Vapor Intrusion Mitigation Methods Eliminate Preferential Pathways – Fill subsurface vaults – Seal cracks/expansion joints in floor slabs – Seal pipe penetrations/floor drains Sealing floor cracks Sealing floor drains
  • 8. 8 BRAC Program Management Office. Vapor Intrusion Mitigation Methods Increase Ventilation Inside the Building – Fresh air intake – Increased air exchange rate
  • 9. 9 BRAC Program Management Office. Vapor Intrusion Mitigation Methods Active Sub-slab Ventilation – Sub-slab depressurization system creates a negative pressure field below the building preventing soil gas from entering the building Schematic Sub-Slab Depressurization System Sub-Slab Depressurization Blower and Vent
  • 10. 10 BRAC Program Management Office. Confirmation Sampling ROD Amendment for the Vapor Intrusion Pathway (EPA, 2010) for long-term exposure Chemical of Concern Indoor Air Cleanup Level (µg/m3) Commercial Trichloroethene (TCE) 5 Perchloroethylene (PCE) 2 cis-1,2-Dichloroethene 210 trans-1,2-Dichloroethene 210 Vinyl Chloride 2 1,1-Dichloroethane 6 1,1-Dichloroethene 700 Following implementation of mitigation measures, conduct air sampling to verify effectiveness.
  • 11. 11 BRAC Program Management Office. Current Status and Schedule • Vapor Intrusion Mitigation Work Plan – Draft submitted March 17, 2017 – Final scheduled for Summer 2017 • Vapor Intrusion Mitigation Field Work – Scheduled for Fall 2017 through Spring 2018 • Completion Report – Draft scheduled for Summer 2018 – Final Scheduled for Winter 2018
  • 12. 12 BRAC Program Management Office. Vapor Intrusion Mitigation QUESTIONS ?